70153 - Texarkana GSA Elevator Modernization - Waste Diversion Plan - AR0057ZZ.xlsx
XLSX spreadsheet 17 KB Posted
- Solicitation number
- 47PH0522R0028
About this file
This document provides details for a federal contract solicitation to modernize elevators at the Texarkana Post Office and US Courthouse in Texarkana, Texas. The General Services Administration is seeking proposals to upgrade elevators with a project magnitude between $1,000,000 to $5,000,000. Proposals are due by May 2nd, 2022 and shall be submitted electronically to paul.shirlee@gsa.gov. A pre-solicitation site visit will be held on April 13th, 2022. The contract is valued at Davis Bacon wages and shall be completed within five hundred and fifty-five calendar days of notice to proceed. Liquidated damages of $250 per day will be assessed for delays. Evaluation criteria include technical approach, experience, schedule, past performance, and preventative maintenance approach. A single award will be made based on best value.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Waste Diversion Plan
: +christopher.clever@gsa.gov +walter.tersch@gsa.gov
(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.
-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.
-Christopher Clever - PCBL That's correct.
| -Jake Begnaud - WPIDBB | Project Waste Management Plan | Submittal Type: | Waste Diversion Plan (Anticipated): | Waste Diversion Report (Final) : | |||||||
| The general info in these gray cells replicates onto the Report tabs. | |||||||||||
| Project Name: | Texarkana GSA Elevator Modernization | Texarkana GSA Elevator Modernization | Texarkana GSA Elevator Modernization | ECC (estimated construction cost): | $1,200,000.00 | Project Manager: | Lauren Young | ePM/ePMX Project # : | 70153 | ||
| Project Short Description: | FY22 Baseline project. | ||||||||||
| Elevator Modernization - Upgrade. | FY22 Baseline project. | ||||||||||
| Elevator Modernization - Upgrade. | FY22 Baseline project. | ||||||||||
| Elevator Modernization - Upgrade. | FY22 Baseline project. | ||||||||||
| Elevator Modernization - Upgrade. | FY22 Baseline project. | ||||||||||
| Elevator Modernization - Upgrade. | FY22 Baseline project. | ||||||||||
| Elevator Modernization - Upgrade. | PM email or phone: | lauren.j.young@gsa.gov | gBUILD Project # : | ||||||||
| Building Number: | AR0057ZZ | AR0057ZZ | AR0057ZZ | Service Center / Field Office: | P07250A1 | P07250A1 | Budget Activity: | (list all applicable) | RWA # : | RAR10548 |
Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)
| Material* | |||||
| (see weight conversion factors below) | Diversion Method | Target Diversion Rate for each material, by weight | |||
| (Change to actual target(s) as needed) | Diverted (lbs) | Landfilled (lbs) | Total C&D material weight (Diverted + Landfilled) (lbs) | Diversion |
Rate
| Reuse* | Recycle or Compost | Donation | ||||||
| Asphalt | 50% | 0 | 0 | 0 | n/a | |||
| Brick, Masonry, and Tile | 50% | 0 | 0 | 0 | n/a | |||
| Cardboard | 50% | 0 | 0 | 0 | n/a | |||
| Carpet, including Padding | 50% | 0 | 0 | 0 | n/a | |||
| Ceiling tile | 50% | 0 | 0 | 0 | n/a | |||
| Concrete | 50% | 0 | 0 | 0 | n/a | |||
| Drywall/ sheetrock (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Metals | 50% | 0 | 0 | 0 | n/a | |||
| Painted wood, drywall, or plywood | 50% | 0 | 0 | 0 | n/a | |||
| Reusable items | 50% | 0 | 0 | 0 | n/a | |||
| Roofing | 50% | 0 | 0 | 0 | n/a | |||
| Soil, Rock, Land Clearing Debris | 50% | 0 | 0 | 0 | n/a | |||
| Wood (unpainted) | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Other: ____________________ | 50% | 0 | 0 | 0 | n/a | |||
| Total**: | 0 | 0 | 0 | n/a |
| Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse. | |||
| Item | Reuse Onsite | Reuse Offsite | Off-Site Recipient or Salvage/ Deconstruction Company |
| Volume-to-Weight Conversion Factor Reference Table |
| If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal. |
| Asphalt paving: 1 cubic yard = 773 lbs | Dirt or sand: 1 cubic yard = 929 lbs |
| Asphalt or composite roof shingles: 1 cubic yard = 731 lbs | Fiberglass insulation, loose: 1 cubic yard = 17 lbs |
| Brick, laid flat: 1 flat square foot = 20 lbs | Mixed (composite) C&D material: 1 cubic yard = 417 lbs |
| Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs) | Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs |
| Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbs | Rock, crushed: 1 cubic yard = 2,570 lbs |
| Concrete: 1 cubic yard = 860 lbs | Wood: 1 cubic yard = 169 lbs |
| *Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint. |
| **At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics. |
File details come from the government source that posted it. Updated .