7-Westside WTP WSIII and WSIV Addendum No. 1.pdf
PDF 792 KB Posted
- Solicitation number
- 26-0314
- Issued by
- Tarrant County, Texas
About this file
This is an addendum document for the Westside Water Treatment Plant (WTP) WS-3 and WS-4 Pipeline Extensions project in Texas. The addendum modifies the original contract specifications for open cut work involving 609 linear feet of 16-inch water line, 599 linear feet of 36-inch water line, 439 linear feet of common trench construction, and 154 linear feet of concrete-encased common trench, along with associated valves, air release valve assemblies, manholes, and appurtenances. The addendum clarifies or revises specific technical requirements, construction methodologies, or contract terms established in the original solicitation documents to ensure accurate project execution and bidder understanding.
The addendum serves to provide supplementary instructions or corrections to the original contract documents that all prospective bidders must incorporate into their proposals and cost estimates. Contractors should review this addendum in conjunction with the original contract specifications, scope of work, and all previously issued documents to ensure complete compliance with all current requirements. The modifications outlined in this addendum are binding on all bidders and will be reflected in the final executed contract award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 1
CITY OF FORT WORTH
WATER DEPARTMENT
WESTSIDE WTP WS-III WS-IV PIPELINE EXTENSIONS
City Project No. 102052-3
Addendum No. 1 Issue Date: September 25, 2026
Bid Opening Date: October 1, 2026
This addendum forms part of the contract documents referenced above and modifies the original
Contract Documents. Acknowledge receipt of this addendum by signing and attaching it to the Contract
Documents (inside). Note receipt of the Addendum in the Bid Proposal and on the outer envelope of your bid.
Procurement and Contracting Requirements /
General Requirements / Civil
Khidir Abdelwahab Hamad
CDM Smith Inc.
TBPE Firm Registration No. F-3043
DRAWINGS
1. Cover Sheet o MODIFY Drawings Cover Sheet as follows:
1. Replace Cover Sheet with the attached sheet, which has City’s approval and review signatures.
2. Sheet CZ-7 – CIVIL DETAILS VII o MODIFY DETAIL A as follows:
1. Replace “A-0.04” with “CZ-7” in callouts in Elevation view, Section 6 and Section 7.
09/25/2026
By the signature affixed below, Addendum No. 2 is hereby incorporated into and made part of the above referenced Invitation to Bid.
COMPANY NAME: .
SIGNATURE: _
NOTE: Company name and signature must be the same as on the original bid documents. Failure to return this form with your sealed bid may constitute grounds for rejection of your offer.
00 45 12
PREQUALIFICATION STATEMENT
BIDDER:
By:
Title:
Date:
END OF SECTION
(Signature)
N/A
N/A
N/A
N/A
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed.
N/A
SECTION 00 45 12
PREQUALIFICATION STATEMENT
Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s)
N/A
Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 09/19/2025 00 41 00 Bid Proposal Workbook.xlsx