Addendum No. 2 to RFP #6-B143-P-00148-00.doc

DOC document 147 KB Posted

Attached to
Request for Proposal: ALCF Artemis Compute Cluster
Solicitation number
6-B143-P-00148-00
Issued by

About this file

This is Addendum No. 2 to Request for Proposal (RFP) No. 6-B143-P-00148-00 for the ALCF Artemis Compute Cluster, issued by Argonne National Laboratory on June 3, 2026. The addendum clarifies and updates key specifications previously provided in Addendum No. 1. The primary changes address installation requirements and component handling procedures for the proposed compute cluster solution.

The addendum modifies the rack installation requirement from five (5) existing HPE P9K58A racks to four (4) racks in Building 240 Data Center, each equipped with four (4) HPE R4N79A Power Distribution Units (PDUs). Each PDU provides twenty-four (24) IEC 60320/C13 outlets at 12A @208V L-L (15A Peak) and twelve (12) C-series outlets at 16A @208V L-L (20A Peak). Additionally, the addendum clarifies the spare components policy, specifying that non-volatile storage components (SSDs, HDDs, SDCards, etc.) may not be shipped back to the Original Equipment Manufacturer (OEM), while other non-storage components may be shipped back and their handling terms may be negotiated as part of the contract award. Offerors are required to acknowledge receipt of this addendum by returning a signed copy to the Procurement Specialist at atkinson@anl.gov.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Court Atkinson Procurement Specialist Financial Management and Procurement Services (FMPS) Argonne National Laboratory

9700 South Cass Avenue, Bldg. 201

Lemont, IL 60439

630-252-3388 atkinson@anl.gov

June 3, 2026

TO ALL OFFERORS:

Subject:

ALCF Artemis Compute Cluster

Request for Proposal (RFP) No. 6-B143-P-00148-00 Addendum No. One (2)

Attached herewith for your information and use in preparing your proposal for subject project is Addendum No. 2.

Kindly acknowledge receipt of this Addendum by signing and returning one (1) copy of this letter to atkinson@anl.gov.

Sincerely, Court Atkinson

Procurement Specialist

Argonne National Laboratory FMPS

Receipt Acknowledged:

Company:

By:

Addendum No. TWO (2)

TO

REQUEST FOR PROPOSAL (RFP) 6-B143-P-00148-00

FOR

ALCF Artemis Compute Cluster

Date of Addendum: June 3, 2026 This addendum is being issued to modify the subject RFP as follows:

I. Clarifications and Offeror Questions

The following clarifications are made to responses previously issued under Addendum No. 1:

Q: What type of power – C13/C14 or C19/C20?

Original response: Proposals must include on-site services for installation into a set of five (5) existing racks (HPE P9K58A) in the Building 240 Data Center, each with four (4) PDUs (HPE R4N79A). The HPE R4N79A provides (24) x IEC 60320/C13 ≤ 12A @208V L-L (15A Peak) and (12) x Cx ≤ 16A @208V L-L (20A Peak).

Updated response: Proposals must include on-site services for installation into a set of four (4) existing racks (HPE P9K58A) in the Building 240 Data Center, each with four (4) PDUs (HPE R4N79A). The HPE R4N79A provides (24) x IEC 60320/C13 ≤ 12A @208V L-L (15A Peak) and (12) x Cx ≤ 16A @208V L-L (20A Peak).

Q: SOW Section 3.4 - When a part is replaced from the spares kit, is it allowed to be sent back to the OEM or is it expected to stay with the customer?

Original response: It is not allowed for storage components to be shipped back to the OEM. Shipping other non-storage components is allowed and may be negotiated as part of the award.

Updated response: It is not allowed for non-volatile storage components (SSDs, HDDs, SDCards, etc.) to be shipped back to the OEM. Shipping other components are allowed and may be negotiated as part of the award.

U. S. Department of Energy laboratory managed by UChicago Argonne, LLC