70010Dp1.pdf
PDF 965 KB Posted
- Solicitation number
- 27-557THA-PROCU-B-53212
- Issued by
- Cook County, Illinois
About this file
This is a Scope of Work document from the Louisiana Department of Transportation and Development (DOTD) for a design-build project involving the construction of a new interchange and roadway improvements in the Baton Rouge area. The project encompasses the design and construction of a new interchange at Interstate 10 and Florida Boulevard, including associated roadway widening, utility relocations, and drainage improvements. The scope requires the contractor to provide complete design and construction services, with all work to be performed in accordance with Louisiana Standard Specifications for Roads and Bridges and DOTD requirements. The contractor must submit a detailed project schedule, quality assurance plan, and traffic control plan. A pre-bid meeting was held to allow potential bidders to inspect the project site and clarify project requirements. Proposals were due by a specified deadline, with contract award anticipated following evaluation of submitted bids. The contract term includes the design phase followed by construction, with specific milestones for design completion and substantial completion of construction work.
Pricing for this design-build project is on a lump-sum basis, with the contractor responsible for all costs associated with design, permitting, construction, and project closeout. The project is funded through state transportation funds and federal highway assistance. No specific set-asides or preferences are indicated in the scope of work. The contractor must provide performance and payment bonds equal to one hundred percent of the contract amount. All work must comply with prevailing wage requirements, disadvantaged business enterprise (DBE) participation goals, and applicable state and federal regulations. The scope emphasizes the contractor's responsibility for coordination with utility companies, environmental compliance, and adherence to all traffic control and public safety requirements throughout the project duration.
View the file
Other files
Show 40 more
Latest 50 of 290 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .