This document is an attachment titled "Attachment 5 (ES7034) REWORK AND REPAIR OF NONCONFORMING MATERIAL" which outlines the procedures for rework and repair of nonconforming material for a federal contract.
The key details are:
- Rework is defined as reprocessing nonconforming material to make it completely conform to drawings, specifications or contract requirements.
- Repair is defined as reprocessing nonconforming material in accordance with approved procedures to reduce, but not completely eliminate, the nonconformance to bring the item into usable condition.
- Rework procedures must be documented by the contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to QAR disapproval.
- Repair procedures must be documented by the contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
- Submissions for rework or repair must include the cause of the nonconformance and the action taken or planned to prevent recurrence.
- Rework and repair requirements flow down to contractors, suppliers, vendors and subcontractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment 1.pdf | ||
| 12 CDRLs.pdf | ||
| 2 Air Spec.pdf | ||
| 4 EDLs.pdf | ||
| 5 Item Descriptions.pdf | ||
| 1 ADC SOW.docx | DOCX document | |
| 8 RESHIP.docx | DOCX document | |
| 3 CADPAD Item Marking Instructions.pdf | ||
| 6a JQR Fin Ctg.pdf | ||
| 6b JQR Elevon Ctg.pdf | ||
| Solicitation.pdf | ||
| 11 Packaging Requirements.pdf | ||
| 10b SPI F011259400.pdf | ||
| 10a SPI F008508522.pdf | ||
| 9 SOW Packaging.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)
(ES7034)