This is a Standard Low Bid Project solicitation document from the University of Utah Facilities Office for the SJHC Humidifier Plant Replacement project (Project #70491). The project involves a full mechanical scope including plumbing, seismic work, concrete demolition, and installation of a new housekeeping pad. The bid documents will be available on April 24, 2025, through BidNet Direct, with a mandatory pre-bid meeting and site visit scheduled for May 2, 2025, at 12:30 PM in the SJHC Front Lobby. Electronic bids are due by 2:00 PM on May 16, 2025, with a substantial completion date of December 31, 2025.
The project has a construction cost estimate of $700,000 and requires a 100% Payment and Performance Bond for bids over $100,000. The project is tax-exempt and has potential energy incentives from public utilities such as Rocky Mountain Power and Dominion Energy. Bids will be evaluated based on the lowest responsive and responsible bidder, with the University reserving the right to reject any or all bids. The project will be completed under Utah state license laws, and contractors must obtain necessary permits from the Utah Division of Air Quality and the Utah Department of Environmental Quality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UU70491-REV -4.17.25 -Approved-Plans (2).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
University Form 1a – Standard Low Bid, 11.5.24
SOLICITATION FOR
CONSTRUCTION SERVICES
STANDARD LOW BID PROJECT
(PROJECT BUDGETS UP TO $3.5M)
4/24/2025
SJHC Humidifier Plant Replacement – Full Mechanical Scope
University Project # 70491
Van Boerum & Frank Associates 181 East 5600 South #200
Murray, UT 84107
University Standard Low Bid, 11.5.2024 2
TABLE OF CONTENTS
PAGE
TITLE PAGE………………………………………………………………………………………………………………………. 1
TABLE OF CONTENTS………………………………………………………………………………………………………. 2
INVITATION TO BID…………………………………………………………………………………………………………. 3
PROJECT DESCRIPTION………………………………………………………………
BIDDING PROCESS…………………………………………………………………………………………………………… 5
PROJECT SCHEDULE………………………………………………………………………………………………………… 9
BUYER’S ATTACHMENTS WITHIN BIDNET DIRECT SOLICITATION:
-SUBCONTRACTOR LIST FORM & INSTRUCTIONS
-UNIVERSTIY SAMPLE CONTRACTS
-CERTIFICATE OF SUBSTANTIAL COMPLETION
-CONTRACTORS PAST PERFORMANCE RATING EVALUATION FORM
-APPROVED DRAWINGS
-APPROVED SPECS
The University of Utah U Facilities Office is located at:
Turpin University Services Building (Bldg #350) 1795 E South Campus Drive Salt Lake City, UT 84112
USPS Mailing Address 1795 E South Campus Drive Salt Lake City, UT 84112
Visitors, FedEx, UPS and Amazon deliveries:
Turpin University Services Building (Bldg #350) 1795 E South Campus Drive Salt Lake City, UT 84112
BidNet Direct Contact Information:
● Project Specific Questions: Refer to Selection Schedule for deadline. All questions are to be submitted on the BidNet Direct Website at www.bidnetdirect.com//universityofutah-ufacilities
● BidNet Direct Technical/Bidding Questions: 1-800-835-4603, Option 2 or support@bidnet.com
The current General Conditions (“General Conditions”) and all Supplemental General Conditions (“also referred to a General Conditions”) of the University of Utah are available on the U Facilities website and are hereby made part of these contract documents by reference.
http://www.bidnetdirect.com/universityofutah-ufacilities mailto:support@bidnet.com https://pdc.utah.edu/contractors/ https://pdc.utah.edu/
University Standard Low Bid, 11.5.2024 3
INVITATION TO BID
Sealed bids will be received by the University of Utah (U Facilities) for:
SJHC Humidifier Plant Replacement – Full Mechanical Scope University PROJECT #70491
Project Description: See Project Description and contact information on page 4.
Construction Cost Estimate: $700,000.00
The bid documents will be available 9:00 AM on April 24, 2025 on the BidNet Direct website .
A MANDATORY pre-bid meeting and site visit will be held at 12:30 PM on May 2, 2025. Please meet at the SJHC Front Lobby. All contractors wishing to bid on this project must attend this meeting.
Bids are to be submitted electronically until 2:00 PM on May 16, 2025 through the BidNet Direct website. It is the sole responsibility of the contractor to ensure their bid reaches the BidNet Direct website before the closing date and time. There is no cost to the contractor to submit electronic bids the BidNet Direct website. Bids may require the uploading of attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files. For questions relating to BidNet Direct, please call 1-800-835-4603, Option 2 or email them at support@bidnet.com.
Any bids over $100,000 will require a 100% Payment and Performance Bond to be included with the cost of your bid. Failure to provide this cost information may result in being deemed non-responsive.
Please do not submit any exceptions in Bidnet. If you have questions, please reach out.
The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University.
https://bidnetdirect.com/universityofutah-ufacilities https://bidnetdirect.com/universityofutah-ufacilities mailto:support@bidnet.com
University Standard Low Bid, 11.5.2024 4
PROJECT DESCRIPTION
Contact Information:
o Project Specific Questions: Refer to Project Schedule for deadline. All questions are to be submitted through the BidNet Direct website.
University Project Manager: Robert Rackliff | 801-213-1555 | robert.rackliff@utah.edu
Project Description/Base Bid: Full mechanical scope, plumbing, seismic, Demo concrete and pour new house keeping pad.
Additive Alternates: N/A
Notes/Additional Information: N/A
Construction Cost Estimate: $700,000.00
Liquidated Damages: $50.00
Tax Exempt: YES
☐THIS PROJECT WILL HAVE AN ENERGY INCENTIVE.
Energy Incentive: This project has been identified as having potential energy incentive(s) to be collected from the public utility.
This will require some additional information be filled out and provided back to the University for submission to the utility company. Please reference the incentive information available on the Rocky Mountain Power and Dominion Energy websites.
mailto:robert.rackliff@utah.edu
University Standard Low Bid, 11.5.2024 5
BIDDING PROCESS
1. Drawings and Specifications, Other Contract Documents Drawings and Specifications, as well as other available Contract Documents, may be obtained as stated in the Notice to Contractors.
2. Bids Before submitting a bid, each contractor shall carefully examine the Contract Documents, shall visit the site of the Work; shall fully inform themselves as to all existing conditions and limitations; and shall include in the bid the cost of all items required by the Contract Documents. If the bidder observes that portions of the Contract Documents are incompliant with applicable laws, building codes, rules, regulations or contain obvious erroneous or uncoordinated information, the bidder shall promptly notify the University Representative and the necessary changes shall be accomplished by Addendum.
Bids are to be submitted electronically through the BidNet Direct website until the date and time in this document. It is the sole responsibility of the contractor to ensure their bid reaches the BidNet Direct website before the closing date and time. There is no cost to the contractor to submit electronic bids via the BidNet Direct website. Electronic bids may require the uploading of electronic attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files.
By submitting a bid, in any format, the Bidder / Offeror / Vendor certifies that: (1) no product to be supplied by the Bidder / Offeror / Vendor in connection with this Solicitation is a “forced labor product” as that term is defined in Utah Code 63G-6a-121; and (2) to the extent, if any, that this Solicitation involves technology, or technology services, networks or systems, the Bidder / Offeror / Vendor is not a “restricted foreign entity” as that term is defined in Utah Code 63G-6a-121.
A bid bond properly signed by the contractor and a qualified surety, on the AIA Document A310 – 2010 Bid Bond, or equivalent, in the amount of 5% of the bid, shall accompany the bid submission and uploaded in the BidNet Direct website. If the bid bond is not furnished with the bid through the BidNet Direct website, the BID is NONRESPONSIVE. THIS BID BOND MUST BE ON THE AIA DOCUMENT A310 – 2010 BID BOND, OR EQUIVALENT IN ORDER TO BE CONSIDERED AN ACCEPTABLE BID unless only one bid is received by the University, or the failure to comply with the bid bond requirements is determined by the Director of U Facilities to be non-substantial based on the following:
(a) the bid bond is submitted on a form other than the University’s required Bid Bond form and the bid bond meets all other requirements including being issued by a surety firm authorized to do business in the State of Utah and be listed in the U.S. Department of the Treasury Circular 570, Companies Holding Certificates of Authority as Acceptable Securities on Federal Bonds and as Acceptable Reinsuring Companies for an amount not less than the amount of the bond to be issued. A co-surety may be utilized to satisfy this requirement; and
(b) the contractor provides a bid bond properly signed by a qualified surety and on the required Bid
Bond form by the close of business of the next succeeding business day after the University notifies the bidder of the defective bid bond.
A CASHIER’S CHECK CANNOT BE USED AS A SUBSTITUTE FOR A BID BOND.
3. Contract and Bond
A copy of the Contractor's Agreement can be found on the U Facilities website. The Contract Time will be as indicated in the bid. The successful bidder, simultaneously with the execution of the Contract Agreement, will https://bidnetdirect.com/universityofutah-ufacilities https://bidnetdirect.com/universityofutah-ufacilities https://bidnetdirect.com/universityofutah-ufacilities https://bidnetdirect.com/universityofutah-ufacilities https://bidnetdirect.com/universityofutah-ufacilities https://bidnetdirect.com/universityofutah-ufacilities https://pdc.utah.edu/
University Standard Low Bid, 11.5.2024 6 be required to furnish a performance bond and a payment bond on the AIA Document A312 - 2010 Performance and Payment Bond, or equivalent. These fully executed/signed bonds are to be uploaded to the BidNet Direct website.
The performance and payment bonds shall be for an amount equal to one hundred percent (100%) of the contract sum and secured from a company that meets the requirements specified in the requisite forms. Any bonding requirements for subcontractors will be specified in the Supplementary General Conditions.
4. Listing of Subcontractors Listing of Subcontractors shall be as summarized in the “Instructions and Subcontractor’s List Form”, which are included as part of these Contract Documents. The Subcontractors List shall be e-mailed to PDCContracts@utah.edu within 24 hours of the bid opening. Requirements for listing additional subcontractors will be listed in the Contract Documents.
The University retains the right to audit or take other steps necessary to confirm compliance with requirements for the listing and changing of subcontractors. Any contractor who is found to not be in compliance with these requirements is subject to a debarment hearing and may be debarred from consideration for award of contracts for a period of up to three years.
5. Interpretation of Drawings and Specifications If any person or entity contemplating submitting a bid is in doubt as to the meaning of any part of the drawings, specifications or other Contract Documents, such person shall submit to the University Project Manager a request for an interpretation thereof. The person or entity submitting the request will be responsible for its prompt delivery. Any interpretation of the proposed documents will be made only by addenda posted through the BidNet Direct website. Neither the University nor A/E will be responsible for any other explanations or interpretations of the proposed documents. A/E shall be deemed to refer to the architect or engineer hired by the University as the A/E or Consultant for the Project.
6. Addenda Addenda will be posted through the BidNet Direct website. Contractors are responsible for obtaining information contained in each addendum. Addenda issued prior to the submittal deadline shall become part of the bidding process and must be acknowledged when the bid is submitted electronically through the BidNet Direct website. Failure to acknowledge addenda may result in disqualification from bidding.
7. Award of Contract The Contract will be awarded as soon as possible to the lowest, responsive and responsible bidder, based on the lowest combination of base bid and acceptable prioritized alternates, provided the bid is reasonable, is in the interest of the University of Utah to accept and after applying the Utah Preference Laws in U.C.A. Title 63, Chapter 56. the University reserves the right to waive any technicalities or formalities in any bid or in the bidding. Alternates will be accepted on a prioritized basis with Alternate 1 being highest priority, Alternate 2 having second priority, etc.
8. University Contractor Performance Rating As a contractor completes each the University project, the University, the architect/engineer and the using agency will evaluate project performance based on the enclosed “University Contractor Performance Rating” form. The ratings issued on this project will not affect this project but may affect the award on future projects.
mailto:PDCContracts@utah.edu https://bidnetdirect.com/universityofutah-ufacilities
University Standard Low Bid, 11.5.2024 7
9. Licensure The Contractor shall comply with and require all of its subcontractors to comply with the license laws as required by the State of Utah.
10. Permits In concurrence with the requirements for permitting in the General Conditions, it is the responsibility of the Contractor to obtain the fugitive dust plan requirements from the Utah Division of Air Quality and the SWPPP requirements from the Utah Department of Environmental Quality and submit the completed forms and pay any permit fee that may be required for this specific project. Failure to obtain the required permit may result in work stoppage and/or fines from the regulating authority that will be the sole responsibility of the Contractor. Any delay to the project as a result of any such failure to obtain the permit or noncompliance with the permit shall not be eligible for any extension in the Contract Time.
11. Right to Reject Bids The University reserves the right to reject any or all Bids.
12. Time is of the Essence Time is of the essence in regard to all the requirements of the Contract Documents.
13. Withdrawal of Bids Bids may be withdrawn on written request received from bidder prior to the time fixed for opening.
Negligence on the part of the bidder in preparing the bid confers no right for the withdrawal of the bid after it has been opened.
14. Product Approvals Where reference is made to one or more proprietary products in the Contract Documents, but restrictive descriptive materials of one or more manufacturer(s) is referred to in the Contract Documents, the products of other manufacturers will be accepted, provided they equal or exceed the standards set forth in the drawings and specifications and are compatible with the intent and purpose of the design, subject to the written approval of the A/E. Such written approval must occur prior to the deadline established for the last scheduled addenda to be issued. The A/E’s written approval will be in an issued addendum. If the descriptive material is not restrictive, the products of other manufacturers specified will be accepted without prior approval provided they are compatible with the intent and purpose of the design as determined by the A/E.
15. Financial Responsibility of Contractors, Subcontractors and Sub-subcontractors Contractors shall respond promptly to any inquiry in writing by the University to any concern of financial responsibility of the contractor, subcontractor or sub-subcontractor.
16. Debarment By submitting a bid, the Contractor certifies that neither it nor its principals, including project nor site managers, have been, or are under consideration for, debarment or suspension, or any action that would exclude such from participation in a construction contract by any governmental department or agency. If the Contractor cannot certify this statement, attach to the bid a detailed written explanation which must be reviewed and approved by the University as part of the requirements for award of the Project.
University Standard Low Bid, 11.5.2024 8
STANDARD LOW BID PROJECT SCHEDULE
SJHC Humidifier Plant Replacement
PROJECT #70491
EVENT DATE TIME PLACE
BIDDING
DOCUMENTS POSTED April 24, 2025 9:00 AM BidNet Direct website
MANDATORY
PRE-BID SITE MEETING
May 2, 2025
12:30 PM
SJHC Front Lobby
QUESTIONS DEADLINE May 9, 2025 4:00 PM BidNet Direct website
ADDENDUM DEADLINE May 13, 2025 4:00 PM BidNet Direct website
CONTRACTOR BID
& BID BONDS DUE May 16, 2025 2:00 PM BidNet Direct website
SUBCONTRACTOR LISTS DUE May 19, 2025 2:00 PM EMAILED TO PDCContracts@utah.edu
SUBSTANTIAL
COMPLETION DATE December 31, 2025 mailto:dfcmcontracts@utah.gov