7. Plans.pdf

PDF 7 MB Posted

Attached to
Riverside Day Use Area Rehabilitation - GAOA 2. 0
Solicitation number
127EAW26Q0026
Issued by

About this file

This document is a set of construction drawings and specifications for the Riverside Day Use Area Rehabilitation project located in Tuolumne County, California, within the Stanislaus National Forest under the Miwok/Summit District.

The project encompasses mandatory work items including mobilization (1 lump sum), asphalt concrete pothole patching and bridge approaches (14 tons), timber trail bridge fabrication and installation (lump sum), and reinforced concrete retaining wall construction estimated at 15 linear feet (lump sum). Optional work items include water system repair for a hand pump system and stone veneer facing at the retaining wall, both as lump sum contract items. The project requires compliance with Best Management Practices for water quality, Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG), Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14), and Forest Service Supplemental Specifications. Key requirements include equipment weed-free certification, utility protection coordination via 811, comprehensive documentation of existing site conditions, restoration of any disturbed areas, and adherence to limited operation periods when water is present in the overflow channel. The work involves asphalt repair with specific patching details, a timber trail bridge with railing system and concrete sill connections, a reinforced concrete retaining wall with maximum height of 6 feet, and hand pump system repair using specific USDA Forest Service standards. All materials must be certified weed and asbestos-free, and the contractor is responsible for all project safety compliance with a site safety and staging plan required 14 days prior to work commencement.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

nicolethompson Text Box

REISSUED 4/13/2026

NET

nicolethompson Text Box

REISSUED 4/13/2026

NET

nicolethompson Text Box

REISSUED 4/13/2026

NET

ESTIMATE OF QUANTITIES

MANDATORY WORK ITEMS

PAY ITEM ITEM DESCRIPTION ESTIMATED QUANTITY PAY UNIT

15101 Mobilization 1 Lump Sum

41801 Asphalt Concrete, Pothole Patching & Bridge Approaches 14 Ton

55700 Timber Trail Bridge, Fabricate & Install All Lump Sum

25901 Reinforced Concrete Retaining Wall (Estimated 15 LF) All Lump Sum

OPTIONAL WORK ITEMS

PAY ITEM ITEM DESCRIPTION ESTIMATED QUANTITY PAY UNIT

61101 Water System, Repair Hand Pump System All Lump Sum

62001 Stone Veneer Facing at Retaining Wall All Lump Sum

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

6 0 8:

N

IC

OL

ET

HO

MP

SO

N C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

RI

VE

RS

ID

E

DA

Y

US

E

AR

EA

R

EH

AB

IL

IT

AT

IO

N\

RI

VE

RS

ID

ED

UA

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

RIVERSIDE DAY

USE AREA

REHABILITATION

STANISLAUS NATIONAL

FOREST

MIWOK/SUMMIT DISTRICT

WORK NOTES

5/15/2025

N.THOMPSON

KB, GC, KD

G-02 2 12

REISSUE 4/13/2026

GENERAL NOTES:

1. REQUIRED WORK NOT SPECIFIED IN THE SCHEDULE OF ITEMS SHALL BE CONSIDERED INCIDENTAL TO OTHER PAY ITEMS.

2. BEFORE ANY EXCAVATION ACTIVITIES BEGIN, THE CONTRACTOR SHALL CONTACT 811. DO NOT BEGIN GROUND DISTURBING WORK UNTIL A MEETING IS HELD WITH THE FOREST SERVICE TO CONVEY THE LOCATION OF FOREST SERVICE UTILITIES THAT

NEED TO BE PROTECTED.

3. EQUIPMENT MUST BE IN GOOD WORKING ORDER AND INSPECTED BY USFS FOR COMPLIANCE WITH WEED FREE REQUIREMENT, NOTIFY COR 7 DAYS IN ADVANCE TO SCHEDULE INSPECTION. EQUIPMENT FOR THIS PROJECT, IF DRIVEN ON STATE OR

COUNTY ROADS, SHALL BE CURRENTLY LICENSED. ALL EQUIPMENT MUST STAY ON EXISTING ROADS AND TRAILS. NO OVERLAND TRAVEL IS PERMITTED.

4. ALL WORK SHALL BE IN COMPLIANCE WITH THE BEST MANAGEMENT PRACTICES FOR WATER QUALITY MANAGEMENT ON NATIONAL FOREST SYSTEM LANDS, DATED APRIL 2012. REFER TO PROJECT BMP & BMP CHECKLIST.

5. ALL DIMENSIONS, UNLESS OTHERWISE SPECIFIED, ARE IN U.S. FEET.

6. THE CONTRACTOR IS RESPONSIBLE FOR ALL PROJECT AND SAFETY COMPLIANCE. CONTRACTOR TO SUBMIT SITE SAFETY AND STAGING PLAN 14 DAYS PRIOR TO STARTING WORK.

7. ALL FOREST SERVICE ROADS OR INFRASTRUCTURE DAMAGE BY CONTRACTOR DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR, AT THEIR COST.

8. THE CONTRACTOR SHALL THOROUGHLY DOCUMENT EXISTING SITE CONDITIONS PRIOR TO THE COMMENCEMENT OF ANY WORK. THIS DOCUMENTATION SHALL BE SUFFICIENT TO ESTABLISH THE PRE-WORK CONDITION OF ALL AFFECTED AREAS. THE

CONTRACTOR IS RESPONSIBLE FOR EXERCISING APPROPRIATE CARE THROUGHOUT THE PERFORMANCE OF THE WORK TO PREVENT DAMAGE TO GOVERNMENT PROPERTY, FACILITIES, EQUIPMENT, OR ADJACENT AREAS. ANY DAMAGE ATTRIBUTABLE TO THE CONTRACTOR'S OPERATIONS SHALL BE PROMPTLY CORRECTED OR REPAIRED BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE GOVERNMENT, AND TO THE SATISFACTION OF THE CONTRACTING OFFICER.

9. BORROW SOURCES, IF NEEDED, WILL BE DESIGNATED BY THE FOREST SERVICE DURING CONSTRUCTION.

10. PROVIDE COPIES OF WEIGHT TICKETS FOR MATERIAL DELIVERED TO THE SITE FROM COMMERCIAL SOURCES. AGGREGATE SHALL BE OBTAINED FROM AN APPROVED SOURCE, CERTIFIED WEED AND ASBESTOS FREE.

11. ANY EROSION CONTROL PRODUCT MADE OF NATURAL MATERIALS, SUCH AS STRAW WATTLES, MUST BE CERTIFIED WEED FREE.

12. WHILE THERE IS WATER IN THE OVERFLOW CHANNEL, NO WORK MAY BE PERFORMED IN THAT AREA. REFER TO PROJECT BEST MANAGEMENT PRACTICES FOR OTHER REQUIREMENTS, INCLUDING LIMITED OPERATION PERIODS.

13. ANY DISTURBANCE, SUCH AS A BORROW SITE OR STAGING AREA, SHALL BE RESTORED.

14. ALL WORK IS TO COMPLY WITH STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-14) HTTPS://HIGHWAYS.DOT.GOV/SITES/FHWA.DOT.GOV/FILES/DOCS/FEDERAL-LANDS/SPECS/12851/FP14.PDF, FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS (FSSS), AND WHERE APPLICABLE, CAL TRANS STANDARD SPECIFICATIONS HTTPS://DOT.CA.GOV/PROGRAMS/DESIGN/JULY-2023-CCS-STANDARD-PLANS-AND-STANDARD-SPECIFICATIONS

15. WORK TO COMPLY WITH FOREST SERVICE OUTDOOR RECREATION ACCESSIBILITY GUIDELINES (FSORAG) HTTPS://WWW.FS.USDA.GOV/SITES/DEFAULT/FILES/FSORAG-2013-UPDATE.1.PDF

ABBREVIATIONS

AB AGGREGATE ROAD BASE

AC ASPHALT CONCRETE

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER'S REPRESENTATIVE

CY CUBIC YARD

FP-14 STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS

FSORAG FOREST SERVICE OUTDOOR RECREATION ACCESSIBILITY GUIDELINES

FSSS FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

LF LINEAR FEET

SF SQUARE FEET

TYP TYPICAL

(N) NEW

(E) EXISTING

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

6 0 9:

N

IC

OL

ET

HO

MP

SO

N C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

RI

VE

RS

ID

E

DA

Y

US

E

AR

EA

R

EH

AB

IL

IT

AT

IO

N\

RI

VE

RS

ID

ED

UA

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

RIVERSIDE DAY

USE AREA

REHABILITATION

STANISLAUS NATIONAL

FOREST

MIWUK/SUMMIT DISTRICT

SITE MAP

1/16/2025

N.THOMPSON

N.THOMPSON

KB, GC, KD

G-05 5 12

REISSUE 4/13/2026

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text

RECONSTRUCT TRAIL BRIDGE, REPAVE AC APPROACHES

AutoCAD SHX Text

OPTION ITEM: REPAIR HANDPUMP WELL

AutoCAD SHX Text

RIVERSIDE DAY USE AREA

AutoCAD SHX Text

STANISLAUS NATIONAL FOREST, TUOLUMNE, CA

AutoCAD SHX Text

RESTROOM (E)

AutoCAD SHX Text

BEACH AREA (E)

AutoCAD SHX Text

PARKING AREA (E)

AutoCAD SHX Text

PARKING AREA (E)

AutoCAD SHX Text

TRAIL REPAIR AC SURFACE

BUCHANAN ROAD

DRAWN

DESIGNER

STAMPS, LOGOS, AND SEALS

PROJECT NAME

DRAWING TITLE

CHECKED

ARCHIVE NO.DATE

PROJECT NO.

DRAWING SHEET NO.

DATENO.

REVISION / ISSUE

OFSHEET

United States Department of Agriculture Forest Service

4/1 3/2

6 0 8:

N

IC

OL

ET

HO

MP

SO

N C:

\U

SE

RS

\N

IC

OL

ET

HO

MP

SO

N\

BO

X\

SO

~P S\

EN

GI

NE

ER

IN

G\

FY

P

RO

JE

CT

S\

RI

VE

RS

ID

E

DA

Y

US

E

AR

EA

R

EH

AB

IL

IT

AT

IO

N\

RI

VE

RS

ID

ED

UA

.D

W G;

(R05)

PACIFIC SOUTHWEST REGION

RIVERSIDE DAY

USE AREA

REHABILITATION

STANISLAUS NATIONAL

FOREST

MIWOK/SUMMIT RANGER DISTRICT

RETAINING WALL

1/26/2026

N.THOMPSON

N.THOMPSON

JB, PH, KB

C-03 8 12

REISSUE 4/13/2026

AutoCAD SHX Text

WOODEN TRAIL BRIDGE (REFER TO BRIDGE PLAN)

AutoCAD SHX Text EXISTING GABION CELLS W/VARYING EROSION, FILL ALL VOIDS WITH CONCRETE. REINFORCING STEEL MUST HAVE 2" MIN COVER.

AutoCAD SHX Text

RETAINING WALL AT BRIDGE, FOR HEIGHTS FROM 4'-9'

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

NO 4 @ 30" OC VERT

AutoCAD SHX Text

NO 5 @ 12" OC

AutoCAD SHX Text

NO 4 @ 15" OC HORZ

AutoCAD SHX Text

NO 7 @ 15" OC VERT

AutoCAD SHX Text 2" WEEP HOLES @ 4' OC, PVC PIPE, PRESERVE 1 CFT GABION ROCK FOR DRAIN @ EACH WEEP HOLE. WRAP PIPE INLET END IN SEPARATION GEOTEXTILE TO PROVIDE BARRIER FROM FINE SEDIMENT

AutoCAD SHX Text

ABUTMENT

AutoCAD SHX Text

CONCRETE FOOTING, CLASS 1 FINISH

AutoCAD SHX Text

NO 5 @ 9" OC

AutoCAD SHX Text MINIMUM 1' WALL THICKNESS AT BRIDGE BEARING. (REFER TO BRIDGE PLAN, CONCRETE SILL DETAIL, CLASS 2 FINISH) ANCHOR BOLT TO BE IMBEDDED IN A MINIMUM OF 1'. FOR AREAS NOT AT BRIDGE, SUBSTITUTE FOR CURB/STONE VENEER CURB. 8"X6" MINIMUM CURB DIMENSIONS.

AutoCAD SHX Text

ASPHALT CONCRETE TRAIL. REFER TO ASPHALT CONCRETE PAVING DETAILS, C-02

AutoCAD SHX Text

OPTION ITEM:STONE VENEER, MORTAR TO CONCRETE

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text NOTES: 1. NO WORK MAY BE PERFORMED WHILE THERE IS WATER IN THE OVERFLOW CHANNEL. NO WORK MAY BE PERFORMED WHILE THERE IS WATER IN THE OVERFLOW CHANNEL. 2. CONTRACTOR SHALL PROVIDE CONCRETE MIX DESIGN AT LEAST 36 DAYS PRIOR TO CONTRACTOR SHALL PROVIDE CONCRETE MIX DESIGN AT LEAST 36 DAYS PRIOR TO PRODUCTION, INCLUDING ALL REQUIRED DATA AS IDENTIFIED IN SPECIFICATIONS. 3. CONCRETE MIX TO COMPLY WITH FP-14 SECTION 552, CLASS A. THE NOMINAL CONCRETE MIX TO COMPLY WITH FP-14 SECTION 552, CLASS A. THE NOMINAL MAXIMUM AGGREGATE SIZE SHALL BE IN. AND AIR CONTENT PERCENTAGE SHALL 34 IN. AND AIR CONTENT PERCENTAGE SHALL BE 6%, TO COMPLY WITH ACI 19.3.3.1, EXPOSURE CLASS F3. 4. AGGREGATE USED IN CONCRETE MIX SHALL NOT BE ALKALI-SILICA REACTIVE OR AGGREGATE USED IN CONCRETE MIX SHALL NOT BE ALKALI-SILICA REACTIVE OR ALKALI-CARBONATE REACTIVE. AGGREGATE SHALL BE WEED AND ASBESTOS FREE. CONTRACTOR TO PROVIDE WRITTEN CERTIFICATION THAT AGGREGATE MEETS THESE STANDARDS WITH MIX DESIGN SUBMITTAL. 5. OPTION ITEM: STONE VENEER TO COMPLY WITH FP-14 SECTION 620, MASONRY OPTION ITEM: STONE VENEER TO COMPLY WITH FP-14 SECTION 620, MASONRY CLASS (d), FINISH (5). DRESS, BED, AND JOINT STONE UNDER SPECIFICATIONS FOR RUBBLE-TYPE MASONRY. PROVIDE A VARIABLE ROCK FACE FINISH. FACING SHALL BE PLACED AS SPECIFIED IN 620.08(a) or 620.08(b). CONTRACTOR TO PROVIDE MATERIAL SUBMITTAL FOR STONE VENEER AND NOTIFY CO OF PLACEMENT METHOD 14 DAYS PRIOR TO STARTING WORK. 2. CONCRETE EXPANSION JOINTS ARE TO BE PLACED AT REGULAR INTERVALS. COR TO CONCRETE EXPANSION JOINTS ARE TO BE PLACED AT REGULAR INTERVALS. COR TO IDENTIFY LOCATION OF CONSTRUCTION JOINTS WITHIN FIVE DAYS OF A WRITTEN REQUEST FROM THE CONTRACTOR. EXPANSIONS JOINTS ARE TO COMPLY WITH FP-14 552.13 (a). FOR OPTION ITEM: LAY STONE VENEER TO REFLECT THE WIDTH OF THE EXPANSION JOINTS. DO NOT LEAVE A GAP OR A MORTAR EDGE AT THE EXPANSION JOINT. 3. CONTRACTOR TO VERIFY MEASUREMENTS PRIOR TO CONSTRUCTION. CONTRACTOR TO CONTRACTOR TO VERIFY MEASUREMENTS PRIOR TO CONSTRUCTION. CONTRACTOR TO REMOVE DEBRIS FROM DAMAGED RETAINING STRUCTURE (E), INCLUDING CONCRETE. DEPTH OF EROSION VARIES, CONTRACTOR TO FIELD VERIFY. ALL VOIDS ARE TO BE FILLED WITH CONCRETE GROUT. HEIGHT OF WALL VARIES, FIELD FIT TO MATCH EXISTING GRADES AND TRAIL. AT EDGES, TAPER TO MEET (E). 4. REFER TO BRIDGE PLAN FOR ABUTMENT, SILL, AND CURB DETAILS. REFER TO BRIDGE PLAN FOR ABUTMENT, SILL, AND CURB DETAILS. 5. REPAIR ANY PARTS OF THE ASPHALT CONCRETE TRAIL DAMAGED AS A RESULT OF REPAIR ANY PARTS OF THE ASPHALT CONCRETE TRAIL DAMAGED AS A RESULT OF CONSTRUCTION. 6. APPROXIMATE LOCATIONS ARE SHOWN, LOCATIONS TO BE STAKED BY COR. STAKING APPROXIMATE LOCATIONS ARE SHOWN, LOCATIONS TO BE STAKED BY COR. STAKING WILL BE COMPLETED BY THE COR WITHIN FIVE DAYS OF A WRITTEN REQUEST FROM THE CONTRACTOR. 7. DESIGN CONDITIONS: SOIL UNIT WEIGHT, 120PCF; ANGLE OF INTERNAL FRICTION, DESIGN CONDITIONS: SOIL UNIT WEIGHT, 120PCF; ANGLE OF INTERNAL FRICTION, 30DEG; FRICTION COEFF, 0.35 (IBC 1806.2); ALLOWABLE BEARING PRESSURE, 3,000 PSF (IBC 1806.2); FC CONCRETE, 4,500PSI; FY STEEL, 60,000 PSI 8. OTHER AREAS OF DAMAGED GABION RETAINING WALL SHALL NOT BE REPAIRED.OTHER AREAS OF DAMAGED GABION RETAINING WALL SHALL NOT BE REPAIRED.

AutoCAD SHX Text APPROXIMATE LOCATIONS OF RETAINING WALL. AT SIDES, ANGLE WALL TO PROVIDE PROTECTIVE 'WING WALL', ANGLE TO BE FIELD FIT. WING WALL MAY TAPER DOWN TO 8" THICKNESS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

OVERFLOW CHANNEL

RiversidePlans_Reissue.pdf
RiversidePlans_Reissue.pdf
RiversideDUA-Work Notes_UPDATE.pdf
Sheets and Views
Work Notes_UPDATE

RiversidePlans_Reissue

RiversideDUA-Site Map_UPDATE'.pdf
Sheets and Views
Site Map
RiversidePlans_Reissue
RiversideDUA-Retaining Wall_UPDATE.pdf
Sheets and Views
Retaining Wall - UPDATE

RiversidePlans_Reissue

File details come from the government source that posted it. Updated .