7-2-CS27028-20417810-Approved Revised Plans.pdf
PDF 31 MB Posted
- Solicitation number
- CS27028
- Issued by
- Utah
About this file
This document consists of approved revised plans for the WSU Waterline Replacement Phase 3 project, a construction initiative under the State of Utah Division of Facilities Construction and Management (DFCM) at Weber State University. The project encompasses the replacement of culinary water and secondary irrigation mains along 4100 South at the south end of the WSU main campus, including associated infrastructure such as vaults, valves, hydrant connections, and surface restoration. This Stage II Invitation to Bid is restricted to contractors who have been prequalified under the Stage I Prequalification process and currently appear on the DFCM Prequalified Contractors list as of the solicitation date. The construction cost estimate for this project is $1,400,000.00, and the approved revised plans serve as the technical specifications governing bidder proposals and project execution.
The revised plans document provides the detailed engineering drawings and specifications necessary for contractors to prepare accurate bids and execute the waterline replacement work. These plans reflect any modifications or clarifications made during the design phase and have received official approval from the project stakeholders. Contractors must use these approved revised plans as the basis for their bid submissions and construction activities. The document is essential for ensuring that all bidders have access to identical project specifications and that construction work meets the intended design standards for this critical campus infrastructure replacement project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .