This is a Standard Form 30 (Amendment of Solicitation/Modification of Contract) package consisting of two amendments to RFQ 6982AF26Q000007 issued by the Federal Highway Administration, Central Federal Lands Highway Division.
Amendment A002, effective 5/6/26, removes and replaces the Wage Determination document (all D sheets) and corrects the project number in Box 5 from Amendment A001. The solicitation number is 6982AF26Q000007, dated 4/16/26, with the project designated as CO NP COLM 10(5). The amendment is not extended and offerors must acknowledge receipt in Block 19 of the SF 1442 by the designated date and hour specified in the solicitation or face potential rejection of their bid. Amendment A001, effective 5/1/26, removes and replaces sheets C-3 through C-18. The updated Wage Determination (General Decision Number CO20260014, dated 01/02/2026) applies to highway construction projects in Larimer, Mesa, and Weld Counties in Colorado, and specifies prevailing wage rates for various classifications including carpenters, electricians, laborers, truck drivers, and equipment operators, with rates and fringe benefits varying by county and job classification. The wage determination references Executive Orders 13706 (paid sick leave) and 13658 (minimum wage rates) and includes procedures for wage determination appeals to the Department of Labor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QnA 05.01.2026 COLM.pdf | ||
| Amendment A001.pdf | ||
| QnA 04.28.2026 COLM.pdf | ||
| CO NP COLM 10(5) Guardrail Improvement Plans.pdf | ||
| 6982AF26Q000007 RFQ .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
9A. AMENDMENT OF SOLICITATION NUMBER
5. PROJECT NUMBER (If applicable)
9B. DATED (SEE ITEM 11)
A002
6982AF26Q000007
4/16/26
5/6/26
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
RFQ
1- Remove and replace Wage Determination, all D sheets.
2 - Remove and replace page one from Amendment A001. Box 5 project number has been corrected
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
DENISE MARTINEZ
CO NP COLM 10(5)
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION:
9A. AMENDMENT OF SOLICITATION NUMBER
5. PROJECT NUMBER (If applicable)
9B. DATED (SEE ITEM 11)
Amendment A002 5/6/2026
"General Decision Number: CO20260014 01/02/2026
Superseded General Decision Number: CO20250014
State: Colorado
Construction Type: Highway
Counties: Larimer, Mesa and Weld Counties in Colorado.
HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/02/2026
ENGI0009-012 05/01/2024
Rates Fringes
POWER EQUIPMENT OPERATOR:
(3)- Drill Rig Caisson (smaller than Watson 2500 and similar)................$ 35.03 15.20 (4)-Oiler Weld County................$ 35.20 15.20 (5)-Drill Rig Caisson (Watson 2500 similar or larger).....................$ 35.41 15.20
SUCO2011-009 09/15/2011
Rates Fringes
CARPENTER
Excludes Form Work..........$ 20.72 5.34 Form Work Only Larimer, Mesa..............$ 18.79 3.67 Weld.......................$ 16.54 3.90
CEMENT MASON/CONCRETE FINISHER
Larimer.....................$ 16.05 3.00 Mesa........................$ 17.53 3.00 Weld........................$ 17.48 3.00
ELECTRICIAN
Excludes Traffic Signalization Weld.......................$ 33.45 7.58 Traffic Signaliztion Weld.......................$ 25.84 6.66
FENCE ERECTOR
Weld........................$ 17.46 3.47
GUARDRAIL INSTALLER
Larmer, Weld................$ 12.89 3.39
HIGHWAY/PARKING LOT
STRIPING:Painter Larimer.....................$ 14.79 3.98 Mesa........................$ 14.75 3.21 Weld........................$ 14.66 3.21
IRONWORKER, REINFORCING
D-1 A002 Amendment 05.06.2026
(Excludes Guardrail Installation) Larimer, Weld...............$ 16.69 5.45
IRONWORKER, STRUCTURAL
(Excludes Guardrail Installation) Larimer, Weld...............$ 18.22 6.01
LABORER
Asphalt Raker Larimer....................$ 18.66 4.66 Weld.......................$ 16.72 4.25 Asphalt Shoveler............$ 21.21 4.25 Asphalt Spreader............$ 18.58 4.65 Common or General...........$ 16.29 4.25 Concrete Saw (Hand Held)....$ 16.29 6.14 Landscape and Irrigation....$ 12.26 3.16 Mason Tender- Cement/Concrete.............$ 16.29 4.25 Pipelayer Larimer....................$ 17.27 3.83 Mesa, Weld.................$ 16.23 3.36 Traffic Control (Flagger)...$ 9.55 3.05 Traffic Control (Sets Up/Moves Barrels, Cones, Install Signs, Arrow Boards and Place Stationary Flags)(Excludes Flaggers) Larimer, Weld..............$ 12.43 3.22
PAINTER (Spray Only).............$ 16.99 2.87
POWER EQUIPMENT OPERATOR:
Asphalt Laydown Larimer....................$ 26.75 5.39 Mesa,Weld..................$ 23.93 7.72 Asphalt Paver...............$ 21.50 3.50 Asphalt Roller Larimer....................$ 23.57 3.50 Mesa.......................$ 24.25 3.50 Weld.......................$ 27.23 3.50 Asphalt Spreader Larimer....................$ 25.88 6.80 Mesa, Weld.................$ 23.66 7.36 Backhoe/Trackhoe Larimer....................$ 21.46 4.85 Mesa.......................$ 19.81 6.34 Weld.......................$ 20.98 6.33 Bobcat/Skid Loader Larimer....................$ 17.13 4.46 Mesa, Weld.................$ 15.37 4.28 Boom........................$ 22.67 8.72 Broom/Sweeper Larimer....................$ 23.55 6.20 Mesa.......................$ 23.38 6.58 Weld.......................$ 23.23 6.89 Bulldozer Larimer, Weld..............$ 22.05 6.23 Mesa.......................$ 22.67 8.72 Crane.......................$ 26.75 6.16 Drill Larimer, Weld..............$ 31.39 0.00 Mesa.......................$ 35.06 0.00
D- A002 Amendment 05.06.2026
Forklift....................$ 15.91 4.68 Grader/Blade Larimer....................$ 24.82 5.75 Mesa.......................$ 23.42 9.22 Weld.......................$ 24.53 6.15 Guardrail/Post Driver.......$ 16.07 4.41 Loader (Front End) Larimer....................$ 20.45 3.50 Mesa.......................$ 22.44 9.22 Weld.......................$ 23.92 6.67 Mechanic Larimer....................$ 27.68 4.57 Mesa.......................$ 25.50 5.38 Weld.......................$ 24.67 5.68 Oiler Larimer....................$ 24.16 8.35 Mesa.......................$ 23.93 9.22 Roller/Compactor (Dirt and Grade Compaction) Mesa, Weld.................$ 21.33 6.99 Roller/Compactor (Dirt and Grade Compaction Larimer....................$ 23.67 8.22 Rotomill Larimer....................$ 18.59 4.41 Weld.......................$ 16.22 4.41 Scraper Larimer....................$ 21.33 3.50 Mesa.......................$ 24.06 4.13 Weld.......................$ 30.14 1.40 Screed Larimer....................$ 27.20 5.52 Mesa.......................$ 27.24 5.04 Weld.......................$ 27.95 3.50 Tractor.....................$ 13.13 2.95
TRAFFIC SIGNALIZATION:
Groundsman Larimier....................$ 11.44 2.84 Mesa........................$ 16.00 5.85 Weld........................$ 16.93 3.58
TRUCK DRIVER
Distributor Larimer....................$ 19.28 4.89 Mesa.......................$ 19.17 4.84 Weld.......................$ 20.61 5.27 Dump Truck Larimer....................$ 18.86 3.50 Mesa.......................$ 15.27 4.28 Weld.......................$ 15.27 5.27 Lowboy Truck Larimer....................$ 18.96 5.30 Mesa,Weld..................$ 18.84 5.17 Mechanic....................$ 26.48 3.50 Multi-Purpose Specialty & Hoisting Truck Larimer, Mesa..............$ 16.65 5.46 Weld.......................$ 16.87 5.56 Pickup and Pilot Car........$ 13.93 3.68 Semi/Trailer Truck..........$ 18.39 4.13 Truck Mounted Attenuator....$ 12.43 3.22 Water Truck Larimer....................$ 19.14 4.99 Mesa.......................$ 15.96 5.27
Weld.......................$ 19.28 5.04
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
D- A002 Amendment 05.06.2026
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .