This Scope of Work is issued by the State of Utah Division of Purchasing and the Cedar City Field Office of the Bureau of Land Management for aerial herbicide application services in Iron County, Utah. The project requires aerial application of imazapic herbicide (Plateau or approved equivalent) on approximately 526 acres located 1 mile southwest of New Castle, Utah, to control cheatgrass. The contractor must furnish all herbicide, adjuvants, equipment, supervision, transportation, and operating supplies necessary to complete the work. Application may be conducted using a helicopter, fixed-wing aircraft, or unmanned aircraft system (UAS/drone) capable of meeting GPS tracking and coverage requirements. The contract performance period runs from September 28 through December 15, with a project performance time of 2 calendar days from the Notice-to-Proceed. No mandatory site visit is required prior to bidding, though potential bidders are strongly encouraged to inspect the site. A pre-work conference will be held at the project site to review specifications, schedules, and administrative provisions. Participation is limited to pre-qualified contractors only, and the contract will be awarded to the lowest responsive and responsible bidder.

Bidding will be conducted on a per-acre price basis, with the total project price calculated by extending the per-acre rate across the 526 acres; this price must include all labor, equipment, materials, mobilization, and operating costs with no fuel surcharges or adjustments negotiated. Bidders must submit detailed specifications of the proposed aircraft type and spray system configuration to demonstrate capability to meet required application rates and project specifications. Payment will be based on actual acres treated as verified by GPS tracking data and application records submitted within two business days of treatment completion. The contractor is responsible for GPS equipment, water supply, herbicide transportation and storage, cleanup of accidental spills, disposal of used containers in accordance with local regulations, and restoration of any roads damaged during operations. No government property will be furnished. The State reserves the right to implement minor change orders of up to 10 percent of the original project acreage at the original per-acre bid price, or to negotiate major change orders for changes exceeding 10 percent, subject to a liability cap calculated as the per-acre bid price multiplied by 10 percent of remaining untreated acreage. Winter stoppage provisions allow the State to halt work due to frozen soil or winter conditions and either pay the contractor or issue a resumption order when conditions permit.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B SCOPE OF WORK

NC27-110 Newcastle Herbicide PROJECT: New Castle Herbicide LOCATION: 1 mile southwest of New Castle, UT

PRE-QUALIFICATION:

Pursuant to the Utah Procurement Code, participation in this is limited to pre-qualified contractors only. Bids or quotes submitted by a non-prequalified contractor will not be considered.

Introduction: Cedar City Field Office - Bureau of Land Management (CCFO) is acquiring services in this contract to provide for aerial application of Plateau on approximately 526 acres of lands managed by the BLM for cheatgrass control. This task order includes the Contractor to furnish herbicide, adjuvant, equipment, supervision, transportation, operating supplies, and incidentals. The project area totals approximately 526 acres as identified on the attached site map. Comment by Shotwell, Erica A - DOI USWFS: Review again. New template is a little rough Comment by Bayles, Douglass M: I think it reads fine.

SECTION I – PROJECT REQUIREMENTS

SITE SPECIFICS:

Location and Description: The work under this contract is located 1 mile SW of New Castle within Iron County. Elevations range from 5,350 feet to 5,650 feet within the project site. The treatment boundaries will not be flagged and must be located by GPS. The work location is shown on the general location and site maps

Acreage:526

Access to the site: Access to the project site is provided by a combination of paved highways, county dirt surface roads, and jeep trails. Four (4) wheel drive vehicles are recommended in and around the project area. It will be the contractor’s responsibility to get the equipment to the work site.

SPECIFIC TASKS:

Work Limits: The Contractor shall aerially apply imazapic herbicide only within the treatment polygons identified on the Project Map on BLM-administered lands. Application may be completed using a helicopter, fixed-wing aircraft, or unmanned aircraft system (UAS/drone) capable of meeting the application, coverage, and GPS requirements of this contract.

Project area boundaries will be provided electronically. The Contractor shall furnish and utilize GPS equipment capable of loading and displaying treatment polygon boundaries and recording flight lines and treatment activities. Application shall provide complete and uniform coverage while minimizing skips, excessive overlap, drift, and application outside designated treatment boundaries.

The Contractor shall record GPS flight lines/tracks for all applications and maintain application records documenting, at a minimum, the date of application, acres treated, herbicide product and quantity applied, adjuvant product and quantity applied, carrier volume, and application rate. GPS data and application records shall be provided to UDWR within two (2) business days following treatment. These records will be used by the Project Inspector to verify treatment coverage, application uniformity, compliance with treatment boundaries and specified rates, and actual acres completed.

Payment will be based on the actual acres treated and verified by GPS tracking data, calculated to the nearest acre. Payment will not be authorized until treatment records have been submitted and satisfactory completion has been verified by the Project Inspector.

The Contractor shall furnish all herbicide, adjuvants, water, aircraft, spray and mixing equipment, GPS equipment, qualified personnel, fuel, transportation, and all other materials, supplies, and equipment necessary to complete the work.

Herbicide:

1. Herbicide and Application Rate: The herbicide shall consist of Plateau or another imazapic formulation approved in writing by the BLM Project Inspector prior to application. The product must be labeled for the proposed rangeland and aerial application and contain approximately 2.0 pounds imazapic acid equivalent per gallon. Imazapic shall be applied at a rate equivalent to 6 fluid ounces per acre of a 2.0 lb a.e./gallon formulation (approximately 0.094 lb a.e./acre) in 7 gallons of total spray solution per acre.

2. Adjuvants: MSO as appropriate for the application objective, may be used in accordance with herbicide and adjuvant label directions and applicable BLM requirements. Where drift or off-target movement is a concern, including areas adjacent to private property, an appropriate drift-control and/or deposition adjuvant may be required. Other compatible products may be proposed by the Contractor and approved during the pre-work meeting or in writing by the BLM Project Inspector prior to use.

3. Product Substitutions: No substitutions or replacements of specified herbicides, adjuvants, or other spray additives shall be made without prior written approval from the BLM Project Inspector. All proposed products shall be compatible with the herbicide, labeled for the intended use, and meet applicable BLM requirements.

4. Equipment/Spray Nozzles: Application equipment shall be equipped and calibrated to provide uniform distribution at the specified application and carrier rates and to minimize drift and off-target application. The Contractor shall furnish all mixing, agitation, loading, and application equipment necessary to safely prepare and apply the treatment mixture. Treatment materials shall be mixed and handled in accordance with product labels and applicable requirements. The Contractor shall arrange for and furnish all water required for the project.

5. Environmental Conditions: Application of treatment chemicals shall not be done when the wind velocity exceeds 6 miles per hour. Contractor shall be responsible for timing herbicide application to ensure application adequate moisture is present for herbicide activation. Herbicides shall not be applied when ground is frozen. Spraying operations will be permitted only during daylight hours. The contractor is responsible for ensuring that the application of herbicide meets all label specifications. The contractor shall be responsible for cleanup of accidental spills, following proper handling and storage precautions, and ensuring proper exposure control and personal protection is proved as defined by the herbicide label and Safety Data Sheets.

6. Transportation of Herbicide: The Contractor shall load and transport herbicide from the Contractor's home base to the work site and between sites according to all applicable laws and regulations. The contractor is responsible for the transportation and storage of the supplies (including water) and equipment used for the project. Upon completion of the work or termination of the contract. Disposal of all used containers and other materials shall be done according to the label and local laws and regulations.

CONTRACTOR FURNISHED EQUIPMENT:

Equipment Requirements: The Contractor shall furnish all personnel, aircraft, materials, and equipment required to complete the project. This includes Plateau herbicide, MSO surfactant, water, mixing and loading equipment, aircraft, GPS technology, vehicles, fuel, and all other associated tools and equipment. The Contractor is responsible for supplying all mixing equipment and water, as well as the chemicals and MSO.

GOVERNMENT FURNISHED PROPERTY:

No Government property shall be furnished on this project.

EQUIPMENT AND WORKMANSHIP:

All equipment and/or materials incorporated into the work covered by this contract shall be of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. All work under this contract shall be performed in a skillful and workmanlike manner. The State may require, in writing, that the contractor remove from the work any employee deemed by the State to be incompetent, careless, or otherwise objectionable.

Surface Conditions: Application of treatment chemicals shall not be done when the wind velocity exceeds 6 miles per hour. Contractor shall be responsible for timing herbicide application to ensure application adequate moisture is present for herbicide activation. Herbicides shall not be applied when ground is frozen. Treatments with chemical shall only be applied on those days when weather permits as per label instructions. Application shall only occur when ambient air temperatures are above 32°F (0°C) and the wood surface is free of ice, frost, or standing moisture. Application is strictly prohibited if freezing temperatures are forecast within 24 hours post-treatment. Comment by Shotwell, Erica A - DOI USWFS: Repetitive, could remove as it is in the above work specific section. Comment by Bayles, Douglass M: Agreed. Comment by Shotwell, Erica A - DOI USWFS: Review Plateau labels for this. Comment by Bayles, Douglass M: Yeah google says do not spry below 60 °F or with a hard freeze or frost. But I think that’s if your actively targeting at the time of application. But will still be active for one full season.

Surface Disturbance: Public or private access roads damaged by the Contractor shall be restored at the Contractors expense to the same condition they were in at the commencement of work. Staging site will be determined during pre-work conference.

Tests for Uniformity: The Contractor shall provide GPS-recorded flight lines and application records documenting the total gallons of Plateau herbicide and adjuvant applied within five (5) business days following completion of the treatment. The Project Inspector will review these records to verify uniform coverage, application rates, and completion of the project area. Payment will be based on satisfactory verification of treatment completion and compliance with the specified application requirements.

CONTRACT TIME – September 28 through December 15, unless the ground becomes frozen or weather conditions result in persistent snow cover that prevents effective herbicide application.

Project Performance Time: 2 calendar days from the official Notice-to-Proceed (NTP)

SECTION II – BID REQUIREMENTS/INFORMATION

SITE VISIT:

A site visit will NOT be held prior to bidding. It is strongly recommended that each potential bidder inspect the site where services are to be performed and satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

MAPS/FILES

New Castle Herbicide Project Map New Castle Herbicide Vicinity Map New Castle Shapefile

QUESTIONS:

Only questions specific to the site should be asked at the site visit (if held). Questions related to this solicitation, specifications, or bidding procedures MUST be asked in writing on the Q&A board within the solicitation to keep the process fair and transparent. There are no exceptions to this. Questions asked at the site visit and subsequent answers will be recorded and posted in the solicitation so that all potential bidders can review questions and answers.

BIDDING:

This contract will be bid on a per-acre price. The per-acre price will be extended based on the number of acres to show a total project price. The total price shall include all labor, equipment, and materials necessary to complete the job, which includes all mobilization and operating costs. There will be no fuel surcharges or adjustments negotiated.

EQUIPMENT:

Bidders must provide the make, model, and type of aircraft or unmanned aircraft system (UAS) proposed for use with the bid submittal. Aircraft type may include helicopter, fixed-wing aircraft, or UAS/drone. The submittal must also identify the spray system and application equipment, including tank or payload capacity, boom or nozzle configuration, and other relevant equipment specifications necessary to demonstrate the ability to meet the required application rate and project specifications. Comment by Shotwell, Erica A - DOI USWFS: I’m fine with helicopter, fixed wing or drone. I think this could be changed. Comment by Bayles, Douglass M: I agree. Comment by Shotwell, Erica A - DOI USWFS: Updated.

This information will be used by the Project Manager to determine whether the proposed aircraft and application equipment are suitable for the project.

CONTRACT AWARD:

A contract will be awarded to the lowest responsive/responsible bidder who meets any experience and equipment requirements noted elsewhere in this solicitation.

USE OF SUBCONTRACTORS:

The Project Manager must approve the use of all subcontractors in writing prior to their performance of any work on the project. Any company or individual who submitted a bid on the project, was offered the project as the low bidder, and declined that award, or who defaulted on project after being awarded the contract, is ineligible to be a subcontractor for, or an employee of, the successful bidder.

SECTION III – ADDITIONAL REQUIREMENTS

ENVIRONMENTAL CONSIDERATIONS:

Project sites shall be cleaned up, and all refuse removed by the Contractor. The Contractor shall be responsible for the disposal of materials in a manner consistent with State, Federal, and local laws and for all expenses incurred with the disposal. Public or private access roads damaged by the Contractor shall be restored at the contractor's expense to the same condition they were in at the commencement of work.

Use of 2-wheel and 4-wheel vehicles is permitted in the project areas. Off-road driving will be prohibited when soils are wet and rutting may occur.

Hazardous Materials:

1. Use of Hazardous Materials and/or petroleum products requires that all appropriate State and Federal Regulations be complied with including, but not limited to, Materials Safety Data Sheets (MSDS) on hand and use of necessary Personal Protective Clothing (PPE).

2. On-site disposal of Hazardous Materials or Waste including hydrocarbons is not authorized. On-site disposal will subject the contractor to at least the cost of reclamation and the appropriate disposal of contaminated soil.

3. Incidental (de minimus) leaks from fittings, gaskets, or ruptured hoses will not subject the contractor to remedial requirements. They will be considered to be normal and unavoidable losses. Continual leaks will be noted on inspection reports and correction through maintenance is required.

4. Maintenance and repair operations that require the draining of engines or hydraulic systems may be conducted on-site only if the fluids are captured, containerized, and removed from public lands for proper disposal.

PUBLIC ACCESS:

Access into and through the project site shall remain open to the public at all times. The Contractor shall maintain roadways free of vehicles, tools, and debris.

SECURITY OF EQUIPMENT AND PROPERTY:

The Contractor may leave equipment at the work site, however, the Contractor shall be solely responsible for the protection of equipment and is solely responsible if the equipment is lost, stolen, or damaged.

CREW SUPERVISION:

1. The contractor shall designate one English-literate supervisor who will be on site during operation hours. Supervisors shall be identified during the pre-work conference. Any changes in supervisory designations must be submitted in writing to the Project manager at least 24 hours before the change takes effect.

2. The person designated by the Contractor, as supervisor must remain with and effectively direct the crew by (1) making periodic inspections of the crew’s work, (2) advising them as to improper work methods, (3) providing instructions for correcting any improper work methods encountered.

3. Emergency transportation will be provided by the Contractor at all times.

WORK CAMPS:

Work camps may be established only in locations authorized in advance by the Project Manager in coordination with the Government. Should such a camp be authorized, the Contractor shall maintain the camp in an orderly and sanitary manner. Upon vacating a camp and before final payment, the Contractor shall remove all refuse and other signs of occupancy to the satisfaction of the Project Manager.

WORK HOURS:

Work hours under this contract shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. Work hours may extend into darkness only when the contractor’s equipment is suitably outfitted with exterior lighting sufficient to allow safe operation; AND only when mutually agreed upon between the contractor and the project manager. Work may be done on Saturday, Sunday, and legal national holidays as mutually agreed between the Contractor and the Project Manager.

WORK SCHEDULE:

The work schedule shall be submitted at the pre-work conference.

DELAYS:

The contractor is expected to complete all contract performance in a timely manner, regardless of the contractor or subcontractor's other workload, including any work being performed under other state contracts. A delay or failure to perform may be considered excusable when the delay or failure arises from causes beyond the control and without the fault or negligence of the Contractor or subcontractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the State in either its sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (8) freight embargoes, and (9) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor or subcontractor.

Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results from one or more of the causes above, the delivery schedule may be revised, subject to the State’s contract termination rights under the contract.

Note: “Unusually severe weather” means weather that is outside the normal weather patterns for a specific area at a specific time of the year. For example, strong wind and snow storms in fall and winter, or strong wind, rain or hail storms in spring and summer are not considered unusually severe. An unusually severe snow, wind or rain storm is one that is worse than even the harshest normal conditions during a season.

PROJECT MEETINGS:

Pre-work Conference:

Location: Meetings shall be held at the project site, or as determined by the Project Manager.

Notification: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of the meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.

Attendance: The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

Presentation: The Contractor shall be prepared to summarize and explain procedures planned for each project and present the work schedule requested in the specifications.

Progress Meetings:

Location: Meetings shall be held at the project site, or as determined by the Project Manager.

Notification: Meetings may be called by either the Project Manager or the Contractor. Request shall state who should attend.

PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA:

The Contractor agrees that should he or any of his employees in the performance of this contract discover evidence of possible scientific, pre-historical, historical, or archeological data he will notify the Project Manager immediately giving the location and nature of the findings.

Where appropriate by reason of discovery, the Project Manager may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted.

The Contractor agrees to insert this paragraph in all subcontracts, which involve the performance of work on the terrain of the site.

PROTECTION OF CULTURAL RESOURCES:

Location of known historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture, such as settler or Indian artifacts, protected by American Antiquities Act of 1906 (16 U.S.C. 431-433), National Historic Preservation Act of 1966 (16 U.S.C. 470) and the Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa-ll) (36 CFR 296.4 and 36 CFR 261.9(g)), shall be identified on the ground by the Government. The Government may unilaterally modify or cancel this contract to protect an area, object of antiquity, artifact, or similar object that is or may be entitled to protection under these Acts regardless of when the area, object, or artifact is discovered or identified. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the site is determined.

The contractor shall protect all known and identified historic or prehistoric sites, buildings, objects, and properties related to American history, architecture, archaeology, and culture against destruction, obliteration, removal, or damage during the Contractor's operations. The contractor shall immediately notify the Government if disturbance occurs to any known site, and shall immediately halt operations in the vicinity of the site until the Government authorizes the Contractor to proceed. The contractor shall bear costs of evaluation and restoration in accordance with 36 CFR 296.14(c), provided that such payment shall not relieve the Contractor from civil or criminal remedies otherwise provided by law.

NOTICE TO PROCEED:

Unless notified by the project manager that notice-to-proceed will be delayed, receipt of the contract or purchase order by email shall constitute a Notice to Proceed. The Project Manager may issue a separate delayed notice-to-proceed for any reason including adverse soil, vegetative, climatologic, or other environmental conditions.

CONTRACT PERFORMANCE:

The Contractor shall begin work within seven (7) calendar days from the effective date of the notice to proceed. The Contractor shall continue the performance of the work under the contract without delay or interruption except by causes beyond his control identified in the Delays clause. While an extended performance window is provided in this statement of work, this extended window is designed for contractors who may have multiple contracts to complete for the State of Utah at the same time as this contract. The extended performance window is not to be construed as a full performance time window just for this project unless approved in advance in writing by the State’s project manager. Once the contractor is on site working, the contractor shall work diligently and complete all work within the project performance time in the Contract Time clause below.

It is the contractor’s sole responsibility to complete contract performance regardless of the contractor’s current workload, including other state contracts. If necessary, the contractor will be expected to take whatever means are necessary to ensure timely contract performance. At the discretion of the contractor, this may include sub-contracting, additional equipment/manpower, and/or any other necessary action. Any necessary action taken by the contractor to ensure timely completion shall be at no additional expense to the State of Utah beyond the original contract price.

INSPECTION:

Surveillance Plan: The Government will inspect completed acres and provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to ensure that work complies with the contract specifications.

Final Inspection:

Location: Meeting shall be held at the project sites, or as determined by the Project Manager.

Notification: The Contractor shall notify the Project Manager at least three (3) working days before the completion date so the Government can schedule the final inspection.

Deficiencies: The Contractor shall correct deficiencies and project areas will be re-inspected by the Project Manager.

ACCEPTANCE:

Based on inspection results, if the quality level falls below contract specifications, the Project Manager will immediately notify the Contractor in writing and instruct the Contractor to improve the quality of work. If the quality of the work is not raised to an acceptable level after written notification, the Project Manager may issue a suspension work order to resolve the problem, during which time contract time will continue to run.

If untreated or unsatisfactorily treated areas are the primary reason for unsatisfactory work, the Contractor shall rework acres designated by the Government until satisfactory work quality is obtained.

PAYMENT:

One lump-sum final payment will be made for the actual number of acres completed following a final inspection of the completed project, and consistent with the payment clause in the State’s standard terms and conditions. Normally, requests for partial payments will not be considered. However, if a partial payment request is considered, approval of said request shall be at the total discretion of the State. The contractor must get a partial payment request approved in writing before submitting an invoice for partial payment. Partial payment invoices received without prior approval will be returned to the contractor as not proper for payment.

WINTER STOPPAGE:

At the sole discretion of the State and or the Federal Partner this contract may be stopped at any time due to frozen soil or other winter conditions. Once the contract work is stopped for winter, the state may pay the contractor and cancel the remaining portion of the contract, or issue a resumption of work order when spring weather permits. The contractor must proceed diligently with all work as weather permits until a stop-work order is issued.

CHANGE ORDERS:

Minor Change Order. If the State determines that a change in the Scope of Work is necessary, they may modify acreage totals or parcel configuration by up to 10% of the originally proposed Project Area by providing written notice to the Contractor (“Minor Change Order”). Issuance of a Minor Change Order does not excuse the Contractor from their obligation to perform the work under their original per-acre bid price, nor does it excuse the State from paying Contractor for work completed to project specifications. Changes in acreage or parcel configuration will add or exchange work areas with characteristics similar to those in the original Project Area. When possible, a Minor Change Order should be implemented so as to leave a consolidated and contiguous project area having similar access to that originally described in the Scope of Work.

Major Change Order. If the State determines that a change in the Scope of Work is necessary, and that change does not qualify as a Minor Change Order, the State and the Contractor may negotiate a Major Change Order as an amendment to the original contract. Examples of Major Change Orders include: (1) a reduction or cancellation of acreage that is greater than 10% of the original Project Area or (2) a change in the Project Area such that the new project characteristics are not comparable to those described in the original Scope of Work. Major Change Orders may authorize an increase in the unit price of per-acre bid submitted by the Contractor, payment of part or all of equipment mobilization costs incurred by the Contractor, or a combination of both. Any Major Change Order shall be supported by documentation supporting the equitable adjustment in contract terms and is subject to approval by the State of Utah Division of Purchasing.

Change Order Limitations. The sum of all payments made under one or more Change Orders on a single contract may not exceed the liability cap for the contract, calculated by identifying the per-acre bid price, and multiplying that figure by 10% of the acreage within the Project Area that remains untreated. For example, the maximum payment authorized under a Major Change Order would be calculated as follows:

$50 per acre bid price x (10% of 500 acres left untreated) = $2,500 Maximum or $250 per acre bid price x (10% of 1250 acres left untreated) = $31,250 Maximum

Nothing in this Section relieves the Contractor from their obligation to perform as described in Section 1, unless the State determines that a change order is appropriate. Under no circumstances may a Change Order exceed the total approved contract price. In most cases, the actual Change Order amount will be substantially less than the maximum liability cap for the contract. Nothing herein shall be construed as eliminating or modifying a Contractor’s obligation to mitigate damages they may incur due to the circumstances necessitating a Major Change Order, or the State’s right to terminate an Agreement in lieu of issuing a Change Order.