This is a specifications document prepared by the California Department of Developmental Services for the replacement of electrical transformers at Porterville Developmental Center, a state facility located in Porterville, California. The project involves furnishing and installing medium voltage (MV) transformers, electrical conduit, fittings, wire, and associated electrical infrastructure across multiple buildings. Specifically, the work includes replacing existing interior oil and dry-type transformers with exterior pad-mounted units at Buildings 7, 8, 9, 10, 16, and 17 on South Circle Drive; Buildings 21 and 22 on North Sequoia Drive; and Buildings 25 and 26 on Sequoia Drive (the latter two as bid alternates). The contractor must supply all labor, materials, tools, and equipment necessary to complete the installation, including demolition and removal of existing transformers, installation of new concrete pads, trenching and backfilling, sprinkler repair, temporary generator power to maintain electrical service during work, and comprehensive testing and startup of all equipment. Required submittals include product identification and sources, certificates of compliance, manufacturer's samples and specifications, material safety data sheets, proof of contractor training and qualifications, work schedules with progress dates, and equipment specifications submitted within ten calendar days of contract approval and before equipment is ordered.
The contractor must comply with the 2022 California Energy Code, 2022 California Building Code, 2022 California Electric Code, and 2022 Fire Code, with reference to ANSI, ASTM, IEEE, ICEA, NECA, NEMA, NFPA, and UL standards. The project is located at Porterville Developmental Center, a secure treatment area requiring contractor fingerprinting at a cost of $49 per person, daily check-in procedures, contractor ID badges worn at all times, and vehicle security protocols. Work requires coordination with the Chief of Plant Operations III at least 72 hours prior to planned power outages, and the contractor must develop and submit a work sequence schedule minimizing outages for approval before commencing work. The contractor is responsible for all equipment, materials, and tools and must maintain comprehensive daily progress reports, permit state inspections at any time, and provide separate testing and inspection notifications with minimum two business days' notice (three business days for State Fire Marshal presence). All work must be completed to first-class standards consistent with best trade practices by skilled workers, with the installation performed by firms regularly engaged in institutional power systems and medium to high voltage switchgear installation. Upon completion, the contractor must submit as-built drawings and operation and maintenance manuals (three copies each) and provide training on the use and maintenance of all newly installed equipment. All work is warranted free from defects in workmanship and materials for two years following acceptance, or per manufacturer's warranty if longer, with warranty registrations completed by the contractor and sent to the manufacturer for the facility.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5_-_IFB_Exhibit_B_-_GTC__2-2025_.pdf | ||
| 3_-_IFB_Instructions_To_Bidders__new_-_nb_.doc | DOC document | |
| 9_-_PDC_Map_with_Directions.docx | DOCX document | |
| 8_-_IFB_Exhibit_E_-_Plans_Link_Doc.docx | DOCX document | |
| 6_-_IFB_Exhibit_C_-_Special_Cond__rev_2-21-25_.doc | DOC document | |
| 4_-_IFB_Exhibit_A_-_Bid_Proposal__Reg_.docx | DOCX document | |
| 1_-_IFB_Invitation_For_Bid.doc | DOC document | |
| 2_-_IFB_Notice_To_Contractors.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Porterville Developmental Center
Address: 26501 Avenue 140 Porterville, California 93258
SPECIFICATIONS
Department of Developmental Services
Project No. : 25 SR #2 / PR259203 Project Title:
Replace Electrical Transformers:
(Buildings 7, 8, 9, 10, 16, 17 South Circle Drive) (Buildings 21 & 22 North Sequoia Drive) (Buildings 25 & 26 Sequoia Drive)
| PORTERVILLE DEVELOPMENTAL CENTER |
| Plant Operations |
25 SR #2 SPECIFICATIONS
REPLACE ELECTRICAL TRANSFORMERS EXHIBIT D
I. GENERAL
A. Scope of Work:
Contractor to furnish all labor, materials, tools, equipment, and transportation necessary to install MV transformers, electrical conduit, fittings, and wire. All materials including load break elbows, load break junctions, and bushing caps to be new.
B. Location:
The project is located at Porterville Developmental Center, 26501 Avenue 140, Porterville, CA 93257, specifically Buildings 7, 8, 9, 10, 16, 17, South Circle Drive, 21 & 22 North Sequoia Drive and 25 & 26 Sequoia Drive as Additive Alternates.
C. Reference Codes and Standards:
The reference documents below (latest edition unless otherwise indicated), form a part of these specifications and are in the Plant Operations Office for referral.
2022 California Energy Code 2022 CBC California Building Code 2022 CEC California Electric Code 2022 Fire Code
| D. | Work Required: | |
| 1. Contractor to supply and install engineered electrical upgrades, transformers, underground conduits, etc. as shown and as specified. |
E. Required Submittals:
All information listed below shall be submitted in electronic format to the Chief of Plant Operations III or designee within 10 calendar days of the approval of the contract. No work shall begin prior to the submission/approval of this information.
| 1. | Identification and listing of all products and sources. | ||
| 2. | Certificate of Compliance for all materials used on this contract. | ||
| 3. | Manufacturer's samples, specifications & written Material Safety Data Sheets for each product. (If applicable) | ||
| 4. | System manufacturer's certification that the contractor has the training and qualifications to install the manufacturer's product. | ||
| 5. | Schedule of how the contractor proposes to accomplish the work and progress dates. | ||
| 6. | Equipment Submittals: Manufacturer’s specs of equipment will be provided for review to CPO III or designee 10 days following bid approvals, and before equipment is ordered for installation. | ||
| F. | Materials: | ||
| Contractor to provide and turn over to PDC the following equipment. |
1. Fuses – 3 of each type/size used.
2. Load Break Elbows – 12 of each type/size used.
3. Load Break Junctions – 3 of each type/size used.
4. Load Break Bushing Caps – 12 each
5. Fault Indicators – 24 each
II. CONTRACTOR QUALIFICATIONS/WORKMANSHIP
Work shall be performed by skilled workers and shall result in an installation consistent with the best trade practices. References – Contractors using qualified subcontractors will be responsible for their performance. Installation will be performed by firms regularly engaged in the installation of institutional power systems, medium to high voltage switch gear.
III. PROJECT REPORTING, TESTING AND INSPECTIONS
Contractor will make daily progress reports and immediately report any abnormalities to the Chief of Plant Operations III, or his designee. Contractor shall at all times permit the State, its agents, officers and employees to visit the Project site and inspect the Work, including shops where the work is in preparation. This obligation shall include maintaining proper facilities and safe access for such inspection. Including, but not limited to providing lifts, ladders, scaffolds, platforms and paths of travel. When the Contract Documents require a portion of the Work to be tested, such portion of the work shall not be covered up until inspected and approved by the State. The Contractor shall be solely responsible for notifying the State where and when the work is ready for inspection and testing and shall give written notice no fewer than two business days prior to the time of inspection. For inspections that require State Fire Marshal’s (SFM) presence, the Contractor shall provide the State’s Inspector of Record (IOR) written notice where and when the work is ready for inspection no fewer than three business days prior to the time of inspection. Should any work be covered without the required testing and approval, such work shall be uncovered and recovered at the Contractor’s expense.
IV. MAINTAINING EXISTING SERVICES
PDC client residences and ancillary buildings will require constant electrical services. The existing electrical systems switch gear must remain in service until the new system is capable of being online. Down time for electrical tie-in will be coordinated with the Chief of Plant Operations III, or his designee, to ensure the facilities security systems are operational. Affected buildings will require portable power generators. PDC staff will supervise the portable generator tie-in.
V. PROPER EQUIPMENT
Contractor shall provide all equipment to properly complete project, complying with all standards, codes and regulations.
VI. JOB SITE DAMAGE
Contractor shall utilize caution to prevent damage to building structure and adjacent areas of stored goods protected from water damage. The job site will be kept clean of debris and demolished equipment will be properly removed and disposed of daily to prevent hazards to clients and staff. The job site will require safety barriers to ensure client safety during construction and thoroughly cleaned at project completion.
VII. SECURITY – SAFETY
Contractor or tradesmen will be required to check-in at PDC Plant Operations daily before and after each workday. Contractor ID badges are required and will be issued by PDC Office of Protective Services to ensure security while on facility grounds. ID badges must be worn at all times above the waist while on grounds. Keys for access will be issued by PDC Plant Operations and returned daily. Temporary fencing of work area and lay down area will be required. Temporary restroom and hand washing facility will be required. All vehicles and staff are subject to search by PDC Facility Police when entering or exiting the STA (Secure Treatment Area) through the sally port to ensure safety and compliance.
Contractor is required to secure vehicles, equipment, materials, and tools at all times while working in the STA. Vehicles and service bodies shall be locked at all times. Loose materials shall be stored inside temporary fencing or lay down area. Lay down area will be provided and designated by PDC outside of the STA.
Contractors, subcontractors, and all other individuals working at PDC must be fingerprinted. The contractor will be required to pay $49.00 per person to process the fingerprinting at PDC. The PDC Project Manager will advise the contractor of the fingerprinting process.
VIII. ELECTRICAL
All electrical wiring will be installed by contractor in approved raceway or conduit, (electrical specifications attached).
IX. ISOLATION FLOOR MOUNTING
Contractor will secure equipment to concrete floor with approved vibration isolators and seismic hanger supports and/or bolts.
| X. | SYSTEMS TEST |
| A. | Test electrical systems switch gear per manufactures recommendation to ensure power transfer equipment is functional. Tests will be conducted under supervision of Project Manager. Provide report of findings in triplicate to Chief of Plant Operations III, or his designee. |
| B. | Demonstrate start-up, operation, controls adjustment, and servicing methods to Porterville Developmental Center Plant Operations personnel responsible for system function. |
XI. WARRANTIES/GUARANTEES
A. Contract to be free from defects of workmanship and materials for a period of two years after completion and acceptance by Chief of Plant Operations III, or designee.
B. If manufacturer warranties exceed those listed in A above, then provide manufacturer’s warranty. All warranty registrations shall be completed by contractor and sent to manufacturer for Porterville Developmental Center. Provide copies of completed warranty registration.
C. Warranty shall start on the day of acceptance of the completed project.
PORTERVILLE DEVELOPMENTAL CENTER
25SR #2
REPLACE MEDIUM VOLTAGE ELECTRICAL VAULTS
SPECIFICATIONS
FINAL CONSTRUCTION DOCUMENTS
Signed: 3/31/26 Electrical Engineer
California State Fire Marshal
Approval of this specification does not authorize or approve any omission or deviation from applicable regulations. Final approval is subject to field inspection. One set of approved specifications shall be available at the project site at all times.
SECTION 00 01 10
TABLE OF CONTENTS
PORTERVILLE DEVELOPMENTAL CENTER
25 SR #2
REPLACE ELECTRICAL TRANSFORMERS
SPECIFICATIONS TABLE OF CONTENTS
Section
| 00 01 10 | Table of Contents |
| 00 01 15 | List of Drawings |
| 26 00 00 | Scope of Work |
| 26 05 00 | Basic Electrical Requirements |
| 26 05 13 | Medium Voltage Cable and Accessories |
| 26 05 19 | Low Voltage Wires and Cables |
| 26 05 26 | Grounding |
| 26 05 35 | Conduit, Boxes and Fittings |
| 26 05 36 | Underground Raceways |
| 26 05 74 | Overcurrent Devices |
| 26 12 19 | Medium Voltage Transformers, Oil-Filled Pad-Mount |
| 26 24 16 | Panelboards |
| 26 28 13 | Disconnect Switches |
END OF SECTION
SECTION 00 01 15
LIST OF DRAWINGS
PORTERVILLE DEVELOPMENTAL CENTER
25 SR #2
REPLACE ELECTRICAL TRANSFORMERS
LIST OF DRAWINGS
Drawing Title
| T-1 | Title Sheet | |
| T-2 | Building Code Analysis and Applicable Codes | |
| E-0 | Site Medium Voltage Single Line Diagram | |
| E-1 | Electrical Plans, 7 South Circle Drive | |
| E-2 | Electrical Plans, 8 South Circle Drive | |
| E-3 | Electrical Plans, 9 South Circle Drive | |
| E-4 | Electrical Plans, 10 South Circle Drive | |
| E-5 | Electrical Plans, 16 South Circle Drive | |
| E-6 | Electrical Plans, 17 South Circle Drive | |
| E-7 | Electrical Plans, 21 North Sequoia Drive | |
| E-8 | Electrical Plans, 22 North Sequoia Drive | |
| E-9 | Electrical Plans, 25 Sequoia Drive | |
| E-10 | Electrical Plans, 26 Sequoia Drive | |
| E-11 | Electrical Details |
SECTION 26 00 00
SCOPE OF WORK
PART 1 - GENERAL
1.01 SCOPE OF WORK
A. Furnish and install all necessary labor, materials, equipment, and incidentals required to perform the work described herein and as shown on the Drawings. The work generally involves the replacement of existing interior oil and dry-type transformers with exterior pad-mounted units at the locations listed in Paragraph B below. The work includes interception of existing underground medium voltage circuits for redirection to new transformer locations, new secondary conductors to existing main panels, and the installation of medium voltage load break connectors in existing vault numbers MH-13, MH-14, MH-17, MH-19, MH-32, MH-33, MH-35 and MH-36. The work includes disconnection of existing medium voltage feeder conductors, demolition and removal of existing transformers to be replaced; installation of new transformers, concrete pads, hardware, grounding, terminations; new underground conduits and conductors where required; and the startup and testing of all equipment shown and specified in order to restore complete and operational electrical service to the areas included in the scope. Refer to the plans for detail of work required at each of the buildings and electric vaults identified.
B. Project location: Porterville Developmental Center (PDC), 26501 Avenue 140, Porterville, CA. Specific building locations as follows:
7 South Circle Drive (MH-36) 8 South Circle Drive (MH-35) 9 South Circle Drive (MH-32) 10 South Circle Drive (MH-32) 16 South Circle Drive (MH-33) 17 South Circle Drive (MH-35) 21 North Sequoia Drive (MH-13) 22 North Sequoia Drive (MH-14) 25 Sequoia Drive (MH-17) – Bid Alternate 1 26 Sequoia Drive (MH-19) - Bid Alternate 2 C. The work tasks also include, but are not limited to (see Drawings for additional or supplemental work requirements):
1. Disposition of all oil-filled transformers removed from each building’s electrical room.
2. Furnish and install a new 400A, 120/208V 3-phase, 4-wire distribution panel at 10 South Circle Drive, and re-feed the existing 225-amp Panel M from this new panel. See Keynote 11 and single line diagram on Sheet E-4.
3. Repair or replace all existing irrigation sprinklers and piping affected by the installation of the new exterior pad-mount transformers. Orient all sprinkler heads so that water is directed away from the transformer housing.
4. Perform all saw-cutting, trenching, backfilling, and surface restoration required to restore areas around each new pad-mounted transformer to original condition.
5. Furnish and install temporary generator power as required to maintain electrical service to areas of PDC affected by the work. See Part 1.02, Power Interruptions, for additional requirements.
6. Test, adjust and place into service all equipment furnished for this project. Test all new medium voltage cable terminations, and furnish test reports to the PDC Chief of Plant Operations III or his designee.
D. At the completion of this project, the Contractor will be required to submit hard and electronic copies of the equipment as-built drawings, which accurately represent the as-installed conditions at each electrical vault, and Operation and Maintenance Manuals (3 copies of each).
E. Provide training, where required, on the use and maintenance of the new equipment installed under this scope of work.
1.02 POWER INTERRUPTIONS
A. Coordinate the interruption of existing affected electrical feeder circuits with the PDC Chief of Plant Operations III or his designee at least 72 hours prior to planned outage. It is the responsibility of the contractor to develop and submit a planned outage/work sequence schedule for review and approval by the Chief of Plant Operations III or his designee. The work sequence schedule shall be developed to minimize outages and/or downtime in the affected areas. No work shall commence until the outage/work sequence schedule is approved. PDC Fire Chief and fire service monitoring personnel shall be notified prior to all momentary outages associated with transfer of fire alarm system power from normal to portable generator power at the initiation of construction.
B. Furnish temporary power (portable generators) to maintain function of building loads while the affected feeder is taken out of service for modification as described in these Specifications and shown on the Plans. This shall include all connectors, cables and other appurtenant items necessary to provide temporary power to the affected feeder. Coordinate placement of temporary power means with PDC Plant Operations. The Chief of Plant Operations III or his designee will provide to the Contractor electrical load (kVA) information for buildings and structures fed from the existing medium voltage feeders impacted at each location. See plan sheet E-0 for current transformer size.
SECTION 26 05 00
BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL
1.01 DESCRIPTION
A. This Section describes specific requirements, products, and methods of execution that are typical throughout the electrical work of this project. Additional requirements for the specific systems may modify these requirements.
1.02 CODE RULES AND SAFETY REGULATIONS
A. Work installed or material used must comply with latest rules of:
1. California Code of Regulations (CCR), Title 24, Part 3, California Electrical Code 2022.
B. Standards: Reference to the following standards infers that installation, equipment, and material shall be within the limits for which it was designed, tested, and approved.
1. American National Standards Institute - ANSI.
2. American Society for Testing and Materials - ASTM.
3. Institute of Electrical and Electronics Engineers - IEEE.
4. Insulated Cable Engineers Association - ICEA.
5. National Electrical Contractors Association - NECA.
6. National Electrical Manufacturers' Association - NEMA.
7. National Fire Protection Association - NFPA.
8. Underwriters' Laboratories - UL.
C. Each type of material shall be of the same manufacturer and quality throughout the work.
1.03 WORKMANSHIP
A. All workmanship shall be first-class and carried out in a manner satisfactory to, and approved by the State.
1.04 SUBMITTALS
A. Submit 3 copies of list of materials and equipment proposed for use in the work. Except as specified herein for "rough-in" materials, submit complete list at one time and include all proposed alternatives.
Give name of manufacturer and where applicable, brand name, type and/or catalog number of each item. Listing of more than one manufacturer for any one item of equipment, or listing items "as specified", without both make and model or type designation, is not acceptable.
"Rough-in" materials, such as conduit, fittings, outlet and junction boxes, cabinets, wire and cable rated 600 volts or less and connectors, need not be included in the Material List, provided that these items are as specified and are listed by UL.
| B. | Shop Drawings and Descriptive Data: Submit shop drawings and descriptive data of equipment listed hereinafter, and the required wiring diagrams. Do not install materials or equipment until written approval has been obtained from the State. |
| Before submitting for approval, check submittals to ascertain that materials and equipment meet all requirements of plans and specifications and conform to structural and space conditions. Mark submittal sheets covering several types or sizes of equipment to clearly indicate specific equipment being proposed. |
Submittal of catalog data and descriptive bulletins is not required for materials and equipment which are furnished as specified and which are completely identified in Material List.
C. Shop Drawings:
Make shop drawings to scale, showing overall dimensions and other dimensions required for proper installation of equipment. Identify clearly each item on drawings to show piece of equipment it represents. Indicate corrosion resisting treatment and finish.
For panelboards and switchboards, show size, number of poles, trip rating of each circuit breaker, and circuit numbering system. For panelboards, show width of top, bottom, and side wireways, and method of attaching circuit identification markers.
D. Submit 5 copies of catalog cuts and/or complete description, information and performance data.
1.05 COORDINATION
A. Layout all the work in advance and avoid conflict with other work in progress. Physical dimensions shown on the plans shall be field-verified prior to construction. Verify locations for junction boxes, panels, disconnect switches, raceway stub-ups, and other components shown for connection.
1.06 WORKING SPACE
A. Provide adequate working space around electrical equipment in compliance with Article 110 of the California Electrical Code (CEC). Arrange all work to provide access to all serviceable and/or operable products. Lay out work to optimize access to equipment within the confines of the space available. Advise the Chief of Plant Operations III or his designee, in a timely manner, of areas where proper access cannot be maintained. Furnish layout drawings to verify this claim, if requested. Provide access doors in ceilings, walls, floors, etc., for access to junction boxes, automatic devices, and all serviceable or operable equipment in concealed spaces.
1.07 SERVICEABILITY OF PRODUCTS
A. Furnish all products to provide the proper orientation of serviceable components to access space provided.
B. Coordinate installation of panels, equipment, system components, and other products to allow proper service areas for all items requiring periodic maintenance inspection or replacement.
C. Replace or relocate all products incorrectly ordered or installed.
1.08 STORAGE AND HANDLING
A. All items shall be delivered and stored in original containers, which shall indicate manufacturer's name, the brand, and the identifying number. Items subject to moisture and/or thermal damage shall be stored in a dry, heated place. All items shall be covered and protected against dirt, water, chemical, and/or mechanical damage.
1.09 PROTECTION OF MATERIAL AND EQUIPMENT
A. The Contractor shall be responsible for any and all materials and equipment to be installed under this Contract. The Contractor shall make good, at his/her own cost, any injury or damage which said materials or equipment may sustain from any source or cause whatsoever before final acceptance.
PART 2 - PRODUCTS
| 2.01 | MATERIALS AND EQUIPMENT FURNISHED IN DIVISION 26 | |
| A. | All materials furnished and installed in permanent construction shall be new, full-weight, standard in every way, and in first-class condition. |
B. All materials shall conform with the standards of an organization acceptable to the authority having jurisdiction and concerned with product evaluation, that maintains periodic inspection of labeled equipment or materials, and by whose labeling the manufacturer indicate compliance with appropriate standards or performance in a specified manner. Only materials designed for the purpose employed shall be used.
C. Materials shall be identical with apparatus or equipment, which has been in successful operation for at least 2 years. All materials of similar class or service shall be of one manufacturer.
D. Capacities, sizes, and dimensions given are minimum unless otherwise indicated. All systems, materials, and equipment proposed for use on this project shall be subject to review for adequacy and compliance with Contract Documents.
2.02 SUPPORTS
A. General Requirements:
1. Inserts, hangers, brackets and miscellaneous supports for electrical equipment and conduits must be designed with minimum safety factor of 4, based on ultimate strength of material used. For empty conduits, include weight of 4 Type XHHW copper wires of maximum permissible size.
2. Secure hangers, brackets, conduit straps, supports and electrical equipment to surfaces by means of toggle bolts on hollow masonry; expansion shields and machine screws or standard preset inserts on concrete or solid masonry; machine screws or bolts on metal surfaces; wood screws on wood construction. Wood or fiber plugs or concrete nails are not acceptable.
3. Power driven or velocity driven inserts may be used where their use does not affect finished appearance of work, but may not be used in tension, pre-stressed slabs, beams or purlins, or in pre-cast members.
B. Inserts: Unistrut No. P-3245, Elcen Figure 64, Grinnell Figure 282, Code Devices Inc. No. 1, or equal. Finish: Black, if malleable iron; factory finish if steel.
PART 3 - EXECUTION
3.01 INSTALLATION
A. All materials and equipment shall be installed by skilled craftsmen. The norms for execution of the work shall be in conformity with the California Electrical Code, Chapter 3, and the National Electrical Contractors' Association "Standards of Installation", which herewith is made part of these Specifications.
B. Repair all surfaces and furnish all required material and labor to maintain fireproof, airtight and waterproof characteristics of the construction.
C. Installation of all equipment shall be in accordance with manufacturer's published instructions.
3.02 MOUNTING HEIGHTS
A. Mounting height shall be to center of box above finished floor (AFF) as noted below unless otherwise shown or indicated. Other mounting heights are indicated on the drawings by detail.
| Specific dimensions AFF are shown adjacent to the symbol. Where devices are shown on architectural elevations, the elevation height shall govern. | |
| EQUIPMENT | MOUNTING HEIGHT |
1. Panelboards:
| a. | Over 29" high | 6'-6" to handle of highest |
| circuit breaker |
| b. | 29" high, or less | 5'- 6" to handle of highest |
| circuit breaker |
2. Disconnect switches 4'-6"
3. Convenience outlets 18"
If 2 or more panelboards or cabinets are mounted adjacent to each other, mount with top edges of trims on same level base on mounting height of largest panel.
For brick, block, or tile walls, adjust outlet boxes to nearest masonry joint, if specifically approved by the State Construction Supervisor.
3.03 CUTTING, FORMING AND PATCHING
A. Concrete and Masonry Construction:
1. Provisions will be made under General Work for all openings, recesses, chases, etc., and wood blocking required for Electrical Work. Notify Contractor in ample time, when and where such provisions are necessary.
2. Install equipment in concrete slabs, walls, or other location where structural value of construction may be affected, as directed and approved by the State. Move or alter any electrical equipment required to be moved or altered due to structural conditions at no additional cost to the State.
3. Furnish and install all conduit sleeves, inserts, and supports for electrical work, unless otherwise specified or shown.
4. Install pipe sleeves through full thickness of concrete and provide 1/2 inch minimum clearance around conduit.
5. Sleeves:
a. 2 Inches In Diameter and Smaller: 30 gage steel.
b. 2-1/2 Inches In Diameter and Larger: 26 gage steel.
Approved plastic sleeves may be used in lieu of steel sleeves.
6. Remove sleeves after concrete forms have been removed. Caulk space around conduit through openings above grade, if the opening is through an exterior wall, or if airtight separation is required by Mechanical Work, or if directed by the State.
7. Where conduit will be installed after concrete slab is poured and construction requires watertight membrane, furnish and install permanently anchored standard weight galvanized steel pipe sleeves extending 2 inches above finish floor and having ½-inch minimum clearance around conduit. Do not remove these sleeves. Caulk space between conduit and sleeve with oakum and mastic, and make watertight.
B. Steel Construction: Do not weld or burn any structural steel member. Obtain specific approval of the State before field welding or burning not called for on Contract or approved shop drawings. Do not burn holes in beam flanges or narrow members.
C. Wood Construction:
1. Holes up to 1 inch in diameter may be bored in wood members 8 inches deep or greater. Holes shall be located in the middle 1/3 of the span at the mid-depth of the member. For all other conditions, obtain approval from the State prior to cutting holes.
2. Bore or cut holes neatly as directed by the State.
3. In stud walls, holes up to 1/3 the stud depth may be bored in plates or studs. Holes shall be located at the centerline of the stud or plate. Notching is not permitted.
D. Existing Construction:
1. Cut, patch and repair existing structure to permit installation of electrical equipment and conduits. Cutting of structural members shall be limited to the conditions of Section C above. Repair damage to existing work or replace in kind, in first class manner, by skilled craftsmen for each trade involved. Sleeves may be installed in existing floors where necessary to transition from one floor to another.
3.04 PROTECTIVE FINISHES
A. Factory Finish: Pull and junction boxes, panelboard cabinets, equipment enclosures, etc., shall be factory finished as follows:
1. Surface Mounted Boxes: One prime coat over galvanizing, one coat of light grey synthetic enamel or lacquer.
2. Flush Mounted Boxes: Galvanized only.
3. Surface Mounted Fronts: One prime coat, one coat of light grey synthetic enamel or lacquer to match box.
4. Flush Mounted Fronts: Prime coat only.
B. Equipment Enclosures: special equipment enclosures, etc., shall be manufacturer's standard, unless otherwise specified.
C. Field Painting:
1. Unless otherwise specified herein and in other Sections of Division 16, or indicated on plans, all exterior exposed metal, and all interior exposed metal in rooms where walls are painted, shall be painted under General Work, if required. Leave electrical work requiring painting in clean, dry, smooth condition.
2. Paint all exposed ferrous metals which are not galvanized or factory finished and are located in rooms or spaces where walls are not required to be painted. Use one coat of approved asphaltic aluminum paint over prime coat. This also applies to damp, unfinished locations such as pipe tunnels, crawl spaces below ground floor, and manholes.
3. Where field painting of metals is required under Electrical Work (other than work specified under Paragraph 3.04 C.2. above), metal to be painted shall be cleaned, pretreated, primed, and given 2 finish coats of paint as follows:
a. Cleaning: Remove rust, scale, grease, oil, dirt, preservative coatings or other deleterious matter. Treat all bare and clean metal with Primer Pretreatment, before priming.
b. Primer Pretreatment: (Formula 117 for Metals) (MIL-P-15328B).
c. Primer:
1) Steel and Iron (Not Galvanized): Red Oxide Chromate Primer.
2) Aluminum: Zinc Chromate Primer.
3) Galvanized Steel and Nonferrous Metals: Zinc dust Zinc Oxide Primer (FS TT-P-641d, Type II). Apply second coat as soon as possible after priming to provide for proper bonding to primer coat.
d. Finish Coats, Interior: One coat of Enamel Undercoater and one coat of Semigloss Enamel, color as selected by the State.
e. Finish Coats, Exterior: One coat of Exterior Synthetic Enamel Undercoater and one coat of Exterior Synthetic Industrial Enamel, color as selected by the State.
D. Stenciling: After all field painting is completed, paint all stenciled identification of high voltage conduits, etc., as shown on plans, specified, or required by codes.
3.05 TESTING
A. Prior to final test, all equipment shall be in place.
B. Test all electrical systems. Systems shall be free from short circuits and unintentional grounds.
SECTION 26 05 13
MEDIUM VOLTAGE CABLE AND ACCESSORIES
PART 1 - GENERAL
1.01 SUMMARY
A. Medium voltage cable and accessories for new underground 5-kV feeder segments as shown on the plans.
1.02 RELATED SECTIONS
A. Work under this Section shall conform to applicable requirements of Section 26 05 00.
1.03 REFERENCES & STANDARDS
A. ANSI/IEEE C2 - National Electric Safety Code.
B. IEEE 48 - Test Procedures and requirements for High-Voltage Alternating-Current Cable Terminations.
C. NEMA WC8 - Ethylene-Propylene-Rubber-Insulated Wire and Cable for the Transmission and Distribution of Electrical Energy.
D. UL 1072 – Medium Voltage Power Cables
E. IEEE 36 – Separable Insulated Connector Systems
1.04 SUBMITTALS
A. Product Data: Submit manufacturer's catalog data sheets for each type of cable and all cable accessories used on this project.
B. Drawings: Submit shop drawings of cable, splices and terminations for cables of each type and voltage rating, on which work is to be performed under this contract. Cable drawings shall include dimensions, components identified, and a longitudinal cut-back and cross-sectional views.
1.05 DEFINITIONS
A. Dead-break connector – A separable insulated connector designed to close and interrupt current on de-energized circuits only.
B. EPR – Ethylene-Propylene Rubber
C. High Potential Test (High Pot) – A test that consists of the application of a voltage higher than the rated voltage for a specified time for the purpose of determining the adequacy against breakdown of insulating materials and spacings under normal conditions.
D. Load-break Connector – A separable insulated connector designed to close and interrupt current on energized circuits.
E. Medium Voltage (MV) - In a three wire system, 2400 volts – 34,500 volts.
1.06 QUALITY ASSURANCE
| A. | Qualifications: Cable installer shall have specialized in installing products specified in the Section for a minimum of 5 years. |
| B. | Quality Assurance: All splices and terminations shall be made by a certified medium voltage cable splicer/terminator with a minimum of three years experience in splicing cables of the type and rating used under this contract. Submit certification of competency and experience of the splicer/terminator 30 days prior to commencing work, for approval by the DDS Representative. |
| In addition, each splicer/terminator may be required to make an approved dummy splice in the presence of the State Construction Supervisor in accordance with the manufacturer's instructions. |
1.07 CABLE SIZES
A. Cable sizes of cable as shown on plans.
1.08 PACKAGING, STORAGE AND HANDLING
A. Cables shall be delivered on reels with a suitable protective covering over the cable to prevent damage during shipping. Provide cable end seals to prevent moisture from entering ends of cable.
B. Each reel shall carry a tag identifying cable manufacturer, customer order number, cable type, size and voltage.
C. Accept cable and accessories on site in manufacturer's packages and inspect for damage.
D. Protect cable and accessories from weather by covering with opaque plastic or canvas; provide ventilation to prevent condensation.
PART 2 – PRODUCTS (SOME SPECIFIED BELOW ARE NOT USED THIS PROJECT)
2.01 CABLE FOR MED. VOLTAGE SYSTEM
A. General: Construction of the cable shall be the triple tandem extrusion process of the conductor, semiconducting strand shield and the insulation, all EPR
B. Voltage Rating: Cable shall be rated 15 KV, unless otherwise noted on the plans. Cables rated 5/8kV may be specified where existing duct sizes preclude the use of 15kV cables.
C. Conductor: Annealed, uncoated copper, compressed compact-stranded per ASTM B-496, with extruded EPR semiconducting strand screen over conductor, per ICEA S-93-639 and UL 1072.
D. Insulation: EPR per ICEA S-93-639 and UL – 1072. 220 mil insulation thickness; insulation level shall be 133%.
E. Shielding: 5 mil bare copper tape helically applied with 25% nominal overlap.
F. Jacket: Non-metallic jacket made of extruded black PVC, UV - resistant, UL listed as Type MV-105. Thickness shall be in accordance with UL 1072.
G. Cable shall be Okonite Okoguard-Okoseal Type MV-105, or approved equal
2.02 BOLTED CABLE TERMINATIONS
A. IEEE 48, Class 1, rated for outdoor use. Kit form, suitable for use with cable specified.
B. Terminations for single-conductor cables shall consist of heat-shrinkable radiation crosslinked high dielectric constant linear stress relief material and heat-shrinkable radiation crosslinked non-tracking outer insulation.
C. Kits shall be factory engineered and shall accommodate any common form of cable shielding or construction without the need for special adaptors. Kits shall accommodate a wide range of cable sizes and be completely independent of cable manufacturers’ tolerances. Kits shall accommodate a commercially available standard connectors.
D. Manufacturer: Tyco Model HVT-G/SG 1/C, or approved equal.
2.03 DEADBREAK APPARATUS
A. Description: 15/25kV Class deadbreak connector used to terminate high voltage underground cable on deadfront apparatus, with capacitive test point, designed for use with solid dielectric cable (EPR).
B. Connector shall be fully shielded, submersible and meet the requirements of IEEE Standard 386.
C. Voltage Ratings: 25kV Class; 15.2 kV max phase to ground; 40 kV 1-minute AC withstand; 125 kV BIL; 19kV minimum corona voltage level.
D. Current Ratings: 600A RMS continuous; 1,000A 24-hour overload; 40,000A RMS symmetrical short-time of 0.17 seconds.
E. Manufacturer: Eaton-Cooper Power Systems or approved equal.
2.04 DEADBREAK JUNCTION
A. Description: 15/25kV Class deadbreak junction used to provide two, three or four deadbreak interfaces bused together and encapsulated in a precision-molded, peroxide-cured EPDM rubber insulated body. Junctions shall be designed for use in pad-mounted apparatus and electric vaults to establish loops, taps and splices.
B. Deadbreak junction shall be furnished with stainless steel hardware for direct bolting to a mounting surface, and shall be fully shielded, submersible and meet the requirements of IEEE Standard 386 when matched with a comparably rated product.
C. Voltage Ratings: 25kV Class; 15.2 kV max phase to ground; 40 kV 1-minute AC withstand; 125 kV BIL; 19kV minimum corona voltage level.
D. Current Ratings: 600A RMS continuous; 1,000A 24-hour overload; 25,000A RMS symmetrical short-time of 0.17 seconds.
E. Manufacturer: Eaton-Cooper Power Systems or approved equal.
2.05 SEPARABLE CABLE SPLICE
A. Description: 15/25kV Class deadbreak separable splice used to splice two, three or four cables or to deadend a single cable, furnished with capacitive test point and designed for use on solid dielectric XLPE or EPR cable. Splices shall be made of peroxide-cured EPDM rubber. Junctions shall be designed for use with underground feeders in electrical vaults.
B. Separable splices shall be fully shielded, submersible and meet the requirements of IEEE Standard 386 when matched with a comparably rated product.
C. Voltage Ratings: 25kV Class; 15.2 kV max phase to ground; 40 kV 1-minute AC withstand; 125 kV BIL; 19kV minimum corona voltage level.
D. Current Ratings: 600A RMS continuous; 900A RMS 4-hour overload; 40,000A RMS symmetrical short-time of 0.17 seconds.
E. Manufacturer: Eaton- Cooper Power Systems Series SSPL625C2T or approved equal.
2.06 LOADBREAK APPARATUS
A. Description: 15kV Class loadbreak elbow connector, fully shielded and insulated, used to connect underground cables to switching equipment and junctions equipped with loadbreak bushings. Elbows shall be furnished with capacitive test point and designed for use on solid dielectric EPR cable. Elbows shall be made of peroxide-cured, insulating and semi-conducting EPDM rubber.
B. Loadbreak probe shall be tin-plated copper with an ablative arc-follower tip and stainless-steel reinforced pulling eye. Elbows shall be fully shielded, submersible and meet the requirements of IEEE Standard 386 when matched with a comparably rated product.
C. Voltage Ratings: 15kV Class; 8.3 kV max phase to ground; 34 kV 1-minute AC withstand; 95 kV BIL; 11kV minimum corona voltage level.
D. Current Ratings: 200A RMS continuous; 10,000A RMS symmetrical short-time of 0.17 seconds.
E. Manufacturer: Eaton-Cooper Power Systems Series LEJ215 or approved equal.
2.07 LOADBREAK JUNCTION
A. Description: 15/25kV Class loadbreak junction used to provide two, three or four loadbreak interfaces bused together and encapsulated in a precision-molded, peroxide-cured EPDM rubber insulated body.
Junctions shall be designed for use in pad-mounted apparatus and electric vaults to establish loops, taps and splices.
B. Loadbreak junction shall be furnished with stainless steel hardware for direct bolting to a mounting surface, and shall be fully shielded, submersible and meet the requirements of IEEE Standard 386 when matched with a comparably rated product. Furnish with 15 kV Class insulated protective bushing caps, where shown (Eaton-Cooper LPC215 or approved equal)
C. Voltage Ratings: 25kV Class; 15.2 kV max phase to ground; 40 kV 1-minute AC withstand; 125 kV BIL; 19kV minimum corona voltage level.
D. Current Ratings: 600A RMS continuous; 1,000A 24-hour overload; 25,000A RMS symmetrical short-time of 0.17 seconds.
E. Manufacturer: Eaton-Cooper Power Systems Series LJ215C, or approved equal.
2.08 SEALING ADAPTERS
A. Cable Elbows: Heat-shrinkable elbow sealing adapters for jacketed single-conductor URD and shielded power cable, in order to form an environmental jacketing seal. Adapters shall be qualified to ANSI C119.1—1986 and RUS-accepted for termination and sealing of elbows used for loadbreak/deadbreak elbows and separable splices. Furnish Tyco/Raychem Type ESA.
B. Grounding Kits: Furnish external grounding/shield interrupting kits for use with splices involving external grounding or for shield interrupt/cross bonding. Furnish Tyco/Raychem Type HVS-EG.
2.09 FAULT INDICATORS
A. Furnish and install fault indicators on each phase conductor terminating in the primary compartment of each transformer installed. Cable fault indicators shall be suitable for use on 200A and 600A rated connectors having a voltage test point, and be contained in a compact, shielded and corrosion-resistant housing. Operating voltage range shall be 5kV through 35kV. Indicators shall have a “fisheye” display with a highly reflective orange target providing 180-degree visibility.
B. Fault indicators shall have logic circuitry to prevent false indications due to inrush currents, cold load pickup, and overloading, and feature magnetically latched flag indication which will not change state due to shock or vibration. Internal magnetic shielding shall prevent false operation due to adjacent phase effects.
C. Fault indicators must meet or exceed the requirements of ANSI/IEEE Standard 495-1986. Fault withstand capability shall be 25kA for 10 cycles. Response time: 1millisecond. Sensor indication time delay: .001-.30 seconds subsequent to arming.
D. Housing Material: Mounting boot – EPDM conductive rubber; Housing body – UV stabilized polycarbonate polymer
E. Fault indicators shall be Elastimold type TPMVF or approved equal. Furnish with Field Test Tool, model FTT.
PART 3 - EXECUTION
3.01 GENERAL REQUIREMENTS
A. Do not pull cable into duct or conduit until factory test reports of cable submitted and approved with Shop Drawings.
B. The installing Contractor shall submit a schedule of pulls prior to cable installation for review. The installing contractor shall certify in writing that the cable meets the specification and the cable installation meets the requirements of the cable manufacturer for the following: maximum pulling tension(s), allowable sidewall pressure(s) and installed bend radius limitations. All cable pulls greater than 200 feet or incorporating one or more 90º bends must incorporate the use of a tension measuring device. Written documentation of all tension measurements must be submitted to the DDS Representative. Upon request, an applicable project cable sample shall be submitted for testing by an independent test laboratory to ascertain its compliance to this specification at no additional cost to the State.
C. For training of cables, make minimum bend radius to inner surface of cable as follows:
1. For cable with or without lead sheath and without metallic shielding: 8 times cable diameter.
2. For cable with metallic shielding: 12 times cable diameter.
D. For cables with nonmetallic jacket other than polyethylene, lubricate with compound which does not have deleterious effect on jacket.
E. Use only wire and cable pulling compound suitable for specific cable used, and which is listed by UL.
F. Seal all cable ends unless splicing is to be done immediately.
G. Support all cables in manholes by stainless steel cable racks and secure cables to rack insulators with nylon cord or self-locking nylon cable ties. Place each cable on separate insulator. Do not install cables of more than one feeder on same insulator hook. Set racks on not greater than 3-foot centers around perimeter of existing manhole. In pull boxes, where there is insufficient room for cable racks, cables and splice assemblies shall be neatly arranged and tied together with bolted cable spacers.
H. Follow manufacturer's instructions for splicing and cable terminations.
3.02 GROUNDING
A. Cable with Metallic Tape Shield: Ground metallic shield at each splice and termination. Ground connection shall be per approved drawings of splices and terminations and as specified elsewhere in this Section.
3.03 AFTER INSTALLATION TEST
A. Test all cable per ICEA Standards for high voltage DC test. Notify State of proposed date of test sufficiently in advance so arrangements can be made for State to witness test.
B. Perform test after all splices, terminations and connections are complete, except at point where cable under this contract is to be connected to existing system. During test disconnect all equipment for cable systems.
C. Test voltage shall be 25 KV, DC. Use DC tester specifically designed for purpose, with overload or current limiting devices to limit short circuit current. Raise voltage gradually in 10 percent steps to 80 percent of final voltage, then in 5 percent steps to final test voltage, which shall be left on for 15 minutes. Take current readings at each step after current has been stabilized. Plot readings on graph paper. If breakdown is indicated during test by sudden increase in current, discontinue test, locate and remedy trouble, and repeat test. If breakdown is again indicated, replace cable.
D. Submit 2 properly labeled copies of tests to State for review. Include all necessary test information such as ambient temperature, weather conditions, current, voltage, cable length, size, etc.
3.04 IDENTIFICATION OF FEEDERS
A. Each cable at each entry to and exit from each manhole, pull hole, switchgear, switches, or other equipment shall have a tag affixed upon it which is stamped or embossed with the feeder identification. Identification letters shall be ¼-inch minimum size. Typical format shall be “FDR x FROM PH-xx”.
3.05 FIREPROOFING OF CABLES
A. Fireproof cables if specifically shown on plans, in manholes using fireproofing tape in half-lapped wrapping extended one inch into ducts.
SECTION 26 12 00
LOW VOLTAGE WIRES AND CABLES
PART 1 - GENERAL
1.01 DESCRIPTION
A. This Section describes specific requirements, products, and methods of execution relating to wire and cable, 600 volts or less, approved for use on this Project.
1.02 QUALITY ASSURANCE
A. All conductors shall be sized according to the American Wire Gauge (AWG). Stranding, insulation, rating, and geometrical dimensions shall conform to Underwriters' Laboratories (UL) Standards.
1.03 PRODUCT DELIVERY, STORAGE, AND HANDLING
A. Deliver materials and equipment to project site in manufacturer's original packaging with labeling showing product name, brand, model, project name, address and Contractor's name. Store in a location as agreeable with the State Construction Supervisor; secure from weather or accidental damage.
PART 2 - PRODUCTS
2.01 LABELING
A. Conductors shall be delivered to the job site plainly marked or tagged on 24 inch centers as follows:
1. Underwriters' Laboratories (UL) Label.
2. Gauge.
3. Voltage.
4. Kind of Insulation.
5. Name of Manufacturer.
6. Trade Name.
B. Conductor labels shall be with PVC tubing with machine printed black marking. Tubing shall be sized to fit conductor insulation. Adhesive strips are not acceptable.
2.02 INSULATION
A. For secondary power, lighting and control circuits, use wire with following types of insulation at the specified locations:
1. In Ordinary Dry and Wet Locations: Type XHHW; or Type THHN in dry locations and Type THWN in wet locations.
2.03 CONDUCTORS
A. Unless specifically noted otherwise herein, all conductors for general wiring shall be a minimum of 98 percent conductivity, soft drawn copper. Conductors No. 10 AWG and smaller shall be stranded; conductors No. 8 AWG and larger shall be stranded.
2.04 PULLING LUBRICANT
A. Wire pulling lubricant shall be a UL or Factory Mutual approved wire pulling compound.
2.05 WIRING MATERIALS
A. Connectors for Copper Conductors No. 10 AWG and Smaller:
1. Preinsulated Spring Pressure Type: Scotchlok Types Y, R, G and B; Ideal "Wing Nut"; T&B Series PT, or equal.
2. Splice Cap Type: Uninsulated metal cap applied with proper indenter tool which provides deformation of cap in 2 directions at right angles to each other. Buchanan, or equal.
B. Connectors and Lugs for Copper Conductors No. 8 AWG and Larger: Pressure or compression type, Burndy, Dossert, T&B, or equal.
C. Lugs for Parallel Conductors: Provide multiple lugs where parallel conductors are used.
D. Watertight Splice Kits: Epoxy resin type, suitable for the type, size and number of conductors being spliced.
E. Electrical Tapes:
1. Friction Tape: Per ASTM D-69.
2. Rubber Tape: 0.030 inch thick, per ASTM D-119.
3. Plastic Tape: .007 inch thick, minimum, 3M Co. "Scotch" No. 33, Plymouth "All Weather" No. 4453, or equal.
F. Wire Markers: Self-adhesive, wrap around, cloth type, E-Z Code, Brady "Perma Code", or equal.
PART 3 - EXECUTION
3.01 WIRING METHODS
A. General Requirements:
1. Use No. 12 AWG or larger wire for power circuits and No. 14 AWG or larger wire for control circuits, unless smaller wire is specified or shown.
2. Unless otherwise specified or shown, leave at least 9 inches of free conductors at each unconnected outlet. Tape free ends of conductors and coil neatly in outlet box.
B. Splicing and Termination of Conductors:
1. Conductors No. 10 AWG and Smaller:
a. Twist conductors together to be electrically and mechanically secure, and solder, or join conductors together by means of preinsulated spring pressure connectors, or uninsulated splice caps applied with proper indenter tool designed for the specific type of cap used. Twist conductors together before applying splice caps.
b. Insulate splices, joints and free ends of conductors with insulation equivalent to that of conductors by taping with rubber and friction tapes, or with high dielectric strength plastic tape.
c. If splice caps are used, plastic insulating caps may be used. After applying splice caps, use insulating caps rated for the temperatures to which they may be subjected, and install as recommended by the manufacturer.
2. Conductors No. 8 AWG and Larger:
a. Splice and terminate conductors by means of connectors and terminal lugs.
b. Do not use split bolt type connectors.
c. After initial set has been taken, retighten all pressure type connectors and lugs.
d. Insulate all splices, joints, and free ends of conductors as specified under Subparagraph 3.01 B.1.b. above.
e. Where aluminum lug is bolted with steel or copper bolt, use Belleville spring washer and flat washer as follows:
1) Belleville Washer: Either hardened and tempered steel, tin plated, or stainless steel.
2) Flat Washer: Mild steel, tin plated, and slightly larger than Belleville washer.
3) Low Voltage Control Wiring: Splice by twisting conductors together so as to be electrically and mechanically secure, then solder. Other methods may be used if specifically approved by the State.
4) Underground Splices: Conductor and cable splices installed underground in manholes, pullholes and similar locations, shall be made watertight. Splices for lead-sheathed cables shall be wiped lead joints. Approved splice kits may be used for conductors and cables other than lead- sheathed.
C. Color Coding:
1. Color code all secondary branch circuit and feeder conductors as follows:
a. Two Wire Grounded System: One black, one white (neutral).
b. Three wire, Single Phase, Grounded System: One black, one red, one white (neutral).
c. Three Wire, 3 phase, Ungrounded Delta System: One Black, one red, one blue.
d. Four Wire, 3 Phase Grounded Wye or Delta System: One black, one red, one blue, one white (neutral).