The document addresses eight contractor inquiries received on April 21-23, 2026 regarding project execution and specifications. Key clarifications include: water sources for the five-year maintenance period will be determined by the contractor, who must also design and provide the watering irrigation system. The contractor is responsible for surveying per specification Section 152 and must provide biological monitoring services per specification Sections 107.10(e)(1), 107.13, and 623.03(c), which will be paid under item 62303-1010 for Special Labor—Hired Technical Services—Biological Services. Soil disposal areas are designated on Plan Sheet D1. Seeds must comply with specification Section 625.03 and plants with specification Section 626.03, obtainable from local nurseries without requiring collection and propagation. The Notice to Proceed will be issued following bond approval. Regarding grading work, the contracting officer declined a request to change the bid schedule pay item from square yards to cubic yards, instructing bidders to "Bid As Shown" despite the stated uncertainty regarding excavation depth (18"-30") that creates a 2,000 cubic yard variance. Points of contact for site visits are provided: Zachary Ormsby, Field Manager (831-601-6242, zormsby@blm.gov) and Ben Hoke, Assistant Field Manager (831-737-0374, 831-285-2235, bhoke@blm.gov), Bureau of Land Management Central Coast Field Office.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6982AF26R000002
CA FLAP SCR T5(1A) Monterey Bay Sanctuary Scenic
Trial Question and Answers 4/24/2024
Questions Answers
Received 04/21/2026
1. Duration of the 5 years maintenance is there any water source close by?
Water sources be determined by contractor.
2. Watering irrigation system will be design and built?
Contractor to provide means and method for watering plants.
3. On state park side grading and dirt work where will be stored or hauled be all excess dirt?
Soil disposal area shown on Plan Sheet D1.
4. When would be starting time because of the all the plants will be contract grown?
Is it acceptable to get plan from local nurseries without collecting and propagating them ?
The Notice to Proceed (NTP) will be issued after bond approval.
Provide seeds in compliance with specification Section 625.03 and plants in compliance with specification Section 626.03.
5. Surveying will be done by owner or contractor.
Contractor to provide surveying per specification Section 152
6. If need biological monitoring will be done by owner or contractor?
Contractor to provide biological services per specification Section 107.10(e)(1), 107.13, and 623.03(c). Paid for under item 62303-
1010 SPECIAL LABOR, HIRED
TECHNICAL SERVICES, BIOLOGICAL
SERVICES, (BIOLOGICAL
MONITOR).
7. POC’s for Bureau of Land Management if you would like to view the project sites?
Zachary Ormsby Field Manager Central Coast Field Office Bureau of Land Management 831-601-6242 zormsby@blm.gov
Ben Hoke Assistant Field Manager - Multi-Resource Group Bureau of Land Management Central Coast Field Office Marina, CA Cell: (831) 737-0374 Desk: (831) 285-2235 bhoke@blm.gov
Received 04/23/2026 mailto:zormsby@blm.gov mailto:bhoke@blm.gov
6982AF26R000002
CA FLAP SCR T5(1A) Monterey Bay Sanctuary Scenic
Trial Question and Answers 4/24/2024
8. On the grading plan, Detail A & B show 18"-30" depth of cut for the grading work.
The total grading area on the bid schedule is 5,860 SQYD (52,740 SF). With a total square footage of 52,740, each foot of depth we excavate equates to 1,953 cubic yards (CY) of grading work.
If the excavation is 18" deep (1.5' deep), the grading equates to 2,930 CY total
If the excavation is 30" deep (2.5' deep), the grading equates to 4,883 CY total
A 2,000 CY delta is a good amount of dirt. This is about 200 10-wheeler truckloads.
Since we don't know the exact required excavation depth, is it possible to change the grading pay item from SQYD to Cubic Yards on the bid schedule? I think you will get better grading numbers this way.