7-PRK23041-PRK26019 Addendum No. 1.pdf
PDF 240 KB Posted
- Attached to
- Rose Park Golf Course Irrigation and Turf Reduction / Nibley Park Golf Course Irrigation
- Solicitation number
- PRK23041 / PRK26019
- Issued by
- Utah
About this file
This is Addendum No. 1 to a Request for Qualifications (RFQ) issued by the City of Salt Lake City, Utah, Department of Public Services, Architecture and Construction Management Division for contractor pre-qualification on two projects: Rose Park Golf Course Irrigation and Turf Reduction (Job No. PRK23041) and Nibley Park Golf Course Irrigation (Job No. PRK26019). The work comprises demolition and removal of existing irrigation laterals and heads without disturbing playable turf, installation of new irrigation mainline, laterals and heads, excavation and construction of a new settling pond, and installation of a new pump station with corresponding piping at both golf courses. The City anticipates issuing notices to proceed in early 2027, with the preference for substantial completion of both projects by summer 2027, though the schedule is negotiable. Contractors are required to submit a proposed preliminary construction schedule as part of their pre-qualification response. The addendum was issued November 2, 2026, and bidders must acknowledge receipt of the addendum in their cover letters.
The addendum modifies the original RFQ documents, specifically revising Paragraph 3 of the Contractor Prequalification Information, Scope, and Ranking Form to reflect updated project timing and scheduling flexibility. No changes were made to other sections including the Solicitation for Prequalification of Contractors, Contractor Prequalification and Reference Form, or Contractor Prequalification General Information Form. The addendum does not address pricing terms, set-asides, funding sources, or other financial considerations, indicating these details remain as specified in the original RFQ documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT of PUBLIC SERVICES
ERIN MENDENHALL SEAN A. FYFE, AIA
MAYOR CITY ARCHITECT
ARCHITECTURE AND CONSTRUCTION MANAGEMENT DIVISION
P.O. BOX 145506
349 S 200 EAST, STE 100 WWW.SLCGOV.COM
SALT LAKE CITY, UT 84114-5506 TEL 801-535-7116 FAX 801-535-6093
November 2, 2026
ADDENDUM NO. 1 (DOCUMENT 00 91 14)
Job Name: Rose Park Golf Course Irrigation and Turf Reduction & Nibley Park Golf Course Irrigation Contractor Pre-Qualification
Job Nos.: PRK23041 & PRK26019
Attached are copies of Addendum No. 1.
Addendum No. 1 provides changes, corrections, deletions and additions to the initial Statement of Qualifications & Interest (RFQ). In case of any conflict between the RFQ and the attached Addendum, the Addendum shall govern.
The Addendum forms a part of the Contract Documents and modifies the original RFQ documents.
Acknowledge receipt of the Addendum in the Cover Letter accompanying your submission.
The Addendum consists of this cover sheet and one (1) pages of written addendum.
Sincerely, Sean A. Fyfe, AIA City Architect
SF:DW
Attachment(s) cc: Jon Ruedas, PLA, SITES AP
Darian Westrick Matt Kammeyer
Debby Newton Vault
Addendum No. 1 00 91 14 - 1
DOCUMENT 00 91 14
ADDENDUM No. 1
PART 1 GENERAL
1.1 DOCUMENT INCLUDES
A. Changes to the Statement of Qualifications and Interest (RFQ).
1.2 CONSTRUCTION CONTRACT
A. Job Name: Rose Park Golf Course Irrigation and Turf Reduction & Nibley Park Golf Course Irrigation Contractor Pre-Qualification
Job No.: PRK23041 & PRK26019
PART 2 CHANGES
2.1 CHANGES TO PRIOR ADDENDA
A. NA.
2.2 CHANGES TO DOCUMENT – SOLICIATION FOR PREQUALIFICATION OF
CONTRACTORS
A. None.
2.3. CHANGES TO DOCUMENT – CONTRACTOR PREQUALIFICATION
INFORMATION, SCOPE, AND RAKING FORM
A. Information and Instructions Paragraph 3 replaced with:
The City anticipates issuing notices to proceed for Rose Park Golf Course and Nibley Park Golf Course in early 2027. The final construction sequencing and schedule will be coordinated with the selected Contractor following contract award to establish an approach that best accommodates project needs and golf course operations. The City’s preference is for construction of both golf courses to be substantially completed in the summer of 2027, but is willing to work with the chosen contractor on a schedule. The contractor shall provide a proposed preliminary construction schedule for review in this pre-qualification stage.
2.4. CHANGES TO DOCUMENT – CONTRACTOR PREQUALIFICATION AND
REFERENCE FORM
A. None.
2.5. CHANGES TO DOCUMENT – CONTRACTOR PREQUALIFCATION GENERAL
INFORMATION FORM
A. None.
2.6 RESPONSES TO BONFIRE QUESTIONS
A. None.
END OF ADDENDUM
File details come from the government source that posted it. Updated .