7-RFP Ddot inventory audit.pdf

PDF 502 KB Posted

Attached to
DDOT ASSET INVENTORY AUDIT
Solicitation number
545164
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a Request for Proposals (RFP) issued by the City of Detroit Office of Contracting and Procurement on behalf of the Department of Transportation (DDOT) for asset inventory audit services. The RFP seeks qualified vendors to conduct a comprehensive inventory audit of DDOT assets, including buildings and structures, machinery, furniture, equipment, and licensed vehicles across seven designated locations: 100 Mack Avenue (Detroit Health Dept./American Red Cross), 1301 E. Warren Avenue (Detroit DOT), 1121 W. Eight Mile Road (Jason Hargrove Transit Center), 1300 Cass (Rosa Parks Transit Center), 5149 St. Jean (Shoemaker Terminal), 5600 Wabash (Gilbert Terminal), and 14044 Schaefer Highway (Coolidge Terminal). A pre-proposal conference is scheduled for May 11, 2026, at 1:00 PM EST via Microsoft Teams. Questions must be submitted by May 21, 2026, at 1:00 PM EST through the Supplier Portal, with responses distributed upon receipt. Proposals are due June 1, 2026, at 1:00 PM EST via the EUNA Bonfire Procurement Supplier Portal at detroit.bonfirehub.com. The contract term is up to three years with potential renewal options subject to Detroit City Council approval and signature by the Chief Procurement Officer. The City anticipates one or multiple awards from this RFP.

Evaluation of proposals will occur before cost proposals are reviewed, with technical criteria weighted at 85 points (experience at 35 points, scheduling at 25 points, and methodology and approach at 25 points) and pricing weighted at 15 points, for a total of 100 possible points. Detroit Equalization Credits may be applied to prime contractors and subcontractors based on business location, size, and workforce development status. Respondents must meet a minimum qualification threshold of three years of experience providing similar services on comparable projects. Proposals must include completed Attachment A (Respondent Questionnaire), Attachment B (Proposal Introduction and Solution/Approach), Attachment C (Pricing), Attachment D1 (Forms and Affidavits), and acknowledgment of Attachment E (Model Professional Services Contract). The City requires compliance with data standards including machine-readable data access via direct database access, API access, or reporting databases in JSON, CSV, or XML formats. Billing will be based on the percentage of work completed on a monthly basis under the City's standard NET 30 payment terms. No work may commence without receipt of both the Contract Purchase Agreement (CPA) and Standard Purchase Order (SPO); work begun without these authorizations is subject to payment delays or non-payment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Detroit Office of Contracting and Procurement (OCP)

Request for Proposal – asset inventory audit

Revised 12/2/2025 Page 1 of 20

CITY OF DETROIT

OFFICE OF CONTRACTING AND PROCUREMENT

REQUEST FOR PROPOSALS

RFP NO. 545164

DDOT ASSET INVENTORY AUDIT

Buyer: Justin Earley

EVENT / ACTIVITY DUE DATE / TIME

ADVERTISEMENT DATE 5/1/26

PRE-PROPOSAL

CONFERENCE

May 11, 2026 @ 1PM EST Location: Virtual

Microsoft Teams meeting Join: https://teams.microsoft.com/meet/21621714136791?p=YkNz99hZCMejoTkn9P Meeting ID: 216 217 141 367 91 Passcode: 4WY2Ag64

Need help? | System reference Dial in by phone +1 469-998-6602,,154155042# United States, Dallas Find a local number Phone conference ID: 154 155 042# For organizers: Meeting options | Reset dial-in PIN

QUESTIONS DUE 5/21/26 on or before 1PM EST

All questions must be submitted online in the Supplier Portal as indicated in Section

3.3 of this RFP.

ANSWERS DISTRIBUTED Upon receipt

PROPOSAL DUE DATE * 6/1/26 @ 1PM EST

In the Supplier Portal as specified in Section 4.5 of this RFP.

* Respondents must register in EUNA Bonfire to download bid documents and submit bids. The City cannot guarantee the accuracy of any bid documents obtained from outside of EUNA, and bids submitted outside of EUNA Bonfire will not be accepted. Detailed resources about registering and bidding, including video tutorials and live, virtual office hours, are available at www.detroitmi.gov/suppliersupport.

https://teams.microsoft.com/meet/21621714136791?p=YkNz99hZCMejoTkn9P https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTIzNmRlY2YtNjk0NS00ZjkyLTlhMWUtNTBiMjNlMzdhNmIw%40thread.v2/0?context=%7b%22Tid%22%3a%22e154a760-1d2d-4ef6-8fd3-ebc8b4ef31fd%22%2c%22Oid%22%3a%225098e137-7844-4d53-bc74-d846947c4d64%22%7d tel:+14699986602,,154155042 https://dialin.teams.microsoft.com/d8d2f7a3-2364-4c9b-ab3d-7f613057a66c?id=154155042 https://teams.microsoft.com/meetingOptions/?organizerId=5098e137-7844-4d53-bc74-d846947c4d64&tenantId=e154a760-1d2d-4ef6-8fd3-ebc8b4ef31fd&threadId=19_meeting_ZTIzNmRlY2YtNjk0NS00ZjkyLTlhMWUtNTBiMjNlMzdhNmIw@thread.v2&messageId=0&language=en-US https://dialin.teams.microsoft.com/usp/pstnconferencing https://detroit.bonfirehub.com/ http://www.detroitmi.gov/suppliersupport

Request for Proposal – asset inventory audit

Revised 12/2/2025 Page 2 of 20

Questions about the specifics of this RFP must be asked within the EUNA Bonfire Messages interface for the bid on or before the date and time indicated above. Questions asked via phone, email, and/or other means will not be answered.

Proposals must be uploaded in EUNA Bonfire on or prior to the date and time indicated above.

Late and/or emailed proposals will not be accepted.

Revised 12/2/2025 Page 3 of 20

TABLE OF CONTENTS

Section 1. Project Summary and Background

1.1. PROJECT REQUEST

1.2. BACKGROUND/DESCRIPTION OF ENVIRONMENT

1.3. AWARD CLAUSE INCLUDING RENEWAL OPTIONS

Section 2. Statement of Work

2.1. SERVICES TO BE PERFORMED

2.2. OPERATIONAL INFORMATION

2.3. TECHNICAL INFORMATION

2.4. PAYMENT & PERFORMANCE BOND (Construction)

Section 3. Proposal Evaluation and Selection Process

3.1. MINIMUM QUALIFICATIONS

3.2. ADHERENCE TO TERMS OF PROPOSALS

3.3. QUESTION DEADLINE

3.4. EVALUATION CRITERIA

3.5. EVALUATION PROCEDURE

3.6. ORAL PRESENTATION/DEMONSTRATION

3.7. REJECTIONS, MODIFICATIONS, CANCELLATIONS

3.8. PROTESTS

Section 4. Required Proposal Content and Submission Process

4.1. ACCURACY AND COMPLETENESS OF INFORMATION

4.2. REQUIRED PROPOSAL CONTENT AND FORMAT

4.3. REQUIRED COST PROPOSAL

4.4. ECONOMY OF PREPARATION

4.5. SUBMITTAL INSTRUCTIONS

Section 5. General Conditions and Requirements for RFP

5.1. CONTRACT APPROVAL

5.2. PAYMENT

5.3. INVOICES

5.4. ASSIGNMENT

5.5. MODIFICATION OF SERVICES AFTER CONTRACT APPROVAL

5.6. NEWS RELEASE

5.7. MISCELLANEOUS

5.8. OFFICE OF INSPECTOR GENERAL

RFP Attachments List

Revised 12/2/2025 Page 4 of 20

Section 1. Project Summary and Background

1.1. PROJECT REQUEST

The City of Detroit Office of Contracting and Procurement (OCP) on behalf of the department of transportation requests proposals from qualified Respondents to render certain technical or professional services ("Services") as set forth in this RFP to provide asset inventory audit services.

1.2. BACKGROUND/DESCRIPTION OF ENVIRONMENT

Prior to starting the physical inventory portion of the project, the vendor converts all current fixed asset data provided by the city to conduct the re-inventory and verify assets. This is a key step in the process because it will establish a baseline fixed asset inventory database as well as properly track and report on exception assets such as disposals which are important for audit compliance.

1. The city will provide the vendor with current fixed asset data.

2. The vendor will review the data files and will work with the city to get the data in the best possible format for import. Assignment of database code numbers and associated descriptions for locations, buildings, and classification codes will be established.

3. The vendor maps all fixed asset fields for import.

1.3. AWARD CLAUSE INCLUDING RENEWAL OPTIONS

If a contract is awarded as a result of this RFP, it will be a City of Detroit Professional Services Contract (Attachment E). The term of the contract will be for up to three (3) years. Any renewal option exercised under this contract is effective only after the approval of the Detroit City Council and signed by the Chief Procurement Officer. The City anticipates one or multiple awards as a result of the RFP.

Revised 12/2/2025 Page 5 of 20

Section 2. Statement of Work

2.1. SERVICES TO BE PERFORMED

During the term of the contract, the contractor shall complete the following projects:

Buildings & Structures The vendor will independently calculate the square foot area of each building appraised through the review of "as-built" blueprints or physically measuring each building.

Building photographs will be prepared for each structure to become part of our proof-of-loss documentation, in addition to assisting with the valuation efforts. A description for each building will be developed and recorded, depicting construction type and materials utilized.

Primary Construction, Occupancy, Protection, and Exposure (COPE) data include:

a) Occupancy Type j) Construction Date b)Construction/ISO Class k) Heating/Cooling Systems

c) Framing l) Electrical

d) Roofing m) Plumbing

e) Ceiling n) Elevators

f) Exterior Walls o) Identify Protection Systems

g) Square Footage p) Additional Features

h) Foundation/Footings q) GPS Coordinates

i) Condition r) Flood Zone Classifications

During the office valuation portion of the engagement, property exclusions (those items not typically covered by an insurance policy) will be segregated to properly report the site preparation and excavation, footings and foundations, and a portion of plumbing costs (below grade).

Construction/ISO Classifications In addition to the analysis of individual building components, construction classes will also be recorded. ISO classes 1-6, as defined by the Commercial Fire Rating Schedule (CFRS) are defined in terms of the Marshall and Swift construction classes as follows:

ISO Class M and S Class Description

1 D Frame/Combustible

2 C Joisted Masonry

3 S Noncombustible

Revised 12/2/2025 Page 6 of 20

4 C Masonry Noncombustible

5 A Modified Fire Resistive

6 B Fire Resistive

PROPERTY LISTING

• 100 Mack Avenue — Detroit Health Dept./American Red Cross

• 1301 E. Warren Avenue — Detroit DOT

• 1121 W. Eight Mile Rd — Jason Hargrove Transit Center

• 1300 Cass — Rosa Parks Transit Center

• 5149 St. Jean — Shoemaker Terminal

• 5600 Wabash — Gilbert Terminal

• 14044 Schaefer Highway — Coolidge Terminal

Machinery, Furniture, and Equipment A detailed inspection and field inventory will be conducted at all buildings included in the list of locations provided by the city, identifying each asset by location, building and room. All assets included in our re-inventory and appraisal will be recorded and categorized by major accounts. This segregation of items will assist in reporting asset valuation totals for capital asset reporting formats. The assets will be identified under the classes below.

a)Asset Identification Number i) Building

b) Description j) Site/Location

c) Quantity k) Room/Sub-location

d) Acquisition Date l) Historical (and Replacement) Costs

e) Manufacturer m) Miscellaneous/User Defined (i.e., old

f) Model tag#)

g) Serial Number n) Department Code

h) Asset Account o) Normal Useful Life

Department Codes will be included with the assistance of City personnel. The vendor will apply tags to each asset and enter the tag numbers along with all corresponding asset information into the database. Tags will be applied in a consistent location on like items, enabling ease of future re-inventory efforts.

• Capital Assets — All assets with an original cost of $5,000 or more and having an estimated useful life of three years or greater will be inventoried and

Revised 12/2/2025 Page 7 of 20 identified individually and capitalized in the resulting reports and data. Only these assets will appear in the capitalized accounting reports.

• Critical Control Assets — The following types of assets will be tagged and inventoried, regardless of cost:

• All assets with an original cost between $1,000 and $4,999.

• All Laptop Computers (regardless of cost) All Desktop Computers

(regardless of cost)

Licensed Vehicles The vendor will work with City personnel to coordinate the physical inventory of vehicles in a designated location by department.

Property in the Open The staff will account for all property in the open assets with an original cost of $5,000 or more as part of the scope of this project.

VALUATION METHODOLOGY

The valuation portion of the project entails the research and calculations necessary to formulate both historic and/or replacement costs. The vendor and the city’s quality control supervisor work hand in-hand to ensure the integrity of the data. The focus is on completeness, accuracy, and proper formatting of all data prior to final processing and delivery.

The vendors’ investigation of the property will follow generally accepted appraisal techniques and will include the use of specific techniques necessary to develop valid and acceptable original cost and date of acquisition for each asset. This should include the use of the straight-line method of depreciation. The vendor will determine original cost by using the following costing methods:

• The Direct Costing method will be used where historical data is readily available from City records. The actual purchase cost and acquisition date will be maintained for those assets.

• Standard Costing is used when inventoried property units/groups not reconciled to a historical record receive an estimated cost, where possible, based upon a standard cost (a known average installed cost for a like unit) at the estimated acquisition date.

• The Normal Costing method will be used where no historical information is readily available. These assets will be valued on a current basis and back trended to an estimated date of acquisition to estimate the original cost. During the costing and valuation procedures, all items will be assigned a useful life. The useful life of an item will determine its approximate replacement year.

Revised 12/2/2025 Page 8 of 20

During the valuation research, the vendor will examine all assets to determine date of acquisition, original cost and/or replacement cost new, defined as follows:

• ORIGINAL COST is the amount originally paid to acquire the asset, including such cost as set-up charges; transportation; taxes; engineering and architectural fees; and title insurance. If an asset was donated or bought for a nominal sum, GAAP requires that the asset be accounted for at market value as of the date of acquisition.

• REPLACEMENT COST NEW is the amount required to reproduce property in like utility and function, in accordance with current market prices for materials, labor, equipment, contractor's overhead, profit and fees, but with no provisions for overtime or bonuses for labor and premiums for material or equipment, based upon replacing the entire property at one time.

CLASSIFICATION OF ASSETS

During the inventory and coding processes, the vendor will classify each asset by distinct type or category. Assets will be assigned to different classifications, each with their own estimated normal useful life. This classification structure will enable the city to select off data for flexible reporting, as well as provide a benchmark for projecting replacement of capital equipment.

Additionally, this structure will provide the asset life schedule for calculation of depreciation for current reporting requirements and eventual compliance with general accounting requirements.

PROJECT SCHEDULE

The vendor will work with the City of Detroit DOT to devise a schedule that will allow the project to be completed in a timely fashion.

DELIVERABLES

The vendor will provide quality control waypoints, to include the issuance of preliminary reports prior to final report distribution and optical electronic report for future perpetuation.

PRELIMINARY REPORTS

Preliminary reports will be sent via email in Microsoft excel format for review.

FINAL REPORTS

Upon acceptance of preliminary reports, the vendor will prepare and deliver final reports in electronic format. Must include at least one hard copy of the final report in addition to electronic format.

2.2. OPERATIONAL INFORMATION

Awarded Contractor(s) will work closely with City agency staff.

Revised 12/2/2025 Page 9 of 20

The Respondent is expected to provide service in accordance with the terms of the executed contract and under the rules, regulations, and supervision of the City.

2.3. TECHNICAL INFORMATION

City Data Standards The City is committed to centralizing and warehousing Data for the purpose of improving service delivery and enabling cross departmental analytics. The System must enable Data access, Data interoperability, warehousing of resulting Data, and adherence to City data standards which the City has provided to the Contractor for review.

Specifically, the System requires:

• We require access to all System data for automated data warehousing purposes, provided through at least one of the following machine-readable methods:

o Preferred: Direct database access, or access to a reporting database (ODBC-compatible) o Alternative: API access providing data in one or more of the following formats: JSON, CSV, or XML

• Full documentation of APIs (including field names and objects) and the database schema used by the application.

• Ability for City to programmatically update data within the System as needed via

API

• Any location-based data or platform utilizes the City’s base units geocoder, Base Units Database, and/or address Data standards as applicable.

• The ability for the City to use and govern Data as it deems necessary--centralizing it, porting it into other systems, and using it for additional and future organizational needs.

• Data collected, transferred and stored meet minimum standards to ensure confidentiality, integrity and availability.

• Data to meet compliance rules / regulations in order to ensure the sensitive digital assets are guarded against loss, theft and misuse. These rules come in a number of forms including applicable industry compliance / standards (i.e. HIPAA, PII, PCI- DSS, NIST, ISO), state or federal-level laws or even supra-national regulations.

• The System must have the capacity to store field-level metadata and display it in the user interface when appropriate

• API is able to provide Data in a JSON format.

Specifications, Change of Specification, and Errors or Omission. Specifications which refer to brand names are given for reference. Respondents may quote on equivalent articles, provided that brand name and catalog number(s) and any deviations are noted on the bid form and complete descriptive literature is furnished. Exceptions will state “Do Not Substitute.”

The decision of the City shall be final.

Revised 12/2/2025 Page 10 of 20

2.4. PAYMENT & PERFORMANCE BOND (Construction)

N/A

Revised 12/2/2025 Page 11 of 20

Section 3. Proposal Evaluation and Selection Process

3.1. MINIMUM QUALIFICATIONS

Proposals will only be accepted from those firms demonstrating a minimum of 3 years of experience providing the services requested in the RFP for projects of similar scope and size.

3.2. ADHERENCE TO TERMS OF PROPOSALS

A proposal once accepted by the City of Detroit may become a binding contractual obligation of the Respondent. The failure of a successful Respondent to accept this obligation and to adhere to the terms of the Respondent’s proposal may result in rejection of the proposal and the cancellation of any provisional award to the respondent. Respondents are not permitted to take advantage of any errors or omissions in specifications since full instructions will be given should they be discovered before bid submission date.

3.3. QUESTION DEADLINE

All questions regarding the RFP shall be submitted through the Supplier Portal no later than the time and date specified in the solicitation. In the interest of transparency, only written questions will be accepted. Answers to questions will be posted within the Supplier Portal. The City of Detroit does not guarantee a response to questions submitted after the question deadline.

Should a Respondent be in doubt as to the true meaning of any portion of this RFP or find any patent ambiguity, inconsistency, or omission herein, the Respondent must make a written request for an official interpretation or correction in accordance with the instructions for submitting questions as specified in this RFP.

Respondents are advised that no oral interpretation, information or instruction by an officer or employee of the City of Detroit shall be binding upon the City of Detroit.

Respondents requesting changes to the RFPs terms and conditions, specifications, quantities, etc.;

or if clarifications are needed, must make the request in writing by the stated bid submission deadline.

3.4. EVALUATION CRITERIA

Technical Proposals will be evaluated before Cost Proposals are reviewed.

Proposal Evaluation Criteria Possible Points

1. Experience 35

2. Scheduling 25

3. Methodology and approach 25

4. Pricing 15

Total Points Possible 100

Detroit Equalization Credits according to the following table shall be applied after the technical and price evaluation. (Please see Equalization Credit Statement for more information) http://www.michigan.gov/SIGMAVSS

Revised 12/2/2025 Page 12 of 20

Detroit Equalization Credits – Prime Contractor Possible Points

Detroit Headquartered Business 5 Detroit Based Business 2 Detroit Resident Business 5 Construction Workforce Investment Business (Construction over $1M) 3 Construction Workforce Development Business 3 Detroit Small Business 1 Detroit Micro Business Concern 2 Joint Venture 2 Mentor Venture 1

Construction Workforce Development and Construction Workforce Investment credits are applicable to High Impact Construction Projects (over $1M).

Business can only be either a Detroit Small Business or Detroit Micro Business Concern but not both. Business can only be a Joint Venture or a Mentor Venture but not both.

Detroit Equalization Credits – SubContractor Possible Points

Detroit Headquartered Business 5 x % of work Detroit Based Business 2 x % of work Detroit Resident Business 5 x % of work Construction Workforce Investment Business* 3 x % of work Construction Workforce Development Business* 3 x % of work Detroit Small Business 1 x % of work Detroit Micro Business Concern 2 x % of work

Maximum Points Possible 10 *Applicable to High Impact Construction Projects over $1 million.

3.5. EVALUATION PROCEDURE

Following the receipt of proposals, a City designated Evaluation Committee will evaluate each response. All PROPOSALS, which meet the required format of this RFP, will be evaluated. Any proposals determined to be non-responsive to the specifications or other requirements of the RFP, including instructions governing submission and format, will be disqualified unless the City determines, in its sole discretion, that non-compliance is not substantial or that an alternative proposed by the Respondent is acceptable.

The City may also at its discretion, request oral presentations, make site visits at Respondent’s facility and may request a demonstration of Respondent’s operations. If scheduled, a final determination will be made after the oral presentations and/or demonstrations are complete.

The City may also at its sole discretion, elect to rank order the qualified proposals, and negotiate with some limited number of the highest scored qualified respondents. A final determination would include the cumulative inputs of this evaluation procedure. All decisions reached by the Evaluation Committee will be by consensus.

Revised 12/2/2025 Page 13 of 20

Any of the additional data specs and standards described in Section 2.3, that are met will be factored positively into the overall score.

3.6. ORAL PRESENTATION/DEMONSTRATION

The City reserves the right, at its own discretion, to request oral presentations regarding proposals submitted in response to the RFP. Failure to make an oral presentation will be grounds for rejection of your proposal. Respondents will be notified by the Office of Contracting and Procurement of the date, time and location for oral presentations.

3.7. REJECTIONS, MODIFICATIONS, CANCELLATIONS

The City of Detroit expressly reserves the right to:

1) accept or reject, in whole or in part, any and all proposals received;

2) waive any non-conformity;

3) re-advertise for proposals;

4) withhold the award for any reason the City determines;

5) cancel and/or postpone the request for proposals, in part or in its entirety, and/or,

6) take any other appropriate action that is in the best interest of the City.

This RFP does not commit the City of Detroit to award a contract, to pay any cost incurred in the preparation of a proposal under this request, or to procure or contract for services.

3.8. PROTESTS

Protests can be filed with the Office of Procurement. Interested parties aggrieved by a solicitation or the award of any resulting contract, may file written notice of protest to the following:

City of Detroit Chief Procurement Officer 2 Woodward Avenue, Suite 1008

Detroit, MI 48226 “Procurement Protest”

At a minimum, such protests shall include:

1) name of protestor.

2) solicitation/contract number and description; and

3) statement of grounds for protest (reference specific text in the solicitation, bid or contract document that is at issue).

An actual or prospective bidder or offeror whose direct economic interest would be affected by the award of a contract or the failure to award a contract has the right to protest any aspect of the solicitation, evaluation, or selection process of a City of Detroit procurement.

A protest by a prospective bidder which challenges the terms of the solicitation itself must be received by the City no later than 4:00 p.m. EST of the business day prior to the date scheduled for the bid closure. Failure to meet this deadline shall result in a protester waiving its ability to challenge the terms of the solicitation.

A protest by a bidder which challenges a contract award must be received no later than 4:00 p.m.

EST five (5) business days after the award of a City procurement. Failure to meet this deadline shall result in a protester waiving its ability to challenge the contract award.

Revised 12/2/2025 Page 14 of 20

All protests must be submitted in writing and received by the required timeframe.

The Chief Procurement Officer (CPO) or as delegated, the Deputy CPO, has the sole authority to respond to, decide and act upon supplier protests.

The decision of the Chief Procurement Officer and/or the Department Director are final and is not subject to appeal.

Revised 12/2/2025 Page 15 of 20

Section 4. Required Proposal Content and Submission Process

4.1. ACCURACY AND COMPLETENESS OF INFORMATION

All information pertaining to the prospective respondent’s approach in meeting the requirements of the RFP shall be organized and presented in the prospective respondent’s proposal. The instructions contained in this RFP must be strictly followed.

Accuracy and completeness are essential. Omissions and ambiguous or equivocal statements will be viewed unfavorably and may be considered in the evaluation. Since all or a portion of the successful proposal may be incorporated into any ensuing contract, all prospective respondents are further cautioned not to make any claims or statements that cannot be subsequently included in a legally binding agreement.

4.2. REQUIRED PROPOSAL CONTENT AND FORMAT

To be considered responsive, each proposal must, at a minimum, respond to the following RFP sections in their entirety, responses must be uploaded in the Supplier Portal along with the Affidavit of Disclosure Interests Form and Non- Collusion Affidavit found under requirements section of the of RFP# 545695:

Required Response Item

1. Attachment A – Respondent Questionnaire

Respondent shall provide their Organization Experience, per the requirements provided in Attachment A.

2. Attachment B – Proposal Introduction and Solution / Approach Respondent shall provide their Proposal Introduction and Solution / Approach and Capacity/Staffing, per the requirements provided in Attachment B.

3. Attachment C – Pricing Respondent shall provide their Pricing proposal, per the requirements provided in Attachment C.

4. Attachment D1 – Forms, Affidavits and Documents – Bid Requirements Respondent shall provide their completed Certificate of Authority, Non-Collusion Affidavit, and Affidavit of Disclosure of Interests, in Attachment D1.

5. Attachment D2 – Conditions of Award - Award Winners Only Respondent will be required to provide their completed Forms, Affidavits, Insurance and Documents, if they are selected as the award winner provided in Attachment D.

6. Attachment E – Model Professional Services Contract Respondent shall provide their agreement to the Model Professional Services Contract or note any exceptions provided in Attachment E.

4.3. REQUIRED COST PROPOSAL

Respondents are requested to make a firm cost proposal to the City of Detroit, through the completion of Attachment C. If a contract is entered into as a result of this RFP, it will be a contract for fees as related to providing all requested services, with a price not to exceed the total price quoted in the proposal. The City of Detroit reserves the right to select proposals from the most responsible Respondents with the most reasonable costs. The City reserves the right to select one or more firms to perform all or separate parts of this function.

Revised 12/2/2025 Page 16 of 20

4.4. ECONOMY OF PREPARATION

Proposals should be prepared simply and economically providing a straightforward, concise description of the Respondent’s ability to meet the requirements of the RFP. Emphasis should be on the completeness and clarity of content.

4.5. SUBMITTAL INSTRUCTIONS

All proposals must be submitted through the Bonfire/EUNA Procurement Supplier Portal at detroit.bonfirehub.com. Each Respondent is responsible for ensuring that its proposal is received by the City on a timely basis. Faxed or mailed proposals will not be accepted.

Firms shall not distribute their proposals to any other City office or City employee. Proposals received become the property of the City. The City is not responsible for any costs associated with preparation or submission of proposals. All proposals submitted by the due date will be recorded in the Supplier Portal. Responses received will not be available for review. Proposals received will be subject to disclosure under the state of Michigan’s Freedom of Information Act. An officer of the company authorized to bind the company to a contractual obligation with the City must sign the proposals in the Supplier Portal. The successful respondent will receive an award letter.

Respondents who are not awarded will receive a notification that the award decision has been made.

Support Channels for Technical Difficulties and Questions Visit https://detroitmi.gov/suppliersupport for:

- Guides on how to register in EUNA

- Guides on how to submit a response to the solicitation

- FAQs

Contact Bonfire’s technical support in the portal for:

- Technical issues with the e-bidding portal

- Registration problems

- Help submitting responses through the system

Contact the City (eprocurement@detroitmi.gov) for:

- General procurement process questions

- City-specific requirements and policies

For Solicitation/Project-Specific Questions:

- Submit all solicitation-related questions through the Public Q&A tab in the Bonfire/EUNA

Procurement portal. This ensures all vendors receive the same information and maintains transparency in the bidding process. Emails and calls regarding solicitation-specific questions will not receive a response.

https://detroitmi.gov/suppliersupport https://detroit.bonfirehub.com/portal/support mailto:eprocurement@detroitmi.gov

Revised 12/2/2025 Page 17 of 20

Section 5. General Conditions and Requirements for RFP

5.1. CONTRACT APPROVAL

Upon contract award, the City and the successful Respondent shall execute a professional services contract, which shall contain all contractual terms and conditions in a form provided by the City.

No contract shall become effective until the contract has been approved by the required City Departments and Detroit City Council and signed by the City of Detroit Chief Procurement Officer.

Prior to the completion of this approval process, the successful Respondent shall have no authority to begin work under the contract. The Chief Financial Officer shall not authorize any payments to the successful Respondent prior to such approvals; nor shall the City incur any liability to reimburse the successful Respondent regarding any expenditure for the purchase of materials or the payment of services.

5.2. PAYMENT

All properly executed invoices submitted by the successful Respondent will be paid in accordance with the City of Detroit Prompt Payment Ordinance.

5.3. INVOICES

Billing will be based on the percentage of work completed, on a monthly basis.

Vendors must be registered in City of Detroit Vendor Portal and be a registered vendor with the City of Detroit to submit invoices and receive payments. Go to http://www.detroitmi.gov/Supplier to register.

AUTHORIZATION TO COMMENCE WORK OR SHIP GOODS – READ

CAREFULLY!!!

Contractors may begin work or ship goods upon receipt of the required authorization, which is the CPA (Contract Purchase Agreement), in addition to SPO (Standard Purchase Order), from Procurement.

The CPA (City Council Approved and Awarded Contract Purchase Agreement) alone is NOT authorization to begin work! NO letter of Intent, or Letter to Commence Work will be issued.

**Work commencing without issuance of the SPO is subject to Payment Delays and/or Non- Payment! **

Required vendor steps to invoice:

1) Vendors should submit their invoices via City of Detroit Oracle Vendor Portal.City of Detroit Oracle Vendor Portal. Portal invoice amount and creation date must match the date on attached invoice. Please follow the below invoice requirements:

Invoice MUST contain or have as attachment:

• Vendor Name and address on Invoice

• Contact Info on Invoice (Accounts Receivable contact with phone and email)

• Remittance information (MUST be included, or the invoice is subject to rejection

• City of Detroit contact (person who authorized work to commence) http://www.detroitmi.gov/Supplier https://ebkk.login.us8.oraclecloud.com/oam/server/obrareq.cgi?ECID-Context=1.006GbR8nJ1j0zkVay1Na6G001bnV0000sM%3BkXjE

Revised 12/2/2025 Page 18 of 20

• Invoice Date

• Date of service/delivery

• Contract number

• Purchase order number

• Total Invoice amount

• The wording “ Goods/Services” (must be noted on every invoice)

Other invoice requirements:

• Invoice must be billed based on Purchase Order rates

• Total invoice amount must tie to the total supporting documents

• Supporting documentation must be attached to the invoice in the portal

Terms are standard NET 30 Days, unless otherwise negotiated, and start from the invoice receipt date, provided that the invoice is submitted timely to our AP department with the necessary supporting documentation.

If you need payment assistance, please contact the Office of Departmental Financial Services

(ODFS) 313-410-7804.

For technical assistance, please visit detroitmi.gov/suppliersupport.

5.4. ASSIGNMENT

The services to be performed by the successful Respondent shall not be assigned, sublet, or transferred, nor shall the successful Respondent assign any monies due or to become due to him under any contract entered into with the City pursuant to these specifications, without prior written approval of the City.

5.5. MODIFICATION OF SERVICES AFTER CONTRACT APPROVAL

The City reserves the right to modify the services provided by the successful Respondent awarded a contract. Any modification and resulting changes in pricing shall be made by amendment to the contract by the successful Respondent and the City.

5.6. NEWS RELEASE

News releases pertaining to these proposal specifications or the provisions to which they relate shall not be made without prior approval of the City and then only in coordination with the City.

5.7. MISCELLANEOUS

It shall be the responsibility of the Respondent to thoroughly familiarize themselves with the provisions of these specifications. After executing the contract, no consideration will be given to any claim of misunderstanding.

The Respondent agrees to abide by the rules and regulations as prescribed herein by the City as the same now exists or may hereafter from time to time be changed in writing.

Contractors are encouraged to contract with small and minority businesses, women's business enterprises, labor surplus area firms and Detroit businesses. The City strongly encourages the hiring of Detroit residents whenever possible by contacting Detroit At

Revised 12/2/2025 Page 19 of 20

Work for your hiring needs. Visit the Detroit At Work website for specific contact information regarding these opportunities.

Contractors are encouraged to employ innovative approaches, including ethically and responsibly leveraging artificial intelligence and advanced technologies, to enhance goods delivery, services, and operational performance. Vendors using AI solutions will be asked to provide information on how the AI solution functions.

5.8. OFFICE OF INSPECTOR GENERAL

5.8.1. In accordance with Section 2-106.6 of the City Charter, this Contract shall be voidable or rescindable at the discretion of the Mayor or Inspector General at any time if a Public Servant who is a party to the Contract has an interest in the Contract and fails to disclose such interest.

5.8.2. This Contract shall also be voidable or rescindable if a lobbyist or employee of the contracting party offers a prohibited gift, gratuity, honoraria or payment to a Public Servant in relation to the Contract.

5.8.3. A fine shall be assessed to the Contractor in the event of a violation of Section 2-106.6 of the

City Charter. If applicable, the actions of the Contractor, and its representative lobbyist or employee, shall be referred to the appropriate prosecuting authorities.

5.8.4. Pursuant to Section 7.5-306 of the City Charter, the Inspector General shall investigate any

Public Servant, City agency, program or official act, contractor and subcontractor providing goods and services to the City, business entity seeking contracts or certification of eligibility for City contracts and person seeking certification of eligibility for participation in any City program, either in response to a complaint or on the Inspector General’s own initiative in order to detect and prevent waste, abuse, fraud and corruption.

5.8.5. In accordance with Section 7.5-310 of the City Charter, it shall be the duty of every Public

Servant, contractor, subcontractor, and licensee of the City, and every applicant for certification of eligibility for a City contract or program, to cooperate with the Inspector General in any investigation pursuant to Article 7.5, Chapter 3 of the City Charter.

5.8.6. Any Public Servant who willfully and without justification or excuse obstructs an investigation of the Inspector General by withholding documents or testimony, is subject to forfeiture of office, discipline, debarment or any other applicable penalty.

5.8.7. As set forth in Section 7.5-308 of the City Charter, the Inspector General has a duty to report illegal acts. If the Inspector General has probable cause to believe that any Public Servant or any person doing or seeking to do business with the City has committed or is committing an illegal act, then the Inspector General shall promptly refer the matter to the appropriate prosecuting authorities.

For purposes of this Article: “Public Servant” means the Mayor, members of City Council, City Clerk, appointive officers, any member of a board, commission or other voting body established by either branch of City government or the City Charter, and any appointee, employee or individual who provides services to the City within or outside of its offices or facilities pursuant to a personal services contract.

https://urldefense.com/v3/__https:/descmiworks.org/business-services/__;!!NcXZSU8rfchoEksI!efgwb7Az7YQ1WNYz08X3skt7ah9Lt0tZnoFrliM4GlUH9iYP4Dtz_l03Xya-8iVDi2esZRdC59m0O9Xl8DlelS4a5w$

Revised 12/2/2025 Page 20 of 20

RFP Attachments List

The following Attachments are available to download on the Supplier Portal.

Attachment A - Respondent Questionnaire Attachment B - Proposal Introduction and Solution / Approach Attachment C - Pricing Attachment D - Forms, Affidavits and Documents-(Award winner only) Attachment E - Model Professional Services Contract

Section 1. Project Summary and Background
1.1. PROJECT REQUEST
1.2. BACKGROUND/DESCRIPTION OF ENVIRONMENT
1.3. AWARD CLAUSE INCLUDING RENEWAL OPTIONS
Section 2. Statement of Work
1.
2.
2.
2.1. SERVICES TO BE PERFORMED
Buildings & Structures
Construction/ISO Classifications
PROPERTY LISTING
Machinery, Furniture, and Equipment
Licensed Vehicles
Property in the Open
VALUATION METHODOLOGY
CLASSIFICATION OF ASSETS
PROJECT SCHEDULE
DELIVERABLES
PRELIMINARY REPORTS
FINAL REPORTS
3.
4.
2.2. OPERATIONAL INFORMATION
2.3. TECHNICAL INFORMATION
2.4. PAYMENT & PERFORMANCE BOND (Construction)
Section 3. Proposal Evaluation and Selection Process
3.
3.1. MINIMUM QUALIFICATIONS
3.2. ADHERENCE TO TERMS OF PROPOSALS
3.3. QUESTION DEADLINE
3.4. EVALUATION CRITERIA
3.5. EVALUATION PROCEDURE
3.6. ORAL PRESENTATION/DEMONSTRATION
3.7. REJECTIONS, MODIFICATIONS, CANCELLATIONS
3.8. PROTESTS
Section 4. Required Proposal Content and Submission Process
4.
4.1. Accuracy and Completeness of Information
4.2. REQUIRED PROPOSAL CONTENT AND FORMAT
4.3. REQUIRED COST PROPOSAL
4.4. ECONOMY OF PREPARATION
4.5. SUBMITTAL INSTRUCTIONS
All proposals must be submitted through the Bonfire/EUNA Procurement Supplier Portal at detroit.bonfirehub.com. Each Respondent is responsible for ensuring that its proposal is received by the City on a timely basis. Faxed or mailed proposals will not...
Support Channels for Technical Difficulties and Questions
Section 5. General Conditions and Requirements for RFP
5.
5.1. CONTRACT APPROVAL
5.2. PAYMENT
5.3. INVOICES
5.4. ASSIGNMENT
5.5. MODIFICATION OF SERVICES AFTER CONTRACT APPROVAL
5.6. NEWS RELEASE
5.7. MISCELLANEOUS
5.8. OFFICE OF INSPECTOR GENERAL

RFP Attachments List

File details come from the government source that posted it. Updated .