This is a Question and Answers document for federal contract 6982AF26R000002, the CA FLAP SCR T5(1A) Monterey Bay Sanctuary Scenic Trail project. The document addresses seven questions submitted on 04/21/2026 regarding project requirements and points of contact.
Key contractor responsibilities identified include: determining water sources and providing means and methods for watering plants; designing and building the irrigation system; providing surveying services per specification Section 152; providing seeds in compliance with specification Section 625.03 and plants in compliance with specification Section 626.03; and providing biological monitoring services per specifications 107.10(e)(1), 107.13, and 623.03(c), which will be paid under line item 62303-1010 for Special Labor, Hired Technical Services, Biological Services. The soil disposal area for excess dirt from grading and site work is shown on Plan Sheet D1. The Notice to Proceed will be issued after bond approval. For site visits and project questions, the document provides two points of contact from the Bureau of Land Management's Central Coast Field Office: Zachary Ormsby (Field Manager) at 831-601-6242 or zormsby@blm.gov, and Ben Hoke (Assistant Field Manager - Multi-Resource Group) at (831) 737-0374 or (831) 285-2235, or bhoke@blm.gov.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6982AF26R000002
CA FLAP SCR T5(1A) Monterey Bay Sanctuary Scenic Trial
Question and Answers 4/23/2024
Questions Answers
Received 04/21/2026
1. Duration of the 5 years maintenance is there any water source close by?
Water sources be determined by contractor.
2. Watering irrigation system will be design and built?
Contractor to provide means and method for watering plants.
3. On state park side grading and dirt work where will be stored or hauled be all excess dirt?
Soil disposal area shown on Plan Sheet D1.
4. When would be starting time because of the all the plants will be contract grown?
Is it acceptable to get plan from local nurseries without collecting and propagating them ?
The Notice to Proceed (NTP) will be issued after bond approval.
Provide seeds in compliance with specification Section 625.03 and plants in compliance with specification Section 626.03.
5. Surveying will be done by owner or contractor.
Contractor to provide surveying per specification Section 152
6. If need biological monitoring will be done by owner or contractor?
Contractor to provide biological services per specification Section 107.10(e)(1), 107.13, and 623.03(c). Paid for under item 62303-
1010 SPECIAL LABOR, HIRED
TECHNICAL SERVICES, BIOLOGICAL
SERVICES, (BIOLOGICAL
MONITOR).
7. POC’s for Bureau of Land Management if you would like to view the project sites?
Zachary Ormsby Field Manager Central Coast Field Office Bureau of Land Management 831-601-6242 zormsby@blm.gov
Ben Hoke Assistant Field Manager - Multi-Resource Group Bureau of Land Management Central Coast Field Office Marina, CA Cell: (831) 737-0374 Desk: (831) 285-2235 bhoke@blm.gov mailto:zormsby@blm.gov mailto:bhoke@blm.gov
File details come from the government source that posted it. Updated .