7_CDRL- D001 Final-_Redacted.pdf

PDF 148 KB Posted

Attached to
MCB Hawaii Kaneohe Bay Non-Destructive Concrete Survey
Solicitation number
N6426723Q5099
Issued by

About this file

This document is a Contract Data Requirements List (CDRL) outlining requirements for a Professional Engineering (PE) Analysis Report to support the KC-130J Training System contract. The contractor must submit a draft report within 60 calendar days of award and a final report within 90 calendar days of award. Both the Navy and contractor program offices require one electronic copy delivered via secure file transfer in Microsoft Office or Adobe format. The report aims to support Program Management Office 207 and must include the distribution statement that it is for Department of Defense and U.S. DOD contractor use only. Revisions are due as required through the end of the contract period.

View the file

Other files

File Type Posted
N6426723Q5099 Amendment 4.pdf PDF
N6426723Q5099 amend 3.pdf PDF
N6426723Q5099 amend 2.pdf PDF
14_N6426723Q5099_Amendment1.pdf PDF
WD 2015-5689-Hawaii.pdf PDF
7_DI SESS 81839.pdf PDF
N6426723Q5099 RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TBD E TDP _____ TM _____ OTHER SESS

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

KC-130J TRAINING SYSTEM (2F199-5) TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 PROFESSIONAL ENGINEERING (PE) ANALYSIS

REPORT N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-80839 SOW PARA D PMA 207

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

LT REQUIRED ASREQ ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE

D

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. Draft Final A SEE BLOCK 16 SEE BLOCK 16 Reg Repro

16. REMARKS NAWCTSD FACR 1 1 1

The Contractor shall use electronic submissions or other secure file transfer. Each delivery shall include a standard cover letter, method of submission, and supply the control/tracking number, as applicable. Electronic submittals from the Contractor shall be in a format compatible with Microsoft Office or Adobe Acrobat Reader, latest version. DIDs are provided for guidance only; MIL-STDs and MIL-SPECs listed in the DID are for information purposes only.

Block 4: CONTRACTOR FORMAT ACCEPTABLE, FOLLOWING THE DI-SESS

80839 GUIDANCE.

Block 8: THE GOVERNMENT WILL HAVE 15 CALENDAR DAYS FOR REVIEW

AND ACCEPTANCE/REJECTION OF THE FIRST SUBMISSION, AND 30

CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF THE FINAL

SUBMISSION.

Block 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE

DELIVERABLE:

DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO

DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY

(ADMINISTRATIVE OR OPERATIONAL USE) (23 JULY 2019). OTHER REQUESTS

FOR THIS DOCUMENT SHALL BE REFERRED TO PMA-207.

WARNING: THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT

IS RESTRICTED BY THE ARMS EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC

2751, ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED,

TITLE 50, U.S.C., APP. 2401 ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE

SUBJECT TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE

WITH PROVISIONS OF DOD DIRECTIVE 5230.25.

Block 10: REVISIONS SHALL BE DUE AS REQUIRED THROUGH END OF

CONTRACT.

Block 12: FIRST SUBMISSION (DRAFT) SHALL BE DUE 60 CALENDAR DAYS

AFTER CONTRACT AWARD.

Block 13: FINAL SUBMISSION SHALL BE DUE 90 CALENDAR DAYS AFTER

CONTRACT AWARD.

Block 14: ALL DRAWINGS SHALL HAVE DIMENSIONS AND BE TO SCALE AND

PROVIDED WITH SCALE LABEL IN EACH DRAWING.

NAWCTSD DAPML 1 1 1

NAWCTSD PJM 1 0 1

15. TOTAL ▬▬▬▬► 3 2 3

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

1 Sept 2023 DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1

File details come from the government source that posted it. Updated .