This document consists of a series of maps depicting road decommissioning and boulder placement activities for the Banana Peel project area. The maps include a vicinity overview at 1:80,000 scale showing the contract area encompassing locations named Little Bean, Powerline, Shush, and Vantor, along with the Ormiston Gravel Pit. Multiple detailed maps at scales ranging from 1:30,000 to 1:1,000 illustrate specific decommissioning zones and boulder placement locations, identified as Stage 8, Stage 30, and Stage 52 boulders.
The maps identify several road categories for decommissioning including ML 2, ML 3, ML 4, and ML 5 roads, along with access roads and non-system roads within the contract area. Key features shown include the Boggy Trail System, waterbars, and private/other ownership parcels. The contract area boundaries are clearly delineated with red hatching. The maps were created by saksentowitz on 8/11/2026 (vicinity map dated 6/4/2026) and reference Clause 13 (B1.1) for contract area definition, Clause 22 for Boggy Trail System and road designations. These appear to be reference maps for a road decommissioning and site restoration project rather than a solicitation document with specific product/service requirements or response instructions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CTY-W
CTY-31 MO
528.B
257.A
528.1
528.1
ST-145
ST-145
ST-145
Little Bean
Powerline Shush
Vantor
Banana Peel Road Decommissioning and Boulders Vicinity Map
0 1 20.5
Miles Author: saksentowitz, 8/11/2026, 11:13 AM Scale: 1:30,000
Private/Other Ownership
Contract Area, Clause 13, B1.1
Boggy Trail System, Clause 22
Access Road
Road Decommissioning
ML 2 Road, Clause 22
ML 3 Road, Clause 22
ML 4 Road, Clause 22
ML 5 Road, Clause 22
" Non-system Road
ÑôW
ÑôW
ÑôW ÑôW
ÑôW
528.B
257.A
257.A
257.A
257.A
Shush
Stage 8 boulders
Stage 52 boulders
Vantor
Banana Peel Shush Road Decomissioning and Boulders Map
0 0.15 0.30.07
Miles Author: saksentowitz, 8/11/2026, 11:13 AM Scale: 1:4,500
Private/Other Ownership
43 Boulders
ÑôW Waterbar
Boggy Trail System, Clause 22
Access Road
Road Decommissioning
ML 2 Road, Clause 22
ML 3 Road, Clause 22
257.A
257.A
Powerline
Stage 30 boulders
Microsoft, Vantor
Banana Peel Powerline Road Decommissioning and Boulders Map
0 0.03 0.060.01
Miles Author: saksentowitz, 8/11/2026, 11:13 AM Scale: 1:1,000
43 Boulders Boggy Trail System, Clause 22 Road Decommissioning ML 2 Road, Clause 22 ML 3 Road, Clause 22
Little Bean
Stage 30 boulders
Microsoft, Vantor
Banana Peel Little Bean Road Decomissioning and Boulders Map
0 0.03 0.060.01
Miles Author: saksentowitz, 8/11/2026, 11:13 AM Scale: 1:1,000
43 Boulders Boggy Trail System, Clause 22 Access Road Road Decommissioning ML 5 Road, Clause 22
;3!
CTY-S DO
528.B
257.A
528.1
528.1
CTY-31 MO
US-491
US-491
US-491 ST-145
ST-145
ST-145
ST-145
ST-184
ST-184
ST-184
ST-184
Little Bean
Powerline
Shush
Vantor
Banana Peel & Ormiston Pit Vicinity Map
¯0 2.5 51.25 Miles
Author: saksentowitz, 6/4/2026, 4:05 PM Scale: 1:80,000
;3! Ormiston Gravel Pit
Private/Other Ownership
Contract Area, Clause 13, B1.1
PI Transmission, Clause 22
Boggy Trail System, Clause 22
Access Road
Road Decommissioning
ML 2 Road, Clause 22
ML 3 Road, Clause 22
ML 4 Road, Clause 22
ML 5 Road, Clause 22
" Non-system Road
File details come from the government source that posted it. Updated .