7-2-CS27018-26381900-Approved Plans.pdf
PDF 38 MB Posted
- Solicitation number
- CS27018
- Issued by
- Utah
About this file
This is an Approved Plans document for a Stage II construction project administered by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Department of Transportation. The project involves the construction of a metal building to store a tow plow truck at the Brigham City Maintenance Shop (Project #26381900). This Stage II Invitation to Bid is restricted to contractors who have been prequalified under the DFCM Stage I Prequalification for Contractors program and appear on the current DFCM Prequalified Contractors list as of the solicitation date. The approved plans document provides the detailed architectural and engineering specifications necessary for bidders to prepare accurate cost estimates and construction proposals.
The construction cost estimate for this project is $824,000.00. As a Stage II restricted bid, only prequalified contractors are eligible to submit bids, which is intended to ensure that only contractors meeting established performance and financial standards participate in the bidding process. The approved plans represent the final design documents that contractors must use as the basis for their bid submissions, and these plans contain all specifications, drawings, and technical requirements necessary for project execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .