7-Bid Tab Spreadsheet.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
HOYTSVILLE BRIDGE AND ROAD WIDENING AND WEBER CANYON BRIDGE PROJECT
Solicitation number
SCPW-07-26
Issued by
Weber County, Utah

About this file

This is a bid tab spreadsheet for two infrastructure projects in Utah: the Hoytsville Bridge and Road Widening project and the Weber Canyon Bridge project. The Hoytsville project involves constructing a new bridge, demolishing the existing bridge, widening the roadway from twenty-five feet to thirty-four feet, and applying a three-inch asphalt overlay for approximately 3,500 linear feet. The Weber Canyon project requires constructing a new bridge approximately sixty feet north of the existing structure, constructing new road alignment, and demolishing the existing bridge and reclaiming the old roadway. Schedule 1 (Hoytsville Road) contains 28 line items plus one alternative bid item for a boulder retaining wall for an access road, encompassing work categories such as mobilization, traffic control, demolition, embankment work, asphalt paving, bridge construction, guardrails, riprap, and revegetation. Schedule 2 (Weber Canyon Road) contains 28 line items covering similar work categories tailored to the specific project requirements.

Bidders are required to enter unit prices in the green cells (Column E) of the spreadsheet for each line item across both schedules and submit their bids via BONFIRE. The spreadsheet provides estimated quantities for each item, including quantities ranging from lump sum (LS) entries for mobilization, traffic control, demolition work, and specialized tasks, to measured quantities for items such as asphalt removal (87,500 square feet in Schedule 1), embankment fill (4,400 cubic yards in Schedule 1 and 2,800 cubic yards in Schedule 2), hot mix asphalt pavement (1,850 cubic yards in Schedule 1 and 50 cubic yards in Schedule 2), W-beam guardrail (1,100 linear feet in Schedule 1), and riprap (400 cubic yards in Schedule 1). The total bid price will be calculated as the sum of Schedule 1 and Schedule 2, with an option to include the alternative bid item for a total bid price that incorporates both schedules plus the alternative.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Tab Enter Unit prices in green cells (Column E)

SCHEDULE 1 - Hoytsville Road
Item No.Item DescriptionUnitEstimatedBid UnitPrice
QuantityPrice
1.1MobilizationLS1$0.00
1.2Traffic Control (incl. TCP)LS1$0.00
1.3SWPPP & Erosion ControlLS1$0.00
1.4Existing Bridge & Abutment DemolitionLS1$0.00
1.5Guardrail RemovalLS1$0.00
1.6ROW Fence Removal & ReplacementLS1$0.00
1.7Fishing Access Ladder Removal & ReplacementLS1$0.00
1.8Sign Removal & ReplacementLS1$0.00
1.9Clearing & Grubbing and Tree RemovalLS1$0.00
1.10Asphalt Removal / RotomillSF87,500$0.00
1.11Overexcavation and Shoulder WideningCY780$0.00
1.12Embankment FillCY4,400$0.00
1.13Embankment Topsoil ImportedCY900$0.00
1.14Gravel DrivewayCY50$0.00
1.15Untreated Base Course or Rotomill RecycleCY2,750$0.00
1.16Hot Mix Asphalt (HMA) Pavement W/ Reinforcing GridCY1850$0.00
1.17Pavement Striping (4" White & Yellow)LS1$0.00
1.18Boulder Retaining WallLF105$0.00
1.19Boulder Parking BarrierLS1$0.00
1.20New Bridge Structure (Complete in Place)LS1$0.00
1.21Sheet Pile / Cofferdam and DewateringLS1$0.00
1.22RiprapCY400$0.00
1.23W-Beam GuardrailLF1,100$0.00
1.24End Treatments & TransitionsLS1$0.00
1.25Culvert LiningLS1$0.00
1.26Culvert HeadwallLS2$0.00
1.27Biomat, Seeding & RevegetationLS1$0.00
1.28Final Cleanup & DemobilizationLS1$0.00
Subtotal Schedule 1$0.00
ALTERNATIVE BID ITEMS
Item No.Item DescriptionUnitEstimatedBid UnitBid Price
QuantityPrice
1.ABoulder Retaining Wall for Access RoadLF230$0.00

Total Schedule 1

SCHEDULE 2 - Weber Canyon Road
Item No.Item DescriptionUnitEstimatedBid UnitBid Price
QuantityPrice
2.1MobilizationLS1$0.00
2.2Traffic Control (incl. TCP)LS1$0.00
2.3SWPPP & Erosion ControlLS1$0.00
2.4Existing Bridge & Abutment DemolitionLS1$0.00
2.5Guardrail RemovalLS1$0.00
2.6ROW Fence Removal & ReplacementLF1$0.00
2.7Fishing Access Ladder Removal & ReplacementLS0$0.00
2.8Sign Removal & ReplacementLS1$0.00
2.9Clearing & Grubbing and Tree RemovalLS1$0.00
2.10Asphalt Removal / RotomillSF0$0.00
2.11Over excavation and Shoulder WideningCY0$0.00
2.12Embankment Fill ImportedCY2,800$0.00
2.13Embankment TopsoilCY720$0.00
2.14Gravel DrivewayCY0$0.00
2.15Untreated Base Course or Rotomill RecycleCY450$0.00
2.16Hot Mix Asphalt (HMA) Pavement W/ Reinforcing GridCY50$0.00
2.17Pavement Striping (4" White & Yellow)LS0$0.00
2.18Boulder Retaining WallLF0$0.00
2.19Boulder Parking BarrierLS0$0.00
2.20New Bridge Structure (Complete in Place)LS1$0.00
2.21Sheet Pile / Cofferdam and DewateringLS1$0.00
2.22RiprapLS1$0.00
2.23W-Beam GuardrailLF0$0.00
2.24End Treatments & TransitionsLS1$0.00
2.25Culvert LiningLS0$0.00
2.26Culvert HeadwallLS0$0.00
2.27Biomat, Seeding & RevegetationLS1$0.00
2.28Final Cleanup & DemobilizationLS1$0.00
Total Schedule 2$0.00
Total Bid Price (Sch. 1 + Sch 2)$0.00
Total Bid Price (Sch. 1 + Sch 2 + Alt Bid)$0.00

File details come from the government source that posted it. Updated .