This is Amendment 001 to Solicitation 12363N26Q4227 for the Banana Peel Distributed Salvage Program (DxP) Integrated Restoration Service Contract (IRSC), a Stewardship BPA issued by the USDA Forest Service for work on the San Juan National Forest's Dolores Ranger District. The amendment, effective August 31, 2026, does not extend the response date for proposals.

The amendment makes three substantive changes to the original solicitation. First, it increases the diameter limit specifications for Appendix A Section II Mandatory Work Item 2 and Optional Work Item 5 (Cut Skid and Deck operations for non-saw and dead sawtimber), now applying to Contractor-felled trees that are live/dead non-saw 5.0"-8.9" DBH and dead sawtimber 9.0" DBH – 21.9" DBH meeting utilization standards in Appendix B. Second, it corrects Appendix B scaling specifications, amending the maximum gross vehicle weight restriction from the erroneous 8,500 pounds to the correct 85,000 pounds for load count sales. Third, it adds documentation from the August 25, 2026 Banana Peel IRSC Site Visit, including attendee lists from Forest Service, Markit! Forestry, and DNT Logging, and meeting summary notes addressing project overview, work activities, product removal volumes, road maintenance, trail system operations, unit designations, and responses to bidder questions regarding boulder availability, trail closure signage, cutting specifications, scaling methodology, boundary marking, and road closeout requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

363N 1 3

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

001 08/31/2026

6. ISSUED BY CODE 363N 7. ADMINISTERED BY (If other than Item 6) CODE 363N USDA Forest Service Procurement & Property Services National Stewardship Contracting Branch 1400 Independence Ave. SW, MS-1138 Washington DC 20250-1138

Same as issuing office

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

X 12363N26Q4227

9B. DATED (SEE ITEM 11)

08/12/2026

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: 52.211.18 THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 1 and 2.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

BANANA PEEL DxP IRSC

ROCKY MOUNTAIN RESTORATION PROJECT (RMRP) STEWARDSHIP BPA

SAN JUAN NATIONAL FOREST

DOLORES RANGER DISTRICT

AMENDMENT 001

** See page 2-3 for Amendment details**

Except as provided herein, all terms and conditions of the documents referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

KEITH BRUGGER

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 2 of 3

Amendment 001

BANANA PEEL DxP IRSC

ROCKY MOUNTAIN RESTORATION PROJECT (RMRP)

STEWARDSHIP BPA

SAN JUAN NATIONAL FOREST

DOLORES RANGER DISTRICT

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The response date for proposals is NOT extended with this Amendment.

1. Increases diameter limit of App A Section II Mandatory Work Item 2 AND Optional Work Item 5 Cut Skid and Deck non-saw and dead sawtimber Skid/Deck specifications. Specification 1 shall now state “Applies to all Contractor-felled trees that are live/dead non-saw 5.0”-8.9” DBH and dead sawtimber 9.0” DBH – 21.9" DBH that meet utilization standards as identified in Appendix B.”

2. Corrects Appendix B C6.825#-SCALING AS PRESENTED (SALES BY LOAD COUNT) maximum gross vehicle weight restriction to 85,000 pounds. The previously, erroneously, stated 8500.

3. Adds the August 25, 2026, Banana Peel IRSC Site Visit attendee list and meeting summary notes:

Individual Agency-Business S. Martin Aksentowitz Forest Service David J. Casey Forest Service Griffin Harris Forest Service Bryan Brehl Markit! Forestry Guy Wallace DNT Logging Ty Williams DNT Logging

Locations:

Dolores Ranger District Office 29211 Highway 184; Forest Service Road 528.1, between units 1 and 2, Forest Service Road 527, at Shush Road closeout.

Summary:

Overview of the Banana Peel IRSC contract was provided by Forest Service representatives. The group reviewed project work activities and product removal volume/species. The group discussed road maintenance, operations regarding adjacent Boggy Trail system and Powerline right of way, and road closeout work items..

The group visited LTM Unit 2 and discussed the 22” DBH diameter cap and LTM unit Designation, and topography. Potential bidders were relieved that only Unit 2 was interior marked. Forest Service personnel discussed operation requirements regarding the trail system, and communication needed during operations to ensure recreational safety. The group discussed the operating requirements to enter unit 2 first as an example of the cut/leave preferences for the contract. The site visit was fairly short as only two parties were present, and both had experience on the district. Any units not requiring cut, skid and decking of non-saw and dead material are units in which that volume was too low to warrant such operations.

Other Items Discussed During Site Visit

1. Does Orminston Pit contain enough boulders to supply work items 17n, 8b, 9b and 10?

FS has inspected Orminston Pit and ensures we have enough boulders for work item.

2. Who will post the trail safety/closure signs?

FS recreation staff would install all trail closure signs, but require two weeks’ notice before beginning a new unit. During operations, all portions of the trail system through active unit(s) would be closed to public.

3. What are cutting specifications? Is cut to length ok?

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE 3 of 3

Amendment 001

BANANA PEEL DxP IRSC

ROCKY MOUNTAIN RESTORATION PROJECT (RMRP)

STEWARDSHIP BPA

SAN JUAN NATIONAL FOREST

DOLORES RANGER DISTRICT

Yes cut to length is ok. Utilizations specifications are listed in Appendix B and include saw log (cut/remove) as well as cut/skid/deck specifications.

4. Will this be a load count or scale sale?

Per Appendix B C6.825#, Method of scaling is load count.

5. Are all boundaries marked?

Unit boundaries are a mix of painted, discernable, and virtual. Most discernable boundaries are roads, fences, or trails. Painted boundaries are typically unshared boundaries, that do not have discernable features. Virtual boundaries are reserved mainly for shared boundaries between units. See C2.301#

6. What is required for road work closeout?

Description of work provided in Appendix A.