7-Attachment G-Total Project Cost.pdf
PDF 99 KB Posted
- Attached to
- HBS RTU REPLACEMENTS
- Solicitation number
- PROJ-26-073
- Issued by
- Volusia County, Florida
About this file
This is a bid form attachment for Halifax Health Medical Center, a Florida state and local entity, for construction services related to the replacement of four RTUs (Units 11, 12, 13, and 14) at Halifax Health Behavioral Services under Invitation to Bid (ITB) #PROJ-26-073. The project requires qualified contractors to submit comprehensive bid responses that include a detailed project schedule and timeline demonstrating full understanding of the scope and specifications, a Schedule of Values itemized by division with any requested allowances listed separately, and a detailed work description showing comprehension of the Scope of Work. Bidders must hold their proposals open for acceptance for 120 days from the bid due date and agree to complete all work in accordance with the bid solicitation details within a schedule submitted for Halifax Health Medical Center's review and approval.
Contractors submitting bids must provide a total delivered price for the project and acknowledge responsibility for any facility repairs resulting from damages caused by trucks operating outside designated routes. The bid form requires identification of the submitting company and does not specify set-aside categories, incumbent contractors, or specific funding sources. No pricing guidance, contract term length, or renewal options are detailed in this attachment, though the form indicates that a detailed Schedule of Values and allowances documentation must accompany all bid submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT G
HALIFAX HEALTH MEDICAL CENTER
BID FORM of TOTAL PROJECT COST
Invitation to Bid for Construction Services
ITB # PROJ-26-073 — HBS RTU REPLACEMENTS
I/We propose to furnish the work described below at the following delivered price:
Contractor shall be responsible for any repair needed to the facility as a result of damages caused by trucks going outside designated routes.
As part of the project bid submittal, a detailed schedule/timeline must be included with each bid response. Sufficient detail will be included in the project schedule/timeline to demonstrate the bidder fully understands the project scope and specifications.
In addition, a Schedule of Values detailed by division must be provided with bid submittal and will include any requested allowances. Requested allowances will be listed separately.
Bidder will include with their bid submittal a detailed work description to show they fully understand the Scope of Work.
The Contractor agrees to:
A. Hold this bid open to acceptance for 120 days from the bid due date.
B. Accomplish project work in accordance with details provided in the bid solicitation.
C. Complete the work within a detailed schedule submitted to HHMC by the successful bidder for review and approval.
BID SUBMITTED BY: