6-3-CS26089-26243150-Specs.pdf
PDF 13 MB Posted
- Solicitation number
- CS26089
- Issued by
- Utah
About this file
Summary
This is a construction project manual and general conditions document prepared by the State of Utah's Division of Facilities Construction and Management (DFCM) for the Ogden Juvenile Courthouse Fourth Floor Buildout project. The project involves the build-out of fourth floor shelled space and remodeling of a portion of finished first floor space at an estimated construction cost of $2,100,000. This is a Stage II invitation to bid, restricting eligibility to contractors who have been prequalified under the respective DFCM Prequalified Contractors list. The document serves as the specifications and contract framework, containing comprehensive construction documents organized into 28 divisions covering general requirements, existing conditions, metals, wood and composites, thermal and moisture protection, openings, finishes, specialties, furnishings, fire suppression, plumbing, HVAC, electrical systems, and electronic safety and security. The contract documents include DFCM standard forms, general conditions effective August 31, 2020 (revised July 12, 2023), supplemental conditions, and technical specifications prepared by Valentiner Crane Brunjes Onyon Architects, LLC.
The general conditions establish comprehensive contractual requirements governing contractor responsibilities, project scheduling, payment procedures, insurance and bonding, and dispute resolution processes. The contractor must prepare and maintain a critical path method schedule using Primavera, MS Project, or Phoenix software, with monthly updates submitted alongside payment applications. The contract establishes liquidated damages provisions for delays beyond the substantial completion date, initially at a stated amount with increases of 0.5% per day for delays beyond 14 days. Compensable delays caused by DFCM are limited to a formula-based calculation of contract price divided by contract time multiplied by 0.05 and the number of compensable days. The contractor bears responsibility for all permits, fees, taxes, labor, materials, equipment, and supervision necessary for work completion, with specific requirements for submittals, inspections, quality standards, and compliance with applicable laws and building codes. Performance and payment bonds are required, along with comprehensive liability insurance with minimum coverage amounts specified for design professionals providing services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
OGDEN JUVENILE COURTHOUSE 4TH FLOOR BUILDOUT 30 APR 2026 - VCBO 26005
TABLE OF CONTENTS CONSTRUCTION DOCUMENTS PAGE 1 OF 4
TABLE OF CONTENTS
CONSTRUCTION DOCUMENTS
DIVISION / SECTION TITLE
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS
Section 00 4312 DFCM Contract Forms Section 00 5433 Electronic Media Agreement Section 00 7213 DFCM General Conditions Section 00 7313.01 General Conditions August 2020 Rev 07122023 Section 00 7373 DFCM Supplemental Conditions Section 00 7373.01 Defective Construction July15 2008 Section 00 7373.02 Drug and Alcohol Testing 070110 Section 00 7373.03 Illegal Immigration May10 2011 Section 00 7373.04 Health Insurance 051011 Section 00 7373.05 Health Insurance Benchmark
DIVISION 01 GENERAL REQUIREMENTS
Section 01 1000 Summary of Work Section 01 1001 Acknowledgement of DFCM Documents Section 01 1900 Definitions and Standards Section 01 2600 Contract Modification Procedures Section 01 2900 Payment Procedures Section 01 3100 Project Management and Coordination Section 01 3300 Submittal Procedures Section 01 5000 Temporary Facilities and Controls Section 01 5721 Indoor Air Quality Controls Section 01 6000 Product Requirements Section 01 6116 Volatile Organic Compound (VOC) Content Restrictions Section 01 7300 Execution Section 01 7329 Cutting and Patching Section 01 7330 SFRM-Maintenance Section 01 7419 Construction Waste Management and Disposal Section 01 7700 Closeout Procedures Section 01 7701 DFCM Project Closeout Checklist Section 01 7800 Operation and Maintenance Data
DIVISION 02 EXISTING CONDITIONS
Section 02 4119 Selective Demolition
DIVISION 05 METALS
Section 05 5213 Pipe and Tube Railings
TABLE OF CONTENTS CONSTRUCTION DOCUMENTS PAGE 2 OF 4
TABLE OF CONTENTS
CONSTRUCTION DOCUMENTS
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
Section 06 1053 Miscellaneous Rough Carpentry Section 06 4116 Plastic-Laminate-Faced Architectural Cabinets
DIVISION 07 THERMAL AND MOISTURE PROTECTION
Section 07 8413 Penetration Firestopping Section 07 8443 Joint Firestopping Section 07 9200 Joint Sealants
DIVISION 08 OPENINGS
Section 08 1113 Hollow Metal Doors and Frames Section 08 1416 Flush Wood Doors Section 08 3113 Access Doors and Frames Section 08 4113 Aluminum-Framed Entrances and Storefronts Section 08 7100 Door Hardware Section 08 8000 Glazing
DIVISION 09 FINISHES
Section 09 2216 Non-Structural Metal Framing Section 09 2900 Gypsum Board Section 09 3000 Tiling Section 09 5113 Acoustical Panel Ceilings Section 09 6513 Resilient Base and Accessories Section 09 6543 Linoleum Flooring Section 09 6813 Tile Carpeting Section 09 9100 Painting
DIVISION 10 SPECIALTIES
Section 10 1100 Visual Display Surfaces Section 10 1400 Signs Section 10 2600 Wall and Door Protection Section 10 2800 Toilet, Bath, and Laundry Accessories Section 10 4413 Fire Protection Cabinets
DIVISION 12 FURNISHINGS
Section 12 2413 Roller Window Shades
DIVISION 21 FIRE SUPPRESSION
Section 21 1000 Fire Protection
TABLE OF CONTENTS CONSTRUCTION DOCUMENTS PAGE 3 OF 4
TABLE OF CONTENTS
CONSTRUCTION DOCUMENTS
DIVISION 22 PLUMBING
Section 22 1410 Plumbing Piping Section 22 1411 Disinfecting Water Supply System Section 22 1430 Plumbing Specialties Section 22 4440 Plumbing Fixtures
DIVISION 23 HEATING VENTILATING AND AIR CONDITIONING
Section 23 0500 Basic Mechanical Requirements Section 23 0529 Basic Mechanical Materials and Methods Section 23 0540 Mechanical Sound and Vibration Control Section 23 0548 Mechanical Seismic Control Section 23 0593 Testing, Adjusting, and Balancing Section 23 0700 Mechanical Insulation Section 23 0900 Electronic Controls Section 23 2113 HVAC Piping and Specialties Section 23 2500 HVAC Water Treatment Section 23 3300 Ductwork and Accessories Section 23 3600 Air Terminal Units Section 23 3713 Air Inlets and Outlets
DIVISION 26 ELECTRICAL
Section 26 0100 General Electrical Requirements Section 26 0500 Common Work Results for Electrical Section 26 0519 Low-Voltage Electrical Power Conductors and Cable Section 26 0526 Grounding and Bonding for Electrical Systems Section 26 0529 Hangers and Supports for Electrical Systems Section 26 0533 Raceway and Boxes for Electrical Systems Section 26 0536 Cable Trays for Electrical Systems Section 26 0544 Sleeves and Sleeve Seals for Electrical Raceways and
Cabling Section 26 0548 Vibration and Seismic Controls for Electrical Systems Section 26 0553 Identification for Electrical Systems Section 26 0923 Distributed Digital Lighting Controls Section 26 2726 Wiring Devices Section 26 2726.1 Wiring Device Schedule Section 26 2813 Fuses Section 26 2913 Enclosed Controllers Section 26 5100 Interior Lighting
DIVISION 28 ELECTRONIC SAFETY AND SECURITY
Section 28 3111 Digital, Addressable Fire-Alarm System
TABLE OF CONTENTS CONSTRUCTION DOCUMENTS PAGE 4 OF 4
TABLE OF CONTENTS
CONSTRUCTION DOCUMENTS
END OF TABLE OF CONTENTS
OGDEN JUVENILE COURTHOUSE 4TH FLOOR BUILDOUT 30 APRIL 2026 - VCBO 26005
DFCM CONTRACT FORMS CONSTRUCTION DOCUMENTS SECTION 00 4312 – PAGE 1
SECTION 00 4312
DFCM CONTRACT FORMS
PART 1 - GENERAL
1.1 SUMMARY
A. DFCM forms not included herein may be found on the DFCM website:
https://dfcm.utah.gov/construction-management/standard-documents/
B. Use of proper forms is the responsibility of the Contractor.
https://dfcm.utah.gov/construction-management/standard-documents/
This page is intentionally left blank.
ELECTRONIC MEDIA AGREEMENT CONSTRUCTION DOCUMENTS SECTION 00 5433 – PAGE 1
SECTION 00 5433
ELECTRONIC MEDIA AGREEMENT
PART 1 - GENERAL
1.1 AGREEMENT CONCERNING DRAWING FILES ON ELECTRONIC MEDIA
A. The electronic files will be distributed from the Architect to the Construction Manager/General Contractor only once the following form has been signed. It will be the General Contractor’s responsibility to control distribution.
B. Valentiner Crane Brunjes Onyon Architects, L.L.C. (the Architect) does not assume any responsibility for the accuracy of the information contained in these drawing files. Any and all users are aware that differences may exist between the electronic files delivered and the printed hard-copy construction documents. In the event of a conflict between the signed and sealed hard-copy construction documents prepared by the Architect and the electronic files, the signed or sealed hard-copy construction documents shall govern.
C. Any and all users who may obtain these drawings from the Construction Manager/General Contractor under this agreement, including but not limited to, subcontractors, vendors, suppliers etc., agree to indemnify and hold harmless the Architect, its officers, directors, employees and sub-consultants against all damages, liabilities or costs, including reasonable attorneys' fees and defense costs, arising from any changes made by anyone other than the Architect or from any transfer or reuse of the electronic files including data contained in the files without the prior written consent of the Architect.
D. Building Information Model (BIM) drawing files will be made available to the Construction Manager/General Contractor and its subcontractors for the purposes of preparing submittals for their portion of the work only after the “Agreement Concerning Drawing Files on Electronic Media” has been signed by the Construction Manager/General Contractor.
PART 2 - PRODUCTS - Not Used
PART 3 - EXECUTION – Not Used
END OF SECTION
ELECTRONIC MEDIA AGREEMENT CONSTRUCTION DOCUMENTS SECTION 00 5433 – PAGE 2
AGREEMENT CONCERNING DRAWING FILES ON ELECTRONIC MEDIA
Valentiner Crane Brunjes Onyon Architects, L.L.C. (the Architect) does not assume any responsibility for the accuracy of the information contained in these digital models. Any and all users are aware that differences may exist between the electronic files delivered and the printed hard-copy construction documents. In the event of a conflict between the signed and sealed hard-copy construction documents prepared by the Architect and the electronic files, the signed or sealed hard-copy construction documents shall govern.
Any and all users who may obtain these digital models from the Construction Manager/General Contractor under this agreement, including but not limited to; subcontractors, vendors, suppliers etc., agree to indemnify and hold harmless the Architect, its officers, directors, employees and sub-consultants against all damages, liabilities or costs, including reasonable attorneys’ fees and defense costs, arising from any changes made by anyone other than the Architect or from any transfer or reuse of the electronic files without the prior written consent of the Architect.
Under no circumstances shall delivery of the electronic digital models be deemed a sale by the Architect, and the Architect makes no warranties, either express or implied, of merchantability and fitness for any particular purpose. In no event shall the Architect be liable for any loss of profit or any consequential damages as a result of the use or reuse of the electronic files.
The digital Building Information Models provided will contain information as provided on construction documents. The user shall remove all notes, text, detail cuts and member designations from the electronic file prior to use. If used as submittal documents, submittals will be rejected as non-compliant.
The drawing files provided by VCBO may not be reproduced or distributed to individuals outside the company or collective organization signing this agreement.
LIST OF DRAWINGS:
Project Name: Ogden Juvenile Courthouse 4th Floor Buildout VCBO Project No: 26005
List of Revit Models: Architectural, Structural, Mechanical and Electrical.
ACCEPTANCE OF TERMS, CONDITIONS & LIMITATIONS:
Name of Company/Contractor Signature of Company/Contractor Representative Printed Name of Individual Signing
Position/Title Date
This agreement must be signed and returned to VCBO prior to release of any electronic document.
GENERAL CONDITIONS CONSTRUCTION DOCUMENTS SECTION 00 7213 – PAGE 1
SECTION 00 7213
GENERAL CONDITIONS
PART 1 - GENERAL
1.1 SUMMARY
A. DFCM “General Conditions” (08-31-2020, rev 07-12-2023) follows this cover page.
This page is intentionally left blank.
DFCM General Conditions 08312020 (rev 07122023) Approved as to form: Mike Kelley, Assistant AG i
G E N E R A L C O N D I T I O N S
August 31, 2020
Table of Contents
ARTICLE 1. GENERAL PROVISIONS
1.1 Definitions (see revision page 8)
ARTICLE 2. DFCM
2.1 Information and Services Required of DFCM
2.1.1 DFCM’s Representative
2.1.2 Specialists and Inspectors
2.1.3 Surveys and Legal Description
2.1.4 Prompt Information and Services
2.1.5 Copies of Contract Documents
2.2 Construction By DFCM or By Separate
Contractors
2.2.1 DFCM’s Right To Perform
Construction and to Award Separate Contracts
2.2.2 Coordination of the Work
2.2.3 Coordination of Schedules
2.2.4 Reporting Problems to DFCM
2.2.5 Contractor Remedial Work
ARTICLE 3. A/E
3.1 A/E’s Administration of the Contract
3.1.1 In General
3.1.2 Site Visits
3.1.3 Communications Facilitating
Contract Administration
3.1.4 A/E May Reject Work, Order
Inspection, Tests
3.1.5 A/E Review Contractor’s Submittals
3.2 Ownership and Use of A/E’s Drawings, Specifications, and Other Documents
ARTICLE 4. CONTRACTOR
4.1 Review of Contract Documents and Field
Conditions By Contractor
4.1.1 Reviewing Contract Documents, Information, Reporting Errors, Inconsistencies or Omissions
4.1.2 Review of Field Conditions
4.1.3 Subsurface Investigations
4.1.4 Perform in Accordance with
Contract Documents and Submittals
4.1.5 Performance to Produce the Complete
System and Intended Results
4.1.6 Intent and Hierarchy
4.1.7 Dividing Work and Contractor
Representation
4.1.8 Planning and Priority
4.2 Supervision and Representatives
4.2.1 Supervision and Control
4.2.2 Persons Performing Work
4.2.3 Designated Representatives
4.2.4 Discipline and Competence
4.2.5 Responsibility
4.2.6 Not Relieved of Obligations
4.2.7 Inspections and Approvals
4.3 Payment by Contractor
4.4 Taxes and Other Payments to Government
4.5 Permits, Fees, Notices, Labor and Materials
4.5.1 Permits and Fees
4.5.2 Compliance, Notices
4.5.3 Correlation of Contract Documents and
Laws
4.5.4 Failure to Give Notice
4.6 Time and Contractor’s Construction Schedules
4.6.1 Progress and Completion
4.6.2 Schedule Preparation
4.6.3 Schedule Submittal
4.6.4 Schedule Content Requirements
4.6.5 Interim Completion Dates and Milestones
4.6.6 Float Time
4.6.7 Updates
4.6.8 Schedule of Submittals
4.6.9 Schedule Recovery
4.6.10 Schedule Changes and Modifications
4.6.11 Excusable Delay
4.6.12 Compensable Delay, Suspension or
Interruption.
4.6.13 Time Extension Requests
4.6.14 Liquidated Damages
4.7 Documents and Samples at the Site, Certifying “As-Builts”
4.8 Shop Drawings, Product Data and Samples
4.8.1 Not Contract Documents
4.8.2 Promptness
4.8.3 Not Perform Until A/E Approves
STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES
Division of Facilities Construction and Management
DFCM
ii
4.8.4 Representations by Contractor
4.8.5 Contractor’s Liability
4.8.6 Direct Specific Attention to Revisions
4.8.7 Informational Submittals
4.8.8 Professional Services
4.9 Use of Site
4.9.1 In General
4.9.2 Access to Neighboring Properties
4.10 Access to Work
4.11 Intellectual Property Licenses
4.12 Indemnification
4.12.1 Not Exclusive
4.12.2 Not Limited
ARTICLE 5. SUBCONTRACTORS
5.1 Award of Subcontracts and Other Contracts
For Portions of the Work
5.1.1 Subcontracting Work Permitted;
Conditions
5.1.2 Subsequent Changes
5.1.3 Business and Licensing Requirements
5.1.4 Bonding of Subcontractors
5.1.5 Subcontractor Default Insurance
5.2 Subcontractor Relations
5.2.1 Contractor Fully Responsible
5.2.2 Comply with Contact Documents
5.2.3 Rights
5.2.4 Sub-Subcontractors
5.2.5 Document Copies
5.3 Contingent Assignment of Subcontracts
ARTICLE 6. PROTECTION OF PERSONS AND
PROPERTY
6.1 Safety of Persons and Property
6.1.1 Contractor Responsibility
6.1.2 Safety Program, Precautions
6.1.3 Compliance with Laws
6.1.4 Erect and Maintain Safeguards
6.1.5 Utmost Care
6.1.6 Prompt Remedy
6.1.7 Safety Designee
6.1.8 Load Safety
6.1.9 Off-Site Responsibility
6.1.10 Emergencies
6.2 Hazardous Materials
6.3 Historical and Archeological Considerations
6.4 Contractor Liability
ARTICLE 7. MODIFICATIONS, PRs & PCOs, PRE
AND CLAIMS PROCESS
7.1 Modifications: In General
7.1.1 Types of Modifications and Limitations
7.1.2 By Whom Issued
7.1.3 Contractor to Proceed Unless
Otherwise Stated
7.1.4 Adjusting Unit Prices
7.1.5 Concealed or Unknown Conditions
7.1.6 Increase in Contract Time
7.1.7 Allowances
7.2 Contractor Initiated Requests
7.2.1 The Request for Information, RFI, Process and Time to File
7.2.2 Proposed Change Order (“PCO”)
7.2.3 Substitutions
7.3 Proposal Request Initiated by DFCM
7.3.1 If Agreement, Change Order Issued
7.3.2 If Disagreement
7.4 Change Orders
7.4.1 Adjusting Price Based Upon Agreement
7.4.2 DFCM Resolution of Price in the
Absence of an Agreement Under Paragraph 7.4.1
7.4.3 Credits
7.4.4 Effect of a Change Order
7.5 Construction Change Directives
7.5.1 When Used and Contractor’s Right to
Challenge
7.5.2 Proceed with Work
7.5.3 Interim Payments by DFCM
7.6 ASI
7.7 Procedure for Preliminary Resolution Efforts
7.7.1 Request for Preliminary Resolution
Effort (PRE)
7.7.2 Time for Filing
7.7.3 Content Requirement
7.7.4 Supplementation
7.7.5 Subcontractors
7.7.6 Information and Meetings
7.7.7 Contractor Required to Continue
Performance
7.7.8 Decision
7.7.9 Decision Final Unless Claim Submitted
7.7.10 Extension Requires Mutual Agreement
7.7.11 If Decision Not Issued
7.7.12 Payment for Performance
7.8 Resolution of Claim
7.8.1 Claim
7.8.2 Subcontractors
7.8.3 Time for Filing
7.8.4 Content Requirement
7.8.5 Extension of Time to Submit
Documentation
7.8.6 Contractor Required to Continue
Performance
7.8.7 Agreement of Claimant on Method
and Person(s) Evaluating the Claim
7.8.8 The Evaluation Process, Timeframes of Evaluator(s), Director’s
Determination, Administrative Appeal to the Executive Director and Judicial Review
7.8.9 Appeal Process Prerequisite for Further
Consideration or Judicial Review iii
7.8.10 Payment of Claim
7.8.11 Allocation of Costs of Claim Resolution
Process.
7.8.12 Alternative Procedures
7.8.13 Impact on Future Selections
7.8.14 DFCM’s Right to Have Issues, Disputes or
Claims Considered (see revision page 41)
ARTICLE 8. PAYMENTS AND COMPLETION
8.1 Schedule of Values
8.2 Applications for Payment
8.2.1 In General
8.2.2 Payment for Material and Equipment
8.2.3 Warranty of Title
8.2.4 Holdback by DFCM
8.3 Certificates for Payment
8.3.1 Issued by A/E
8.3.2 A/E’s Representations
8.4 Decisions to Withhold Certification
8.4.1 When Withheld
8.4.2 Certification Issued When Reasons For
Withholding Removed
8.4.3 Continue Work Even if Contractor
Disputes A/E’s Determination
8.4.4 DFCM Not in Breach
8.5 Progress Payments
8.5.1 In General, Interest on Late Payments
8.5.2 Contractor and Subcontractor
Responsibility
8.5.3 Information Furnished by A/E or DFCM
to Subcontractor
8.5.4 DFCM and A/E Not Liable
8.5.5 Certificate, Payment or Use Not
Acceptance of Improper Work
8.6 Payment Upon Substantial Completion
8.7 Partial Occupancy or Use
8.7.1 In General
8.7.2 Inspection
8.7.3 Not Constitute Acceptance
8.7.4 Insurance
8.8 Final Payment
8.8.1 Certificate for Payment
8.8.2 Conditions for Final Payment
8.8.3 Waiver of Claims: Final Payment
8.8.4 Delays Not Contractor’s Fault
8.8.5 Waiver by Accepting Final Payment
ARTICLE 9. TESTS AND INSPECTIONS,
SUBSTANTIAL AND FINAL COMPLETION,
UNCOVERING, CORRECTION OF WORK AND
GUARANTY PERIOD
9.1 Tests and Inspections
9.1.1 In General
9.1.2 Failure of an Inspector to Appear
9.1.3 Nonconforming Work
9.1.4 Certificates
9.1.5 A/E Observing
9.1.6 Promptness
9.2 Uncovering of Work
9.2.1 Uncover Uninspected Work
9.2.2 Observation Prior to Covering
9.2.3 When an Inspector Fails to Appear or A/E
or DFCM Did Not Make Prior Request
9.3 Inspections: Substantial and Final
9.3.1 Substantial Completion Inspection
9.3.2 Final Completion Inspection
9.3.3 Punchlist Completion
9.4 Correction of Work and Guaranty Period
9.4.1 Contractor Correct the Work
9.4.2 Guaranty and Correction After Substantial
Completion
9.4.3 Removal of Work
9.4.4 Not Limit Other Obligations
9.5 Additional Warranties
9.5.1 In General
9.5.2 Exclusion
9.5.3 Furnish Evidence on Request
9.6 Acceptance of Nonconforming Work
ARTICLE 10. INSURANCE AND BONDS
10.1 Contractor’s Liability Insurance
10.1.1 In General
10.1.2 Coverage
10.1.3 Endorsements
10.1.4 Terms
10.1.5 Failure to Provide
10.1.6 Certificates
10.1.7 No Limitation
10.2 “Builder's Risk” Insurance
10.2.1 In General
10.2.2 Deductible
10.2.3 Waiver of Subrogation
10.2.4 Special Hazards
10.2.5 Non-Eligible Projects
10.3 Performance Bond and Payment Bond
iv
ARTICLE 11. MISCELLANEOUS PROVISIONS
11.1 A/E’s Responsibilities
11.2 Successors and Assigns
11.3 Written Notice
11.3.1 Personal Delivery and Registered or
Certified Mail
11.3.2 E-mail
11.4 Rights and Remedies
11.4.1 Not Limit
11.4.2 No Waiver
11.5 No Discrimination, No Sexual Harassment
11.6 Applicable Laws and Enforcement
11.7 Interpretation
11.8 Venue
11.9 Severability
11.10 Construction of Words
11.11 No Third-Party Rights
ARTICLE 12. TERMINATION OR SUSPENSION OF
THE CONTRACT
12.1 Termination by Contractor for Cause
12.1.1 In General
12.1.2 Notice
12.2 Termination by DFCM for Cause
12.2.1 In General
12.2.2 DFCM’s Right to Carry Out the Work
Upon Termination for Cause
12.2.3 Items Required to Be Transferred or
Delivered
12.2.4 Payment
12.2.5 DFCM Protection if Lienable
12.2.6 Credits and Deficits
12.2.7 If Contractor Found Not in Default or
Excusable
12.2.8 Rights and Remedies Not Exclusive
12.2.9 Time Period for Claims
12.3 Termination for Convenience of DFCM
12.3.1 In General
12.3.2 Contractor Obligations
12.3.3 Termination Claim
12.3.4 Agreed Upon Payment
12.3.5 Payment Not Agreed Upon
12.3.6 Deductions
12.3.7 Partial Termination
12.3.8 Partial Payments
12.3.9 Preserve and Make Available Records
12.3.10 Suspension, Delay or Interruption of Work
by DFCM for Convenience
12.4 DFCM’s Right to Stop the Work
G E N E R A L C O N D I T I O N S
August 31, 2020
THESE GENERAL CONDITIONS (“General Conditions”) are part of and subject to the Contractor’s Agreement (defined below) between DFCM (defined below) and Contractor (defined below).
ARTICLE 1. GENERAL PROVISIONS.
1.1 DEFINITIONS.
ARCHITECT/ENGINEER OR A/E. “Architect / Engineer” or “A/E” means the person or entity practicing as a design professional, including architect, engineer, interior designer, and/or landscape architect, retained under separate agreement with DFCM to act on behalf of DFCM according to the Contract Documents (defined below) and the A/E’s employees, representatives and consultants. For Work (defined below) where there is no A/E hired by DFCM, references in these General Conditions to A/E shall be deemed to refer to DFCM’s Representative.
ADDENDA. “Addenda” means the written or graphic instruments issued prior to the execution of the Contractor’s Agreement (defined below) that clarify, correct, or change the bidding documents or the Contract Documents.
A/E’s SUPPLEMENTAL INSTRUCTION OR ASI. “A/E’s Supplemental Instruction” or “ASI” means a supplemental instruction issued by the A/E to Contractor that results in a clarification, correction, or minor change in the Work and does not affect the Contract Time (defined below) or the Contract Price (defined below).
AMENDMENT. “Amendment” means any document or communication that changes (or purports to change) the terms of Contractor’s Agreement and/or the General Conditions, except as to: (1) scope of the Work; (2) Contract Price; and/or (3) Contract Time. With the exception of Supplemental General Conditions (defined below), no Amendment shall be valid and/or binding on DFCM unless: (1) the Amendment is set forth in a separate document, clearly titled “Amendment”; and (2) the Amendment is specifically and expressly accepted in writing by the Director (defined below).
BID. “Bid” means the offer or proposal of the bidder submitted on the prescribed form setting forth the prices for the Work to be performed.
BONDS. “Bonds” means collectively the bid bond, performance bond, payment bond, and any other instruments of security.
STATE OF UTAH - DEPARTMENT OF ADMINISTRATIVE SERVICES
Division of Facilities Construction and Management
DFCM
CHANGE ORDER. “Change Order” means a written instrument signed by both DFCM and Contractor, issued after the execution of the Contractor’s Agreement on DFCM’s form, authorizing: (1) a change in the Work; (2) an adjustment of the Contract Price; and/or (3) an adjustment of the Contract Time.
CLAIM. “Claim” means a dispute, demand, assertion or other matter submitted by Contractor, including a subcontractor at any tier, subject to the provisions of these General Conditions. The claimant may seek, as a matter of right, modification, adjustment or interpretation of Contract terms, payment of money, extension of time or other relief with respect to the terms of the Contract. A request for Preliminary Resolution Effort (“PRE”) (defined below) shall not be considered a “Claim”. A request for an amendment of the Contract Documents, requested Change Order or a Construction Change Directive (“CCD”) (defined below) is not a PRE or Claim unless agreement cannot be reached, and the procedures of these General Conditions are followed.
CONSTRUCTION CHANGE DIRECTIVE. “Construction Change Directive” means a written order signed by DFCM, issued after execution of the Contractor’s Agreement, directing Contractor to perform a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Price and/or Contract Time.
CONTRACT DOCUMENTS. “Contract Documents” means collectively Contractor’s Agreement, these General Conditions of Contractor’s Agreement, applicable Supplemental General Conditions, Drawings (defined below), Specifications (defined below), Addenda, other documents listed in the Contractor’s Agreement, authorized Amendments and Supplementary Conditions and Modifications (defined below) issued after execution of the Contractor’s Agreement. The Contract Documents shall also include the bidding/proposal documents, including the Instructions to Bidders/Proposers, Notice to Contractors and the Bid/Proposal Form, to the extent not in conflict with the other above-stated Contract Documents and other documents and oral representations which are memorialized in writing and documented as an attachment to the Contractor’s Agreement.
CONTRACT PRICE. “Contract Price” means the total amount payable by DFCM to Contractor for performance of the Work, including any authorized changes in the Work.
CONTRACT TIME. “Contract Time” means the time within which Contractor shall complete the Work, including any authorized changes in the Work
CONTRACTOR. “Contractor” means the person or entity identified as such in the Contractor’s Agreement.
As used in the Contract Documents, “Contractor” includes Contractor’s employees, agents, representatives, subcontractors at any tier, and any other third party hired by Contractor to perform a portion of the Work and is referred to throughout the Contract Documents as if singular in number.
CONTRACTOR’S AGREEMENT. “Contractor’s Agreement” means, unless the context requires otherwise, the agreement executed by the Contractor and DFCM for the Work.
DAY. “Day” or “days” means calendar day unless otherwise specifically defined.
DEFECTIVE. “Defective” is an adjective which when modifying the word “Work” refers to Work that does not conform to the Contract Documents, or does not meet the requirements of any inspection, referenced standard, code, test or approval referred to in the Contract Documents, or which fails to meet generally accepted craft standards, or which has been damaged.
DIRECTOR. “Director” means the Director of the Division of Facilities Construction and Management, unless the context requires otherwise. Director may include a designee selected by the Director for a particular function described in the Contract Documents.
DFCM. “DFCM” means the State of Utah, Division of Facilities Construction and Management. Unless the context requires otherwise, DFCM is the “Owner” as that term is commonly understood in the construction industry.
DRAWINGS. “Drawings” means the graphic and pictorial portions of the Contract Documents, wherever located and whenever issued, showing the design, location, and dimensions of the Work and generally includes drawings, elevations, sections, details, schedules, and diagrams, including electronic copies.
EXECUTIVE DIRECTOR. “Executive Director” means the Executive Director of the Utah Department of Administrative Services, including unless otherwise stated, the Executive Director’s duly authorized designee.
FINAL COMPLETION. “Final Completion” means the date when all Work to be performed by Contractor has been completed and accepted in writing by DFCM.
INSPECTION. “Inspection” or its derivatives means a review of the Work, including but not limited to a visual review of the Work completed to date to ascertain if the Work is in accordance with the Contract Documents, including all applicable building codes and construction standards.
MODIFICATION. “Modification” means: (1) a Change Order; (2) a Construction Change Directive; or (3) an ASI. Contractor’s Agreement may be amended or modified only by: (1) an authorized Amendment; or (2) a Modification.
NOTICE TO PROCEED. “Notice to Proceed” means a document prepared by DFCM that authorizes Contractor to commence Work. It shall be deemed issued upon being sent by DFCM to Contractor’s address specified in Contractor’s Bid.
PRELIMINARY RESOLUTION EFFORT OR PRE. “Preliminary Resolution Effort” or “PRE” means the processing of a request for preliminary resolution or any similar notice about an issue that could potentially lead to a Claim and is prior to reaching the status of a Claim.
PRODUCT DATA. “Product Data” means illustrations, standard schedules, performance charts, instructions, brochures, diagrams, and other information furnished by Contractor to illustrate materials or equipment for some portion of the Work.
PROPOSAL REQUEST OR PR. “Proposal Request” or “PR” means a request made by DFCM to Contractor requesting a proposal to resolve an issue as part of the Change Order process.
PROPOSED CHANGE ORDER OR PCO. “Proposed Change Order” or “PCO” means a request by Contractor submitted to the DFCM Representative to commence the Change Order process. It shall not be considered a “PRE” or a “Claim”. The PCO may be related to any potential or actual delay, disruption, unforeseen condition or any other matter for which Contractor intends to seek an increase in the Contract Price and/or extension of the Contract Time.
REQUEST FOR INFORMATION OR RFI. “Request for Information” or “RFI” means a written request from Contractor to the A/E seeking information, direction, or clarification related to the Contract Documents, including Drawings and/or Specifications.
RULE. “Rule”, unless the context requires otherwise, means a rule of the Utah Administrative Code.
SALES TAX AND/OR USE TAX. “Sales Tax” and/or “Use Tax”, unless the context requires otherwise, means the sales tax and/or use tax collected or to be collected by the Utah State Tax Commission and shall include any sales and/or use tax that the Utah State Tax Commission collects on behalf of any special district, local government, or political subdivision.
SAMPLES. “Samples” mean physical examples that illustrate materials, equipment or workmanship and establish standards by which the Work shall be judged.
SHOP DRAWINGS. “Shop Drawings” means drawings, diagrams, schedules and other data specially prepared for the Work by Contractor, or a subcontractor at any tier, manufacturer, supplier or distributor to illustrate some portion of the Work.
SPECIFICATIONS. “Specifications” means that portion of the Contract Documents consisting of the written requirements for materials, equipment, construction systems, standards, installation and workmanship for the Work and performance of related systems and services.
SUBCONTRACTOR. “Subcontractor” means any person or entity under contract with Contractor to provide services or labor for the Work. “Subcontractor” includes a trade contractor or specialty contractor.
“Subcontractor” does not include suppliers who provide only materials, equipment or supplies to Contractor or a Subcontractor. The term “Subcontractor” is referred to throughout the Contract Documents as if singular in number and means a Subcontractor or authorized representative of the Subcontractor. The term “Sub-subcontractor” means a person or entity that has a contract with a Subcontractor to provide services or labor for the Work and also includes all lower tier sub-subcontractors. The terms “Subcontractor” and “Sub-subcontractor” do not include a separate contractor retained by DFCM or subcontractors or sub-subcontractors of a separate contractor retained by DFCM.
SUBSTANTIAL COMPLETION. “Substantial Completion” and its derivatives means the date certified in accordance with Section 9.3* when the Work, or a designated portion thereof, is sufficiently complete, and any lack of completion or performance does not materially interfere with DFCM’s intended use of the Work, in accordance with the Contract Documents, so that DFCM can occupy and use the Work for its intended use.
DFCM’s “intended use” or “occupy” as used in this definition, shall include any intended use or occupation by any agency or entity that DFCM intends to use or occupy the Work.
*Revised numbering from ‘Section 9.2’ to ‘Section 9.3’ as of 07122023.
SUPPLEMENTAL GENERAL CONDITIONS. “Supplemental General Conditions” means the Supplemental General Conditions identified on DFCM’s website, dfcm.utah.gov, applicable to the Work, if any, that supplements these General Conditions. Supplemental General Conditions are authorized Amendments.
SUPPLEMENTARY CONDITIONS. “Supplementary Conditions” means the part of the Contract Documents, if any, that amends or supplements these General Conditions and/or applicable Supplemental General Conditions. Supplementary Conditions, if authorized, are an Amendment.
WORK. “Work” means the construction, services, supervision, labor, tools, equipment, materials, products and transportation, to be furnished by Contractor, so as to fulfill the Contractor’s obligations as required by the Contract Documents.
ARTICLE 2. DFCM.
2.1 INFORMATION AND SERVICES REQUIRED OF DFCM.
2.1.1 DFCM’S REPRESENTATIVE. DFCM shall designate a representative authorized to act on behalf of DFCM with respect to the Work (“DFCM’s Representative”). Unless the context requires otherwise, “DFCM’s Representative” is the “Owner’s representative” as that term is commonly understood in the construction industry. DFCM’s Representative shall have authority to review and approve the Work, including the time schedule for completion, and the authority (but not a duty) to stop the Work for any reason, including, without limitation, unsafe conditions, or to direct Contractor to remedy, repair, or replace any Work, if necessary, to ensure its proper execution. DFCM and DFCM’s Representative shall endeavor to render decisions pertaining to documents submitted by the A/E and/or Contractor to avoid a delay in the orderly and sequential progress of the Work. Contractor shall be responsible for time lost and the cost of correcting Work that in DFCM’s judgment was executed improperly. DFCM shall be the final interpreter of the Contract Documents; the decision of DFCM in the absence of arbitrary or capricious conduct shall be conclusive.
Notwithstanding anything to the contrary in the Contract Documents, DFCM’s approval shall not relieve Contractor of Contractor’s sole responsibility for the Work.
2.1.2 SPECIALISTS AND INSPECTORS. DFCM shall provide building inspection services in accordance with the applicable building codes, including routine and special inspections unless otherwise noted in the Contract Documents. DFCM may assign an inspector or specialist to note deviations from, or necessary adjustments to, the Contract Documents or to report deficiencies or defects in the Work. The inspector’s or specialist’s activities in no way relieve Contractor from the responsibilities set forth in the Contract Documents.
2.1.3 SURVEYS AND LEGAL DESCRIPTION. Except to the extent not applicable to the type of Work to be performed pursuant to Contractor’s Agreement, DFCM shall furnish surveys describing physical characteristics, legal limitations and utility locations for the Work site, and a legal description of the Work site.
The Contractor shall be entitled to rely on the accuracy of such survey information furnished by DFCM but shall exercise proper precautions relating to the safe performance of the Work. The Contractor recognizes that the exact location of underground or hidden utilities, plumbing and electrical runs may be somewhat different from the location indicated on such surveys furnished by DFCM or in the Contract Documents. The Contractor shall exercise reasonable skill and care to locate underground or hidden utilities, plumbing and electrical runs that are to remain to prevent damage thereto. The Contractor shall review the survey information provided by DFCM and shall promptly provide written notice to DFCM of any survey information that Contractor knows or discovers to be inaccurate.
2.1.4 PROMPT INFORMATION AND SERVICES. Upon receipt of a written request from Contractor, DFCM shall endeavor to furnish information or services under DFCM’s control with reasonable promptness to avoid delay in the orderly progress of the Work.
2.1.5 COPIES OF CONTRACT DOCUMENTS. Unless otherwise provided in the Contract Documents, DFCM shall provide or make available to Contractor, free of charge, paper or electronic copies of Contract Documents, as determined by DFCM, as are reasonably necessary for execution of the Work. DFCM’s website may also provide Contract Documents for the Work.
2.2 CONSTRUCTION BY DFCM OR BY SEPARATE CONTRACTORS.
2.2.1 DFCM’S RIGHT TO PERFORM CONSTRUCTION AND TO AWARD SEPARATE
CONTRACTS. DFCM reserves the right to enter into contracts with third parties in connection with the Work and to perform construction or other activities itself on or about the Work site.
2.2.2 COORDINATION OF WORK. Contractor shall afford DFCM and the separate contractors or subcontractors retained by DFCM adequate opportunity for the introduction and storage of their materials and equipment and the execution of their work. Contractor shall properly connect and coordinate the Work with the work of DFCM and separate contractors or subcontractors.
2.2.3 COORDINATION OF SCHEDULES. Contractor shall cooperate with DFCM and any separate contractors and subcontractors hired by DFCM in performing the Work so that all portions of the Work may be completed in the shortest possible time within normal working hours. Contractor shall furnish separate contractors and subcontractors full information regarding time schedules for Contractor’s Work. Contractor shall coordinate the Work with the workers who may be retained by DFCM, all separate contractors and subcontractors, and their activities in the vicinity of the Work site.
2.2.4 REPORTING PROBLEMS TO DFCM. If part of Contractor’s Work depends on work by DFCM or a separate contractor, Contractor shall, prior to proceeding with that portion of the Work, promptly report in writing to DFCM any apparent defects in workmanship of the work of DFCM and/or such separate contractor that would render it unsuitable for proper execution of the Work. Failure of Contractor to report defects shall constitute an acknowledgment that DFCM’s or the separate contractor’s completed or partially completed work is fit and proper to receive Contractor’s Work, except as to defects in workmanship not then reasonably discoverable.
2.2.5 CONTRACTOR REMEDIAL WORK. If Contractor causes damage to the work of DFCM or any separate contractors or subcontractors, Contractor shall promptly remedy such damage and shall use all reasonable efforts to promptly negotiate a settlement with DFCM and such separate contractors and subcontractors.
ARTICLE 3. A/E.
3.1 A/E’S ADMINISTRATION OF THE CONTRACT.
3.1.1 IN GENERAL. The A/E shall assist DFCM in administering the Contract in accordance with the Contract Documents. The A/E shall have authority to act on behalf of DFCM, but only to the extent provided in the Contract Documents and/or A/E’s agreement with DFCM.
3.1.2 SITE VISITS.
3.1.2.1 Site visits or inspections by the A/E or DFCM shall in no way limit or affect Contractor’s responsibility to comply with all the requirements and the overall design concept of the Contract Documents as well as all federal, state, and local laws, rules, regulations, ordinances and orders of public authorities applicable to the Work.
3.1.2.2 The A/E shall promptly submit to DFCM a written report subsequent to each site visit detailing the visit.
3.1.3 COMMUNICATIONS FACILITATING CONTRACT ADMINISTRATION. Except as authorized by DFCM or as otherwise provided in the Contract Documents, including these General Conditions, the A/E and Contractor shall communicate through DFCM on issues regarding the timing of the Work, cost of the Work, and scope of the Work. Communications by and with the A/E’s consultants shall be through the A/E.
Communications by and with Subcontractors shall ordinarily be through Contractor. Communications by and with separate contractors shall be through DFCM.
3.1.4 A/E MAY REJECT WORK, ORDER INSPECTIONS, TESTS. The A/E shall have the authority to reject Work which, based upon the A/E’s knowledge or what may be reasonably inferred from the A/E’s site observations and review of data, does not conform to the Contract Documents. Whenever the A/E considers it necessary or advisable for implementation of the intent of the Contract Documents, the A/E shall have the authority to require additional inspections or testing of the Work in accordance with the provisions of the Contract Documents, whether or not such Work is fabricated, installed, or completed; however, the A/E must obtain DFCM’s prior written approval of any such additional inspections or testing. Neither this authority of the A/E nor a decision made in good faith either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the A/E to Contractor, Subcontractors, their agents or employees or other persons performing portions of the Work, including separate contractors. If Contractor disputes the rejection of any
Work and the correction thereof shall involve additional cost or time, it shall be DFCM’s option to accept such Work whether it shall be conforming or nonconforming.
3.1.5 A/E REVIEW OF CONTRACTOR’S SUBMITTALS.
3.1.5.1 Contractor shall submit Shop Drawings, Product Data, and Samples and other submittals required by the Contract Documents to the A/E as required by the approved submittal schedule.
3.1.5.2 The A/E shall review and take appropriate action upon Contractor’s submittals such as Shop Drawings, Product Data, and Samples, but only for the purpose of checking for conformance with the information and design concepts expressed in the Contract Documents. A/E action taken on a submittal shall not constitute a Modification.
3.1.5.3 The A/E’s action shall be taken no later than fourteen (14) days following A/E’s receipt of the submittal, unless agreed to otherwise by Contractor and DFCM, in order to avoid a delay in the Work of Contractor or of separate contractors while allowing sufficient time in the A/E’s professional judgment to permit adequate review.
3.1.5.4 Review of such submittals shall not be conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation or performance of equipment or systems, all of which remain the responsibility of Contractor as required by the Contract Documents.
3.1.5.5 The A/E’s review of Contractor’s submittals shall not relieve Contractor of Contractor’s obligations under the Contract Documents.
3.1.5.6 The A/E’s review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the A/E, of any construction means, methods, techniques, sequences, or procedures.
3.1.5.7 The A/E’s approval of a specific item shall not indicate approval of an assembly of which the item is a component.
3.1.5.8 When professional certification of performance characteristics of materials, systems, or equipment is the responsibility of the Contractor under the Contract Documents, the A/E shall be entitled to rely upon such certifications to establish that the materials, systems or equipment shall meet the performance criteria required by the Contract Documents.
3.2 OWNERSHIP AND USE OF A/E’S DRAWINGS, SPECIFICATIONS AND OTHER
DOCUMENTS. All Drawings, Specifications, and other documents prepared by the A/E for the Work are and shall remain the property of DFCM, and DFCM shall retain all common law, statutory, and other reserved rights with respect thereto. Said documents are intended for use as an integrated set for the Work. Neither Contractor nor A/E shall modify or use Contract Documents on any other project without the prior written consent of DFCM. Any such non-permissive use or modification by Contractor, Contractor’s Subcontractors at any tier, or anyone else for whose acts Contractor is liable, shall be at Contractor’s sole risk. To the fullest extent permitted by law, Contractor shall release, indemnify, hold harmless, and defend DFCM, and require all Subcontractors to release, indemnify, hold harmless, and defend DFCM, from and against any and all liabilities, claims, demands, actions, damages, losses, and expenses, including but not limited to attorney fees and costs of litigation, arising out of such non-permissive use or modification by Contractor or its Subcontractors.
Contractor, including its Subcontractors, are granted a limited license to use and reproduce applicable portions of the Drawings, Specifications, and other documents prepared by the A/E appropriate to and for use in the execution of the Work. Contractor shall preserve the copyright notice, if any, shown on the Drawings, Specifications and other documents prepared by the A/E for the Work, on all copies. Submittals or distributions necessary to meet official regulatory requirements or for other purposes relating to the Work shall not be construed as a publication in derogation of DFCM’s copyright or other reserved rights.
ARTICLE 4. CONTRACTOR.
4.1 REVIEW OF CONTRACT DOCUMENTS AND FIELD CONDITIONS BY CONTRACTOR.
4.1.1 REVIEW OF DOCUMENTS. Contractor shall carefully study and compare the Contract Documents with each other and with information furnished by DFCM and shall at once report to DFCM and A/E all errors, omissions, inconsistencies and/or ambiguities discovered. Contractor shall not be liable to DFCM or A/E for damage resulting from errors, omissions, inconsistencies and/or ambiguities in the Contract Documents unless Contractor recognized such error, omission, inconsistency and/or ambiguity or a contractor of ordinary skill and expertise for the type of Work involved would have readily so recognized such error, omission, inconsistency and/or ambiguity, and Contractor failed to report such to DFCM and A/E. If Contractor performs any Work without such notice to DFCM and A/E and prior to resolution of the error, omission, inconsistency and/or ambiguity, Contractor shall be responsible for such performance and shall bear the costs for correction.
4.1.2 REVIEW OF FIELD CONDITIONS. Contractor shall take field measurements, verify field conditions and carefully compare such field measurements and conditions and other information known to Contractor, or information that a contractor of ordinary skill and expertise for the type of Work involved would have known, before commencing Work. Contractor shall immediately report to DFCM and A/E all errors, omissions, inconsistencies and/or ambiguities discovered. If Contractor performs any Work without such notice to DFCM and A/E and prior to resolution of the error, omission, inconsistency and/or ambiguity, Contractor shall be responsible for such performance and shall bear the costs for correction.
4.1.3 SUBSURFACE INVESTIGATIONS. If DFCM has provided the Contractor with reports of subsurface investigations and/or tests of soils at the Work site (“Geotechnical Report”) as part of the Contract Documents, the Contractor may rely upon the accuracy of the technical data contained in such Geotechnical Report at the locations where the data was obtained and to the depth indicated. However, Contractor acknowledges that the conditions indicated in any Geotechnical Report of any subsurface investigations and/or tests of soils at the Work site may not be representative of conditions existing at locations and/or at depths other than where data was obtained or that conditions different than those indicated by such Geotechnical Report may exist at the Work site. Contractor shall not be entitled to any increase in the Contract Price and/or increase in the Contract Time based on any data, opinion and/or recommendation in any Geotechnical Report and/or any inaccuracy, incompleteness, mistake and/or error in any Geotechnical Report except to the extent that Contractor is entitled to an increase in the Contract Price and/or extension of the Contract Time for a concealed or unknown condition as provided in Section 7.1.5.
4.1.4 PERFORM IN ACCORDANCE WITH CONTRACT DOCUMENTS AND SUBMITTALS.
Contractor shall perform the Work in accordance with the Contract Documents and submittals to which no exception has been taken in accordance with the Contract Documents.
4.1.5 PERFORMANCE TO PRODUCE THE COMPLETE SYSTEM AND INTENDED
RESULTS. The Contract Documents shall be read as a whole and wherever possible, the provisions shall be construed in order that all provisions are operable. The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by Contractor, whether or not specifically set forth in the Contract Documents, for the Contract Price and within the Contract Time. Performance by Contractor shall be required to the extent consistent with and reasonably inferable from the Contract Documents as being necessary to allow the Work to function for its intended use.
4.1.6 INTENT AND HIERARCHY. The Contract Documents are complimentary, and what is required by one Contract Document or provisions thereof, shall be as binding as if required by all the Contract
Documents or provisions thereof. In case of an irreconcilable conflict between provisions within a Contract Document or between Contract Documents, the following priorities shall govern as listed below:
4.1.6.1 A Modification or authorized Amendment (including authorized Supplementary Conditions) shall govern over all Contract Documents listed in Sections 4.1.6.2 – 4.1.6.6 or previous Modifications or authorized Amendments (including authorized Supplementary Conditions).
4.1.6.2 The Contractor’s Agreement shall govern over all Contract Documents listed in Sections 4.1.6.3 - 4.1.6.6.
4.1.6.3 Supplemental General Conditions shall govern over all Contract Documents listed in Sections
4.1.6.4 – 4.6.1.6.
4.1.6.4 These General Conditions shall govern over the Contract Documents listed in Sections 4.1.6.5 – 4.1.6.6.
4.1.6.5 The Drawings and Specifications shall govern over the Contract Documents listed in Section 4.1.6.6.
4.1.6.6 Attachments to the Contractor’s Agreement, Contractor’s management plan, bidding/proposal documents, including the Instructions to Bidders/Proposers, Notice to Contractors and the Bid/Proposal Form and/or documented interview information, if any, are Contract Documents, binding on Contractor, but are subordinate to the Contract Documents listed in Sections 4.1.6.1 – 4.1.6.5.
4.1.6.7 An Addendum shall govern over all other Contract Documents and any previously issued Addendum.
4.1.6.8 In case of a conflict or ambiguity within the same level of hierarchy of described documents, DFCM reserves the right to revise the documents to select the most stringent requirement unless the preponderance of the Contract Documents indicate a less stringent requirement.
4.1.7 DIVIDING WORK AND CONTRACTOR REPRESENTATION.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .