5-4-CR27031-27089730 Hazmat Survey.pdf
PDF 5 MB Posted
- Solicitation number
- CR27031
- Issued by
- Utah
About this file
This is a Limited Asbestos Survey Report prepared by R & R Environmental, Inc. for the Southern Utah University Heat Plant located at 699 West Center Street in Cedar City, Utah, conducted in August 2026 on behalf of the Utah Department of Government Operations Division of Facilities, Construction and Management (DFCM). The survey was commissioned to assess asbestos-containing materials (ACM) in two tanks and surrounding components in the Southeast corner of the heat plant that are scheduled for replacement as part of equipment upgrades within the existing central steam boiler plant (Project #27089730, with a construction cost estimate of $1,164,198.00). The survey consisted of visual assessment and bulk sampling of suspect ACM, with nineteen (19) representative samples collected from various materials including thermal system insulation (TSI) end sealants, pipe thread sealants, tank wrap material, pipe sealants, pipe liners, lagging tape, elbow joints, and block filler. All samples were submitted to Eurofins Reservoirs Environmental, Inc. in Denver, Colorado for analysis via Polarized Light Microscopy (PLM) utilizing EPA Method 600/M4-82-020. The fieldwork was conducted by Trevor Thacker, a Utah Certified Asbestos Building Inspector (Certification Number ASB-8872), and the report was reviewed by David C. Roskelley, MSPH, CIH, CSP (Certification Number ASB-1370).
The survey results indicate that no materials containing asbestos were identified during the limited survey, with all nineteen samples returning "None Detected" results. All assessed materials were noted as undamaged at the time of inspection. The report acknowledges limitations inherent in asbestos surveys, noting that while standard investigative procedures and professional diligence were applied to reduce uncertainty regarding ACM presence, no survey can completely eliminate the possibility that asbestos-containing materials exist but were not identified using ordinary investigative procedures. The survey was limited in scope to the Southeast corner area where tank replacement is planned and does not constitute a comprehensive building-wide asbestos assessment. R & R Environmental, Inc. assumes no responsibility for omissions or errors resulting from inaccurate information provided by external sources and makes no warranty or guarantee regarding the findings and conclusions contained in the report.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS (LIMITED), LEAD (LIMITED), AND HAZARDOUS MATERIALS
INSPECTION, SURVEY AND ASSESSMENT
FOR THE
SOUTHERN UTAH UNIVERSITY
HEAT PLANT
699 WEST CENTER STREET
CEDAR CITY, UTAH 84720
A LIMITED ASBESTOS SURVEY AND ASSESSMENT
FOR THE
SOUTHERN UTAH UNIVERSITY
HEAT PLANT
August 28, 2026
Prepared for:
Mrs. Aubrey Stapel Hazmat Program Manager
Utah Department of Government Operations Division of Facilities, Construction and Management (DFCM)
Taylorsville State Office Building, 3rd Floor 4315 South 2700 West
Taylorsville, Utah 84114
PH: (801) 641-0964
Prepared by:
R & R Environmental, Inc. (R & R) 47 West 9000 South, Suite #2
Sandy, Utah 84070 jamison@rrenviro.com Phone (801) 928-1560
TABLE OF CONTENTS
ASBESTOS
1.0 INTRODUCTION
2.0 EXECUTIVE SUMMARY
3.0 SAMPLING METHODS
4.0 SURVEY RESULTS
5.0 CONCLUSIONS
6.0 LIMITATIONS AND EXCLUSION OF WARRANTY.……………………………………………………6
List of Appendices
Appendix A Sample Log
Appendix B Laboratory Report
Appendix C Photo Log
Appendix D Floor Plans
Appendix E State of Utah Certifications
Limited Asbestos Survey Report Page 1 Southern Utah University Heat Plant
1.0 INTRODUCTION
R & R Environmental, Inc. (R & R) was contacted to conduct a limited asbestos survey for the Southern Utah University, Heat Plant located at 699 West Center Street in Cedar City, Utah 84720.
Two tanks and surrounding components located in the Southeast corner of the heat plant are scheduled to be replaced. The survey consisted of a visual assessment of the previous mentioned section of the building for suspect asbestos containing materials (ACM) and bulk sampling of the materials. The fieldwork component of this survey was conducted by Mr. Trevor Thacker who is a Utah Certified Asbestos Building Inspector.
This report presents the conditions and observations noted on the visit dates.
The following general information is included in this survey report:
• Executive Summary (Section 2.0)
• Sampling Methods (Section 3.0)
• Analytical Results (Section 4.0)
• Conclusions (5.0)
• Limitations & Exclusion of Warranty (6.0)
Limited Asbestos Survey Report Page 2
2.0 EXECUTIVE SUMMARY
No material(s) containing asbestos or assumed to contain asbestos were identified during this limited survey.
Limited Asbestos Survey Report Page 3
SOUTHERN UTAH UNIVERSITY, HEAT PLANT
699 WEST CENTER STREET, CEDAR CITY, UTAH 84720
DATE OF SURVEY: AUGUST 2026
NESHAP - REGULATED
ASBESTOS-CONTAINING MATERIALS (R-ACM)
1. Friable asbestos material (>1% asbestos and can be crumbled, pulverized, or reduced to powder by hand pressure) Thermal system insulation (TSI)* Textured ceiling material (TCM)* (Wallpaper) Spray-on insulation or fireproofing* Blown-in insulation* Ceiling tiles/panels* Plaster, gypsum board, gypsum board joint compound* (Plaster & Concrete Surfacing) Cloth materials* (Boiler Flue Gasket) Paper materials* (HVAC Paper Tape and Insulating Board) Electrical wiring insulation* Sink undercoating (loose)* Other* (Boiler & Fire Rated Curtain)
2. Category I ACM which has become friable
Packings Gaskets Resilient floor coverings (floor tile and sheet vinyl) Asphalt roofing products (Dust Debris, Roofing Underlayment Debris, Flashing Material)
3. Category I ACM that will be or has been subjected to sanding, grinding, cutting, or abrading
Packings Gaskets Resilient floor coverings (floor tile and sheet vinyl) Asphalt roofing products
4. Category II ACM that has a high probability of becoming or has become friable during demolition or renovation operations Asbestos cement materials (TransiteT)* Asphalt, tar and rubber-base ACM products other than roofing products* Non-asphalt and non-paper roofing products* Paint* Fire brick and/or mortar* Stainless steel sink undercoating (solid)* Encapsulated TCM* Encapsulated TSI* Mastic for floor tile, ceiling tile, cove molding, etc.* Other (Fire Rated Door/Frame)
Limited Asbestos Survey Report Page 4
SOUTHERN UTAH UNIVERSITY, HEAT PLANT
699 WEST CENTER STREET, CEDAR CITY, UTAH 84720
DATE OF SURVEY: AUGUST 2026
NESHAP NON-REGULATED
ASBESTOS-CONTAINING MATERIAL (N-R-ACM)
1. > 1% asbestos
2. Category I Non-friable (cannot be crumbled, pulverized, or reduced to powder by hand pressure) ACM with >1% asbestos by new PLM procedure Packings (Caulk and Window Glazing) Gaskets (AHU Gasket) Resilient floor coverings (Floor Tile) Asphalt roofing products
3. Category II Non-friable ACM with >1% asbestos by new PLM procedure (Category includes items meeting Category I definition but not specifically listed in that category) Asbestos cement materials (TransiteT)* (Fume hoods, counter tops, and window panels) Asphalt, tar and rubber-base ACM products other than roofing products* Non-asphalt and non-paper roofing products* Paint* (Silver Paint Sealant) Fire brick and/or mortar* Sink undercoating (solid)* Mastic for floor tile, ceiling tile, cove molding, etc.* Other*
Notes:
1. (*) Denotes R&R’s interpretation of materials included in this category.
2. New PLM procedure is outlined in Appendix A, Subpart F, 40 CFR, Part 783, Section 1, Polarized
Light Microscopy.
3. The Environmental Protection Agency (EPA) National Emission Standard for Hazardous Air
Pollutants (NESHAP) asbestos revision as outlined in 40 CFR, Part 61, became effective November 20, 1990. The asbestos classification system outlined in the revision and included in this section is dynamic in nature. Asbestos materials classified as “NON-REGULATED” at the time of the survey may become “REGULATED” due to ongoing or planned maintenance, renovation, or demolition actions, which can transform a material containing greater than 1% asbestos from a “non-friable” and NON-REGULATED to a friable and REGULATED condition. Classification of ACM in this section and in the executive summary of this report is, therefore, based on the observations of the surveyor at the time of the survey and may or may not be appropriate at later dates.
4. Maintenance, renovation, demolition, weathering, normal wear, water, or other damage can alter the “NON-REGULATED” status of materials, and necessitate precautions required for handling them as “REGULATED” asbestos-materials.
Limited Asbestos Survey Report Page 5
3.0 SAMPLING METHODS
Survey procedures were based on those outlined in Title 40 Code of Federal Regulation (CFR) Part 763, USEPA Asbestos Hazard Emergency Response Act, and the Asbestos Model Accreditation Plan (effective April 4, 1994). The procedures included visual observation, physical inspection, bulk sample collection, and condition assessment of suspect ACM. The number of samples collected was based on the amount and accessibility of each homogeneous material, with consideration given for the type, age, and condition.
Nineteen (19) samples were collected from the suspect materials to assess the presence of asbestos (or lack thereof) in building materials/systems. Each sample collected was placed into a sealable plastic bag or tub, marked with a unique sample identification code, and packaged for subsequent shipment to the laboratory for analysis. Individual sample identification consisted of a numeric code denoting the sampling media/location.
After packaging and labeling, samples were submitted under proper chain-of-custody to Reservoirs Environmental, Inc., Denver, Colorado. The National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896 accredits Reservoirs for asbestos analysis.
Samples were analyzed via Polarized Light Microscopy (PLM) utilizing EPA Method 600/M4- 82-020. Please note that USEPA and OSHA regulations define an ACM as a material containing more than one (1) percent asbestos, by volume, as determined by PLM analysis. In the case of multi-layer systems (e.g., floor tile/mastic layers), the laboratory analyzed and reported each layer separately.
4.0 SURVEY RESULTS
Nineteen (19) representative samples collected were submitted for analytical determination. A summary of analytical results for samples collected and analyzed for this survey are in Appendix B (Laboratory Results) and are discussed below by building material/system type. Photographs of the buildings where samples were taken are included as Appendix C. Floor Plans of the building where samples were taken are included in Appendix D
Limited Asbestos Survey Report Page 6
5.0 CONCLUSIONS
No materials containing asbestos were identified during the limited survey.
6.0 LIMITATIONS AND EXCLUSION OF WARRANTY
This asbestos survey and assessment was performed using procedures and a level of diligence typically exercised by professional consultants performing similar services. However, asbestos-containing material (ACM) can be present in a structure, but not identified using ordinary investigative procedures.
No asbestos survey can completely, eliminate uncertainty regarding the presence of ACM.
R&R Environmental, Inc.’s level of diligence and investigative procedures are intended to reduce, but not eliminate, potential uncertainty regarding the presence of ACM. The procedures used for this survey attempt to establish a balance between the competing goals of limiting investigative costs, time, and building damage, and reducing the uncertainty about unknown conditions. Therefore, the determinations in this report should not be construed as a guarantee that all ACM present in the subject property has been included in this report.
This report presents R&R Environmental, Inc.’s professional determinations, which are dependent upon information obtained during performance of consulting services. R&R Environmental, Inc. assumes no responsibility for omissions or errors resulting from inaccurate information provided by sources outside of R&R Environmental, Inc.
No warranty or guarantee, expressed or implied, is made regarding the findings, conclusions, or recommendations contained in this report. The limitations presented above supersede the requirements or provisions of all other contracts or scopes of work, implied, or otherwise, except stated or acknowledged herein.
Limited Asbestos Survey Report Page 7
OF THE
SOUTHERN UTAH UNIVERSITY
HEAT PLANT
During the month of August 2026, R & R Environmental, Inc. (R & R) of Sandy, Utah, conducted a limited asbestos survey and assessment of the Southern Utah University, Heat Plant, located at 699 West Center Street in Cedar City, Utah 84720. Bulk samples of suspect asbestos-containing materials were collected and analyzed. The condition of all friable and non-friable asbestos-containing materials was, assessed. The following accredited inspector conducted the survey and assessment.
Inspected by:
Trevor Thacker Date State of Utah, Division of Air Quality Inspector Certification Number: ASB-8872 State of Utah Company Certification: ASBC-237
This report was reviewed by:
David C. Roskelley, MSPH, CIH, CSP Date State of Utah, Division of Air Quality Inspector Certification Number: ASB-1370 AHERA Inspector #5 PSI 65451 I Certified Safety Professional #15774 Certified Industrial Hygienist #8529 State of Utah Company Certification: ASBC-237
Appendix A
Sample Log
SAMPLE LOG
Sample
Material/ Homogenous Area
Sample Location Quantity
Lab Result (%/Type) Assessment
B-01 TSI End Sealants Tank 1 1 ft2 None Detected Undamaged B-02 TSI End Sealants Tank 1 1 ft2 None Detected Undamaged B-03 TSI End Sealants Tank 2 1 ft2 None Detected Undamaged B-04 Pipe Thread Sealant Tank 1 1 ft2 None Detected Undamaged B-05 Pipe Thread Sealant Tank 2 1 ft2 None Detected Undamaged B-06 Pipe Thread Sealant Tank 2 1 ft2 None Detected Undamaged B-07 Tank Wrap Material Tank 1 150 ft2 None Detected Undamaged B-08 Tank Wrap Material Tank 2 150 ft2 None Detected Undamaged B-09 Pipe Sealant, Gray Tank 1 1 ft2 None Detected Undamaged B-10 Pipe Sealant, Gray Tank 2 1 ft2 None Detected Undamaged B-11 Pipe Liner Tank 1 10 ft2 None Detected Undamaged B-12 Pipe Liner Tank 2 10 ft2 None Detected Undamaged B-13 Lagging Tape Tank 1 2 ft2 None Detected Undamaged B-14 Lagging Tape Tank 2 2 ft2 None Detected Undamaged B-15 Elbow Joints Tank 1 1 ft2 None Detected Undamaged B-16 Elbow Joints Tank 1 1 ft2 None Detected Undamaged B-17 Block Filler Southeast Corner 950 ft2 None Detected Undamaged B-18 Block Filler Southeast Corner 950 ft2 None Detected Undamaged B-19 Block Filler Southeast Corner 950 ft2 None Detected Undamaged
Appendix B
Laboratory Report
August 04, 2026
Sincerely, Jeanne Spencer President
Subcontractor Number:
Laboratory Report: RES 773749-1
Project #/P.O. #: Suu Heat Plant
Project Description: Tank Replacement Bulk Samples
Trevor Thacker R & R Environmental 47 West 9000 South #2 Sandy, UT 84070
Dear Trevor, Eurofins Reservoirs is an analytical laboratory accredited for the analysis of Industrial Hygiene and Environmental matrices by the National Voluntary Laboratory Accreditation Program (NVLAP), Lab Code 101896-0 for Transmission Electron Microscopy (TEM) and Polarized Light Microscopy (PLM) analysis and the American Industrial Hygiene Association (AIHA LAP), Lab ID 101533 for Phase Contrast Microscopy (PCM) analysis. This laboratory is currently proficient in both Proficiency Testing and PAT programs respectively.
Eurofins Reservoirs has analyzed the following samples for asbestos content as per your request. The analysis has been completed in general accordance with the appropriate methodology as stated in the attached analysis table. The results have been submitted to your office.
RES 773749-1 is the job number assigned to this study. This report is considered highly confidential and the sole property of the customer. Eurofins Reservoirs will not discuss any part of this study with personnel other than those of the client. The results described in this report only apply to the samples analyzed, as received and with the information provided by the customer (i.e. sample volumes and areas). This report must not be used to claim endorsement of products or analytical results by NVLAP or any agency of the U.S. Government. This report shall not be reproduced except in full, without written approval from Eurofins Reservoirs. Samples will be disposed of after sixty days unless longer storage is requested. If you have any questions about this report, please feel free to call 303-964-1986.
by Camryn Baumgartner
08/04/202608/04/202608/04/202608/04/2026
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective July 31, 2025 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
(303) 964-1986 https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
4955 Yarrow St, Suite 100, Arvada, CO 80002
Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLL Asbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non- AAAA SubSubSubSub AsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrous YYYY PhysicalPhysicalPhysicalPhysical PartPartPartPart MineralMineralMineralMineral VisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponents EEEE DescriptionDescriptionDescriptionDescription EstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponents
Client Sample NumberClient Sample NumberClient Sample NumberClient Sample Number RRRR (%) (%) (%) (%) 773749 -773749 -773749 -773749 - B1B1B1B1 A White sealant w/ silver paint 14 NDNDNDND 3 97.0 B Yellow insulation 86 NDNDNDND 90 10.0 773749 -773749 -773749 -773749 - B2B2B2B2 A White sealant w/ silver paint 40 NDNDNDND 3 97.0 B Yellow insulation 60 NDNDNDND 90 10.0 773749 -773749 -773749 -773749 - B3B3B3B3 A White sealant w/ orange paint 35 NDNDNDND 3 97.0 B Brown insulation 65 NDNDNDND 90 10.0 773749 -773749 -773749 -773749 - B4B4B4B4 A Off-white resinous material w/ blue fibrous resinous material
10 NDNDNDND 4 96.0
B White/silver wrap w/ tan paint 15 NDNDNDND 35 65.0 C Tan paint w/ beige resinous material 75 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B5B5B5B5 A Blue fibrous resinous material w/ white resinous material 100 NDNDNDND 7 93.0 773749 -773749 -773749 -773749 - B6B6B6B6 A Gray/tan fibrous resinous material w/ white resinous material
100 NDNDNDND 8 92.0
773749 -773749 -773749 -773749 - B7B7B7B7 A White fibrous plaster 12 NDNDNDND 60 40.0 B Off-white foam 88 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B8B8B8B8 A Gray insulation 100 NDNDNDND 50 50.0 TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective July 31, 2025 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
Job Number:
Client:
Client Project/P.O.:
Client Project Description:
Date Samples Received:
Analysis Type:
Turnaround:
Date Samples Analyzed:
773749-1 R & R Environmental Suu Heat Plant Tank Replacement Bulk Samples August 03, 2026 EPA 600/R-93/116 - Short Report, Bulk Priority August 04, 2026
EUROFINS RESERVOIRS ENVIRONMENTAL, INC
NVLAP Lab Code 101896-0
AIHA LAP, LLC. LAB ID 101533
TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
NA = Not Analyzed NR = Not Received ND = None Detected TR = Trace; <1 % Visual Estimate Trem-Act = Tremolite-Actinolite
(303) 964-1986 https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Laboratory Sample IDLaboratory Sample IDLaboratory Sample IDLaboratory Sample ID LLLL Asbestos ContentAsbestos ContentAsbestos ContentAsbestos Content Non-Non-Non-Non- Non-Non-Non-Non- AAAA SubSubSubSub AsbestosAsbestosAsbestosAsbestos FibrousFibrousFibrousFibrous YYYY PhysicalPhysicalPhysicalPhysical PartPartPartPart MineralMineralMineralMineral VisualVisualVisualVisual FibrousFibrousFibrousFibrous ComponentsComponentsComponentsComponents EEEE DescriptionDescriptionDescriptionDescription EstimateEstimateEstimateEstimate ComponentsComponentsComponentsComponents
Client Sample NumberClient Sample NumberClient Sample NumberClient Sample Number RRRR (%) (%) (%) (%) 773749 -773749 -773749 -773749 - B9B9B9B9 A Silver resinous material 100 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B10B10B10B10 A Silver resinous material 100 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B11B11B11B11 A White/gray insulation 100 NDNDNDND 90 10.0 773749 -773749 -773749 -773749 - B12B12B12B12 A White/gray insulation 100 NDNDNDND 90 10.0 773749 -773749 -773749 -773749 - B13B13B13B13 A White/multi-colored wrap w/ green paint 100 NDNDNDND 30 70.0 773749 -773749 -773749 -773749 - B14B14B14B14 A Yellow insulation 8 NDNDNDND 90 10.0 B White/multi-colored wrap w/ orange paint 25 NDNDNDND 30 70.0 C White paper w/ red paint & yellow adhesive 67 NDNDNDND 40 60.0 773749 -773749 -773749 -773749 - B15B15B15B15 A White resinous material w/ dark-orange paint 100 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B16B16B16B16 A White resinous material w/ dark-orange paint 100 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B17B17B17B17 A Black/gray granular debris w/ gray paint 100 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B18B18B18B18 A Gray paint w/ gray/black granular debris 100 NDNDNDND 0 100.0 773749 -773749 -773749 -773749 - B19B19B19B19 A Gray paint w/ gray granular debris 100 NDNDNDND 0 100.0 TEM Analysis recommended for organically bound material (i.e. floor tile) if PLM results are <1%.
John McIntyre Analyst
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective July 31, 2025 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
Job Number:
Client:
Client Project/P.O.:
Client Project Description:
Date Samples Received:
Analysis Type:
Turnaround:
Date Samples Analyzed:
773749-1 R & R Environmental Suu Heat Plant Tank Replacement Bulk Samples August 03, 2026 EPA 600/R-93/116 - Short Report, Bulk Priority August 04, 2026
EUROFINS RESERVOIRS ENVIRONMENTAL, INC
NVLAP Lab Code 101896-0
AIHA LAP, LLC. LAB ID 101533
TABLE: I ANALYSIS: PLM BULK ANALYSIS, PERCENTAGE COMPOSITION BY VOLUME
NA = Not Analyzed NR = Not Received ND = None Detected TR = Trace; <1 % Visual Estimate Trem-Act = Tremolite-Actinolite
(303) 964-1986 https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
SUBMITTED BY INVOICE TO
Client Sample ID Number
RES Job #: 773749
CONTACT INFORMATION SERIES
ASBESTOS LABORATORY REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES
CHEMISTRY LABORATORY
MICROBIOLOGY LABORATORY
**Turnaround times establish a laboratory priority, subject to laboratory volume and are not guaranteed. Additional fees apply for afterhours, weekends and holidays.**
Laboratory Analysis Instructions
(Sample ID's must be unique)
Company: R & R Environmental Company: R & R Environmental
Address: 47 West 9000 South #2 Address: 47 West 9000 South #2
Sandy, UT 84070 Sandy, UT 84070
Project Number and/or P.O. #: Suu Heat Plant Project Zip Code:
Project Description/Location: Tank Replacement Bulk Samples
Contact: Trevor Thacker -1 PLM Priority Phone: (435) 229-9174
Fax:
Cell: (435) 229-9174
Final Data Deliverable Email Address:
tthacke2008@yahoo.com (+ 4 ADDNL. CONTACTS)
PLM / PCM / TEM / NYS DTL RUSH PRIORITY STANDARD Air = A Bulk = B
Dust = D Food = F
Paint = P Soil = S
Dust RUSH PRIORITY STANDARD
*PRIOR NOTICE REQUIRED FOR SAME DAY TAT
Surface = SU Swab = SW
Tape = T Wipe = W
Metals RUSH PRIORITY STANDARD Drinking Water = DW
Waste Water = WW
Organics* SAME DAY RUSH PRIORITY STANDARD **ASTM E1792 approved wipe media only**
Viable Analysis** PRIORITY STANDARD
**TAT DEPENDENT ON SPEED OF MICROBIAL GROWTH
Medical Device Analysis RUSH STANDARD
Mold Analysis RUSH PRIORITY STANDARD
Special Instructions:
ASBESTOS CHEMISTRY MICROBIOLOGY ICO
1 B1 X B
2 B2 X B
3 B3 X B
4 B4 X B
5 B5 X B
6 B6 X B
7 B7 X B
8 B8 X B
9 B9 X B
10 B10 X B
11 B11 X B
12 B12 X B
13 B13 X B
P L
M
P L
M S h o rt R ep o rt (E
PA
/6
/R
-9 3/
6)
T E
M
P C
M
N Y
S
D U
S T
M E
TA
L
S
O R
G A
N
IC
S
V
IA
B L
E S
M E
D
IC
A L
M O
L D
S am pl e
V ol um e
(L
A re a
S am pl e
Te m pe ra tu re
C
Le ng th (o r A liq uo ts
) x W id th
(o r A re a/
A liq uo t)
M at rix C od e of
C on ta in er s
D at e C ol le ct ed m m
/d d/ yy
T im e C ol le ct ed hh :m m
Eurofins Reservoirs Environmental, Inc establishes a unique Lab Sample ID, for each sample, by preceding each unique Client Sample ID with the laboratory RES Job Number.
Eurofins Reservoirs Environmental, Inc will analyze incoming samples based on information received and will not be responsible for errors or omissions in calculations resulting from the inaccuracy of original data. By signing, client/company representative agrees that submission of the following samples for requested analysis as indicated on this Chain of Custody shall consitute an analytical services agreement with payment terms of NET30. Failure to comply with payment terms may result in a 18% APR finance charge.
Relinquished By:
Trevor Thacker Date/Time: 07/30/2026 15:50:07 Sample Condition: Acceptable
Received By:
Aubree Klausner Date/Time: 08/03/2026 11:27:11 Carrier: Fed-Ex
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective July 31, 2025 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
(303) 964-1986 https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Client Sample ID Number
REQUESTED ANALYSIS VALID MATRIX CODES LAB NOTES
Laboratory Analysis Instructions
(Sample ID's must be unique)
Air = A Bulk = B
Dust = D Food = F
Paint = P Soil = S
Surface = SU Swab = SW
Tape = T Wipe = W
Drinking Water = DW
Waste Water = WW
**ASTM E1792 approved wipe media only**
RES Job #: 773749
Submitted By: R & R Environmental
ASBESTOS CHEMISTRY MICROBIOLOGY ICO
14 B14 X B
15 B15 X B
16 B16 X B
17 B17 X B
18 B18 X B
19 B19 X B
P L
M
P L
M S h o rt R ep o rt (E
PA
/6
/R
-9 3/
6)
T E
M
P C
M
N Y
S
D U
S T
M E
TA
L
S
O R
G A
N
IC
S
V
IA
B L
E S
M E
D
IC
A L
M O
L D
S am pl e
V ol um e
(L
A re a
S am pl e
Te m pe ra tu re
C
Le ng th (o r A liq uo ts
) x W id th
(o r A re a/
A liq uo t)
M at rix C od e of
C on ta in er s
D at e C ol le ct ed m m
/d d/ yy
T im e C ol le ct ed hh :m m
Eurofins Reservoirs Environmental, Inc Eurofins Reservoirs QA Manual
Effective July 31, 2025 Q:\QAQC\Eurofins Reservoirs QA Manual.pdf
(303) 964-1986 https://www.eurofinsus.com/builtenv https://clients.rei.et.eurofinsus.com
Appendix C
Photo Log
PHOTO 1: Southern Utah University, Heat Plant
R & R Environmental, Inc.
47 West 9000 South, Suite #2, Sandy, Utah 84070
(801) 352-2380 • Fax: (801) 352-2381
SITE PHOTOGRAPHS
SOUTHERN UTAH UNIVERSITY
HEAT PLANT
PROJECT NO:
DESIGNED BY:
SCALE: REVIEWED BY:
DRAWN BY:
DATE:
FILE:
Appendix D
Floor Plan
N
SOUTHERN UTAH UNIV.
HEAT PLANT
699 W. CENTER STREET
CEDAR CITY, UT 84720
FEBRUARY 2026
MAIN FLOOR
ASBESTOS FLOORPLAN
= ASBESTOS SAMPLE NUMBER & LOCATION##
TANK 1
TANK 2
11 17
Appendix E
State of Utah Certifications
Utah Asbestos Certification
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
l)e,1ten<mt Governor
February 27, 2026
Trevor Thacker R&R Environmental
Depat1ment of Environmental Quality
Tim Dovis Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
47 West 9000 South, Suite 2 Sandy, UT 84070
Dear Mr. Thacker:
Re: Utah Asbestos Program Individual Certification Card
Trevor Thacker
ASB-8872
Inspector (8' 01/20/2027)
~r
DAQA-001-26
The Utah Division of Air Quality (DAQ) has reviewed your Utah Asbestos Program Certification
Application for Individuals and we are pleased to inform you that your application has been approved. Your new asbestos program individual certification card is enclosed with this letter and this card is the sole method of individual certification documentation that you will receive from the DAQ.
Please check the information on your asbestos program certification card carefully. Please confirm that the photograph, name, and certification discipline(s) are correct. Also, please remember to keep your current asbestos program certification card with you at all times when you are performing regulated asbestos work activities.
Please contact Barbara Perkins at (80 I) 536-0221 or at bperkins@utah.gov if you have any questions regarding this letter or the enclosed asbestos program certification card.
Sincerely, Leonard Wright (Feb'25.2026 13·10:01 MST)
Leonard Wright, Manager Air Toxics, Lead-Based Paint, and Asbestos Section
LW;BP:rh
195 No11h 1950 West• Suh Lnko City, UT Mailing Address; P.O. Oox 144820 • Sul1 Luko City, UT 84114-4820
'1'1:lcphonc {801) 536f4000 • Pnx (801) 536~4099 • T,D.D. 800 346-3128 1111vi11.tleq.11tqh,1:ov l'rintcd on IOO¾ recycled pai1cr
Utah Asbestos Certification
SPENCER J. COX
Governor
DETORE HENDERSON
Lieutenant Governor
February 27, 2026
Jamison Moss R&R Environmental
Depa1tment of Environmental Quality
Tim Davis fa:ec11tive Direc/01·
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
47 West 9000 South, Suite 2 Sandy, UT 84070
Dear Mr. Moss:
Re: Utah Asbestos Program Individual Certification Card
Jamison Moss
ASB-6674
"'" Inspector (Eitp:" 02/20/2027)
Project oeMner'(Exp. 01/12/2027) it V .
4U~hD-~~fA.'Q 1· Director, ta IvIs1on o ir ua 1ty
DAQA-001-26
The Utah Division of Air Quality (DAQ) has reviewed your Utah Asbestos Program Certification Application for Individuals and we are pleased to inform you that your application has been approved. Your new asbestos program individual certification card is enclosed with this letter and this card is the sole method of individual certification documentation that you will receive from the DAQ.
Please check the information on your asbestos program certification card carefully. Please confirm that the photograph, name, and certification discipline(s) are correct. Also, please remember to keep your current asbestos program certification card with you at all times when you are performing regulated asbestos work activities.
Please contact Barbara Perkins at (801) 536-0221 or at bperkins@utah.gov if you have any questions regarding this letter or the enclosed asbestos program certification card.
Sincerely, Leonard Wrlgll (Feht2026 09:17:31 Msn
Leonard Wright, Manager Air Toxics, Lead-Based Paint, and Asbestos Section
LW:BP:rh
195 North 1950 Wes1 • Sah Lakll Chy, UT Mailing Address: P.O. Box 144820 • Sall Lake City, UT 84114-4820
Telephone (80 I) 536-4000 • flax (80 I) 536-4099 • T.D.D. 800 346-3128 www.1l1111,111ul,,Mo11 l'rinlcd on 100¼ recycled p11pcr
Utah Lead-Based Paint Certification
SPENCER J. COX
Go,·tmor
DEIDRE HENDERSON
litutenant Gol'limor
February 11, 2025
Steve Smith
Department of Environmental Quality
Kimberly D. Shelley Exec11tfre Director
DIVISION OF AIR QUALITY
Bryce C Bird
Director
R&R Environmental, Inc.
4 7 West 9000 South, #2 Sandy, UT 84070
Dear Mr. Smith:
Re: Utah Lead-Based Paint Program Individual Certification Card
Inspector l Risk Aue
-4~;_·~
Director, Utah D1v1sion of Air Quality
DAQA-002-25
The Utah Division of Air Quality (DAQ) has reviewed your Utah Lead-Based Paint (LBP)
Program Certification Application for Individuals and we are pleased to inform you that your application has been approved. Your new LBP program individual certification card is enclosed with this letter and this card is the sole method of individual certification documentation that you will receive from the DAQ.
Please check the information on your LBP program certification card carefully. Please confirm that the photograph, name, and certification discipline(s) are correct. Also, please remember to keep your current LBP program certification card with you at all times when you are performing regulated LBP work activities.
Please contact Barbara Perkins at (80 l) 536-0221 or at bperkins@utah.gov if you have any questions regarding this letter or the enclosed LBP program certification card.
Sincerely, ~ Sl1J~ Leonard Wright (Feb 7, 2025 12:09 MST)
Leonard Wright, Manager Air Toxics, Lead-Based Paint, and Asbestos Section
LW:BP:lr
195 Nonh 1950 Wes,, 4~' Hoor • Sall Lake City, Ur Mailing Addrm l' 0 llo"< 144820 • Suh Lnl.c Cny. UT 84114-1820
'I elephone (80 I) 536-4000 • l·a"< (801) 536-4099 ·TDD (80 I) 536-1-11-1 ~• u ,, di:tJ mnh gm•
P11111cd on I00~. 1ccycled papc, LIMITED LEAD-BASED PAINT INSPECTION
SOUTHERN UTAH UNIVERSITY
HEAT PLANT
Utah Department of Government Operations Division of Facilities, Construction and Management (DFCM)
Taylorsville State Office Building, 3rd Floor 4315 South 2700 West
47 West 9000 South, Suite #2
Sandy, Utah 84070
LIMITED LEAD-BASED PAINT INSPECTION
TABLE OF CONTENTS
TITLE PAGE
1.0 Introduction
2.0 Building Description
3.0 Lead-based Paint Definition
4.0 Procedures
4.1 Paint Sampling Methods
4.2 XRF Calibration
4.3 Field Documentation
5.0 Findings
6.0 Results and Recommendation
8.0 Limitations and Exclusion of Warranty
Appendices
A. Data Tables Table 1 – Building Component with Lead Levels at 0.01 mg/cm2 and above Table 2 – Building Component with Lead Levels at below 0.01 mg/cm2 B. Photograph Log
Southern Utah University Limited Lead-Based Paint Inspection Heat Plant Page 1
Limited Lead-Based Paint Inspection
1.0 INTRODUCTION
On August 1, 2026, a limited lead-based paint (LBP) survey was conducted for the Southern Utah University, Heat Plant. The purpose of the survey was to identify lead surrounding two tanks in the Southeast corner of the plant that are going to be replaced.
Measurements for lead in paint were made using a SciApps X550 X-ray Fluorescence (XRF) Spectrum Analyzer. No chip sampling or laboratory analysis was performed for confirmation of XRF measurements.
The survey work was overseen by David C. Roskelley with R & R Environmental, Inc. in Sandy, Utah. Mr. Roskelley has completed Lead Inspector Training through the University of Utah, Rocky Mountain Center for Occupational and Environmental Health (RMCOEH), an EPA-sponsored Regional Lead Training Center, and is certified by the State of Utah, Division of Environmental Quality, as a Lead Inspector.
The U.S. Department of housing and Urban Development (HUD) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in housing (HUD Guidelines), Chapter7: Lead-Based Paint Inspection, 1997 Revision, was generally followed for this survey, with modifications appropriate for a non-residential building.
The following accredited and certified inspector collected the samples:
August 28, 2026 David C. Roskelley, MSPH, CIH, CSP Date Lead-Based Paint Inspector Certification Number: PB-1041
The following accredited and certified inspector oversaw the inspection, made assessment, and reviewed the report:
August 28, 2026 David C. Roskelley, MSPH, CIH, CSP Date Lead-Based Paint Inspector Certification Number: PB-1041
Heat Plant Page 2
2.0 BUILDING DESCRIPTION
Building Identification
Building Name ................................... Southern Utah University, Heat Plant Building Address ............. 699 West Center Street, Cedar City, Utah 84720
Building Construction
Building Construction Date Building Type ........................................................................... Office, Plant Building Total Sq. Ft .......................................... ~2,500 ft2 (Affected Area) Structural System ...................................................................... Wood, Brick Exterior Wall Construction .................................................................. Brick Floor Deck Construction .............................................. Reinforced Concrete Roof Construction ............................... Cement/Asphalt Shingle, Membrane Floors Above Grade Floors Below Grade
Interior Finishes
Floors ................................................................................. Carpet, Concrete Walls ..........................................................................................CMU, Brick Attic ......................................................................................................... Yes Crawl space .............................................................................................. NA
Building Mechanical
Heating Plant ............................................................................... Central Air Main Heating Distribution .......................................................... Central Air Cooling Plant .............................................................................. Central Air Main A / C Distribution .............................................................. Central Air
Heat Plant Page 3
3.0 LEAD-BASED PAINT DEFINITIONS
HUD defines “lead-based paint” as any coating that has a lead concentration of 1.0 milligram of lead per square centimeter (1.0 mg/cm2) or greater, or if the lead concentration is greater than 0.5% by weight. The Consumer Product Safety Commission (CPSC) currently considers paint to be lead-containing if the concentration of lead exceeds 600 ppm (0.06% by weight). In 1978, the CPSC banned the sale of lead-based paint to consumers, and banned its application in areas where consumers have direct access to painted surfaces. Both the CPSC and HUD definitions of lead-containing paint are aimed at protecting the general population from exposure to lead in the residential setting.
By contrast, the mission of the Occupational Safety and Health Administration (OSHA) with respect to lead-containing paint, is to protect workers during construction activities that may generate elevated airborne lead concentrations. OSHA states that construction work (including renovation, maintenance, and demolition) carried-out on structures coated with paint have lead concentrations lower than the HUD or CPSC can still result in airborne lead concentrations in excess of regulatory limits. For this reason, OSHA has not defined lead-containing paint, but states that paint having any measurable level of lead may pose a substantial exposure hazard during construction work, depending upon the work performed.
4.0 PROCEDURES
4.1 Paint Sampling Methodologies
Direct measurements of lead in paint were made using a SciApps X550 X-ray Fluorescence (XRF) Spectrum Analyzer. The SciApps X550 X-ray Fluorescence (XRF) Spectrum Analyzer non-destructively measures lead concentrations of painted surfaces, regardless of the number of layers present. These instruments were developed specifically for addressing lead-based paint issues in housing and their use in identifying potential exposure hazards for renovation or construction work must be augmented by selective collection and analysis of physical paint chip samples.
The newer XRF instruments are capable of identifying lead in paint at concentrations of about 0.01 milligram per square centimeter (mg/cm2) or greater. When lead concentrations are lower than this, the instruments are not capable of making accurate, reliable measurements, and the reported lead concentration may underestimate or overestimate the actual lead concentration in the paint. Therefore, an XRF readings of 0.01 mg/cm2 or greater may be considered lead-containing from an OSHA perspective, and any readings of 0.0 mg/cm2 or less should be confirmed by the collection and laboratory analysis of paint chip samples, or assumed to be positive for lead.
Where paint chip samples are necessary, samples are collected according to the protocol specified in the HUD Guidelines. The samples are then submitted to a laboratory recognized under the EPA’s National Lead Laboratory Accreditation Program (NLLAP) for analysis by flame atomic absorption spectrophotometry according to American Society of Testing and Materials (ASTM) method ASTM E 1645.
Heat Plant Page 4
4.2 XRF Calibration
Before beginning the testing and after the testing was completed, the internal calibration of the LPA-1 was checked by taking two consecutive measurements on a National Institute for Standards and Technology (NIST) standard with a known concentration of lead. Three more readings were taken on a lead-free wood block. These calibration checks are reported within the XRF data tables found in Appendix A of this report and are maintained in a file at R & R Environmental, Inc. to detect changes in instrument performance over time.
4.3 Lead Paint Inspection Data Tables
The XRF instrument generates a unique set of data tables for each inspection and can be exported into Microsoft Excel Spreadsheet format .xls. The Sequential Report lists the measurements made throughout the property in sequential order, from the first measurement to the last. The Data table is maintained in a file at R & R Environmental, Inc.
5.0 FINDINGS
The XRF instrument indicated that lead is present of some of the interior building surfaces.
This surface is listed in Table 1 “positive” building components (Measurements of 0.01 mg/cm2 and above) in Appendix A of this report.
Interior:
-Yellow Metal Ladder -Yellow Metal Support -Black Metal Support
Since lead was detected in some of the building’s painted surfaces, the OSHA Lead in Construction Standard (29 CFR 1926.62) will apply to any construction work (including renovation and demolition) that may disturb those surfaces. The standard requires, among other things, the following:
• Initial training on the hazards of lead exposure, proper work practices, respiratory protection, and other topics;
• An initial exposure assessment, by air monitoring, to determine the lead exposure assessment, until sample analysis indicates exposures below the Permissible Exposure Limit;
• Hand washing facilities, designated clean change areas, and designated eating areas.
In addition to the above considerations, the presence of lead in demolition debris has the potential to impose limitations on where and how the debris may be disposed. The Resource Conservation and Recovery Act (RCRA), Subtitles C and D, require that the waste must be analyzed to determine the amount of leachable lead present. The type of test to be performed on the waste is the Toxicity Characteristic Leaching Procedure (TCLP)
Heat Plant Page 5 for lead, and the results of this test will determine whether the material must be handled and disposed of as hazardous waste. For structures containing large amounts of lead-containing paint, significant potential for failing the TCLP exists.
6.0 RESULTS AND RECOMMENDATIONS
Lead-based paint was detected on some interior surfaces during this limited survey. Any disturbance of materials containing lead-based paint should be done by trained and certified persons.
7.0 LIMITATIONS AND EXCLUSIONS OF WARRANTY
This lead inspection was performed using procedures and a level of diligence typically exercised by professional consultants performing similar services. However, lead-based paint (LBP) can be present in a surface, but not identified using ordinary investigative procedures.
No lead inspection can completely eliminate uncertainty regarding the presence of LBP. R & R Environmental, Inc. level of diligence and investigative procedures are intended to reduce, but not eliminate, potential uncertainty regarding the presence of LBP. The procedures used for this survey attempt to establish a balance between the competing goals of limiting investigative costs, time, and building damage, and reducing the uncertainty about unknown conditions. Therefore, the determinations in this report should not be construed as a guarantee that all LBP present in the subject property has been included in this report.
This report presents R & R Environmental, Inc.’s professional determinations, which are dependent upon information obtained during performance of consulting services. R &R Environmental, Inc. assumes no responsibility for omissions or errors resulting from inaccurate information provided by sources outside of R & R Environmental, Inc.
No warranty or guarantee, expressed or implied, is made regarding the findings, conclusions, or recommendations contained in this report. The limitations presented above supersede the requirements or provisions of all other contracts or scopes of work, implied or otherwise, except those stated or acknowledged herein.
Appendix A
Lead Paint Inspection Data Tables
Table 1
Building Components with Lead Levels at 0.01 mg/cm2 and Above
Room Floor
(2) Sample Number
Lead Level (Mg/Cm2) Component Side (1)
Substrate
Color
Condition
1 1.1 CALIBRATE
2 1.0 CALIBRATE
3 1.0 CALIBRATE
SE CORNER 1 20 .3 SUPPORT
BEAM C METAL YELLOW INTACT
SE CORNER 1 21 .3 LADDER C METAL YELLOW INTACT
SE CORNER 1 22 .8 SUPPORT
BEAM C METAL BLACK INTACT
23 1.0 CALIBRATE
24 1.1 CALIBRATE
25 1.0 CALIBRATE
*Side: A=North, B=East, C=South, D=West
Table 2
Building Components with Lead Levels Below 0.01 mg/cm2
Room
Floor (2)
Sample Number
Lead Level
(mg/cm2)
Component
Side (1)
Substrate
Color
Condition
SE CORNER 1 4 0 TANK 1 C METAL SILVER INTACT
SE CORNER 1 5 0 TANK 1 C METAL SILVER INTACT
SE CORNER 1 6 0 TANK 1 C METAL SILVER INTACT
SE CORNER 2 7 0 TANK 2 C METAL SILVER INTACT
SE CORNER 2 8 0 TANK 2 C METAL SILVER INTACT
SE CORNER 2 9 0 TANK 2 C METAL SILVER INTACT
SE CORNER 1 10 0 PIPE C METAL BLACK INTACT
SE CORNER 2 11 0 PIPE C METAL BLACK INTACT
SE CORNER 1 12 0 PIPE LINER C PVC ORANGE INTACT
SE CORNER 1 13 0 PIPE LINER C PVC RED INTACT
SE CORNER 1 14 0 PIPE LINER C PVC GREEN INTACT
SE CORNER 1 15 0 PIPE LINER C PVC ORANGE INTACT
SE CORNER 1 16 0 PUMP C METAL BLACK INTACT
SE CORNER 2 17 0 WALL B CMU GRAY INTACT
SE CORNER 2 18 0 WALL C CMU GRAY INTACT
SE CORNER 1 19 0 PIPE D METAL BLACK INTACT
*Side: A=North, B=East, C=South, D=West
Appendix B
Photograph Log
PHOTO 1: Southern Utah University, Heat Plant
PHOTO 2: Yellow Ladder Contains Lead
PHOTO 3: Yellow Support Beams Contain Lead
PHOTO 1: Black Metal Support Beam Contains Lead
R & R Environmental, Inc.
47 West 9000 South, Suite #2, Sandy, Utah 84070
(801) 352-2380 • Fax: (801) 352-2381
SITE PHOTOGRAPHS
A LIMITED LEAD BASED PAINT INSPECTION
PROJECT NO:
DESIGNED BY:
SCALE:
REVIEWED BY:
DRAWN BY:
DATE:
FILE:
HAZARDOUS MATERIALS INSPECTION
SOUTHERN UTAH UNIVERSITY
HEAT PLANT
Utah Department of Government Operations Division of Facilities, Construction and Management (DFCM)
Taylorsville State Office Building, 3rd Floor 4315 South 2700 West
47 West 9000 South, Suite #2 Sandy, Utah 84070
Southern Utah University Hazardous Material Inspection
Hazardous Materials Inspection
699 West Center Street Cedar City, Utah 84720
On August 1, 2026, Trevor Thacker of R & R Environmental, Inc., conducted a hazardous materials inspection of the Southern Utah University, Heat Plant, located at 699 West Center Street in Cedar City, Utah 84720. The purpose of this survey was to identify the existence, extent, and condition of hazardous materials. The inspection was conducted based on an agreement with Aubrey Stapel with Utah DFCM.
Hazardous materials requiring proper removal and disposal were identified at the Southern Utah University, Heat Plant, in Cedar City, Utah as follows:
Material Location Quantity Unit Cost Fluorescent Bulb Southeast Corner 36 bulbs $2.00 / bulb PCB Ballast Southeast Corner 18 units $8.00 / unit
The State of Utah’s DFCM policy requires the items above to be removed and disposed of at a facility approved to accept such waste prior to demolition. This may or may not be applied to the city of Cedar City in Iron County, but R & R Environmental, Inc.
recommends removal and proper disposal of these components prior to any demolition activities.
The cost estimate to remove and dispose of these hazardous materials is estimated at approximately >$216.00. This cost estimate does not include transportation, removal, design, or management fees associated with dismantling and packaging the materials.
| 2027 SBS : DCR ACM LBP.pdf |
| SBS UT Asbestos Cert 7 13 2027.pdf |
| 2026 SBS : DCR ACM LBP.pdf |
| 2025 SBS : DCR ACM LBP.pdf |
| SBS LBP Cert Exp Jan 2028.pdf |
| DCR ACM Utah Daq July 2027.pdf |
| 2026 SBS : DCR ACM LBP |
| 2026 SBS : DCR ACM LBP |
| 2026 SBS : DCR ACM LBP |
| 2025 SBS : DCR ACM LBP.pdf |
| 2025 DCR ACM LBP.pdf |
2025 SBS : DCR ACM LBP
2026 SBS : DCR ACM LBP
{"type":"Document","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":false}
{"type":"Form","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":false}
File details come from the government source that posted it. Updated .