This document consists of detailed engineering plans and specifications for the City of Yuma's upgrade of pavement markings at four citywide locations, prepared by the Arizona Department of Transportation (ADOT) and involving coordination with Maricopa County Department of Transportation (MCDOT). The project encompasses pavement marking improvements on 32nd Street (Avenue D to Avenue C and Avenue B to 4th Avenue), 16th Street (Avenue D to Pacific Avenue), and 3rd Street/Giss Parkway (Avenue B to Main Street). The work involves installing approximately 97,186 linear feet of white extruded thermoplastic pavement marking (0.090" thick), 139,144 linear feet of yellow extruded thermoplastic marking, 65,835 linear feet of transverse thermoplastic markings, 39 pavement legends, and 274 pavement symbols. All markings are to be applied over existing striping using 90-mil alkyd extruded thermoplastic reflectorized material. The estimated construction duration is approximately 10 working days, with traffic control maintained throughout the project to preserve at least one 11-foot lane in each direction on arterial streets. All travel lanes must remain open to traffic at the end of working hours.
The contractor shall comply with current ADOT Signing and Marking Standard Drawings (M&S-Series), the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Arizona Supplement, ADOT Traffic Control Design Guidelines (2019), and Maricopa County Department of Transportation Traffic Control Manual (2015) as applicable to each road segment. Traffic control provisions include advance warning signs, changeable message boards, flagging services, and Type C steady-burning yellow lights on barricades, with specific quantities detailed on the construction sequence sheets. The contractor is responsible for preserving all existing pavement markers, permanent signing, object markers, and milepost markers, replacing any damaged during striping operations at no additional cost. No separate payment will be made for surface cleaning and preparation. The project requires the contractor to develop traffic control plans suitable for the construction sequence and obtain engineer approval prior to installation at each work zone location.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0000 YU YUM T0419 01C
YUM-0(226)TDATA
RECORD DRAWING REC. DWG. DATE
REVISION DATES and STANDARD NO.'s REVIEW
NAME
ADOT STANDARD DRAWINGS
OF
PROJECT NO.
FEDERAL ID NO.
DATE
SIGNING & MARKING STANDARDS
1B-1 a2691 1/8/2024 7:52:41 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-October2023-Sht1_MSC.dgn
ACCELERATION LANE
PAVEMENT MARKING FOR FREEWAY PARALLEL -M-15 SHT 4 6/14
FREEWAY LANE DROP PAVEMENT MARKINGSM-17 8/20
RAISED PAVEMENT MARKER PLAN LEGENDM-19 SHT 1 8/20
NON-REFLECTIVE RAISED PAVEMENT MARKER DETAILSM-19 SHT 2 6/14
RETROREFLECTIVE RAISED PAVEMENT MARKER DETAILSM-19 SHT 3 6/14
LANE DROP MARKING AND RAMP OR INTERSECTION GUIDE STRIPINGM-19 SHT 8 5/15
PAVEMENT MARKING CROSS-SECTION DETAILS FOR HIGHWAYS AND FREEWAYSM-19 SHT 9 8/20
LONGITUDINAL RUMBLE STRIP EXCEPTION DETAILSM-22 SHT 2 9/21
ENTRANCE AND EXIT RAMPS RUMBLE STRIP INSTALLATION DETAILSM-22 SHT 3 9/21
AND LOCATION DETAILS
CENTERLINE RUMBLE STRIP GROOVE, PATTERN - M-22 SHT 4 3/22
DELINEATION DETAILS FOR MEDIAN CROSSOVERSM-27 SHT 1 2/21
DELINEATOR FOUNDATION DETAILSM-26 SHT 5 2/21
GUARDRAIL END TERMINAL DELINEATION DETAILSM-34 6/14
PAVEMENT MARKING SYMBOLSM-10 SHT 2 6/14
OFF- MAINLINE REFERENCE MARKER LOCATION DETAILM-29 6/14
BRIDGE AND BARRIER MARKER DETAILSM-32 6/14
OBJECT MARKER FOR SAND BARREL CRASH CUSHIONM-35 6/14
DELINEATOR PLACEMENT AND SPACINGM-26 SHT 1 2/21
OBJECT MARKER PLACEMENT DETAILSM-24 6/14
OFF- MAINLINE REFERENCE MARKER DETAILSM-30 6/14
BRIDGE AND BARRIER MARKER PLACEMENT AND INSTALLATION DETAILSM-33 6/14
(RPM) FOR UNDIVIDED HIGHWAYS
RETROREFLECTIVE RAISED PAVEMENT MARKERSM-19 SHT 6 6/14
FREEWAY AND DIVIDED HIGHWAY EDGE LINE AND LANE STRIPINGM-19 SHT 7 8/20
PAVEMENT MARKING DETAILS FOR UNDIVIDED HIGHWAYSM-19 SHT 5 5/15
PAVEMENT LETTERSM-8 6/14
PAVEMENT MARKING SYMBOLSM-10 SHT 1 6/14
TURN LANE PAVEMENT MARKINGSM-11 6/14
PAVEMENT NUMBERSM-9 6/14
PARALLEL ACCELERATION LANE WITH HOV BYPASS
PAVEMENT MARKING FOR FREEWAY ENTRANCE RAMP -M-15 SHT 3 8/20
RETROREFLECTIVE RAISED PAVEMENT MARKER DETAILSM-19 SHT 4 6/14
AND LOCATION DETAILS
LONGITUDINAL RUMBLE STRIP GROOVE, PATTERN -M-22 SHT 1 9/21
OBJECT MARKER DETAILSM-23 6/14
DATE
REVISION
NUMBER
STANDARD
SIGNING AND MARKING DETAILS
SUBJECT :
ADOT STANDARD DRAWINGS
FLEXIBLE DELINEATOR ASSEMBLIESM-26 SHT 3 2/21
SQUARE STEEL POST DELINEATORM-26 SHT 4 2/21
STRIPING AND DELINEATION FOR TRUCK ESCAPE RAMPSM-14 6/14
WRONG-WAY ARROWSM-12 6/14
PREFERENTIAL LANE PAVEMENT MARKINGSM-13 1/19
TAPERED ACCELERATION LANE
PAVEMENT MARKING FOR FREEWAY ENTRANCE RAMP -M-15 SHT 1 8/20
RAILROAD PAVEMENT MARKINGSM-5 6/14
WORD MARKINGSM-6 6/14
PAVEMENT LETTERSM-7 6/14
CHIP SEAL MARKER USAGE FOR TEMPORARY MARKERSM-20 SHT 2 6/14
TRANSVERSE RUMBLE STRIP DETAILSM-21 6/14
CHIP SEAL MARKER USAGE FOR TEMPORARY MARKERSM-20 SHT 1 6/14 CURB MARKINGS FOR RAISED MEDIAN AND ISLANDSM-1 6/14
INTERSECTION STRIPINGM-2 SHT 1 1/20
INTERSECTION STRIPING (TWO-LANE RURAL)M-2 SHT 2 5/15
CENTERLINE AND REVERSE CURVE DETAILSM-2 SHT 3 6/14
STRIPING AND DELINEATION FOR FREEWAY TERMINALSM-3 6/14
PASSING LANE STRIPING DETAILSM-4 6/14
EFFECTIVE JUNE 2024
(SHEET 1 OF 2)
TRAFFIC SIGNING & MARKING STANDARDS
DELINEATOR PLACEMENT AND SPACINGM-26 SHT 2 2/21
1B-1
DATE
REVISION
NUMBER
STANDARD
PARALLEL ACCELERATION LANE
PAVEMENT MARKING FOR FREEWAY ENTRANCE RAMP -M-15 SHT 2 8/20
TAPERED DECELERATION LANE
PAVEMENT MARKING FOR FREEWAY EXIT RAMPS -M-16 SHT 1 8/20
PARALLEL DECELERATION LANE
PAVEMENT MARKING FOR FREEWAY EXIT RAMP -M-16 SHT 2 8/20
SIGNING AND MARKING DETAILS
SUBJECT :
DELINEATION DETAILS FOR MEDIAN CROSSOVERSM-27 SHT 2 2/21
CONTRAST LANE LINE FOR FREEWAY AND DIVIDED HIGHWAYM-19 SHT 10 6/24
LEAD-LAG CONTRAST PAVEMENT MARKINGS FOR CONCRETE PAVEMENTM-19 SHT 11 10/23
09/24D. SMITH
1B-2 14
NAME
ADOT STANDARD DRAWINGS
DATE
SIGNING & MARKING STANDARDS
ADOT STANDARD DRAWINGS
EFFECTIVE JUNE 2024
(SHEET 2 OF 2)
TRAFFIC SIGNING & MARKING STANDARDS
MILEPOST AND REFERENCE LOCATION SIGNSS-10 6/14
TAPERED TUBE SIGN STRUCTURE SINGLE BEAMS-11 SHT 1 11/22
SIGN INSTALLATION ON POLE BAND-TYPE CLAMPS-9 SHT 4 8/22
48, 60 AND 72 INCH WIDTHS
THREE POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 7 6/14
WARNING SIGN ASSEMBLY - SINGLE POSTS-3 SHT 9 6/14
WARNING SIGN ASSEMBLY - THREE POSTS-3 SHT 11 6/14
84 - 144 INCH WIDTHS
THREE POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 8 6/14
W SHAPE BREAKAWAY POST FUSE PLATE AND HINGE DETAILSS-4 6/14
SIGN INSTALLATION ON SIGNAL POLES-9 SHT 3 8/22
DATE
REVISION
NUMBER
STANDARD
SIGNING AND MARKING DETAILS
SUBJECT :
STRINGER DETAILS FOR SQUARE TUBE POSTSS-3 SHT 14 6/14
MULTIPLE ROUTE MARKER ASSEMBLIESS-3 SHT 12 6/14
SPECIAL SIGN ASSEMBLIESS-3 SHT 13 6/14
SQUARE TUBE SIGN POST FOUNDATIONS-3 SHT 15 6/14
36, 42 AND 48 INCH WIDTHS
TWO POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 4 6/14
54, 60 AND 72 INCH WIDTHS
TWO POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 5 6/14
84 - 144 INCH WIDTHS
TWO POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 6 6/14
GENERAL SIGNING NOTESS-1 SHT 1 4/19
S & W BREAKAWAY POST SELECTION CHARTS-2 SHT 1 6/14
S & W BREAKAWAY POST INSTALLATION DETAILSS-2 SHT 2 6/14
FLAT SHEET SIGNS SQUARE TUBE POST GENERAL NOTESS-3 SHT 1 6/14
12, 18 AND 24 INCH WIDTHS
SINGLE POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 2 6/14
30, 36, 42 AND 54 INCH WIDTHS
SINGLE POST FLAT SHEET RECTANGULAR SIGN ASSEMBLY -S-3 SHT 3 6/14
SQUARE TUBE POST SLIP BASE DETAILSS-3 SHT 16 6/14
S4x7.7 BREAKAWAY POST DETAILSS-6 6/22
ALUMINUM EXTRUSION SIGN PANEL DETAILSS-7 SHT 1 6/14
W SHAPE BREAKAWAY POST DETAILSS-5 6/22
ALUMINUM EXTRUSION AUXILIARY SIGN INSTALLATION DETAILSS-7 SHT 2 6/14
ALUMINUM EXTRUSION EXIT PANEL INSTALLATION DETAILS-7 SHT 3 5/15
FLAT SHEET ALUMINUM PANEL ON BREAKAWAY POSTS INSTALLATION DETAILS-8 SHT 1 6/14
ALUMINUM EXTRUSION SIGN TO PERFORATED POSTS INSTALLATION DETAILS-8 SHT 2 6/14
SIGN INSTALLATION ON POLES-9 SHT 1 8/22
TAPERED TUBE SIGN STRUCTURE SINGLE BEAM POST AND BEAM DETAILSS-11 SHT 2 4/19
WARNING SIGN ASSEMBLY - TWO POSTS-3 SHT 10 6/14
SIGN IDENTIFICATION DETAILSS-13 6/14
TYPE C AND D ARROWSS-12 SHT 2 6/14
C2 ARROW DETAILS-12 SHT 3 6/14
TYPE A, B, AND DOWN ARROWSS-12 SHT 1 6/14
DATE
REVISION
NUMBER
STANDARD
SIGNING AND MARKING DETAILS
SUBJECT :
ROTATING OPEN/CLOSED SIGNS-14 SHT 1 6/14
ROTATING OPEN/CLOSED SIGN DETAILSS-14 SHT 2 6/14
ROTATING OPEN/CLOSED SIGN MOUNTING DETAILS S-14 SHT 3 6/14
FOLDING RECTANGULAR SIGN ASSEMBLYS-15 SHT 1 6/14
FOLDING DIAMOND SIGN ASSEMBLYS-15 SHT 3 6/14
FOLDING RECTANGULAR SIGN OPERATIONS-15 SHT 2 6/14
TEMPORARY WOOD POSTS SELECTION CHARTS-16 SHT 2 4/19
TEMPORARY WOOD POSTSS-16 SHT 1 4/19
ALUMINUM GRAFFITI SHIELD SPLICE PLATES-18 SHT 5 7/19
ALUMINUM GRAFFITI SHIELD SIDE PANELS-18 SHT 8 7/19
ALUMINUM GRAFFITI SHIELD CORNERS-18 SHT 4 7/19
ALUMINUM GRAFFITI SHIELD FINS-18 SHT 6 7/19
PRECAST CONCRETE BARRIER STRUCTURAL DETAILSC-3 SHT 1 6/14
SAND BARREL CRASH CUSHION TYPICAL INSTALLATIONC-2 12/18
SAND BARREL CRASH CUSHIONC-1 12/18
ALUMINUM GRAFFITI SHIELD SPLICE PLATE FOR FINS-18 SHT 11 7/19
ALUMINUM GRAFFITI SHIELD LEFT TRANSITION FROM RIDERS-18 SHT 10 7/19
ALUMINUM GRAFFITI SHIELD RIGHT TRANSITION FROM RIDERS-18 SHT 9 7/19
PRECAST CONCRETE BARRIER PIN AND LOOP ASSEMBLYC-3 SHT 2 6/14
MEDIAN CROSSOVERC-4 SHT 1 6/14
BARRIER (TCB)
TYPICAL END TREATMENTS FOR DETOURS USING TEMPORARY CONCRETEC-4 SHT 2 6/14
BARRIER
APPROACH PLATE AND TRANSITION SECTION FOR TEMPORARY CONCRETEC-5 SHT 1 6/14
BARRIER
APPROACH PLATE AND TRANSITION SECTION FOR TEMPORARY CONCRETEC-5 SHT 2 6/14
END OF ROAD BARRICADES-17 6/14
ALUMINUM GRAFFITI SHIELD RIGHT RIDER SIDE PANELS-18 SHT 2 7/19
ALUMINUM GRAFFITI SHIELD EXIT AND GUIDE SIGN ASSEMBLYS-18 SHT 1 7/19
ALUMINUM GRAFFITI SHIELD TOP PANELS-18 SHT 7 7/19
ALUMINUM GRAFFITI SHIELD LEFT RIDER SIDE PANELS-18 SHT 3 7/19
SIGNS (BACK TO BACK) INSTALLATION ON POLES-9 SHT 2 8/22
1050 W. WASHINGTON STREET SUITE 114
TEMPE, ARIZONA 85288 T0419 01C
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
LOCATION
TRACS NO. OF
NO.
SHEET
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
ARIZ.
F.H.W.A. Arizona Division
MILEPOST
STRUCTURE NO.
0000 YU YUM YUM-0(226)T
S. LICARI
S. LICARI
D. SMITH
DESIGN DATA SHEET
Avenue B to Main St
Avenue D to Pacific Ave
Avenue B to 4th Ave
Avenue D to Avenue C
INDEX OF SHEETS
Sheet TypeSheet No. Dwg. No.
GENERAL NOTES
GENERAL
No survey data was collected for this project
TRAFFIC
T-01.03-
9-14
4-5
1B-1, 1B-2
T-02.02
T-02.01
T-01.04
T-01.02
T-01.01
G-01.01
Standard Drawings
Pavement Marking Quantity Summary
Pavement Marking General Notes & Quantities
Roundabout Special Detail
Traffic Control Sequence
Traffic Control General Notes, Quantities, & Advance Warning Detail
Design Data Sheet
ADOT Standard Drawings
Face Sheetthis project.
No new right-of-way and easements are required for
Stake Laws and Section 107.15 of the Specifications.
The contractor shall comply with all current Blue
LENGTH OF PROJECT
3rd St/Giss Parkway
16th Street
32nd Street pavement marking plans.
Marking Standard Drawings (M&S-Series) and the in accordance with the current edition of the Signing and
The project roadway shall be striped by the contractor
MIDPOINT OF PROJECT
State Plane Coordinates
West Zone
Y=619,000
X=428,270
= 49,688' = 9.41 Miles
= 10,111'
= 26,369'
= 7,900'
= 5,308'
DESIGN DATA
4th Ave to Main St
Avenue B to 4th Ave
I-8 to Pacific Ave
Avenue D to I-8
Avenue A to 4th Ave
Avenue D to Avenue A
45mph
35mph
35mph
25mph
35mph
40mph
Posted Speed
3rd St/Giss Parkway
16th St
32nd St
G-01.01
2 14
.A.S.U ,ANOZI
RA
)l i vi C( r e e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
ENGINEERING DEPARTMENT
UPGRADE PAVEMENT MARKING 4 CITYWIDE LOCATIONS
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
D. SMITH
S. LICARI
S.GENTILE
& ADVANCE SIGNING DETAIL
GENERAL NOTES, QUANTITIES
TRAFFIC CONTROL
UNITELEMENT OF WORK
ESTIMATED DURATION
WARNING
ADVANCE
10WORKING DAYS
APPROXIMATE TRAFFIC CONTROL QUANTITIES *
item 7010005 Maintenance and Protection of Traffic.
under basis sum lump a on for paid be shall traffic protecting and maintaining for table this in shown not Items
Hour
Hour
Each-Day
Each-Day
Flagging Services (Uniformed Officer)
Flagging Services (Civilian)
Changeable Message Board (Contractor Furnished)
Truck-Mounted Attenuator or as directed by the Engineer.
17. Adjustments to the details of these traffic control plans and requirements and construction sequence may be necessary due to construction activities
6, 2009 Edition, Arizona Supplement to the 2009 MUTCD, and the ADOT Traffic Control Design Guidelines, 2019.
(MUTCD), Part construction. Traffic control plans and devices are to be prepared in accordance with the Manual on Uniform Traffic Control Devices control plan in accordance with Section 701 of the Specifications. The traffic control plan is subject to the approval of the Engineer before beginning
The construction sequence plan represents a suggested method for traffic control during construction. The contractor may prepare another traffic 16.
15. All drawings are schematic only and not to scale.
14. The contractor shall not utilize a flashing arrow panel in connection with any shifting taper.
13. When traffic control devices are not in use, they shall be moved behind the sidewalk and turned away from approaching traffic.
equivalent or greater than the reflective area of a Type 2 barricade.
12. The contractor may substitute Type 1 barricades for Type 2 barricades as long as the reflective area on the top panel of each Type 1 barricade is
"ROAD WORK AHEAD" and "SHOULDER WORK AHEAD" sign as directed by the Engineer to alert the public to the construction activities.
Where no closure is necessary but where there is construction alongside a roadway under construction, the contractor shall place a 48 x 48 inch 11.
10. Speed limit signing is preliminary and is subject to review and change by the Engineer as dictated by field conditions.
All construction signs shall have black letters on a fluorescent orange background, except as otherwise noted.9.
completion of construction activities.
as included in the price of the traffic control work. No further compensation will be made. These signs shall be removed within 24 hours after the earlier, but shall be covered or turned away from traffic until the start of work. The cost of covering or turning the traffic control signs shall be considered
Construction signs shall not be displayed to traffic more than 24 hours prior to the actual start of construction. The traffic control signs may be placed 8.
Channelizing devices shall be placed per specifications in MUTCD Section 6F.63.7.
Type C steady-burning yellow lights shall be mounted on every barricade.6.
Type A flashing warning lights shall be required on all nighttime construction signs except the "END ROAD WORK THANK YOU" sign.5.
Flags shall be mounted on top of all construction signs except the "END ROAD WORK THANK YOU" sign. 4.
Short-term signs may be installed on spring stands, at the height recommended by the spring stand manufacturer.3.
The retroreflective sheeting on all construction signs shall meet criteria established in Section 1007 of the Specifications.2.
shall be replaced by the contractor at no additional cost to the Department.
shall be considered included in the price of the Traffic Control bid items. No further compensation will be made. Any items damaged by the contractor store and reinstall items which have been removed or relocated in a manner approved by the Engineer. The cost for removal or relocation of covering
All existing signs in conflict with the construction signs shall be removed, relocated, or covered in place, as directed by the Engineer. The contractor shall 1.
TRAFFIC CONTROL NOTES:
QUANTITIES
TOTAL
1 & 2
ACTIVITIES
500'
500'
3rd St / Giss Pkwy
16th St
32nd St
A rt e ri a l/
C o ll e c to r C ro s s S tr e e t
2 1
1 2
Begin Work Zone
End Work Zone
500'
X X
X X
X
X X
X X
X
500'
X X
X X
X
X X
X X
X
(48"x36")
G20-2AZ
(36"x36") W20-1
1 2
SYMBOL LEGEND:
Sign on Spring Stand
XXXXX
XXXXX
Changeable Message Board (CMB)
Work Zone
T-01.01
.A.S.U ,ANOZI
RA
)l i e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
S. LCARI
S. LICARI
D. SMITH
SHEET 1 OF 2
CONSTRUCTION SEQUENCE
MAINTENANCE OF TRAFFIC
plans.
During construction activities complete all work in area not otherwise scheduled in these construction sequence4.
Close left and right turn lanes where appropriate utilizing sign R3-1 or R3-2. Space channelizing devices at 40'.6.
9:00 AM to 3:00 P.M. and between 9:00 PM to 5:00 A.M. unless otherwise approved by the Engineer.
Except during work hour restrictions as shown in the Special Provisions, lane restrictions are permitted between5.
Traffic Control Design Guidelines, 2019 edition.
ADOT supplement to the 2009 MUTCD. All references to "TTCDG" are to the Arizona Department of Transportation All references to "MUTCD" are to Part 6, Manual on Uniform Traffic Control Devices, 2009 edition and the2.
implementation.
requirements of the specifications. All revised traffic control plans shall be approved by the Engineer prior to shall develop traffic control plans suitable for the revised sequence of construction in accordance with the This construction sequence is not mandatory. If the contractor elects to deviate from this plan, the contractor1.
design and shall design and obtain design approval for each location from the engineer prior to installation.
The contractor shall identify all work zone access points, obtain approval from the engineer before beginning3.
MOT & Construction Sequence Notes:
COMMENTSTRAFFIC CONTROLCONSTRUCTION ACTIVITY
ACTIVITY
1 Install advance warning signs and devices
MAINTENANCE OF TRAFFIC & CONSTRUCTION SEQUENCE *
Partially close intersection per Figure 6H-24 of the MUTCD intersections
Install stop bars and crosswalk striping at arterial and signalized
Provide advance warning per detail shown on sheet T-01.01
Maintain traffic in all existing travel lanes
Temporary signs are to be placed on spring stands for the entire duration of the project
WORK AT INTERSECTIONS
Maintain at least one 11' lane in each direction on arterial streets
All travel lanes shall be open to traffic at the end of working hours
ADOT TTCDG, 2019
For roads in the ADOT system, partially close intersection per Figure SA-2 of the
TC-403 of the MCDOT Traffic Control Manual, 2015
For roads not in the ADOT system, partially close intersection per Typical Application streets with one lane in each direction
Install stop bars and crosswalk striping on local or collector cross
Maintain at least one 11' lane in each direction on arterial streets
All travel lanes shall be open to traffic at the end of working hours
4TH AVENUE
AVENUE B
ARIZONA AVE.
45TH AVENUE
AVENUE D
AVENUE A
45TH AVENUE
AVENUE D
FROM
MAIN ST.
4TH AVENUE
PACIFIC AVE.
ARIZONA AVE.
45TH AVENUE
4TH AVENUE
AVENUE C
45TH AVENUE
TO
2 LANES
1 LANE
3 LANES
2 LANES
1 LANE
2 LANES
1 LANE
RAISED
NONE
RAISED
STRIPED
NONE
STRIPED
STRIPED
STRIPED
GISS PARKWAY3RD ST. /
16TH ST.
32ND ST.
EACH DIRECTION
NO. OF LANES
TYPE
MEDIAN
PROJECT SEGMENT LANE SUMMARY
Three lanes begin West of intersection with Arizona Avenue and one EB lane with a striped median.
32nd St. between Avenue D and 45th Avenue consists of two WB lanes of medians and traveled way widths
Contractor shall determine limits of traffic control based on actual limits
Note: Limits of medians and number of traveled lanes are approximate.
COMMENTSTRAFFIC CONTROLCONSTRUCTION ACTIVITYACTIVITY
1 Install advance warning signs and devices
MAINTENANCE OF TRAFFIC & CONSTRUCTION SEQUENCE *
Partially close roundabout per detail on sheet T-01.04Install all striping in the closed quadrant of the intersection
Provide advance warning per detail shown on sheet T-01.01
Maintain traffic in all existing travel lanes
Temporary signs are to be placed on spring stands for the entire duration of the project
WORK AT GISS PKWY ROUNDABOUT
Maintain at least one 11' lane for travel in alternating directions
All travel lanes shall be open to traffic at the end of working hours
T-01.02
.A.S.U ,ANOZI
RA
)l i e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
S. LICARI
S. LICARI
D. SMITH
SHEET 2 OF 2
CONSTRUCTION SEQUENCE
MAINTENANCE OF TRAFFIC
COMMENTSTRAFFIC CONTROLCONSTRUCTION ACTIVITY
ACTIVITY
1 Install advance warning signs and devices
MAINTENANCE OF TRAFFIC & CONSTRUCTION SEQUENCE *
Transportation (MCDOT) Traffic Control Manual, 2015
Close right lane per Typical Application TC-223 of the Maricopa County Dept. of Install white edge line striping (where present)
Provide advance warning per detail shown on sheet T-01.01
Maintain traffic in all existing travel lanes
Temporary signs are to be placed on spring stands for the entire duration of the project
1 LANE EACH DIRECTION WITH STRIPED MEDIAN
Maintain at least one 11' lane in each direction on arterial streets
All travel lanes shall be open to traffic at the end of working hours
MCDOT Traffic Control Manual, 2015
Close center lane per Typical Application TC-222 or Typical Application TC-223 of the Install yellow median line striping
Maintain at least one 11' lane in each direction on arterial streets
All travel lanes shall be open to traffic at the end of working hours
COMMENTSTRAFFIC CONTROLCONSTRUCTION ACTIVITY
ACTIVITY
1 Install advance warning signs and devices
MAINTENANCE OF TRAFFIC & CONSTRUCTION SEQUENCE *
"Keep Right" signs assumed in quantities)
Close right lane per Figure SA-5(R) of the ADOT TTCDG, 2019. (Optional R4-8a Install white lane line striping between the middle and right-most lanes
Provide advance warning per detail shown on sheet T-01.01
Maintain traffic in all existing travel lanes
Temporary signs are to be placed on spring stands for the entire duration of the project
3 LANES EACH DIRECTION WITH RAISED MEDIAN
2 LANES EACH DIRECTION WITH RAISED MEDIAN
Maintain at least one 11' lane in each direction on arterial streets (two lanes in each direction)
All travel lanes shall be open to traffic at the end of working hours
"Keep Right" signs assumed in quantities)
Close left lane per Figure SA-5(L) of the ADOT TTCDG, 2019. (Optional R4-7a Install white lane line striping between the middle and left-most lanes
Maintain at least two 11' lane in each direction on arterial streets (three lanes in each direction)
All travel lanes shall be open to traffic at the end of working hours
COMMENTSTRAFFIC CONTROLCONSTRUCTION ACTIVITY
ACTIVITY
1 Install advance warning signs and devices
MAINTENANCE OF TRAFFIC & CONSTRUCTION SEQUENCE *
Close lane per Figure 6H-10 of the MUTCD centerline striping
Install one direction of white edge line striping (where present) and
Provide advance warning per detail shown on sheet T-01.01
Maintain traffic in all existing travel lanes
Temporary signs are to be placed on spring stands for the entire duration of the project
1 LANE EACH DIRECTION WITH NO MEDIAN
* See Standard Specifications and Special Provisions Section 104 for construction activity restrictions. Construction activities and traffic control shall be adjusted to accomodate restrictions.
Maintain one 11' lane for travel in alternating directions
All travel lanes shall be open to traffic at the end of working hours.
3 Close lane per Figure 6H-10 of the MUTCD, 2023Install white lane line striping in the opposing direction (where present)
Maintain one 11' lane for travel in alternating directions
All travel lanes shall be open to traffic at the end of working hours.
COMMENTSTRAFFIC CONTROLCONSTRUCTION ACTIVITY
ACTIVITY
1 Install advance warning signs and devices
MAINTENANCE OF TRAFFIC & CONSTRUCTION SEQUENCE *
"Keep Right" signs assumed in quantities)
Close right lane per Figure SA-5(R) of the ADOT TTCDG, 2019. (Optional R4-8a Install white edge line striping (where present)
Provide advance warning per detail shown on sheet T-01.01
Maintain traffic in all existing travel lanes
Temporary signs are to be placed on spring stands for the entire duration of the project
2 LANES EACH DIRECTION WITH STRIPED MEDIAN
Maintain at least one 11' lane in each direction on arterial streets
All travel lanes shall be open to traffic at the end of working hours
"Keep Right" signs assumed in quantities)
Close left lane per Figure SA-5(L) of the ADOT TTCDG, 2019. (Optional R4-7a Install yellow median line striping and dashed line striping
Maintain at least one 11' lane in each direction on arterial streets
All travel lanes shall be open to traffic at the end of working hours
T-01.03
.A.S.U ,ANOZI
RA
)l i e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
ROUNDABOUT SPECIAL DETAIL
MAINTENANCE OF TRAFFIC
D. SMITH
S. LICARI
S. LICARI
T-01.04
.A.S.U ,ANOZI
RA
)l i e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
S. LICARI
S. LICARI
D. SMITH
GENERAL NOTES & QUANTITY SUMMARY
PAVEMENT MARKING
Pavement Marking Notes
Dotted Guide Lines on ADOT roads shall be 6" wide (deviation from Yuma Std. 10-025) reimbursed under item 7040074 Pavement Symbol (Extruded Thermoplastic)(Alkyd)(0.090") for the thermoplastic arrows.
Each thermoplastic single arrow will be reimbursed as a single symbol regardless of the size or configuration of the arrow(s). Each symbol will be that may be damanged as part of the striping operation at no cost to the Department.
The Contractor shall preserve all existing pavement markers on the roadway. The Contractor shall be responsible for replacing all pavement markers
All dimensions are in feet unless otherwise noted on the plans or detail drawings.
The Engineer may modify the pavement markings.
The Contractor shall preserve all roadway permanent signing, object markers, and milepost markers.
thermoplastic pavement markings. No separate payment will be made for cleaning and preparing the roadway surface.
of all pavement markings. The roadway surface shall be dry and the air and pavement temperatures shall not be less than 55° F for the placement of
The Contractor shall clean the roadway surface to the satisfaction of the Engineer, by sweeping and air-jet blowing, immediately prior to the placement as directed by the Engineer.
The new pavement markings shall be 90 mil (0.090 inch) thick Alkyd Extruded Thermoplastic reflectorized striping placed over the existing striping or marking unless directed otherwise by the Engineer.
There will be no pavement marking plans as part of this project. The new striping, lines, legend, and symbols shall be overtop the existing pavement
9.
8.
7.
6.
5.
4.
3.
2.
1.
APPROXIMATE PAVEMENT MARKING QUANTITIES
* Pavement marking pay quantity based on equivalent 4" wide stripe unless otherwise noted
ITEM DESCRIPTION
PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090")
PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090")
PAVEMENT MARKING (TRANSVERSE) (THERMOPLASTIC) (ALKYD) (0.090")
PAVEMENT LEGEND (EXTRUDED THERMOPLASTIC) (ALKYD) (0.090")
PAVEMENT SYMBOL (EXTRUDED THERMOPLASTIC) (ALKYD) (0.090")
BID ITEM
7040005
7040006
7040072
7040073
7040074
TOTAL
64,090
92,683
19,020
PAY QUANTITY
97,186*
139,144*
65,835*
UNIT
L. FT.
L. FT.
L. FT.
EACH
EACH
Exst 4" Stripe
New 6" Stripe new and exst stripes Maintain exst separation between
(TYP)
2"
TYPICAL SECTION
DOUBLE YELLOW STRIPE APPLICAITON
(SHARK TOOTH) DETAIL
YIELD LINE
24"
Solid White Fill
36"
Match Exst Spacing
12"
T-02.01
.A.S.U ,ANOZI
RA
)l i e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
09/24
09/24
09/24
DWG NO.
DESIGN
DRAWN
DATE
CHECKED
NAME
ROUTE
SHEETS
TOTAL
RECORD DRAWINGPROJECT NO.STATE
S. LICARI
S. LICARI
D. SMITH
QUANTITY SUMMARY
PAVEMENT MARKING
Striping Quantity Notes southern, respectively).
Cross-street crosswalks, stop bars, and cat tracks at intermediate segment intersections were included in the following sequential segment (eastern or
Only cross-walk striping and stop bars on cross streets are included in these quantities.
Crosswalk striping at HAWK on 32nd St. west of Avenue A is omitted from these quantities.
Striping on 16th St. within ADOT maintenance limits (bridge over I-8) is omitted from these quantities. Limits are approximately 60' from the stop bars.
4.
3.
2.
1.
T-02.02
.A.S.U ,ANOZI
RA
)l i e ni gn E l anoisseforP d e r e t si g e
R
O
N
ETACIFITR
E C
SMITH
DEREK
67086 den gi
S e t a D
5 16
CITY OF YUMA
YUMA STANDARD DRAWINGS
CONSTRUCTION STANDARDS
a2691 8/1/2023 12:53:39 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-November2022-Sht1_MSC.dgn
9 14 a2691 8/1/2023 12:53:39 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-November2022-Sht1_MSC.dgn
10 14 a2691 8/1/2023 12:53:39 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-November2022-Sht1_MSC.dgn
11 14
MCDOT STANDARD DRAWINGS
a2691 8/1/2023 12:53:39 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-November2022-Sht1_MSC.dgn
12 14
MCDOT STANDARD DRAWINGS
a2691 8/1/2023 12:53:39 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-November2022-Sht1_MSC.dgn
13 14
MUTCD STANDARD DRAWINGS
a2691 8/1/2023 12:53:39 PM Z:\AZDOT\Configuration\WorkSpaces\AZDOT-2021R1\WorkSets\Test_WorkSet\dgn\Traffic\1B-November2022-Sht1_MSC.dgn
14 14
| A-00.02 T0419-1B-1 |
| A-00.03 T0419-1B-2 |
| G-01.01 T0419GN01 |
| T-01.01 T0419TC01 |
| T-01.02 T0419TC02 |
| T-01.03 T0419TC03 |
| T-02.01 T0419SS01 |
| T-02.02 T0419SS02 |
File details come from the government source that posted it. Updated .