QnA El Vado 12.04.2025.pdf
PDF 223 KB Posted
- Attached to
- NM BR AAO EL VADO HERON & EL VADO ROAD REHAB
- Solicitation number
- 6982AF25B000003
About this file
This document is a Questions and Answers (Q&A) file for the NM BR AAO El Vado Heron & El Vado Road Rehabilitation project, dated December 4, 2025. The Q&A covers multiple technical details about the road rehabilitation project, including specifications for Full Depth Reclamation (FDR), asphalt requirements, and site-specific construction details. Key clarifications include: no curb reconstruction at the Willow Creek boat ramp, lime is required as an antistrip agent in hot mix asphalt, contractors should follow the advertised plans for improvements, and water sources for FDR operations should be referenced in Section 105.02 of the SCRs. For site access, potential bidders can contact Mark Schichtle at (802) 793-9419 to visit the site, which is located on a seasonally closed road (Rd 5001). The solicitation is a Part 14 sealed bid, with no extensions granted and no page limitations for cover letters.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| El Vado BidTabulationReport.pdf | ||
| Bid Opening Summary.pdf | ||
| QnA 12 9 2025.pdf | ||
| Amendment A001.pdf | ||
| QnA 12 8 2025.pdf | ||
| Plans - Final.pdf | ||
| 6982AF25B000003.pdf | ||
| 21.100 DrainageMemo.pdf | ||
| Geotech Eng Report - El Vado and Heron Lake GEO Pavement Report_Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for
NM BR AAO EL VADO HERON & EL VADO ROAD REHABILITATION
December 4, 2025
Questions Answers 1 Reps & Certs: Will the government please confirm that offerors do not have to fill out and provide representations and certifications?
Reps and Certs information is provided by SAM.gov.
2 Due to complex pricing and the requirement for hardcopy submission, will the government please provide an extension of 10 days to the due date?
No extensions.
3 Will the government allow offerors to submit a cover letter that does not count toward any page limitations?
This is a Part 14, sealed bid, page limitations are not applicable.
4 RFP states: "you must be registered in the System for Award Management (SAM) prior to submission of a bid in response to this solicitation. Must offerors provide any proof of this with the proposal submission?
No
5 VETS 4212 Reporting: Do offerors merely need to select one of the checkboxes and provide that with proposal submission?
Refer to https://www.dol.gov/agencies/vets/programs/vets4212#verify
See Confirmation of Filing section, specifically Upon the successful submission of VETS-4212 Report(s), federal contractors will receive an email confirmation of receipt for their records. Provide the email confirmation.
6 D-4: The plans call for demolition of the existing concrete curb at the Willow Creek boat ramp but do not indicate whether it is to be reconstructed.
Please confirm whether curb replacement is required.
If yes, provide curb type, dimensions, and layout limits.
If not, confirm the required pavement edge condition.
Removed curb will not be reconstructed. Refer to Sheet A-9 and D-4.
7 D-4: The earth along the edge of the Willow Creek boat ramp parking lot is significantly sloped toward the lot and shows signs of long-term erosion.
Will the contractor be responsible for regrading this area to establish and maintain a proper slope away from the parking lot?
a) If regrading is required, please provide direction on the intended drainage pattern, acceptable slopes, and any required erosion control measures.
b) Please confirm if additional work (import fill, export, erosion matting, seeding, riprap, etc.) is expected as part of this correction.
No, Contractor should construct improvements shown in the advertised plans.
8 D-6: The existing sidewalk outside of the Visitor Center has deteriorated.
No, Contractor should construct improvements shown in the advertised plans.
https://www.dol.gov/agencies/vets/programs/vets4212#verify
Should this sidewalk be removed and replaced?
a) If asphalt elevation changes, how should the transition be handled?
Option A: Excavate ~4" to maintain current elevation.
Option B: Raise asphalt and provide a compliant ramp/transition.
9 D-1: Plans for Option X do not clearly indicate whether curb is required.
Please confirm if curb installation is included in this option.
If yes, provide curb type, dimensions, and layout.
If not, confirm intended pavement edge treatment.
No, Curb is not required.
10 C-1 to 10: The plans reference ditch reconditioning but provide no details.
Are there specifications describing acceptable methods?
a) Should the ditch be reshaped to a specified depth, width, or slope?
b) Is seeding, riprap, or erosion matting required?
Please clarify the intended scope.
Refer to FP-14 Section 303.
11 C-11: At the entrance to the Willow Creek boat ramp access road (Option X), no culvert is shown despite the existing slopes indicating drainage flow through this area.
Please confirm whether a culvert is required.
If yes, provide size/type and invert elevations.
Culvert is not required.
12 C-11: At the same entrance, there is a small road section leading to a sign.
This area appears to fall within the reclamation boundary.
Please confirm whether this section should be included in reclamation, grading, and paving costs.
If included, clarify the exact limits and required finish.
The improvements are limited to main line of Willow Creek Boat Ramp Access Road.
13 C-1 to 10: Clarification is needed regarding water supply for Full Depth Reclamation (FDR) stabilization:
Where are contractors allowed to pull water for FDR operations?
Can water be pumped directly from the lake, or do we need permission to do so?
Is there an approved on-site water source we may tap into?
If no on-site source is available, will contractors be required to haul water in via water trucks?
Please confirm acceptable water sources and any restrictions, permits, or environmental considerations.
Refer to Section 105.02 of the SCRs.
14 E-49 Section 401: Asphalt Additives, Base Course Material, and Pay Factor Requirements Lime vs. Liquid Antistrip in Hot Mix Asphalt The specifications appear to require lime as the antistrip agent in the
Lime is required. Bid as advertised.
Hot Mix Asphalt (HMA).
Please confirm whether lime may be substituted with a liquid antistrip additive, provided it meets moisture susceptibility and stripping resistance requirements.
If substitution is allowed, please provide the approved dosage rate, type, and testing requirements (e.g., TSR minimums).
Use of 1" Minus Commercial Base Course
15 E-49 Section 401: Please confirm whether 1" minus commercial base course is acceptable for this project.
If not acceptable, please specify the required gradation, spec section, or approved aggregate base course standard (AASHTO, DOT spec, etc.).
If testing or certification is required, please confirm those requirements.
See FP-14 Section 302, SCR Section 302, and FP-14 Subsection 703.06.
16 E-49 Section 401: Hot Mix Asphalt Pay Factor Applicability Please confirm whether the Hot Mix Asphalt is subject to pay factor adjustments.
If pay factors apply, please provide the specific criteria, including:
Density requirements Asphalt content tolerances Air voids Smoothness specification (if any) Testing frequency and acceptance methods If pay factors do not apply, please confirm that HMA will be paid at the contract unit price without adjustment.
Covered in Sections 106 and 401 of the SCRs and FP-14.
17 It states in the solicitation that Rd 5001 is seasonally closed and to contact they CO for access for site visit. I can not find CO contact information. We would like to visit the site on 12/8/2025. Please advise.
To access the site please contact Mark Schichtle at (802) 793-9419.