70B01C18R00000006_A0003.pdf

PDF 132 KB Posted

Attached to
Equipment Maintenance and Facility Repairs in East Texas Region
Solicitation number
70B01C18R00000006
Issued by

About this file

70B01C18R00000006 A0003

View the file

Other files

File Type Posted
70B01C18R00000006_A0005.pdf PDF
RFP_Attachment_1A_--_ETX_Facilities_List_Rev_02072018-1.xlsx XLSX spreadsheet
70B01C18R00000006_A0004.pdf PDF
Amendment__4_--_Vendor_Questions_and_Responses.pdf PDF
RFP_Attachment_3_--_ETX_Line_Item_Number_Detail_Rev_02072018-2.xlsx XLSX spreadsheet
RFP_Attachment_1B_--_ETX_Equipment_List.xlsx XLSX spreadsheet
RFP_Attachment_1A_--_ETX_Facilities_List.xlsx XLSX spreadsheet
RFP_Attachment_3_--_ETX_Line_Item_Number_Detail.xlsx XLSX spreadsheet
Amendment__2_--_Vendor_Questions_and_Responses.pdf PDF
70B01C18R00000006_A0002.pdf PDF
RFP_Attachment_1A_--_ETX_Facilities_List19Jan2018.xlsx XLSX spreadsheet
70B01C18R00000006_A0001.pdf PDF
RFP_Attachment_1B_--_ETX_Equipment_List19Jan2018.xlsx XLSX spreadsheet
Companies_at_Site_Visit.docx DOCX document
Vendor_Questions_and_Responses.pdf PDF
RFP_Attachment_3_--_ETX_Line_Item_Number_Detail_19Jan2018.xlsx XLSX spreadsheet
RFP_Attachment_1B_--_ETX_Equipment_List.xlsx XLSX spreadsheet
RFP_Attachment_7_-_ETX_Filter_Frequency_Changes.xlsx XLSX spreadsheet
RFP_Attachment_2_--_ETX_Line_Item_Summary.xls XLS spreadsheet
RFP_Attachment_4B_--_Past_Performance_Relevant_Experience_Form.pdf PDF
RFP_Attachment_3_--_ETX_Line_Item_Number_Detail.xlsx XLSX spreadsheet
RFP_Attachment_5_--_Wage_Determinations.xlsx XLSX spreadsheet
RFP_Attachment_6_--_ETX_Certifications_&_Permits_.xlsx XLSX spreadsheet
RFP_Attachment_1_--_ETX_PWS.pdf PDF
FINAL_RFP_70B01C18R00000006.pdf PDF
RFP_Attachment_4A_--_Past_Performance_Contract_Reference_Data_Sheet.pdf PDF
RFP_Attachment_1A_--_ETX_Facilities_List.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

A0003

3. EFFECTIVE DATE

2/5/2018

4. REQUISITION/PURCHASE REQ. NO

0020099791

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (IF OTHER THAN ITEM 6) CODE

DHS - Customs & Border Protection, Procurement Directorate Intech Two, Suite 100 650 Telecom Drive Indianapolis, IN 46278

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State, and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

70B01C18R00000006

9B. DATED (SEE ITEM 11) 1/23/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

CODE: FACILITY CODE: 10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered, solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 4 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers, FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If Required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO., AS DESCRIBED IN ITEM 14

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify Authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43,103 (b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is NOT is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

See Page 2 for description of A0003

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR 15C. DATE

SIGNED

16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070 STANDARD FORM 30 (REV. 10-83)

Previous Edition Unusable Prescribed by GSA FAR (48 CFR) 53.243

The purpose of the amendment is to:

a) Correct the following inconsistencies which are highlighted in yellow in both the Facilities List (Attachment 1A) and the Line Item Summary Detail Spreadsheet (Attachment 3):

Location (BE) Changed from (BU): Changed to (BU):

TX0161 TMP01 TX15513

TX0216 TMP01 TX9168

TX11553 TMP01 TX15888

TX11553 TMP02 TX15865

TX0016 TX8408 TX16118

LA0031 LA0133 LA19535

Location (BE) Changed to (BE) Building (BU): Changed to (BU):

TX2830 LA0116 TX7031 LA15544

b) Correct the following inconsistencies have been corrected and are highlighted in yellow in the Equipment List (Attachment 1B):

Location (BE) Changed from (BU): Changed to (BU): # of Equipment Items

TX11553 TMP03 TX15864 31

TX11553 TMP01 TX15513 9

TX0129 TX10587L TX0064 3

TX0166 TX18316 TX7416 3

TX0216 TMP01 TX9168 4

TX11553 TMP01 TX15888 33

TX11553 TMP02 TX15865 8

TX0016 TX8408 TX16118 2

Location (BE) Changed to (BE) Building (BU): Changed to (BU): # of Equipment Items

TX2830 LA0116 TX7031 LA15544 1

c) As a result of the changes the proposal due date and time have changed to 8 February 2018 (12:00PM

Eastern Time)