This document is the Minimum Sampling and Testing Requirements for Materials and Pavements issued by the Utah Department of Transportation (UDOT) Materials and Pavements Division, with a revision date of March 17, 2026. The document provides comprehensive guidance on verification sampling and testing procedures for materials used in construction projects in compliance with 23 CFR 637B requirements. It establishes frequency schedules and testing protocols for materials processed at or near project sites, as well as materials obtained from qualified sources. The document covers numerous specification categories including embankment and borrow materials, base courses, asphalt mixes, concrete pavements, seal coats, and specialized materials such as MSE backfill and precast concrete elements. Testing requirements are detailed for each material type, specifying maximum lot sizes, sampling frequencies, sampling locations, laboratory testing references (primarily AASHTO standards), and specific measurement protocols.

The Resident Engineer is responsible for obtaining all substantiating documentation to verify acceptance of contractor work and ensure specification compliance to support payment. Materials processed at or near project sites undergo acceptance sampling and testing performed by UDOT TTQP qualified personnel, while certain manufactured products from qualified sources—including Portland cement, flyash, pozzolans, reinforcing steel, coatings, precast prestressed concrete, hydrated lime, and emulsions—may be accepted through the Department's Qualified Supplier Requirements and industry quality control procedures. The document specifies that any material found to be out of specification will be rejected and removed from the project site at the contractor's expense or be subject to applicable price adjustments. Complete records including test and inspection reports must be maintained in project files, with the Resident Engineer certifying that incorporated materials conform to approved plans and specifications in accordance with UDOT Policy 08B-31.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Materials Minimum Sampling and Testing Requirements

March 17, 2026

Minimum Sampling and Testing Requirements

Materials and Pavements Division Page 1 of 1

Index by Specification Specification Number Specification Name MS&TR Revision Date

Introduction 09/02/2015

02056 Embankment, Borrow, and Backfill 12/7/2022

02712 Lean Concrete Base Course 6/26/2014

02721 Untreated Base Course 05/31/2024

02735 Micro Surfacing 6/26/2014

02737 Pavement Soft Spot Repair 10/7/2021

02741 Asphalt Mix 2/15/2023

02744 Stone Matrix Asphalt 12/7/2022

02745 Asphalt Material 11/14/2022

02752 Portland Cement Concrete Pavement 2/14/2022

02765 Pavement Marking Paint 11/7/2022

02785 Chip Seal Coat 12/7/2022

02786 Open-Graded Seal Coat 12/7/2022

02787 Bonded Wearing Course 12/7/2022

02789 Slurry Seal Coat 6/26/2014

02832 MSE Backfill 3/17/2026

03055 Portland Cement Concrete 12/7/2022

03056 Self-Consolidating Concrete 11/15/2018

03058 Rapid Strength Concrete 10/7/2021

Materials from Qualified Sources 12/7/2022

Materials and Pavements Division Page 1 of 3

September 2, 2015

Introduction

Purpose This document provides general guidance to personnel responsible for verification sampling and testing consistent with the Code of Federal Regulations 23 CFR 637B, which requires each State Transportation Department to establish frequency guide schedules for verification sampling and testing.

Scope This document consists of two parts. The first outlines the testing and documentation required for materials that are manipulated and processed at or near the project site and tested for acceptance as close as practical to final incorporation in the work under the direction of the Resident Engineer. The second summarizes the testing and documentation required for materials obtained from qualified sources as determined through the Department’s Qualified Supplier Requirements for manufactured products where industry quality control procedures demonstrate consistent satisfaction of the specifications.

References UDOT Materials Manual of Instruction (MMOI)

UDOT Standard Specifications

UDOT Qualified Supplier Requirements

AASHTO Standard Specifications for Transportation Materials

UDOT Policy 08B-31 – Project Materials Certification https://www.udot.utah.gov/connect/business/materials-testing/ https://www.udot.utah.gov/connect/business/standards/ https://www.udot.utah.gov/connect/business/materials-testing/ https://www.udot.utah.gov/connect/business/materials-testing/ https://drive.google.com/file/d/1CWlQOsggnYq4VnDG_talQ12RD_uqjWBk/view https://drive.google.com/file/d/1CWlQOsggnYq4VnDG_talQ12RD_uqjWBk/view

Minimum Sampling and Testing Requirements, Introduction

Materials and Pavements Division Page 2 of 3

General Procedures The Resident Engineer is responsible for obtaining all substantiating documentation used to justify acceptance of the Contractor’s work and provide documentary evidence of specification compliance to support acceptance and payment to the Contractor for materials furnished and work completed. The Resident Engineer verifies supporting documentation prior to partial and final payment. In the case of failure to meet the material quality requirements, the documentation will constitute the basis for rejection or work deemed unfit for acceptance, or it may be the basis for its acceptance upon appropriate contract price adjustment where this is permitted under the contract provisions. (Reference UDOT Standard Specification Sections 00727 and 01455.)

Complete records including test and inspection reports covering acceptance or rejection are to be maintained in the project files.

The Resident Engineer certifies the materials incorporated into the project are in conformance with the approved plans and specifications in accordance with UDOT Policy 08B-31.

Materials Processed at or Near the Project Site

Acceptance sampling and testing is performed in accordance with Part 1 of this document under the direction of the Resident Engineer by UDOT TTQP qualified personnel. Samples are taken at the point of acceptance and compliance tests are performed to determine if the material is acceptable under the applicable section of the specifications.

Qualified Sources

Part 2 of this document identifies certain materials found to be acceptable from qualified sources through the Department’s Qualified Supplier Requirements. These materials include: Portland cement, flyash and pozzolans, reinforcing steel and coatings, precast prestressed concrete, hydrated lime, and emulsions.

Samples of any material may be taken at any time. Any material found to be out of specification will be rejected and removed from the project site at the contractor’s expense or be subject to applicable price adjustments. Items not identified in the Minimum Sampling and Testing Requirements require appropriate testing or verification as outlined in supplemental specifications and/or approved special provisions.

Minimum Sampling and Testing Requirements, Introduction

Materials and Pavements Division Page 3 of 3

Manufactured Products

Reference Materials Manual of Instruction Section 1011: Materials Acceptance Program.

Materials and Pavements Division Page 1 of 4

December 7, 2022

Specification 02056, Embank ment, Borrow, and Back fill

Soil Classification Materials: Embankment, Embankment for Bridge, Granular Borrow, and Backfill

Placements

Testing References: AASHTO M 145

Maximum Lot Size: Source / soil type or each 20,000 cubic yards or 30,000 tons thereafter

Frequency per Lot: One per lot

Sampling Location: Grade after processing prior to compaction

Sampling Reference: AASHTO T 2

Sieve Analysis (Gradation) Materials: Free Draining Granular Backfill

Testing References: AASHTO T 27 / T 11

Maximum Lot Size: One per 500 tons or 350 cubic yards

Frequency per Lot: Daily Placement

Sampling Location: Either:

Grade, after processing, prior to compaction.

Or:

Stockpile on the project, where approved, for daily placements less than 150 tons or 100 cubic yards.

Sampling Reference: AASHTO T 2

Minimum Sampling and Testing Requirements, Specification 02056

Materials and Pavements Division Page 2 of 4

Laboratory Maximum Dry Density and Optimum Moisture Materials: Embankment, Embankment for Bridge, Granular Borrow, and Backfill

Placements

Testing References: AASHTO T 99 Method D / AASHTO T 180 Method D for A-1 soils*

Maximum Lot Size: Source / soil type and each 20,000 cubic yards or 30,000 tons thereafter

Frequency per Lot: One per 20,000 cubic yards or 30,000 tons for each layer

Sampling Location: Grade after processing, prior to compaction

Sampling Reference: AASHTO T 2

Notes: *Refer to the Materials Manual of Instruction Section 989 Establishing Maximum Field Density, for materials too rocky to apply the correction for coarse particles: greater than 30% retained on the ¾” sieve. See AASHTO T 224.

In-Place Density Materials: Embankment, Granular Borrow, and Subgrade Placements

Testing References: AASHTO T 310. Use the average of two one-minute readings per test.*

Maximum Lot Size: A lot equals material placed to line and grade and compacted in one production day

Frequency per Lot: A lot is divided into equal sublots not to exceed 5000 square yards per lift, 15,000 square yards in cut sections. A minimum of one randomly located determination per sublot.

Sampling Location: Grade after Compaction

Sampling Reference: Materials Manual of Instruction – 981 Random Sampling

Notes: *Refer to the Materials Manual of Instruction Section 989 Establishing Maximum Field Density, for materials too rocky to apply the correction for coarse particles: greater than 30% retained on the ¾” sieve. See AASHTO T 224.

Materials and Pavements Division Page 3 of 4

In-Place Density Materials: Embankment for Bridge

Testing References: AASHTO T 310. Use the average of two one-minute readings per test.*

Maximum Lot Size: One foot lift

Frequency per Lot: Six randomly located determinations per one foot lift. Two of the six determinations must be within two feet of the outside perimeter.

Sampling Location: Grade after Compaction

Sampling Reference: Materials Manual of Instruction – 981 Random Sampling

Notes: *Refer to the Materials Manual of Instruction Section 989 Establishing Maximum Field Density, for materials too rocky to apply the correction for coarse particles: greater than 30% retained on the ¾” sieve. See AASHTO T 224.

In-Place Density Materials: Backfill Placements

Testing References: AASHTO T 310. Use the average of two one-minute readings per test.*

Maximum Lot Size: A lot equals not more than 40 feet of one pipe, pipe culvert, box culvert, foundation, abutment, backwall, wing wall, drain, or small structure.

Frequency per Lot: Minimum of one random determination per lift.

Sampling Location: Grade after Compaction

Sampling Reference: Materials Manual of Instruction – 981 Random Sampling

Notes: *Refer to the Materials Manual of Instruction Section 989 Establishing Maximum Field Density, for materials too rocky to apply the correction for coarse particles: greater than 30% retained on the ¾” sieve. See AASHTO T 224.

Materials and Pavements Division Page 4 of 4

Visual Acceptance Materials: Small Quantities other than Backfill

Application: For small quantities not to exceed 200 cubic yards or 300 tons per day or 1000 cubic yards or 1500 tons per project.

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Not to exceed 200 cubic yards or 300 tons per day

Frequency per Lot: Report each day’s installations separately Inspection Location:

In-place

Sampling Location: Supplementary test samples may be taken as described above.

Notes: Visual Inspection in lieu of testing may only be used for material being furnished from sources found to be satisfactory under normal sampling and testing procedures.

June 26, 2014

Specification 02712, Lean Concrete Base Course

Sieve Analysis Materials: Lean Concrete Base Course

Testing References: AASHTO T 27 / T 11

Maximum Lot Size: Paving Day

Frequency per Lot: One per stockpile

Sampling Location: Project stockpile

Sampling Reference: AASHTO T 2

Thickness Materials: Lean Concrete Base Course

Testing References: Thickness, determined by three measurements on each core (using a tape measure), recorded to 1/8 in. and averaged.

Maximum Lot Size: Project

Frequency per Lot: One core per 12000 sq. ft. Final areas less than 6000 sq. ft. will be added to the previous section. Final section over 6000 sq. ft. will constitute a separate area. Hand placements are considered separately, with one core per placement area.

Sampling Location: Finished pavement

Sampling Reference: Randomly sampled according to AASHTO T 24

May 31, 2024

Specification 02721, Untreated Base Course (UTBC)

Sieve Analysis (Gradation) Materials: UTBC Type I Placement

Testing References: AASHTO T 27 / T 11

Maximum Lot Size: Quantity processed, placed to line and grade in one day

Frequency per Lot: One per sublot of 500 cubic yards or 900 tons

Sampling Location: Grade after processing prior to compaction

Sampling Reference: AASHTO T 2

Laboratory Maximum Dry Density and Optimum Moisture Materials: UTBC Type I Placement

Testing References: AASHTO T 180 Method D

Maximum Lot Size: 10,000 cubic yards or 18,000 tons

Frequency per Lot: One to be used as a density standard for in-place density determination

Sampling Location: Grade after processing prior to compaction

Minimum Sampling and Testing Requirements, Specification 02721

Materials: UTBC Type I Placement

Testing References: AASHTO T 310

Maximum Lot Size: Quantity processed, placed to line and grade in one day

Frequency per Lot: One per sublot of 2500 square yards

Sampling Location: Grade after compaction

Sampling Reference: MMOI 8-984

Moisture Content Materials: UTBC Type I Placement

Testing References: AASHTO T 255 or T 310

Maximum Lot Size: Quantity processed, placed to line and grade in one day

Frequency per Lot: One per sublot of 2500 cubic yards or 4500 tons

Sampling Location: Grade after processing prior to compaction

Sampling Reference: AASHTO T 2

Sieve Analysis (Gradation) and Moisture Content Materials: UTBC Type II Placement

Testing References: AASHTO T 27 / T 11, AASHTO T 255 or T 310

Maximum Lot Size: Quantity processed, placed to line and grade in one day

Frequency per Lot: One per lot: Curb and Gutter – 10,000 feet; Sidewalk – 3000 square yards; Driveway, Pedestrian Access Ramp, Waterway, Flatwork, and other items not listed above – 25,000 square feet.

Sampling Location: Grade after processing prior to compaction

Laboratory Maximum Dry Density and Optimum Moisture Materials: UTBC Type II Placement

Testing References: AASHTO T 180

Maximum Lot Size: 10,000 cubic yards or 18,000 tons

Frequency per Lot: One to be used as a density standard for in-place density determination

Sampling Location: Grade after processing prior to compaction

Sampling Reference: AASHTO T 2

In-Place Density Materials: UTBC Type II Placement

Testing References: AASHTO T 310

Maximum Lot Size: Quantity processed, placed to line and grade in one day

Frequency per Lot: One per sublot: Curb and Gutter – 10,000 feet; Sidewalk – 3000 square yards; Driveway, Pedestrian Access Ramp, Waterway, Flatwork, and other items not listed above – 25,000 square feet.

Sampling Location: Grade after compaction

Sampling Reference: MMOI 8-984

Moisture Content Materials: UTBC Type III Placement

Testing References: AASHTO T 255 or AASHTO T 310

Maximum Lot Size: Quantity processed, placed to line and grade in one day

Frequency per Lot: Twice daily during placement

Sampling Location: Grade

Sampling Reference: AASHTO T 2, MOI 8-984

Notes: Contractor-provided optimum moisture may be used as the moisture standard.

Visual Acceptance of Very Small Quantities of Materials

Materials: UTBC Type I, II, or III Placement

Application: For small quantities not to exceed 200 tons per day or 1500 tons per project.

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Not to exceed 200 tons per day

Frequency per Lot: Report each day’s installations separately

Inspection Location: In-place

Sampling Location: Supplementary test samples may be taken as described above in this section; loose mix samples may also be sampled from the truck transports at the hot mix plant.

Notes: Visual Inspection in lieu of testing may only be used for material

June 26, 2014

Specification 02735, Micro Surfacing

Sieve Analysis (Gradation) Materials: Aggregates

Testing References: AASHTO T 27 / T 11

Maximum Lot Size: Approximately 500 tons of material

Frequency per Lot: One

Sampling Location: Stockpile

Sampling Reference: AASHTO T 2

Notes: Stockpiles are approved a minimum of one and maximum of seven days prior to use.

Materials and Pavements Division Page 1 of 2

October 7, 2021

Specification 02737, Pavement Soft Spot Repair

Laboratory Maximum Dry Density and Optimum Moisture Materials: Granular Borrow and Untreated Base Course Placements

Testing References: AASHTO T 180 and T 224

Materials Manual of Instruction, Section 989

Maximum Lot Size: 20,000 cubic yards or 30,000 tons for each source and soil type

Minimum Frequency: One for each project lot for each source and soil type.

Sampling Location: In the final position, prior to compaction

Sampling References: AASHTO T 2

Notes: Use AASHTO T 180 Method D for A-1 soils.

Refer to the Materials Manual of Instruction, Section 989 for materials too rocky to apply the correction for coarse particles, (greater than 30% retained on the ¾” sieve). See AASHTO T 224.

Theoretical Maximum Specific Gravity (Rice) Materials: Asphalt Mixtures, including Stone Matrix Asphalt

Testing References: AASHTO 209

Maximum Lot Size: 1000 tons for each mix design

Minimum Frequency: One for each project lot and at least every two weeks during production for each mix design.

Sampling Location: In the final position, prior to compaction

Sampling References: Materials Manual of Instruction, Sections 984 and 985

Notes: One determination is the average of two test results split from a single sample. The two test results must be within the “Acceptable Range of Two Results – single-operator precision” as defined in

AASHTO T 209.

Minimum Sampling and Testing Requirements, Specification 02737

Materials and Pavements Division Page 2 of 2

Materials: Granular Borrow and Untreated Base Course Placements

Testing References: AASHTO T 310

Materials Manual of Instruction, Section 989

Maximum Lot Size: One patch

Minimum Frequency: One per lift

Sampling Location: In the final position, after compaction

Sampling Reference: Materials Manual of Instruction, Section 981

Notes: Use the average of two one-minute readings per test.

Refer to the Materials Manual of Instruction, Section 989 for materials too rocky to apply the correction for coarse particles, (greater than 30% retained on the ¾” sieve). See AASHTO T 224.

In-Place Density Materials: Asphalt Mixtures, including Stone Matrix Asphalt

Testing References: AASHTO T 355

Maximum Lot Size: One patch

Minimum Frequency: One per lift

Sampling Location: In the final position, after compaction

Sampling Reference: Materials Manual of Instruction, Section 981

Notes: Use the average of two one-minute readings per Alternate Method 1.

Materials and Pavements Division Page 1 of 6

February 15, 2023

Specification 02741, Asphalt Mix

Asphalt Sieve Analysis and Binder Content Materials: Asphalt Mix

Testing References: AASHTO T 30 and T 308 Method A, except Note 6

Maximum Lot Size: Production Day

Frequency per Lot: Four random samples per lot

If at least three random samples cannot be taken, combine test results with the next day of production. Take one sample for each 500 tons or portion thereof from the following day’s production.

Add the lot to the previous day’s production for the final day’s production if three random samples cannot be taken.

The lot may be increased to include up to three production days when agreed upon in advance by both the Contractor and the Engineer when less than 900 tons are anticipated per production day.

Sampling Location: Where the lift thickness is greater than 1.5 inches, sample from the grade behind the paver.

Where the lift thickness is less than or equal to 1.5 inches, sample from the truck transports at the hot mix plant.

Sampling Reference: MMOI 984

Minimum Sampling and Testing Requirements, Specification 02741

Materials and Pavements Division Page 2 of 6

Theoretical Maximum Specific Gravity (Rice) Materials: Asphalt Mix

Testing References: AASHTO T 209

Maximum Lot Size: Production Day

Frequency per Lot: Three, in conjunction with VMA determination from samples taken with those for gradation and binder content.

Sampling Location: Where the lift thickness is greater than 1.5 inches, sample from the grade behind the paver.

Where the lift thickness is less than or equal to 1.5 inches, sample from the truck transports at the hot mix plant.

Sampling Reference: MMOI 984

Note: One determination is the average of two test results split from a single sample. The two test results must be within the “Acceptable Range of Two Results – single-operator precision” as defined in T

209. A third test result from the same sample may be necessary to have two within the range.

Voids in the Mineral Aggregate (VMA) Materials: Asphalt Mix

Testing References: AASHTO T 312, AASHTO R 35

Maximum Lot Size: Production Day

Frequency per Lot: Three, in conjunction with Rice Determination from samples taken with those for gradation and binder content.

Sampling Location: Where the lift thickness is greater than 1.5 inches, sample from the grade behind the paver.

Where the lift thickness is less than or equal to 1.5 inches, sample from the truck transports at the hot mix plant.

Note: One VMA determination is based on an average of two specimens.

Materials and Pavements Division Page 3 of 6

In-Place Mat Density Materials: Compacted Asphalt Mix

Testing References: AASHTO T 166

Maximum Lot Size: Production Day

Frequency per Lot: 700 tons and under: 4 cores

701 to 900 tons: 6 cores

901 to 1100 tons: 8 cores

>= 1100 tons:10 cores

Take 2 cores in each equally divided sublot

Sampling Location: In-place after compaction, prior to traffic

Move transversely to a point 1 ft from the edge of the pavement for in place mat density if the random location for coring falls within 1 ft of the edge of the pavement or longitudinal joint.

Sampling Reference: MMOI 984 and AASHTO R 67

Note: This applies to all pavement as shown in the table above except for lane-leveling, profile leveling, and bridge decks.

Materials and Pavements Division Page 4 of 6

Longitudinal Joint Density Materials: Compacted Asphalt Mix

Testing References: AASHTO T 166

Maximum Lot Size: Production Day

Frequency per Lot: Take one core randomly for every 1000 feet or fraction thereof from each longitudinal joint closed within each lift of the new finished pavement. Include longitudinal joints created along adjacent existing pavement or concrete elements.

Take a minimum of four longitudinal joint cores per lot where the longitudinal joints are closed.

Sampling is not required from lane-leveling, profile leveling, bridge decks, thin overlay pavement, joints less than 200 feet in length, or through intersections.

Sampling Location: In-place after compaction, prior to traffic. Take 6-inch diameter cores for Joint Density. Four cases will be considered as follows:

Type Offset* Gmm** 1 New asphalt to existing pavement or to other concrete elements.

3 inches H

2 New asphalt to new asphalt where the edge slope is steeper than 1:1

0 inches B

3 New asphalt to new asphalt where the edge slope is 1:1 or flatter

3 inches B

4 Echelon paving 0 inches B

* The offset is from the visible joint to the center of the core.

Offset is always to the hot side.

** Gmm is the average Gmm from the lot. Gmm may be from either the hot side (H) or both the hot and cold side (B). Use the average Gmm for each lot to calculate relative density. Use the daily averages of both Gmms if two different sides or values exist for the cores taken between two lots.

Sampling Reference: MMOI 984 and AASHTO R 67

Note: Incentives and disincentives are not paid on lengths excluded from random sampling as outlined above.

Materials and Pavements Division Page 5 of 6

Thickness Materials: Compacted Asphalt Mix

Measurement: Average of three measurements on each core recorded to 1/8 inch

Maximum Lot Size: Production Day

Frequency per Lot: In conjunction with in-place mat density determination.

Sampling Location: In-place after compaction

Smoothness Materials: Compacted Asphalt Mix

Testing Reference: UDOT Standard Specification 02701, Pavement Smoothness

Maximum Lot Size: Pavement Section

Sampling Location: In-place

Materials and Pavements Division Page 6 of 6

Visual Inspection Materials: Asphalt Mix

Application: For small projects with plan quantities of asphalt mix less than 500 tons or for work such as approaches, detours, driveways, traffic signals, utility work, etc., the Engineer may elect to accept material based upon visual inspection.

Acceptance for in-place mat density and longitudinal joint density may be based on establishing and maintaining a roller pattern for the items mentioned above, lane-leveling and bridge deck paving.

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Daily installation

Frequency per Lot: Report each day’s installations separately

Inspection Location: In-place

Sampling Location: Supplementary test samples may be taken as described above in this section; loose mix samples may also be sampled from the truck transports at the hot mix plant.

Notes: Visual Inspection in lieu of testing may only be used for material

Materials and Pavements Division Page 1 of 5

December 7, 2022

Specification 02744, Stone Matrix Asphalt

Asphalt Sieve Analysis and Binder Content Materials: Stone Matrix Asphalt Mix

Testing References: AASHTO T 30 and T 308 Method A, except Note 6

Maximum Lot Size: Production Day

Frequency per Lot: Four random samples per lot

If at least three random samples cannot be taken, combine test results with the next day of production. Take one sample for each 500 tons or portion thereof from the following day’s production.

Add the lot to the previous day’s production for the final day’s production if three random samples cannot be taken.

The lot may be increased to include up to three production days when agreed upon in advance by both the Contractor and the Engineer when less than 900 tons are anticipated per production day.

Sampling Location: Truck transports at the asphalt mix plant.

Minimum Sampling and Testing Requirements, Specification 02744

Materials and Pavements Division Page 2 of 5

Theoretical Maximum Specific Gravity (Rice) Materials: Stone Matrix Asphalt Mix

Testing References: AASHTO T 209

Maximum Lot Size: Production Day

Frequency per Lot: Three, in conjunction with VMA determination from samples taken with those for gradation and binder content.

Sampling Location: Truck transports at the asphalt mix plant.

Sampling Reference: MMOI 984

Note: One determination is the average of two test results split from a single sample. The two test results must be within the “Acceptable Range of Two Results – single-operator precision” as defined in T

209. A third test result from the same sample may be necessary to have two within the range.

Voids in the Mineral Aggregate (VMA) Materials: Stone Matrix Asphalt Mix

Testing References: AASHTO T 312 and R 35

Maximum Lot Size: Production Day

Frequency per Lot: Three, in conjunction with Rice Determination from samples taken with those for gradation and binder content.

Sampling Location: Truck transports at the asphalt mix plant

Note: One VMA determination is based on an average of two specimens.

Materials and Pavements Division Page 3 of 5

Voids in the Coarse Aggregate - Dry Rodded (VCADRC) Materials: Coarse Aggregate

Testing References: AASHTO T 19, T 85, and R 46

Maximum Lot Size: Production Day

Frequency per Lot: One test per lot on cold-feed samples taken at the same time as a mix sample

Sampling Location: Asphalt mix plant

Sampling Reference: AASHTO R 90

Voids in the Coarse Aggregate of the Compacted Mix (VCAmix) Materials: Coarse Aggregate

Testing References: AASHTO T 85, T 166, and R 46

Maximum Lot Size: Production Day

Frequency per Lot: Calculate VCAMIX as a daily calculation using the Gmb average of lot acceptance gyratory compacted specimens and the GCA from the daily cold-feed samples.

In-place Density Materials: Compacted Stone Matrix Asphalt Mix

Testing References: AASHTO T 166

Maximum Lot Size: Production Day

Frequency per Lot: 700 tons and under – 4 cores

701 to 900 tons – 6 cores

901 to 1100 tons – 8 cores

>= 1100 tons – 10 cores

Take 2 cores in each equally divided sublot

Sampling Location: In-place after compaction, prior to traffic.

Sampling Reference: MMOI 984 and AASHTO R 67

Materials and Pavements Division Page 4 of 5

Thickness Materials: Compacted Stone Matrix Asphalt Mix

Measurement: Average of three measurements on each core recorded to 1/8 inch

Maximum Lot Size: Production Day

Frequency per Lot: In conjunction with in-place density determination.

Sampling Location: In-place after compaction.

Smoothness Materials: Compacted Stone Matrix Asphalt Mix

Testing Reference: UDOT Standard Specification 02701, Pavement Smoothness

Maximum Lot Size: Pavement Section

Sampling Location: In-place

Materials and Pavements Division Page 5 of 5

Visual Inspection Materials: Stone Matrix Asphalt Mix

Application: For small projects with plan quantities of stone matrix asphalt mix less than 500 tons or for work such as approaches, detours, driveways, traffic signals, utility work, etc., the Engineer may elect to accept material based upon visual inspection.

Acceptance for in-place density may be based on establishing and maintaining a roller pattern for the items mentioned above and for bridge deck paving.

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Daily installation

Frequency per Lot: Report each day’s installations separately

Inspection Location: In-place

Sampling Location: Supplementary test samples may be taken as described above in this section; loose mix samples may also be sampled from the truck transports at the hot mix plant.

Notes: Visual Inspection in lieu of testing may only be used for material

December 7, 2022

Specification 02745, Asphalt Material

Cutback Asphalt Materials: Liquid Asphalt

Testing References: AASHTO M 81, M 82, ASTM D2026

Maximum Lot Size: Each Truck/Trailer

Frequency per Lot: Sample each lot, two 1-quart samples, (in metal cans). Submit one sample per 155 tons to central.

Sampling Location: Project or Plant

Sampling Reference: AASHTO T 40

Asphalt Emulsions and Rejuventating Agents Materials: Asphalt Emulsions/Rejuvenating agents, SS, CSS, MS, CMS, CQS, emulsified

Primes/Type B, C, D.Testing

Reference: UDOT Qualified Supplier Requirements Section 508

Lot Size: Only when product is questionable.

Frequency per Lot: Check sample, one quart sample, (in plastic bottles).

Sampling Location: Project or Plant

Sampling Reference: AASHTO T 40

Minimum Sampling and Testing Requirements, Specification 02745

Performance-Graded Asphalt Binders Materials: Liquid Asphalt Binders

Reference: AASHTO M 320, UDOT Qualified Supplier Requirements Section

Lot Size: Production Week, Saturday through Friday, for each binder, each mix, and each project.

Frequency per Lot: One sample per each day’s mix production. At least one random sample per lot will be tested.

Sampling Location: Injection line at the asphalt mix plant.

Sampling Reference: AASHTO T 40

Notes: Divide the binder lot when mix production for the project ceases for two or more days.

Each sample consists of three one-quart metal sample containers, one for UDOT Central Materials, one for the UDOT Region as a backup, and one for the asphalt mix supplier.

Minimum Sampling and Testing Requirements, Specification 02745

Materials: Liquid Asphalt Materials

Application: For small quantities to exceed 10 tons per day or 45 tons per project.

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Not to exceed 10 tons per day

Frequency per Lot: Report each day’s installations separately.

Inspection Location: In-place

Sampling Location: Supplementary test samples may be taken as described above in this section.

Notes: Visual Inspection in lieu of testing may only be used for material

February 14, 2022

Specification 02752, Portland Cement Concrete Pavement

Sieve Analysis Materials: Aggregates for Portland Cement Concrete

Testing References: AASHTO T 11, T 23

Maximum Lot Size: Production Day

Frequency per Lot: One per stockpile

Sampling Location: Project stockpile

Sampling Reference: AASHTO T 2

Slump, Air Content, and Concrete Temperature Materials: Portland Cement Concrete

Testing References: AASHTO T 119, T 152, T 309

Maximum Lot Size: Production Day

Frequency per Lot: Test until three consecutive batches meet specification at beginning of placement, after shutdowns of 1 hour or more, and after each failed batch, Randomly thereafter for each 800 cubic yards. If the first test fails, immediately retest. If the second test meets specification, immediately retest. Batch is rejected on two failed tests.

Sampling Location: Grade in front of the paver for slump and temperature.

For air content: in place pavement (as measured at grade in front of paver and adjusted per results of correlation testing).

Sampling Reference: WAQTC TM 2 – Sampling from paving mixers

Notes: Perform air content correlation testing twice per production day, one in the first half and one in the second half. Perform air testing in front of the paver and again from the same load in the finished pavement.

Minimum Sampling and Testing Requirements, Specification 02752

Compressive Strength Test When cylinders are used for strength acceptance Materials: Portland Cement Concrete

Testing References: AASHTO T22, T23

Maximum Lot Size: Paving Day

Frequency per Lot: One strength test represents 2600 square yards.

Sampling Location: Grade in front of the paver

Sampling Reference: MOI 981, WAQTC TM 2 – Sampling from paving mixers

Notes: One compressive strength test consists of a set of three cylinders.

Hand placements are considered separately, refer to 03055.

Thickness When cylinders are used for strength acceptance Materials: Portland Cement Concrete Pavement

Measurement: Thickness determined by three measurements on each core, recorded to 1/16 inch and averaged.

Maximum Lot Size: Paving Day

Frequency per Lot: One core per 12,000 square ft. Final areas less than 6000 square

ft. will be added to the previous section. Final areas over 6000 square ft. will constitute a separate area.

Sampling Location: Finished Pavement

Sampling Reference: Randomly sampled according to AASHTO T24

Notes: Hand placements are considered separately, refer to 03055.

For placements over existing pavement graph the deviations from the profile grade established by the plans or Engineer. Meet requirements listed in 02752. Take elevations at 100 ft. intervals and compare against the profile and graph.

Compressive Strength Test and Thickness When cores are used for strength and thickness acceptance Materials: Portland Cement Concrete Pavement

Testing References: AASHTO T22

Maximum Lot Size: Production Day

Frequency per Lot: One core per 12,000 square ft.

Final areas less than 6000 square ft. will be added to the previous section. Final areas over 6000 square ft. will constitute a separate area.

Sampling Location: Finished Pavement

Sampling Reference: Section 02752

Notes: Hand placements are considered separately, refer to 03055.

Thickness determined by three measurements on each core, recorded to 1/16 inch and averaged. Verify thickness prior to placement for Hand placements

For placements over existing pavement graph the deviations from the profile grade established by the plans or Engineer. Meet requirements listed in 02752. Take elevations at 100 ft. intervals and compare against the profile and graph.

Sand Equivalent Materials: Aggregates for Portland Cement Concrete

Testing References: AASHTO T 176, alternate method 2, pre-wet method.

Maximum Lot Size: Week

Frequency per Lot: Once

Sampling Location: Project Stockpile

Smoothness Materials: New, Finished Pavement Surface

Testing Reference(s): Standard Specification 02701

December 7, 2022

Specification 02765, Pavement Marking Paint

Physical and Chemical Properties Materials: Pavement Marking Paint

Testing References: ASTM D562, D1475, D1644, D2805, D3723, D3960, D5381, E1347

Federal Standard 595B

EPA SW-846 Test Method 1311

Maximum Lot Size: Project

Frequency per Lot: One sample of each color of pavement marking paint for projects with quantities over 100 gallons

Sampling Location: Project Location

Sampling Reference: MMOI 932

December 7, 2022

Specification 02785, Chip Seal Coat

Sieve Analysis (Gradation) Materials: Asphalt Mix

Testing References: AASHTO T 11, T 27

Maximum Lot Size: 500 tons

Frequency per Lot: One per lot

Sampling Location: Stockpile

Sampling Reference: AASHTO T 2

Notes: Stockpiles are accepted at least one and not more than seven days before use.

December 7, 2022

Specification 02786, Open-Graded Surface Course

Asphalt Sieve Analysis and Binder Content Materials: Asphalt Mix

Testing References: AASHTO T 30 and T 308, Method A, except Note 6

Maximum Lot Size: Production Day

Frequency per Lot: Four random samples per lot is standard, for exceptions see Section 02786 "Acceptance."

If at least three random samples cannot be taken, combine test results with the next day of production. Take one sample for each 500 tons or portion thereof from the following day’s production.

Add the lot to the previous day’s production for the final day’s production if three random samples cannot be taken.

The lot may be increased to include up to three production days when agreed upon in advance by both the Contractor and the Engineer when less than 900 tons are anticipated per production day.

Sampling Location: Asphalt Mix Plant

Sampling Reference: MMOI 984

Thickness Materials: Compacted Asphalt Mix

Measurement: Verify with a depth probe

Minimum Sampling and Testing Requirements, Specification 02786

Smoothness Materials: Compacted Asphalt Mix

Testing Reference: UDOT Standard Specification 02701, Pavement Smoothness

Maximum Lot Size: Pavement Section

Sampling Location: In-place

Visual Inspection Materials: Asphalt Mix

Application: Not to exceed 100 tons per day or 1000 tons per project

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Daily installation not to exceed 100 tons

Frequency per Lot: Report each day’s installations separately

Inspection Location: In-place

Sampling Location: Supplementary test samples may be taken as described above in this section.

Notes: Visual Inspection in lieu of testing may only be used for material

December 7, 2022

Specification 02787, Bonded Wearing Course

Sieve Analysis (Gradation) Materials: Aggregates

Testing References: AASHTO T 30

Maximum Lot Size: Production Day

Frequency per Lot: Four - If at least three samples cannot be taken, combine test results with the next day of production. Take one sample for each 15,000 yards or portion thereof from the following day’s production.

Sampling Location: Plant

Sampling Reference: MOI 984, MOI 981

Asphalt Binder Content Materials: Bonded Wearing Course Asphalt Mix

Testing References: AASHTO T 308

Maximum Lot Size: Production Day

Frequency per Lot: Four - If at least three samples cannot be taken, combine test results with the next day of production. Take one sample for each 15,000 yards or portion thereof from the following day’s production.

Sampling Location: Plant

Sampling Reference: MOI 984, MOI 981

Minimum Sampling and Testing Requirements, Specification 02787

Smoothness Materials: Compacted Asphalt Mix

Testing Reference: UDOT Standard Specification 02701, Pavement Smoothness

Maximum Lot Size: Pavement Section

Sampling Location: In-place Visual Inspection Materials: Asphalt Mix

Application: Not to exceed 100 tons per day or 1000 tons per project

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Maximum Lot Size: Daily installation not to exceed 100 tons

Frequency per Lot: Report each day’s installations separately

Inspection Location: In-place

Sampling Location: Supplementary test samples may be taken as described above in this section.

Notes: Visual Inspection in lieu of testing may only be used for material

June 26, 2014

Specification 02789, Slurry Seal Coat

Sieve Analysis (Gradation) Materials: Aggregates

Testing References: AASHTO T 11, T 27

Maximum Lot Size: Approximately 500 tons of material

Frequency per Lot: One

Sampling Location: Stockpile.

Sampling Reference: AASHTO T 2

Notes: Stockpiles are approved a minimum of one and maximum of seven days prior to use.

Specification 02832, MSE Backfill

Sieve Analysis (Gradation) Materials: MSE Backfill

Testing References: AASHTO T 27

Maximum Lot Size: Approximately 5000 yd3 of material

Frequency per Lot: One

Sampling Location: In final position, prior to compaction.

Sampling Reference: AASHTO T 2

Laboratory Maximuym Dry Density and Optimum Moisture Materials: MSE Backfill

Testing References: AASHTO T 99 Method D

Maximum Lot Size: Approximately 5000 yd3 of material

Frequency per Lot: One

Sampling Location: In final position, prior to compaction.

Sampling Reference: AASHTO T 2

In-Place Density Materials: MSE Backfill

Testing References: AASHTO T 310

Maximum Lot Size: Each lift per 100 linear feet of wall

Frequency per Lot: 2

Sampling Location: In final position, after compaction.

Sampling Reference: Materials Manual of Instruction – 981 Random Sampling

December 7, 2022

Specification 03055, Portland Cement Concrete

Sieve Analysis (Gradation) Materials: Aggregates

Testing References: AASHTO T 27 / T 11

Maximum Lot Size: Weekly production

Frequency per Lot: One test per stockpile during any week concrete is being provided to a UDOT

Sampling Location: Supplier Stockpile

Sampling Reference: AASHTO T 2

Slump, Air Content, and Concrete Temperature Materials: Portland Cement Concrete

Testing References: AASHTO T 119, AASHTO T 152, AASHTO T 309A

Maximum Lot Size: Production Day

Frequency per Lot: For each mix design test until two consecutive batches meet specification at beginning of placement, after shutdowns of 1 hour or more, and after each failed batch, randomly thereafter for each 50 cubic yard minimum. If the first determination fails, immediately retest. If the second test meets specification, immediately retest.

Batch is rejected on two failed determinations.

Sampling Location: Mixer truck

Sampling Reference: WAQTC TM 2

Minimum Sampling and Testing Requirements, Specification 03055

Materials: Portland Cement Concrete

Testing References: Cast in accordance with AASHTO T 23 Tested in accordance with AASHTO T 22. One compressive strength test consists of a set of three cylinders.

Maximum Lot Size: Production Day

Frequency per Lot: One determination for each 50 cubic yards or fraction thereof for each mix design. Visual acceptance and laboratory testing is done at Engineers discretion for daily quantities between 4 cubic yards and less than 8 cubic yards.

Sampling Location: Mixer Truck

Sampling Reference: WAQTC TM 2

Visual Acceptance of Very Small Quantities of Material Materials: Portland Cement Concrete

Testing References: Acceptance is limited to materials being furnished from sources found satisfactory under normal sampling and testing procedures.

Maximum Lot Size: Not to exceed 4 cubic yards per day and not to exceed 50 cubic yards of total continuous visual acceptance quantities.

Frequency per Lot: One report for each day material is accepted

Sampling Location: Point of Placement

Visual Acceptance of Class B and B(AE) Concrete Materials: Portland Cement Concrete

Testing References: As directed by Engineer

Maximum Lot Size: Daily placement

Frequency per Lot: One report for each day material is accepted

Sampling Location: Point of Placement

Minimum Sampling and Testing Requirements, Specification 03055

Verification of Cementitious Blends in Volumetric Truck Bins Materials: Portland Cement Concrete

Testing References: Materials Manual of Instruction Section 978

Maximum Lot Size: Daily placement

Frequency per Lot: One test from the truck bin at the yard after blend is added. One test from the bin at point of placement

Sampling Location: Point of Placement

Sampling Reference: Materials Manual of Instruction Section 978

November 15, 2018

Specification 03056, Self-Consolidating Concrete

Sieve Analysis (Gradation) Materials: Aggregates

Testing References: AASHTO T 27 / T 11

Maximum Lot Size: Weekly production

Frequency per Lot: One test per stockpile during any week concrete is being provided to a UDOT project

Inspection Location: Supplier Stockpile

Sampling Reference: AASHTO T 2

Slump Flow, Static Segregation Penetration Test, Air Content and Concrete Temperature Materials: Self-Consolidating Concrete

Testing References: AASHTO T 347, ASTM C1712, AASHTO T 351, AASHTO T 152 (meter type B, do not rod, vibrate, or tap the bowl), AASHTO T 309

Maximum Lot Size: Production Day

Frequency per Lot: Test until two consecutive batches meet specification at beginning of placement, after shutdowns of 1 hour or more, and after each failed batch, Randomly thereafter for each 50 cubic yard minimum.

If the first determination fails, immediately retest. If the second test meets specification, immediately retest. Batch is rejected on two failed determinations.

Sampling Location: Project Location – If first determination fails, immediately retest. If the second test meets specification, immediately retest. Batch is rejected on two failed determinations.

Minimum Sampling and Testing Requirements, Specification 03056

Materials: Self-Consolidating Concrete

Testing References: Cast in accordance with ASTM C1758. Tested in accordance with AASHTO T 22. One compressive strength test consists of a set of three cylinders.

Maximum Lot Size: Production Day

Frequency per Lot: One determination for each 50 cubic yards or fraction thereof.

Sampling Location: Project Location

October 07, 2021

Specification 03058, Rapid Strength Concrete

Compressive Strength Materials: Rapid Strength Concrete

Testing References: AASHTO T 22 and T 23

Maximum Lot Size: Production Day

Frequency per Lot: One determination per mix design per volumetric mixer truck

Sampling Location: Point of placement

Sampling Reference: Western Alliance for Quality Transportation Construction, TM 2

Notes: One compressive strength test consists of a set of three cylinders from the same sample.

Cement Performance Materials: Rapid Hardening Hydraulic Cement

Testing References: ASTM C1600

Maximum Lot Size: Production day

Frequency per Lot: One cement sample per volumetric mixer truck

Sampling Location: Mixer Truck

Sampling Reference: ASTM C183

Notes: Test samples as determined by the Engineer for compliance with

ASTM C1600

Minimum Sampling and Testing Requirements, Specification 03058

Materials: Rapid Strength Concrete

Maximum Lot Size: Daily installation, not to exceed 4 yards per production day.

Frequency per Lot: Report each day’s installations separately.

Inspection Location: Point of placement

Notes: May only be used to accept material being furnished from sources found satisfactory under normal sampling and testing procedures.

Not to exceed 25 cubic yards per project.

Any visual inspection may be supplemented with testing to ensure compliance with the specifications.

Materials and Pavements Division Page 1 of 5

December 7, 2022

Materials from Qualified Sources

Central Materials Acceptance Central Materials performs acceptance on the following through a combination of Inspection, Testing, and Qualified Supplier Requirements. Reference the applicable UDOT Standard Specification for acceptance criteria.

The Resident Engineer is responsible for obtaining all substantiating documentation used to justify acceptance of the Contractor’s work and provide documentary evidence of specification compliance to support acceptance and payment to the Contractor for materials furnished and work completed.

Specification 02633, Concrete Drainage Structures Wet Cast Concrete Drainage Structures

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Dry Cast Concrete Drainage Structures

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: Manufacturer’s Certificate of Compliance

Specification 02745, Asphalt Material Asphalt Emulsion

Qualified Supplier Requirements: Section 508, Asphalt Emulsions

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Minimum Sampling and Testing Requirements, Materials from Qualified Sources

Materials and Pavements Division Page 2 of 5

Specification 02746 Hyrated Lime Hydrated Lime

Qualified Supplier Requirements: Section 510, Hydrated Lime

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Specification 02844, Concrete Barrier Precast Concrete Barrier

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Specification 02861, Precast Retaining/Noise Walls Precast Retaining/Noise Walls

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Specification 02893, Overhead Sign Structures All Materials for Fabrication of overhead sign structures, including Anchor Bolts for

Sign Structures

Qualified Supplier Requirements: AISC Highway Components Manufacture (CPT)

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Specification 02633, Concrete Drainage Structures Wet Cast Concrete Drainage Structures

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Materials and Pavements Division Page 3 of 5

Specification 03055, Portland Cement Concrete Hydraulic Cement

Qualified Supplier Requirements: Section 502, Cement

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Notes: Verified as part of mix design approval.

Flyash and Pozzolan

Qualified Supplier Requirements: Section 507, Flyash and Pozzolan

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Notes: Verified as part of mix design approval.

Specification 03211, Reinforcing Steel and Welded Wire Epoxy Coated Steel

Qualified Supplier Requirements: Section 503, Reinforcing Steel Epoxy

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Reinforcing Steel

Qualified Supplier Requirements: Section 504, Reinforcing Steel

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Galvanized Steel

Qualified Supplier Requirements: Section 504, Reinforcing Steel Galvanized Coating

Product Documentation Required: Verification that the material is from a pre-qualified supplier. See the UDOT Qualified Supplier’s Listing.

Materials and Pavements Division Page 4 of 5

Specification 03338, Precast Substructure Elements Precast Substructure Elements

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Specification 03339, Full-Depth Precast Concrete Deck Panel Precast Full-Depth Precast Deck Panels for Bridge Decks

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product Documentation Required: R 256 Inspection/Test Report from Central Materials

Specification 03340, Precast Approach Slabs Precast Bridge Approach Slabs

Qualified Supplier Requirements: Section 505, Precast/Prestressed Concrete Structures

Product…