QUESTION # RFP Reference VENDOR QUESTION Government Responses 1 FAR 52.212-1, 1-8 (pg. 49-51) Will a Table of Contents count towards our page counts? No
FAR 52.212-1, 2 (pg. 49)
Since this is an electronic submission, may we submit our technical, management and past performance, and price supporting documents in a PDF? We assume that Attachments 2 and 3 would be submitted in its native Excel format. Yes
3 FAR 52.212-1, 7 (pg. 50-51) Is it permissible to use a lesser font for tables, graphics other than the “12 pitch” Minimum 8 pitch font acceptable for tables or graphics.
4 FAR 52.212-1, 1-8 (pg. 49-51) Do we need a Cover Letter with Each Volume, or will one Cover Letter suffice for the Electronic Submission? No. A single cover letter will suffice.
5 FAR 52.212-1, 1-8 (pg. 49-51) Is there a size limitation on the File Size that can be accepted on the Governments Email/Server? 10 MB
III.6 52.209-7 Information Regarding Responsibility Matters (pg. 34-45)
Can you advise where this section needs to be placed, we assume in Volume III – Price. Yes, Volume III - Price
III.8 52.212-3 Offeror Representations And Certifications (pg. 35-49)
Can you advise where this section needs to be placed, we assume in Volume III – Price. Yes, Volume III - Price
FAR 52.212-1, 7,D, 1, Factor 1: Technical Approach, Subfactor B: Experience (pg.
52)
The Offeror shall describe the experience and qualifications of their proposed contract manager, service manager and quality control manager. The Offeror shall provide specific examples detailing the Offeror’s experience, demonstrating innovative approaches and problem resolution. Q1:
Can you confirm that this is correct to provide experience just for these three individuals or for the company’s experience?
The experience referred to in Subfactor B refers to both the company and the positions listed in the RFP.
FAR 52.212-1, 7, D, 2 Factor II Management (pg. 53)
Can you confirm that these Key Personnel, Contract Manager, QC Manager, Environmental Control Specialist, and Project Security Officer do not need to be on site, just available within the hours depicted in the
PWS?
Weekly progress meetings shall be held on-site at McAllen. Otherwise on-site requirements shall be sufficient to successfully meet the government's requirements.
FAR 52.212-1, 7, D, 2 Factor II Management (pg. 53)
The Offeror shall provide sufficient detail that demonstrates its ability to perform the work, to include but not be limited to organization plan, draft Transition-In Plan, key personnel designation plan, detail staffing plan matrix of proposed personnel that demonstrates qualifications, capabilities, skills and assignments.
Q1: Are you requiring a BOE for the entire organization, as this could take several pages to complete? Q2: if they are requiring Qualifications for the entire organization, as this could take several pages to complete?
A staffing plan matrix designating qualifications/capabilities/skills/assignments can help demonstrate the Offeror's management approach to the contract per page 53 of the RFP
FAR 52.212-1, 7, D, 2, Volume II, Factor III Past Performance (Attachment B, Paragraph 10)
“Did you perform interior and routine maintenance on large HVAC (e.g.
filters, vacuuming)? Indicate manufacturer/models. (use separate sheet if required.)” Q1: One of our project references covers 149 buildings and involves extensive HVAC equipment. Would it be acceptable to provide a sampling of our manufacturer/models for the HVAC systems rather than a full listing? A sample list of equipment is acceptable
Attachment 1B, Sheet 1 1718
The RPIE indicates one elevator; however, on the site-walk we observed 2 elevators and also a crane (which could possibly be used as a 3rd elevator). Can the government confirm the count and asset information of elevators?
attachment 1B, equipment list shall be used for proposal submission. Any changes in equipment shall be addressed during the equipment validation phase of the contract
13 Attachment 1. C.1.3.3.10 Can the government please advise where Backflow reports should be submitted, the Jurisdiction, or EMCOR?
Certifications and permits shall comply with federal, state , and local requirements(
PWS C.1.3.3.10)
Attachment 1B, Sheet 1 Rows 4786-4788
The solicitation does not provide information on fire protection equipment at location RGV-TX0042-TX0081. Can the government confirm if the fire protection equipment at this location is being serviced as part of a different contract?
attachment 1B, equipment list shall be used for proposal submission. Any changes in equipment shall be addressed during the equipment validation phase of the contract
Performance Work Statement (PWS), C.6.1.5
Is the Project Security Officer position strictly an administrative position? Meaning, will the individual’s task be focused only on collecting the proposed candidate’s paper work and submitting said paperwork to the Government for processing?
The Contractor shall supervise Program Security aspects(PWS table C.5.1, item 4).
Security Officer shall oversee background check investigations. PWS C.6.1.6)
Performance Work Statement (PWS), C.6.1.5
Can the Government please advise if the Project Security Officer will need access to JPAS? Is a current security clearance needed for this position, if so what level of clearance? JPAS is a DOD system. Refer to PWS C.6.5 for suitability.
17 General Please confirm resumes are NOT included in the page count. Resumes not included in page count
RFP_Attachment_1B_-- _ETX_Equipment_List
Please provide a list of all subcontractors. Please provide list of subcontractors per location/state. A list of subcontractors is not available at this time.
RFP_Attachment_1B_-- _ETX_Equipment_List
Please provide a detailed (Make, Model, Serial Number, KW, Size, etc.)
Inventory/CMMS list for ALL Equipment to include generators in excel format. To include condition. RFP Attachment 1B, equipment list is the only list available.
20 General Please provide a list of current incumbents with current staffing levels. EMCOR is the incumbent
Attachment 1A and 1B
The facility list (1A) and line item detail reflect CBP's owned Real Property portfolio.
In some cases there may be no assocaited equipment listed in attachment 1B. This will be investigated during the equipment validation.
RFP_Attachment_7_- _ETX_Filter_Frequency_Changes
Please provide the total count of systems provided in RFP Attachment 7 ETX FFC. Are the systems listed in the provided attachment fully functional/operating properly? Please provide a list of last service dates
Attachment 7 is the most recent list of functional items that require special servicing
23 General Will Letters of commitment need to be provided? Yes
24 General Will the government provide the current CMMS Database upon/after award? contractor shall provide and maintain a CMMS system (PWS C.1.5)
RFP_Attachment_1B_-- _ETX_Equipment_List
How many AFF systems are in use? When is the last time the bladders replaced on the AFF systems? RFP Attachment 1B, equipment list is the only list available.
C.1.3.9 Firing Range Maintenance Is the firing range maintenance performed inhouse or subcontracted? If subcontracted, please provide the subcontractor name. Firing Range requirements are identified in C.1.3.9 of the PWS 27 General Will the gov’t provide a copy of the site visit sign in sheet? Names of companies in attendance @ site visit will be provided.
28 General Please identify equipment that is considered non-operational. All equipment on attachment 1B shall be considered operational
29 General Please identify the equipment and or systems that are scheduled to be replaced or upgraded soon. A list of equipment planned for replacement is not available
30 General Please clarify the requirements to escort subcontractors. Escorting requirements are stated in C.6.3.1.5 of the PWS
General
For the HVAC filters and the detention cells, are those systems designed with filters that need to be replaced with new filters or the existing filters to be washed and returned to service? RFP Attachment 1B, equipment list is the only list available.
32 General How many and what type of Maximo licenses should be provided for authorized government users?
For Bidding purposes, seven CMMS licenses are required.
SOW
The statement of work states that weekly meetings will be held. Will those be in physically located in McAllen or can they be done via conference call?
The Contract Manager and/or the Service Manager shall attend weekly coordination meetings with CBP at the McAllen, Texas maintenance facility (PWS C.6.1)
Please provide a detailed (Make, Model, Serial Number, KW, Size, etc.) Inventory list for the Following BE-BU Numbers in excel format:
TX0088-TX0205 TX0154-TX0618
TX0127-TMP01 TX0156-TX16004
TX0129-TX7423 TX0156-TX16314
TX0131-TX15291 TX0156-TX16315
TX0143-TX1007 TX0156-TX9797
TX0143-TX1008 TX0161-TX7336
TX0190-TX7341 TX0193-TX0052
TX0196-TX8897 TX0215-TX9208
TX0216-TMP01 TX0300-TX0001
TX0300-TX7408 TX11553-TX15864
TX0529-TX9199 TX11536-TX15395
TX11492-TX15400 TX11390-TX7315
TX0016-TX14927 TX0016-TX7377
TX0016-TX7378 TX0016-TX8407
TX0016-TX8408 LA0031-LA0133
TX0021-TX8841 TX0021-TX8893
TX0426-TX8853 TX0074-TX15999
Please provide a detailed (Make, Model, Serial Number, KW, Size, etc.) Inventory list for the Following BE-BU Numbers in excel format:
TX0088-TX0205 TX0154-TX0618
TX0127-TMP01 TX0156-TX16004
TX0129-TX7423 TX0156-TX16314
TX0131-TX15291 TX0156-TX16315
TX0143-TX1007 TX0156-TX9797
TX0143-TX1008 TX0161-TX7336
TX0190-TX7341 TX0193-TX0052
TX0196-TX8897 TX0215-TX9208
TX0216-TMP01 TX0300-TX0001
TX0300-TX7408 TX11553-TX15864
TX0529-TX9199 TX11536-TX15395
TX11492-TX15400 TX11390-TX7315
TX0016-TX14927 TX0016-TX7377
TX0016-TX7378 TX0016-TX8407
TX0016-TX8408 LA0031-LA0133
TX0021-TX8841 TX0021-TX8893
TX0426-TX8853 TX0074-TX15999
34 General Is security equipment such as cameras and surveillance CCTV included in this contract?
RFP Attachment 1B, equipment list is the only list available. Excluded items are identified in the PWS. C.1.9
Personnel
Please identify all positions for which a resume should be included in our proposal.
All personnel submitted for Key Positions on the contract shall be submitted for review by CBP. CBP will review each resume to ensure the individuals meet the required qualifications (PWS C.6.1)
RFP_Attachment_1B_-- _ETX_Equipment_List/General
Who currently provides preventative maintenance services for all lifts? EMCOR is the incumbent
RFP_Attachment_1B_-- _ETX_Equipment_List
Do you want the load testing for Generators to be both a building load test as well as a separate load bank test where we bring in an artificial load? Can you tell me how long you would like each of these tests to be? 0.5 hour building load test and 2 hour load bank test?
The Contractor shall provide PM on a recurring basis and as identified by the original manufacturer’s recommendations, GSA or industry standard, whichever provides the higher standard of service (PWS C.1.3.3.3 ). However, Preventive maintenance for all generators and other emergency backup power systems shall include power load testing every 6 months. The Contractor shall drop power to the building to test functionality of systems.(PWS C.1.3.8)
TX0021 Del Rio Air Branch – The equipment list shows a list of assets assigned to TX0021 BE but does not break these assets down into the BUs TX8841 and TX8893. Can the Government provide the asset inventories specific to these two BUs? RFP Attachment 1B, equipment list is the only list available.
There are numerous assets listed in Attachment 1B that are located in BUs not contained in Attachment 3 Line Item Detail. Are these assets and BUs not included in this contract?
Line item detail, equipment list, and facility list have been reconciled and changed
Is it the intent of the Government that the contractor provide a 24x7 Call Center to meet the requirements of C.1.4 Telephone Services? The Contractor shall provide a single contact telephone number for service calls.
The Contractor shall receive calls at this number twenty four (24) hours per day, seven (7) days per week. (PWS C.1.4)
How many Government seats on the CMMS will be required under PWS C.1.5?
For Bidding purposes, seven CMMS licenses are required.
Will any information such as the equipment histories and preventive maintenance practices contained in the current CMMS be provided to the awardee or will this information have to be assembled from scratch?
The government shall provide whatever historical information is available after contract award
Is the Government currently providing the incumbent the office and storage space mentioned in PWS C.3.1? The Government does not intend to provide Government-furnished equipment
(GFE), office space or Government-furnished information (GFI) during the execution of this contract.(PWS C.3.1.1)
The equipment list has numerous chillers but there are not any cooling towers listed. Are there any cooling towers that will be included in this contract? RFP Attachment 1B, equipment list is the only list available.
Staffing – Please define the meaning of “close proximity” with regard to staffing contractor shall be able to respond to all classification of service calls(PWS C.1.4.1.2)
Contract Manager or Alternate response times – Is a phone response within one hour acceptable? contractor shall be able to comply to all classification of service calls(PWS C.1.4.1.2)
47 PWS C.1.3.2 QC and Safety Plan – Which BAA Act governs?
Contract performance shall comply with all federal, state, and local requirements
(PWS C.5.2.2)
Are any special permits required to work in Texas?
contractor is responsible for compliance with state and local regulations (PWS C.2)
49 Instructions to Offerors, Section 7.C.2.b Typing shall not be less than 12 pitch. Please confirm that text used in tables and other graphics can be smaller than 12 pitch font. Minimum 8 pitch font acceptable for tables or graphics.
Reference PWS Section C.1.5, Web- Based Tracking System/ Computer Maintenance Management System
(CMMS)
a. What is the current CMMS system used by the incumbent O&M Contractor? B.
Upon award, will the incoming contractor be provided a flat file of existing government equipment and repair and maintenance history? c. How many CMMS user licenses will the government require?
d. Will the four (4) required training sessions for government employees be conducted on site at an office in TX, on site at the government offices in DC or can they be performed via online web meeting?
MAXIMO is presently being used. The government shall provide whatever historical information is available. For Bidding purposes, 7 seat are requested. Location of CMMS training shall be determined after contract award.
Reference PWS Section C.1.3.3.6.4, Coefficient
a. It is anticipated that many repairs for Work Orders, Task Orders and IROs may require the one-time use of speciality contractors will not have received site clearance and will require escorting. Is it the government's intent that the contractor price escorting time into the coefficient or will the contractor be allowed to price in the escorting labor prior to adding the coefficient? b. Will the government be providing the Contractor with a transferable sales tax indemnification for purchase of parts and materials for use in the performance of repairs or should any tax liability be covered in the coefficient?
The contractor's coefficient is described in PWS C.1.3.3.6.4 and the RFP
Reference PWS Section C.1.3.7, Load Test and Certification
The equipment in this section is very important and potentially dangerous if not properly maintained. Upon award will the government provide the awardee with all pertinent maintenance records, certifications and load test results?
The government shall provide whatever historical information is available
Reference PWS Section C.1.3.8, Emergency Power Back-up Systems
The equipment in this section is CBP mission critical and could potentially lead to mission interruptions if not properly maintained. Upon award will the government provide the awardee with all pertinent maintenance records, certifications and load test results? The government shall provide whatever historical information is available
Reference PWS Section C.6.1.5, Project Security Officer
Is it required that the Project Security Officer be a key “on-site” position or can this position be fulfilled from a corporate or remote office location?
Specific requirements for the Project SecurityOfficer are identified in C.6.1.5 of the
PWS
Reference PWS Section C.1.3.3.2.1, Equipment Validation
The equipment validation is a large level of effort spanning a wide geographic area that must be completed and submitted to the government within 60 days of contract award. Please confirm that it is the government’s expectation that Contractor-proposed staffing reflect that this work
The equipment validation is scheduled to last 60 days (PWS C.1.3.3.2.1)
According to PWS Sections C.1.3.3.4, Minor Repair (At or Below the Micro-purchase Threshold); C.1.3.3.5, Intermediate Repairs (Above the Micro-purchase Threshold and less than $10,000); and C.1.3.3.7, Major Repair (Above $10,000)
All task orders shall have, at a minimum, a one-year all-inclusive warranty.” Please provide a list of all active warranties applicable to equipment included in this PWS All available warranties shall be provided upon contract award
Please provide a list of any unique, manufacturer/system-proprietary, or government- mandated software systems with which the contractor is required to work. government is not aware of any proprietary systems at this time. However, site specific energy management systems may be encountered over the course of this contract
On average over the duration of the current contract, how many task orders were issued under DBA?
Under the current contract, approximately 50-60 task orders were issued over the duration of the contract
Are we required to maintain the DDC (direct digital control) systems within the buildings?
This performance work statement emphasizes Contractor overall system maintenance responsibilities. The term “system” encompasses all ancillary parts required for the total system to properly function as intended and accomplish its purposes. (PWS C.1.3.4)
Attachment 7 frequency list and Attachment 1B Equipment List.
Upon comparing the Filter frequency list to the Equipment list, it was noted the following filters were not linked to an asset. Please provide the asset that belongs to these particular filters.
ASSET #: 8004 0883995 08893 ASSET #:
8004 0883995 08898
RFP Attachment 1B, equipment list is the only list available.
61 Who is the current incumbent? EMCOR Government Services 62 What is the current incumbent’s price for the contract? $17,066,721.65 63 Can you provide a current seniority list for personnel? A list is not available 64 Can you provide Key Personnel List? A list is not available
Are resumes required for proposed key personnel in the technical?
All personnel submitted for Key Positions on the contract shall be submitted for review by CBP. CBP will review each resume to ensure the individuals meet the required qualifications (PWS C.6.1). The RFP identifies the submission procedures
Section C.7.3. states “The Contractor shall submit its Transition-In Plan for the COR’s approval not later than twenty-one (21) calendar days after contract award.” And C.7.5. states “Performance of transition-in services begins at contract award.” Can you clarify?
Some transition-in activities can be initiated upon contract award, that will be part of the plan's submission
67 Are performance bonds required for this contract, if so when?
Yes, for constuction task orders see RFP Section II.40 FAR 52.228-15 – Performance & Payment Bonds Construction (OCT 2010)
C.1.3.9 Firing Range Maintenance. Can you clarify scope of contractor's responsibility? Firing range maintenance requirements are described in the PWS C.1.3.9
69 Can you provide a list of current subcontractors being used? That information is not available
70 Are there any formatting requirements? (Margin sizes, font sizes etc..) Yes, see RFP for formatting requirements
Are there any special on site staffing requirements for the buildings? contract shall include all labor, supervision, tools, materials, parts, equipment, transportation, licenses, permits, certifications and management necessary to provide for equipment and system maintenance and repairs at government facilities(PWS C.1.3.1)
What is the expected response time for a routine and urgent service call?
contractor shall be able to respond to all classification of service calls(PWS C.1.4.1.2)
73 Can you provide an Offeror Checklist? No
Will DHS accept completed CPARS in lieu of the past performance forms? Yes
What type of building automation system is in the building?
RFP Attachment 1B, equipment list is the only list available. This performance work statement emphasizes Contractor overall system maintenance responsibilities. The term “system” encompasses all ancillary parts required for the total system to properly function as intended and accomplish its purposes. (PWS C.1.3.4)
76 Is the Project Manager required to be on site? Key personnel requirements are identified in the PWS, C.6.
As a Joint Venture submission, does past performance and experience requirements require both companies making up the JV to submit separate references? No.
78 Does DHS provide any on-site vehicles to travel between buildings?
No. Government furnished space, equipment and service is identified in the PWS, C.3.
What are the normal operating hours for each site and what is the expected hours for contractors to be on site at each? Hours of operation is described in the PWS C.1.3.10)
Volume I, Factor II: “In addition, Offerors shall provide their proposed staffing and identify Key Personnel that meet the PWS standards. At a minimum, each resume shall list education, and employment history which includes employer, timeframes and a short description of responsibilities and accomplishments.” In C.6. of PWS it lists 10 positions. Are contractors required to submit 10 resumes with Volume I? C.6 of the PWS identifies the key personnel.
81 Can you release the number of current FTEs and staff at each location? That information is not available
Can the government provide us more information on the chillers. Are they Absorption, Centrifugal, reciprocal, or screw? RFP Attachment 1B, equipment list is the only list available.
83 How much tonnage is each chiller on the asset inventory? RFP Attachment 1B, equipment list is the only list available.
This information is not readily available but it is reasonable to assume they are located in either Hangar A, B or 32C.
The following assets show up on the Attachment 1 B EXT Equipment list but only the BE is identified in the inventory. Can the government tell us which buildings these assets are associated to, the price schedule has building under this BE already, but the following are not assigned to any particular BU building?
RGV-TX0074 Air Compressor RGV-TX0074 Air Handling Unit RGV-TX0074 Condensing Unit RGV-TX0074 Evaporator RGV-TX0074 Fan (Exhaust) RGV-TX0074 Hot Water Heater
Please note that Attachment 1B EXT Equipment List is missing the following locations. Can the Government provide asset lists for these locations?
TX7423 TX7341 TX7378
TX15291 TX0052 TX8407
TX1007 TX8897 TX8408
TX1008 TX7408 LA0133
TX0618 TX15864 TX18406
TX16004 TX15395 TX8841
TX16314 TX15400 TX8893
TX16315 TX7315 TX15999
TX9797 TX14297
TX7336 TX7377
TX7423 Window Unit (No PM necessary); TX15291 Window Unit (No PM necessary); TX1007 (2) AC Units (8004 0883995 09758, 8004 0883995 09758); TX1008 (2) AC Units (8004 0883995 09730, 8004 0883995 09731); TX0618 No equipment; TX16004 No equipment; TX16314 No equipment; TX16315 No equipment. TX9797
85 cont.
Will GOVERNMENT/INCUMBENT CONTRACTOR provide the CURRENT CMMS database upon/after award? CMMS data shall be available after award
87 How many of the fuel tanks are horizontal and how many are vertical? Additional information is not available
How many gallons is the Largest and how Small is the smallest?
Additional information is not available
Are any of these fuel/propane tanks at remote sites or are they all at offices/Facilities? Additional information is not available
How many positions(aka Firing lines, or shooting targets) are at this facility? the range features 6 shooting lanes
Please provide the length of the firing range from left to right. each lane 5 feet wide. The farthest shooting distance is 50 yards.
TX7336 (3) Gate Operators; TX7341 No equipment; TX0052 No equipment; TX8897 No equipment;
TX7408 This is a generator; TX15864 No equipment; TX15395 No equipment; TX15400 No equipment;
TX7315 No equipment; TX14297 BE not found; TX7377 (1) Package AC Unit (8004 0883995 10006);
TX7378 (1) Evaporator (8004 0883995 26547); TX8407 No equipment; TX8408 No equipment. LA0133
TX18406 See equipment list); TX8841 See equipment list; TX8893 See equipment list; TX15999 No equipment.
there are 232 items on the inventory sheet that are not associated with a specific building on the Line Item Detail spreadsheet. They are as follows:
Equipment List BU
# Items on Equipment List
Notes
TX0021 56 TX0021 is listed as a BE, with two Bus – TX8841 and TX8893.
There is no associated BU with these items on the Equipment Listing
TX0074 11 TX0074 is listed as BE, w/4 BU’s: TX2600, TX2601, TX14918 and
TX15999
TX0216 4 TX0216 is listed as BE, e/6 BU’s: TX15214, TX7361, TX8842, TX8846, TX8862 and TX9168
TX15953 5 The Equipment list shows this associated with BE TX0426, which has TX8853 as the BU, not TX15953.
TX18046 165 This may be a typo, there is a BU on the Line Item Detail sheet that is TX18406 associated with BE TX11621. Just need clarification which one is correct.
If you could just let me know for the 1st 4 items which of the Buildings they would be associated with and the correct BU for the last item
1) For the equipment associated with BE, TX0021, reflect the price with TX0021/TX8841 on the line item detail
2) For the equipment associated with BE, TX0074, reflect the price with TX0074/TX2600 on the line item detail
3) For the equipment associated with BE, TX0216, reflect the price with TX0216/TX15214 on the line item detail sheet
4) TX15593 is in fact a BU, but the price still needs to be reflected with TX0426/TX8853 on the line item detail sheet as noted.
5) TX8406 is a BU and is a typo on the line item detail sheet. It should read TX8046. Equipment pricing associated with TX8406 or TX8046 should be reflected with TX11621/TX8046 on the line item detail sheet as noted.
The line items associated with Carrizo Springs BPS TX0156-TX15420 has been deleted and the line items associated with Carrizo Springs AMF (Helipad) TX0156- TX15420 shall be the only one utilized. Attachment 1A and Attachment 3 have been updated.
I am curious as to why this bid is titled East Texas Preventative Maintenance Program when the majority of the facility locations are in South Texas? I just want to be sure I am not missing something and I am pricing the quote correctly for S TX and not E TX.
CBP created the name for the East Texas Region based on the locations which are identified in the RFP.
TX15420 is listed twice on the Line Item Detail sheet, once beginning on line 91 in the Del Rio (BPFTI) Regional Location, as the Fuel Tank and the second time on line 267 in the Carrizo Springs (AMF) Regional Location, Jet Fuel Tank. It is difficult to determine which of the equipment list items are for which location. There are a total of 11 items in question for this BU. Below is a table of the items in the Equipment list, with the Cell number referenced in the first column for your reference:
Cell # Site ID Asset Number Asset Type Description Location
A2337 CBPETR 8004 0883995 26217 TANK Tank (Unleaded) DR-TX0156-
TX15420
A2338 CBPETR 8004 0883995 26218 CARWASH Automotive Car Wash DR-TX0156-
TX15420
A2339 CBPETR 800408839930712669 MONITOR Fuel Management System DR-TX0156-
TX15420
A2340 CBPETR 800408839930712670 TANK Tank - Jet Fuel DR-TX0156-
TX15420
A4908 CBPETR 8004 0883995 10317 PUMP Pump (Fuel) DR-TX0156-
TX15420
A4909 CBPETR 8004 0883995 10318 READER Card Reader (Fuel Accounting System)
DR-TX0156-
TX15420
A4910 CBPETR 8004 0883995 10319 PUMP Pump (Fuel) DR-TX0156-
TX15420
A4911 CBPETR 8004 0883995 10320 PUMP Pump (Fuel) DR-TX0156-
TX15420
A4912 CBPETR 8004 0883995 10321 READER Card Reader (Fuel Accounting System)
DR-TX0156-
TX15420
A4913 CBPETR 8004 0883995 10322 TANK Tank (Unleaded) DR-TX0156-
TX15420
A4914 CBPETR 8004 0883995 10324 TANK Tank (Diesel) DR-TX0156-
TX15420
Numbers stated in current equipment list are accurate. There is no BU TX10587L as it was changed to TX0064. There were 3 pieces of equipment affected by that change. The comment “TX10587L (NO Equipment listed in A2 Eqp list)” is unclear.
Amendment #2 changed BU TX10587L to TX0064.
we noticed there are buildings in the price schedule that are not in the asset inventory. As we prepare our bid, can you please provide guidance on how to accurately reflect this?
The equipment inventory identified in attachment 1B reflects our most comprehensive list of equipment. That equipment shall be subjected to Preventive maintenance as described in the Performance Work Statement. Attachment 1A identifies all the buildings and locations that are covered on this contract. In some cases, for instance a leased building, our maintenance and repair responsibilities may be limited. For example a vehicle lift. For the purposes of the solicitation, vendors should bid on the lists as they are shown.
the 3 shown below seem to be inconsistent. Is the following information correct?
b) Correct the following inconsistencies have been corrected and are highlighted in yellow in the Equipment List (Attachment 1B):
Location (BE) Changed from (BU): Changed to (BU): # of Equipment Items TX11553 TMP03 TX15864 31 (I show 32) TX11553 TMP01 TX15513 9 (Is this correct, I’m showing 32?
TX0129 TX10587L (NO Equipment listed in A2 Eqplist) TX0064 3 (states added three but Amendment 2 Equipment list doesn’t show any equipment for TX10587L)
Sheet1