7-2-CS26089-26243150-Approved Plans.pdf

PDF 150 MB Posted

Attached to
DFCM Construction - Prequalified General Stage II - Administrative Office of the Courts - Juvenile Court Fourth Floor Buildout - Project #26423150
Solicitation number
CS26089
Issued by
Utah

About this file

This document consists of approved construction plans for a State of Utah Division of Facilities Construction and Management (DFCM) project involving the Administrative Office of the Courts' Juvenile Court Fourth Floor Buildout (Project #26423150). The project encompasses build-out of fourth floor shelled space and remodeling of a portion of finished first floor space within an existing facility. This Stage II invitation to bid is restricted to contractors who have been prequalified under the DFCM Stage I Prequalification for Contractors process and currently appear on the respective DFCM Prequalified Contractors list as of the solicitation date. The approved plans document provides detailed architectural and engineering specifications necessary for bidders to prepare accurate cost estimates and construction methodologies for the project.

The construction cost estimate for this project is $2,100,000.00. The approved plans serve as the baseline design documentation that all prequalified bidders must reference when submitting their bids. These plans have been formally approved and represent the scope of work that contractors will be required to execute. As this is a Stage II solicitation limited to prequalified contractors, the procurement process assumes that all eligible bidders have already demonstrated requisite qualifications, bonding capacity, and technical capability during the initial prequalification phase.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .