This document is a logging plan map for the Banana Peel Designation by Prescription (DxP) Stewardship Integrated Resource Stewardship Contract (IRSC) project, presented across two detailed map sheets at a 1:7,000 scale.
The plan delineates cutting units, harvest areas, and resource protection zones across the contract area. Key operational features include designated tractor harvest areas, leave tree marks, reserve tree locations, skid trails, and temporary road networks (both new and existing). The maps identify special protection areas (shown in yellow shading), streamcourses, fence lines, stock ponds/reservoirs, monuments, transmission lines, closure gates, and dispersed campsites. Haul-restricted zones are marked with distinct designations, and traffic control points are specified. Additional protections include boggy OHV trail protection areas and powerline protection areas. Landings and pile locations are marked with diamond symbols, and boundary designations are shown through painted, discernable, and virtual marking methods. The maps reference specific contract clauses and sections (including Clauses 13, 21, 22, and 23, and various sections of the Contract Specifications) that govern the operational requirements, environmental protections, and resource management protocols for timber harvesting activities within the designated cutting units.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
R
RR
RR
R R
R R
R R
R
R
R
R
R
R
R
R
R
R
R R
R
R
R R
R R
R R
R R
R
R
R R
R R
R
R
R
R
R
R
R
R R
R R
R R
R R
R R
R
R
R
R
R
R
R
R
XXX
XXX
X X
X
X
X
X
XX
X
X X
X
X
X
X
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D
D
D
D D D D D D D D D D
D D
D D
D
D D
D D
D D
D D
D D
DDDDDDDDDDDDDDD
D D
D D
D D
D
D
D
D
D D
D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D
D D
D D
D
D
D
D D
D
D D
D
D
D
DD
D
D
D
D D
D
D D
D
D
D
D
D D
D D
DD
D D
O O
O
O
O
O
O
X
X X
ÑôL
""8
DxP—T
DxP—T
DxP—T
DxP—T
Dx—T
DxP—T
L MT—T
ÑôR
ÑôR
ÑôR
ÑôR
ÑôR
L
L
L
L
L
L L
L
L L
L
L
L L
L L
L
L
L
L
L
LL
L
L
L
LLL
L
L
L
L
L
L
L L L
L
764076
756075
748074
80007960
79207860
40 7520
528.1
E.2
C.1
C.2
E.1
A
C
E
D
D
C
C
951956
Vantor
Author: saksentowitz, Exported: 6/12/2026 11:39 AM Scale: 1:7,000
DxP—T Designation by Prescription, C2.355#; Tractor Harvest, B6.42#, C6.42#
L MT—T
Leave Tree Mark, B6.32, C2.356#; Tractor Harvest, B6.42#, C6.42#
ÑôR Reserve Trees, C2.3#, C6.32#
L Landings and Pile Locations, C5.34#, C6.7#
;; Traffic Controls, B6.33
ÑôL PI Stock Pond/Reservoir, Clause 22
X PI, Monument, Clause 22
""8 PI Closure Gates, Clause 22, C5.41#
PI Transmission, Clause 22
! ! Streamcourse, Clause 23
D D PI Fence Line, Clause 22
PI, Boggy OHV Trail, Clause 22
R Haul Restricted, Clause 13, C5.12#
X Haul Restricted, Clause 13, C5.12#
New Temporary Road, C5.34#
Existing Temporary Road, C5.34#
& Skid Trails, C5.34#, C6.42#
Painted Boundary Designation, C2.30#
Discernable Boundary Designation, C2.30#
O Virtual Boundary Designation, C2.30#
PI, Dispersed Campsite, Clause
Special Protection Area, Clause 21
Cutting Units B1.1
Contract Area, Clause 13, B1.1
Boggy OHV Trail Protection Area, Clause 22, C6.7#
0 1,320 2,640660
Feet
Banana Peel DxP Stewardship IRSC Log Plan 1 of 2
R
R
R
R
R
R R
R
RR
R
R
RR
RR
R R
R
R
R
R
RR
R
R
R
R
R
R
R
R
R
R
R
R
R R
R
R R
R
R R
R
R
R R
R
R
R R R R R
R
R
R R
R R
R R R R R
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D D D D D D D D D D D D D D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D D D D
D
D D
DD
D D
DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
D
D D
D D
D D
D D
D D
D D
D D
O
O
O
O
O O
O
O
O
O
O
O
OO
OO
O O
O O
O
O
O
O
O
O
O O O
O O
X X
ÑôL ÑôL
ÑôL
""8
DxP—T
DxP—T
DxP—T
DxP—T
DxP—T
ÑôR
ÑôR
ÑôR
ÑôR
ÑôR
L L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
L L
L
L
L
L
L
L
L
LL
82208200
81608140
76207600
82204
527.G
527.K
J
K
I
G
C.2
C
H
527.K1.T
527.K1.T
527.K1.T
350351
599 600
Vantor
Author: saksentowitz, Exported: 6/12/2026 11:39 AM Scale: 1:7,000
DxP—T Designation by Prescription, C2.355#; Tractor Harvest, B6.42#, C6.42#
ÑôR Reserve Trees, C2.3#, C6.32#
L Landings and Pile Locations, C5.34#, C6.7#
;; Traffic Controls, B6.33
ÑôL PI Stock Pond/Reservoir, Clause 22
X PI, Monument, Clause 22
""8 PI Closure Gates, Clause 22, C5.41#
PI Transmission, Clause 22
! ! Streamcourse, Clause 23
D D PI Fence Line, Clause 22
PI, Boggy OHV Trail, Clause 22
R Haul Restricted, Clause 13, C5.12#
X Haul Restricted, Clause 13, C5.12#
New Temporary Road, C5.34#
Existing Temporary Road, C5.34#
& Skid Trails, C5.34#, C6.42#
Painted Boundary Designation, C2.30#
Discernable Boundary Designation, C2.30#
O Virtual Boundary Designation, C2.30#
PI, Dispersed Campsite, Clause
Special Protection Area, Clause 21
Cutting Units B1.1
Contract Area, Clause 13, B1.1
Boggy OHV Trail Protection Area, Clause 22, C6.7#
Powerline Protection Area, Clause 22, C6.7#
0 1,320 2,640660
Feet
Banana Peel DxP Stewardship IRSC Log Plan 2 of 2