Summary of Amendment A001 to Solicitation 6982AF26Q000016
This is Amendment A001 to a Request for Quotation (RFQ) issued by the Federal Highway Administration's Central Federal Lands Highway Division for geotechnical drilling services at two sites along Trail Ridge Road in Rocky Mountain National Park, Colorado. The amendment extends the quotation due date from July 23, 2026 to July 31, 2026 and replaces Scope of Work pages 7, 14, 15, and 16 with revised pages containing technical modifications highlighted in red.
The revised scope requires contractors to perform geotechnical drilling investigations to determine depth to bedrock and locate potential permafrost and groundwater. Work will utilize Sonic or ODEX drilling (preferred) through overburden soils, with HQ3 wireline coring required for a minimum of 10 feet into bedrock. Contractors must provide hourly rates for drilling and associated equipment, mobilization/demobilization costs (lump sum), geotechnical instrumentation per foot (inclinometers at 550 linear feet, piezometers at 300 linear feet, one thermistor at 100 linear feet), SPT sample costs (approximately 135 samples estimated), traffic control estimates, stand-by and on-site move rates, per diem based on CONUS rates, miscellaneous expenses, and water truck services. Drilling is estimated at 810 linear feet for Sonic/ODEX and up to 40 linear feet for HQ3 coring. Work is scheduled for late August or early September 2026 with strict environmental compliance requirements for Rocky Mountain National Park, including equipment inspection for weed-free status, traffic management limiting delays to 15 minutes or one mile of backup, safety plans addressing high-elevation hazards, and prohibition of Davis Bacon wages as this is classified as a service contract rather than construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6982AF26Q000016 CO NP ROMO 10(98) Geotech Investigation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return 1 copy to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
A001
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: ERIC GROSSKREUZ
9A. AMENDMENT OF SOLICITATION NUMBER
6982AF26Q000016
5. PROJECT NUMBER (If applicable)
CO NP ROMO 10(98)
07/23/2026
9B. DATED (SEE ITEM 11)
07/13/2026
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The Quotation Due Date is extended to July 31, 2026
Replace Scope of Work (SOW) pages 7, 14, 15 and 16 with attached SOW with the red highlights pages 7, 14, 15 and 16.
Eric Grosskreuz Rectangle
Eric Grosskreuz Line
Eric Grosskreuz Line
CO NP ROMO 10(98) – Trail Ridge Geotechnical Investigation
6982AF26Q000016
Amendment A001
Figure 2: NPS Map (focused view with starred locations)
II. Work Required
All investigations outlined in this section will be required to align with environmental compliance as identified by the NPS. Drilling for both sites will take place within the existing roadway or shoulder and will be accessible by a truck-mounted rig or track mounted rig with rubber tracks. Sonic or ODEX drilling will be utilized to advance through overburden soils due to the anticipated presence of oversized particles and in accordance with NPS request. Sonic drilling is preferred, however ODEX is acceptable. If bedrock is encountered, HQ3 wireline coring will be required to advance a minimum of 10 feet into bedrock. Inclinometers, piezometers, and one thermistor will be installed in select boreholes. Geophysical investigations scheduled for early July 2026 will optimize borehole placement and target depths while mitigating hazards. Consequently, these findings are expected to streamline and reduce the advanced drilling scope outlined below.
Scope of Work: This scope of work (SOW) is to perform geotechnical drilling to determine the depth to bedrock and locate potential permafrost and groundwater at two sites along Trail Ridge Road, Rocky Mountain National Park. This includes drilling and collecting soil and rock samples at the identified areas. Exact locations and extents will be provided in the field by CFL.
A summary of background information is shown in Table 1 below and photos of the existing High Point Slump and Switchback Walls sites can be seen in Figure 3 and 4.
Amendment A001 withdrawn (coordinate with FHWA). Water will be available at the west NPS headquarters. If water from the NPS is not elected/unable to be used, water must be procured off site and is the responsibility of the contractor.
Cleanliness of Site and Environmental Impact: Rocky Mountain National Park has high ecological, physical and regulatory sensitivity. The high-altitude tundra and alpine lakes are highly vulnerable to airborne pollutants and visitor trampling. It is the responsibility of the driller to collect and dispose of any drilling mud or slurry. It is allowable to backfill the completed borings with cuttings from drilling. It may be prudent to bring bags of bentonite, or similar material, if insufficient drill cuttings are produced to completely backfill the borings. It is imperative that any cement-bentonite grout or drilling lubricant be contained within a five-foot radius of the drilling location. Additionally, no material shall be washed or otherwise be allowed to enter the adjacent waters or any other area (upland) where it has the potential to migrate off-site. All contractors working on public lands will follow the applicable agency’s rules and guidelines pertaining to environment and cleanliness.
Utility Locates: Trail Ridge Road does not have continuous underground utilities spanning its alpine route over the Continental Divide.
Borings and Sampling: A combination of Sonic or ODEX and HQ3 core drilling will be used for the subsurface exploration. Planned sample frequency will be every five (5) feet, with potential to vary at depth, using an SPT sampler provided by the contractor. SPT sampling will be performed in accordance with ASTM D 1586 and D 1586 M. If an obstruction, such as a boulder, is located at the five-foot interval and the sampler refuses to advance, drilling will commence, and a sample will be taken as soon as the hole passes the obstruction. Photos will be taken of all drive samples and Sonic or ODEX drilling samples. Soil samples will be sealed and labeled in 1-gallon plastic bags. The geotechnical drill will use a calibrated automatic trip hammer to drive the samples. Hammer calibration must be within 1 year of the date drilling is performed, and a hammer calibration report is requested to be provided to FHWA prior to drilling. Grab samples will be collected if significant changes in the subsurface are noted between drive samples. Core drilling will use HQ3 wireline tooling with the ability to advance through gravels, cobbles, and boulder overburden, as well as bedrock. Photos will be taken of all core samples while wet. Core samples will be stored in core boxes and labeled with borehole number, depths, and date. Provide and be prepared with sufficient diamond bits, casing shoes, reaming shells, core boxes, core blocks (or a hand saw and lumber) and an extra inner core barrel on site. The drilling contractor will provide 5-gallon buckets with lids for shipping samples, and core boxes. FHWA will assist in coordinating an area to stage the drill rig overnight if needed.
Miscellaneous and Scheduling: Bathrooms are available at the Alpine Visitor Center. FHWA will provide personnel on-site to determine the boring locations and depths, log the borings, and collect samples. Drilling must require a strict, standardized “stop-work” procedure during extreme weather events to secure the rig, protect the crew, and stabilize the open borehole. Work is anticipated to take place in late August or early September 2026 as agreed upon by the FHWA and the drilling contractor. Drilling may not take place on Fridays or the weekends.
Amendment A001 Laboratory Testing Program: Soil and rock samples collected from the investigation will be transported to the CFLHD Materials Laboratory in Lakewood, CO for index and geotechnical engineering property testing. Anticipated testing includes:
• Index testing on all material types encountered in all borings (sieve analysis, Atterberg limits, moisture content, USCS & AASHTO classification)
• Corrosivity of soils testing on representative samples
• Unconfined compressive strength of bedrock
Additional mitigations required by the Park include:
Vegetation - Weed/Seed Free: All contractor equipment and hauling trailers must be inspected by Park staff before entry and reentry into the park. Equipment must be fully clean of debris (mud, weed seeds, etc.) to pass inspection.
Visitor Use & Experience - Communication: A public information program to warn of temporary closures, delays, and road hazards during construction shall be implemented.
This program would help convey appropriate messages to the public and aid in mitigating potential impacts on visitors' expectations and experiences. Work with public information officer and park staff to ensure that potential for delays is communicated to visitors, including location and potential duration.
Transportation: A copy of a Traffic Management Plan shall be submitted for review and approval prior to the commencement of work activities. This plan shall address location of warning signs, type of signs, placement of flaggers, placement of cones/fencing, barricades, duration of anticipated delays, use of pilot cars, etc. This plan shall address vehicle and pedestrian traffic within the construction zone. Delays should be limited to no longer than 15 minutes or one mile of traffic backup.
Human Health & Safety - Safety Plans: The contractor shall submit a safety plan to the Park Safety Officer prior to commencement of work. Safety plan shall demonstrate compliance with OSHA and other applicable safety laws. It shall include an emergency safety plan and shall list contractor points of contact. Include the special circumstances of this project, including the proximity of steep slopes, high elevation work, potential for severe weather at high elevation and exposed areas (with equipment), and communication plans in both areas with limited/no cell phone coverage.
Please provide costs pertaining to the following:
1. Mobilization/Demobilization (Lump sum).
2. Drilling and Costs (Sonic or ODEX and HQ3 coring). Hourly rate, to include equipment, operator, helper, support truck, water pump and hoses, and all other equipment and supplies required to perform drilling and excavation. Estimate 810 linear feet (Sonic or ODEX), and up to 40 linear feet (HQ3).
Amendment A001
3. Geotechnical instrumentation (per foot). Inclinometers at 550 linear feet, piezometers at 300 linear feet, and one possible thermistor at 100 linear feet (pending presence of permafrost;
TBD post-geophysics processing).
4. Traffic Control Subcontractor’s experience and estimate.
5. SPT sample cost. Estimate 135 SPT samples.
6. Stand-by rate due to weather (please provide an hourly rate less than drilling rate to be paid if needed).
7. On-site move rate (please provide an hourly rate less than drilling rate to be paid if needed).
8. Per diem based on CONUS (daily rate per person) (https://www.gsa.gov/travel/plan-book/per-diem-rates).
9. Rough estimate of misc. expenses (core boxes, buckets with lids, bentonite, etc.).
10. Water truck or trailer with an appropriate capacity to handle the drilling conditions and an adequately powered pump (daily rate).
11. Business Classification, and DUNS Number.
12. Other notable items: Davis Bacon wages are not applicable as this is a service contract and not a construction contract. Work schedule to be determined but 10 to 12-hour days likely.
Should you have any questions please contact Devin Dixon, E: devin.dixon@dot.gov | O: (720) 963- 3702 | C: (303) 264-8544.