Summary of Approved Plans Document
This document comprises the approved construction plans for a Stage II mechanical upgrade project at Southern Utah University's central steam boiler plant, prepared for the Utah Division of Facilities Construction and Management (DFCM). The project involves equipment upgrades within the existing heat plant, specifically focused on deaerator and surge tank system replacements. The construction cost estimate totals $1,164,198.00, with bidding limited to contractors who have been prequalified under DFCM's Stage I Prequalification process and appear on the current DFCM Prequalified Contractors list as of the solicitation date. The approved plans serve as the technical specifications and design documentation that prequalified mechanical contractors must follow when preparing their bids for this equipment upgrade work.
The plans establish the baseline technical requirements and construction standards for the project scope. As an approved plans document, it represents the final design stage authorization necessary for the Stage II bidding process to proceed. All prequalified bidders are expected to base their pricing and scheduling on these approved specifications. The document functions as the binding technical reference for contract performance and provides the detailed drawings and specifications required for accurate bid preparation and subsequent construction execution at the Southern Utah University facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .