This document is a Questions and Answers (Q&A) file for the OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge federal contract opportunity. The Q&A covers four key inquiries from potential bidders dated between April 17-22, 2025, addressing critical project details. Key points include: (1) the existing submerged bridge is estimated to weigh 70,000 lb, with its condition and underwater characteristics unknown; (2) the project explicitly states there are no warranties associated with the contract; (3) potential bidders must contact CHIC representatives (Jeremie Johnston or Linda Richards) and may require a Special Use Permit before site access; and (4) technical specifications for hydraulic seeding and mulching are referenced in specific sections (SCR 713.04, FP-14 713.05, FP-14 625.07, and FP-14 625.08). The project involves replacing a pedestrian trail bridge at the Chickasaw National Recreation Area in Murray County, Oklahoma, with construction anticipated in Summer 2025 and an estimated completion date of June 2026.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for OK ERFO NP CHIC 2024-1(1) Veterans Lake Trail Bridge
April 17, 2025
Questions Answers 1 Can you please provide additional information on the Submerged
Bridge? The drawings give the length and width of the bridge.
We need to be able to calculate the Weight of the submerged bridge.
If the original submittals are available, they would provide all the necessary information. We suspect this was a performance specification from looking at the drawings as there is very little information provided.
The weight of the existing bridge is unknown, but roughly estimated to be 70,000 lb; with, the bridge condition and underwater weight/buoyancy also unknown. It is unknown if the existing bridge is intact, or if it is lodged in the lakebed. The only information known about the existing bridge is provided in the physical data as listed in FAR Clause 52.236-4. Refer to SCR Subsection 203.04 for requirements to develop a bridge removal plan, including assessment and documentation of existing bridge conditions.
April 18, 2025
2 We can find no reference within the bid documents to the required warranty period associated with this contract, and the typical government FAR clauses which address warranty (FAR 52.246- 21 or Subpart 46.7) do not seem to be included by reference. Can you please clarify the required warranty period associated with this contract or direct the bidders where this information can be found?
There are no warranties for the project.
April 22, 2025
3 We would like to go and take a look at this site before finalizing a proposal. Can you let us know where it is located (a pin would be awesome), permissions required, and if it is accessible from the roadways (gates, etc?)
Prior to arriving, notify CHIC of all activities & depending on activities, they may have to issue a Special Use Permit:
• jeremie_johnston@nps.gov or 580-622-7252
• Linda_Richards@nps.gov or 580-618-1317 See plans for bridge location.
4 On sheet B1 summary of quantities – schedule A, is noting hydraulic seeding and hydraulic mulching, we cannot seem to
Review the following for more information:
• Seed mix: SCR 713.04.
locate any further information stating specific requirements on these items. Can a specification be given for seeding and mulching on this project? Namely identifying the type of seed and mulch, as well as verifying application method.
• Mulch type: FP-14 713.05
• Seed application: FP-14 625.07.
• Mulch application: FP-14 625.08.