This is a Bid Tabulation Report for the Heron & El Vado Road Rehabilitation project (Project No. NM BR AAO EL VADO) administered by the Bureau of Reclamation in Rio Arriba County, New Mexico. The solicitation (No. 6982AF25B000003) was opened on December 12, 2025, at Lakewood, Colorado, with bids tabulated by Contract Specialist Denise Martinez and certified on December 23, 2025. Eight contractors submitted bids for both the Base Schedule A and an optional Schedule X component.

For Schedule A (Base), the bid amounts ranged from $5,527,280.00 (West Point Contractors, Inc., lowest) to $11,431,273.62 (Miami Nation Stronghold, LLC, highest), with an Engineer's Estimate of $3,940,804.14. For Schedule X (Option), bids ranged from $2,047,095.00 (Siete, Inc.) to $5,639,452.28 (Miami Nation Stronghold, LLC), with an Engineer's Estimate of $2,122,590.11. The project encompasses road rehabilitation work including mobilization, surveying and staking, quality control and testing, soil erosion control, roadway aggregate and reclamation, asphalt concrete pavement, and related construction items such as culvert installation, sidewalk work, traffic control, and landscaping. The detailed line-item pricing throughout the tabulation reflects unit prices and total amounts for numerous work categories across all bidders, enabling comparison of cost proposals for contract award evaluation.

View the file

Other files

File Type Posted
Bid Opening Summary.pdf PDF
QnA 12 9 2025.pdf PDF
Amendment A001.pdf PDF
QnA 12 8 2025.pdf PDF
QnA El Vado 12.04.2025.pdf PDF
Plans - Final.pdf PDF
6982AF25B000003.pdf PDF
21.100 DrainageMemo.pdf PDF
Geotech Eng Report - El Vado and Heron Lake GEO Pavement Report_Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HERON & EL VADO ROAD

REHABILITATION

Siete, Inc. $8,131,845.00 Engineer's Estimate $6,063,394.25

TNT General Contractors $10,313,234.60 West Point Contractors, Inc. $8,387,048.00

Whelcon Contractors LLC. $11,961,831.38 Eagle Eye Electric, LLC $11,191,751.00

Miami Nation Stronghold, LLC $17,070,725.90 McKenzie Construction & Site D l t LLC

$12,607,323.01

Engineer's Estimate $3,940,804.14 $2,122,590.11

Contractor Responsive? Total Base Schedule A and Option(s): X

West Point Contractors, Inc. $5,527,280.00 $2,859,768.00 Siete, Inc. $6,084,750.00 $2,047,095.00

Eagle Eye Electric, LLC $7,457,497.00 $3,734,254.00 TNT General Contractors $7,555,502.20 $2,757,732.40

McKenzie Construction & Site

$8,879,506.82 $3,727,816.19 Whelcon Contractors LLC. $7,490,885.74 $4,470,945.64

Option: X Miami Nation Stronghold, LLC $11,431,273.62 $5,639,452.28

BID TABULATION REPORT

Project No. : NM BR AAO EL VADO Project Name:

Contractor Responsive? Base Schedule A

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Denise Martinez

TNT General $680,000.00

Unit Unit Price Amount A0020 15101-0000 MOBILIZATION McKenzie Construction $1,052,488.77

Miami Nation $712,944.85

Line Item Number

Pay Item Number

Description Contractor Quantity

Schedule: A Schedule Type: Base Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO ROAD

West Point Contractors, Inc., $5,527,280.00

Engineer's Estimate $3,940,804.14

Eagle Eye Electric, LLC, $7,457,497.00 Siete, Inc., $6,084,750.00

TNT General Contractors, $7,555,502.20 Whelcon Contractors LLC., $7,490,885.74

Miami Nation Stronghold, LLC, $11,431,273.62

$8,879,506.82

Contractor Comment Bid Amount Responsive

Date:

Contract Awarded to: Award Date:

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Federal Land: Bureau of Reclamation Bid Open Date and Time: 12/12/2025 State: NM County: Rio Arriba Solicitation No. : 6982AF25B000003 Opened at: Lakewood, CO Opened by: Denise Martinez Schedule: A Schedule Type: Base Lead Designer:

BID TABULATION REPORT

Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO Division: Central Federal Lands

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Denise Martinez

Contract Specialist

12/23/2025

BID TABULATION REPORT

$346,686.00 Miami Nation $199,290.39

Siete, Inc. $500,000.00

A0100 15401-0000 CONTRACTOR

TESTING

TNT General

McKenzie Construction

Eagle Eye Electric, LLC $126,500.00 Whelcon Contractors $106,980.04

$150,000.00 Miami Nation $99,645.19

$302,835.81 McKenzie Construction $301,536.00

$502,500.00

$13,860.00 $63,894.60

$1,321,250.00 Siete, Inc. $500,000.00

A0080 15301-0000 CONTRACTOR

QUALITY CONTROL

TNT General

Whelcon Contractors

West Point

Eagle Eye Electric, LLC $45,800.00 Engineer's Estimate ALL LPSM LPSM $98,528.00

A0060 15216-2000 SURVEY AND

STAKING, GRADE

FINISHING STAKES

McKenzie Construction 4.61

Eagle Eye Electric, LLC 4.61

West Point 4.61

Miami Nation 4.61 $2,179.76 $10,048.69 Engineer's Estimate 4.61 MILE $17,500.00 $80,675.00

$8,000.00 $36,880.00 Siete, Inc. 4.61 $7,500.00 $34,575.00

$30,300.00 $139,683.00 TNT General 4.61

$7,500.00 $34,575.00

$19,431.00 $89,576.91 TNT General 4.61 $13,860.00 $63,894.60

$88,524.00 $408,095.64 Whelcon Contractors 4.61 $33,575.28 $154,782.04

$24,400.00 $112,484.00 Whelcon Contractors 4.61 $22,630.39 $104,326.10

A0040 15210-3000 CENTERLINE,

VERIFICATION AND

STAKING

Eagle Eye Electric, LLC 4.61

McKenzie Construction 4.61

Miami Nation 4.61

West Point 4.61 $5,000.00 $23,050.00 Engineer's Estimate 4.61 MILE $15,000.00 $69,150.00

$8,164.55 $37,638.58 Siete, Inc. 4.61

ALL LPSM LPSM $400,774.64

Eagle Eye Electric, LLC $343,450.00 West Point $600,000.00 Siete, Inc. $600,000.00 Whelcon Contractors $604,804.51

Engineer's Estimate

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0200 20402-0000 SUBEXCAVATION Miami Nation 200.000

$55,000.00 Whelcon Contractors $28,315.55

$100,000.00 Eagle Eye Electric, LLC $61,000.00

$754.91 $150,982.00

$23,000.00

$280,000.00 Miami Nation $156,160.21

A0180 15802-0000 WATERING FOR

DUST CONTROL

TNT General

Siete, Inc.

West Point

McKenzie Construction $12,040.00 Engineer's Estimate ALL LPSM LPSM $40,000.00

A0160 15720-0000 STORM WATER

POLLUTION

PREVENTION PLAN

Siete, Inc.

Miami Nation

McKenzie Construction

Eagle Eye Electric, LLC $7,260.00 Engineer's Estimate ALL LPSM LPSM $5,000.00

$20,371.00 Whelcon Contractors $13,166.77

$37,682.54 West Point

$76,000.00

$130,000.00 Siete, Inc. $100,000.00

$100,000.00 TNT General $45,000.00

$508,005.85 McKenzie Construction $468,897.00

A0140 15701-0000 SOIL EROSION

CONTROL

Miami Nation

TNT General

West Point

Whelcon Contractors $51,222.90 Engineer's Estimate ALL LPSM LPSM $41,482.20

$80,000.00 Eagle Eye Electric, LLC

LPSM LPSM $16,421.00

$15,000.00 West Point $9,000.00

$22,144.77 McKenzie Construction $16,260.00

$50,000.00 Whelcon Contractors $22,829.70

A0120 15501-0000 CONSTRUCTION

SCHEDULE

Siete, Inc.

Miami Nation

TNT General

Eagle Eye Electric, LLC $7,000.00 Engineer's Estimate ALL

West Point $82,000.00 Engineer's Estimate ALL LPSM LPSM $98,528.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$565.00 $367,250.00 Whelcon Contractors 650.000 $512.58 $333,177.00

$15.83 $902,310.00

$649.40 $422,110.00 McKenzie Construction 650.000 $589.00 $382,850.00

A0280 30510-0000 CEMENTITIOUS

MATERIAL

Miami Nation 650.000

Eagle Eye Electric, LLC 650.000

A0260 30502-0400 FULL DEPTH

RECLAMATION WITH

CEMENT, 4-INCH

DEPTH

McKenzie Construction 57,000.000

Miami Nation 57,000.000

TNT General 57,000.000

Eagle Eye Electric, LLC 57,000.000 $4.50 $256,500.00 Engineer's Estimate 57,000.000 SQYD $9.00 $513,000.00

$12.00 $684,000.00 Siete, Inc. 57,000.000 $10.00 $570,000.00

$16.08 $916,560.00 Whelcon Contractors 57,000.000

$25.00 $2,500.00

$225.00 $22,500.00 Siete, Inc. 100.000 $200.00 $20,000.00

$24.00 $1,368,000.00 West Point 57,000.000 $19.00 $1,083,000.00

$1,095.31 $109,531.00 Whelcon Contractors 100.000 $261.72 $26,172.00

A0240 30302-1000 DITCH

RECONDITIONING

Miami Nation 100.000

West Point 100.000

McKenzie Construction 100.000

Eagle Eye Electric, LLC 100.000 $12.00 $1,200.00 Engineer's Estimate 100.000 LNFT $50.00 $5,000.00

$120.00 $12,000.00 TNT General 100.000

TON $40.00 $28,000.00

$103.00 $72,100.00 Siete, Inc. 700.000 $100.00 $70,000.00

$119.00 $83,300.00 McKenzie Construction 700.000 $108.00 $75,600.00

$250.00 $50,000.00 West Point 200.000 $220.00 $44,000.00

$674.52 $472,164.00 Whelcon Contractors 700.000 $341.50 $239,050.00

A0220 30202-2000 ROADWAY

AGGREGATE,

METHOD 2

Miami Nation 700.000

Eagle Eye Electric, LLC 700.000

West Point 700.000

TNT General 700.000 $46.00 $32,200.00 Engineer's Estimate 700.000

Whelcon Contractors 200.000 $259.49 $51,898.00

Siete, Inc. 200.000

McKenzie Construction 200.000

Eagle Eye Electric, LLC 200.000 $38.00 $7,600.00 Engineer's Estimate 200.000 CUYD $100.00 $20,000.00

$56.00 $11,200.00 TNT General 200.000 $39.00 $7,800.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$1,700.00 $85,000.00

A0400 41101-1000 PRIME COAT,

METHOD 1

Eagle Eye Electric, LLC 50.000

Whelcon Contractors 50.000

McKenzie Construction 50.000

Siete, Inc. 50.000 $750.00 $37,500.00

$1,444.00 $72,200.00 TNT General 50.000 $960.00 $48,000.00

$2,199.01 $109,950.50 West Point 50.000

$1,200.00 $42,000.00

$2,399.33 $83,976.55 McKenzie Construction 35.000 $2,251.00 $78,785.00

$7,375.00 $368,750.00 Miami Nation 50.000 $6,594.44 $329,722.00

$7,375.00 $258,125.00 Miami Nation 35.000 $6,594.44 $230,805.40

A0380 40601-0000 FOG SEAL Eagle Eye Electric, LLC 35.000

Whelcon Contractors 35.000

TNT General 35.000

Siete, Inc. 35.000 $1,000.00 $35,000.00 Engineer's Estimate 35.000 TON $2,295.63 $80,347.05

$1,727.00 $60,445.00 West Point 35.000

TON $462.10 $41,589.00

$500.00 $45,000.00 West Point 90.000 $320.00 $28,800.00

$1,805.00 $162,450.00 Eagle Eye Electric, LLC 90.000 $1,475.00 $132,750.00

$361.00 $3,321,200.00 Whelcon Contractors 9,200.000 $347.21 $3,194,332.00

$2,468.77 $222,189.30 Miami Nation 90.000 $1,978.33 $178,049.70

A0340 40105-3000 ANTISTRIP ADDITIVE,

TYPE 3

Whelcon Contractors 90.000

McKenzie Construction 90.000

Siete, Inc. 90.000

TNT General 90.000 $248.00 $22,320.00 Engineer's Estimate 90.000

Eagle Eye Electric, LLC 9,200.000 $485.00 $4,462,000.00

A0300 40101-5600 ASPHALT CONCRETE

PAVEMENT,

GYRATORY MIX, 1/2-

INCH OR 3/4-INCH

NOMINAL

MAXIMUM SIZE

AGGREGATE, 0.3 TO

<3 MILLION ESAL

Miami Nation 9,200.000

McKenzie Construction 9,200.000

West Point 9,200.000

TNT General 9,200.000 $235.00 $2,162,000.00 Engineer's Estimate 9,200.000 TON $175.00 $1,610,000.00

$265.00 $2,438,000.00 Siete, Inc. 9,200.000 $250.00 $2,300,000.00

$266,500.00 Siete, Inc. 650.000 $375.00 $243,750.00

$649.87 $5,978,804.00

TNT General 650.000

West Point 650.000 $292.00 $189,800.00 Engineer's Estimate 650.000 TON $380.00 $247,000.00

$410.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0500 62201-0950 WHEEL LOADER, 3

CUBIC YARD

Eagle Eye Electric, LLC 20.000

$135.00 $2,700.00

$240.00 $4,800.00 West Point 20.000 $200.00 $4,000.00

$300.00 $6,000.00 McKenzie Construction 20.000 $258.00 $5,160.00

$434.61 $8,692.20 McKenzie Construction 20.000 $252.00 $5,040.00

A0480 62201-0200 DUMP TRUCK, 8

CUBIC YARD

MINIMUM CAPACITY

Miami Nation 20.000

Eagle Eye Electric, LLC 20.000

Whelcon Contractors 20.000

TNT General 20.000 $125.00 $2,500.00 Engineer's Estimate 20.000 HOUR $205.00 $4,100.00

$194.85 $3,897.00 Siete, Inc. 20.000

EACH $2,000.00 $22,000.00

$2,400.00 $26,400.00 Miami Nation 11.000 $1,833.88 $20,172.68

$4,213.00 $46,343.00 Eagle Eye Electric, LLC 11.000 $3,500.00 $38,500.00

$2,400.00 $60,000.00 Whelcon Contractors 25.000 $2,199.01 $54,975.25

$12,000.00 $132,000.00 Whelcon Contractors 11.000 $5,909.22 $65,001.42

A0460 60704-0000 CLEANING CULVERT

IN PLACE

Siete, Inc. 11.000

McKenzie Construction 11.000

West Point 11.000

TNT General 11.000 $640.00 $7,040.00 Engineer's Estimate 11.000

Miami Nation 25.000 $6,594.44 $164,861.00 A0440 41201-0000 TACK COAT Eagle Eye Electric, LLC 25.000

West Point 25.000

McKenzie Construction 25.000

TNT General 25.000 $960.00 $24,000.00 Engineer's Estimate 25.000 TON $1,848.67 $46,216.75

$2,082.00 $52,050.00 Siete, Inc. 25.000 $1,500.00 $37,500.00

$3,200.00 TNT General 8.000 $96.00 $768.00

$822.92 $6,583.36 McKenzie Construction 8.000 $662.00 $5,296.00

$7,400.00 $185,000.00

$1,475.00 $11,800.00 Miami Nation 8.000 $1,318.89 $10,551.12

A0420 41105-0000 BLOTTER Eagle Eye Electric, LLC 8.000

Whelcon Contractors 8.000

West Point 8.000

Siete, Inc. 8.000 $50.00 $400.00 Engineer's Estimate 8.000 TON $425.00 $3,400.00

$400.00

Engineer's Estimate 50.000 TON $2,334.20 $116,710.00

[Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$301.00 $3,010.00 Miami Nation 10.000 $282.62 $2,826.20

$584.56 $5,845.60 Eagle Eye Electric, LLC 10.000 $340.00 $3,400.00

A0580 62302-1000 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES

Whelcon Contractors 10.000

McKenzie Construction 10.000

West Point 10.000 $180.00 $1,800.00

HOUR $67.00 $1,340.00

$65.00 $1,300.00 Siete, Inc. 20.000 $60.00 $1,200.00

$114.00 $2,280.00 Whelcon Contractors 20.000 $86.03 $1,720.60

$250.00 $5,000.00 Miami Nation 20.000 $224.84 $4,496.80

$240.00 $4,800.00 West Point 20.000 $120.00 $2,400.00

A0560 62301-0000 GENERAL LABOR McKenzie Construction 20.000

Eagle Eye Electric, LLC 20.000

TNT General 20.000

Miami Nation 20.000 $37.68 $753.60 Engineer's Estimate 20.000

Eagle Eye Electric, LLC 20.000 $280.00 $5,600.00

A0540 62201-3350 HYDRAULIC

EXCAVATOR, 1 CUBIC

YARD MINIMUM

CAPACITY

McKenzie Construction 20.000

West Point 20.000

TNT General 20.000

Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000 HOUR $180.00 $3,600.00

$210.00 $4,200.00 Whelcon Contractors 20.000 $195.68 $3,913.60

$4,600.00 West Point 20.000 $200.00 $4,000.00

$278.85 $5,577.00 Whelcon Contractors 20.000 $272.70 $5,454.00

$361.00 $7,220.00

$222.33 $4,446.60

$343.00 $6,860.00 Eagle Eye Electric, LLC 20.000 $340.00 $6,800.00

A0520 62201-2850 MOTOR GRADER, 12

FOOT MINIMUM

BLADE

McKenzie Construction 20.000

Miami Nation 20.000

TNT General 20.000

Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000 HOUR $195.00 $3,900.00

$230.00

MINIMUM RATED

CAPACITY

West Point 20.000

TNT General 20.000

Whelcon Contractors 20.000 $150.22 $3,004.40 Engineer's Estimate 20.000 HOUR $215.00 $4,300.00

$190.00 $3,800.00 Siete, Inc. 20.000 $160.00 $3,200.00

$225.00 $4,500.00 Miami Nation 20.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

LPSM LPSM $200,000.00

$214,726.92 West Point $150,000.00

$314,021.16 McKenzie Construction $252,535.00

$7,020.26 $196,567.28 McKenzie Construction 28.000 $6,992.00 $195,776.00

$720,000.00 Siete, Inc. $400,000.00

A0660 63501-0000 TEMPORARY TRAFFIC

CONTROL

TNT General

Miami Nation

Whelcon Contractors

Eagle Eye Electric, LLC $101,500.00 Engineer's Estimate ALL

TNT General 28.000 $12,980.00 $363,440.00

A0640 63402-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID

Whelcon Contractors 28.000

Miami Nation 28.000

Eagle Eye Electric, LLC 28.000

Siete, Inc. 28.000 $1,100.00 $30,800.00 Engineer's Estimate 28.000 MILE $1,600.00 $44,800.00

$6,050.00 $169,400.00 West Point 28.000 $1,850.00 $51,800.00

$16,625.00 TNT General 2.500 $4,200.00 $10,500.00

$10,000.00 $25,000.00 West Point 2.500 $9,500.00 $23,750.00

$17,382.41 $486,707.48

$251.22 $2,512.20

$16,640.61 $41,601.53 Whelcon Contractors 2.500 $11,691.21 $29,228.03

A0620 62501-0000 TURF

ESTABLISHMENT

Miami Nation 2.500

Siete, Inc. 2.500

Eagle Eye Electric, LLC 2.500

McKenzie Construction 2.500 $4,131.00 $10,327.50 Engineer's Estimate 2.500 ACRE $16,178.00 $40,445.00

$6,650.00

A0600 62302-1100 SPECIAL LABOR,

HIRED SURVEY

SERVICES

Whelcon Contractors 10.000

McKenzie Construction 10.000

West Point 10.000

TNT General 10.000 $110.00 $1,100.00 Engineer's Estimate 10.000 HOUR $250.00 $2,500.00

$230.00 $2,300.00 Siete, Inc. 10.000 $165.00 $1,650.00

$252.00 $2,520.00 Miami Nation 10.000

$150.00 $1,500.00

$584.56 $5,845.60 Eagle Eye Electric, LLC 10.000 $364.00 $3,640.00

TNT General 10.000 $95.00 $950.00 Engineer's Estimate 10.000 HOUR $190.00 $1,900.00

Siete, Inc. 10.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$40,333.00 $40,333.00

A0700 63701-0000 FIELD OFFICE West Point 1.000

Whelcon Contractors 1.000

Siete, Inc. 1.000

TNT General 1.000 $15,000.00 $15,000.00 Engineer's Estimate 1.000 EACH $30,000.00 $30,000.00

$40,000.00 $40,000.00 Eagle Eye Electric, LLC 1.000 $23,500.00 $23,500.00

$46,083.71 $46,083.71 McKenzie Construction 1.000

$4.27 $8,540.00

$7.00 $14,000.00 Siete, Inc. 2,000.000 $6.00 $12,000.00

$110,000.00 $110,000.00 Miami Nation 1.000 $73,365.08 $73,365.08

$21.00 $42,000.00 Eagle Eye Electric, LLC 2,000.000 $11.00 $22,000.00

A0680 63503-1000 TEMPORARY TRAFFIC

CONTROL, PLASTIC

FENCE

McKenzie Construction 2,000.000

West Point 2,000.000

TNT General 2,000.000

Whelcon Contractors 2,000.000 $2.79 $5,580.00 Engineer's Estimate 2,000.000 LNFT $10.00 $20,000.00

$4.50 $9,000.00 Miami Nation 2,000.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

TNT General $360,000.00

Unit Unit Price Amount X0020 15101-0000 MOBILIZATION West Point $399,388.00

Whelcon Contractors $382,727.38

Line Item Number

Pay Item Number

Description Contractor Quantity

Schedule: X Schedule Type: Option Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO ROAD

Siete, Inc., $2,047,095.00

Engineer's Estimate $2,122,590.11

West Point Contractors, Inc., $2,859,768.00 TNT General Contractors, $2,757,732.40

Eagle Eye Electric, LLC, $3,734,254.00

$3,727,816.19

Miami Nation Stronghold, LLC, $5,639,452.28 Whelcon Contractors LLC., $4,470,945.64

Contractor Comment Bid Amount Responsive

Date:

Contract Awarded to: Award Date:

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Federal Land: Bureau of Reclamation Bid Open Date and Time: 12/12/2025 State: NM County: Rio Arriba Solicitation No. : 6982AF25B000003 Opened at: Lakewood, CO Opened by: Denise Martinez Schedule: X Schedule Type: Option Lead Designer:

BID TABULATION REPORT

Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO Division: Central Federal Lands

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Denise Martinez

Contract Specialist

12/23/2025

$30,300.00 $18,786.00 TNT General 0.62 $19,350.00 $11,997.00

Whelcon Contractors 0.62 $36,414.95 $22,577.27

X0100 15216-2000 SURVEY AND

STAKING, GRADE

FINISHING STAKES

McKenzie Construction 0.62

Eagle Eye Electric, LLC 0.62

West Point 0.62 $19,000.00 $11,780.00 Miami Nation 0.62 $16,207.54 $10,048.67

$2,512.17 Eagle Eye Electric, LLC 1.000 $2,425.00 $2,425.00

$3,690.05 $3,690.05 Siete, Inc. 1.000 $3,000.00 $3,000.00

$117,556.00 $72,884.72

$45,000.00

$9,000.00 $9,000.00 McKenzie Construction 1.000 $6,630.00 $6,630.00

X0080 15215-3000 SURVEY AND

STAKING, DRAINAGE

STRUCTURE

West Point 1.000

Whelcon Contractors 1.000

Miami Nation 1.000

TNT General 1.000 $1,000.00 $1,000.00 Engineer's Estimate 1.000 EACH $1,050.00 $1,050.00

$2,512.17

X0060 15214-3000 SURVEY AND

STAKING, PARKING

AREA

Eagle Eye Electric, LLC

Whelcon Contractors

West Point

TNT General $6,000.00 Engineer's Estimate ALL LPSM LPSM $25,000.00

$12,000.00 Miami Nation $7,536.51

$56,103.30 Siete, Inc.

$13,168.63 $8,164.55

$22,000.00 $13,640.00 TNT General 0.62 $19,350.00 $11,997.00

$82,300.00 McKenzie Construction $81,695.00

$43,697.92 $27,092.71 McKenzie Construction 0.62 $36,356.00 $22,540.72

X0040 15210-3000 CENTERLINE,

VERIFICATION AND

STAKING

Whelcon Contractors 0.62

West Point 0.62

Eagle Eye Electric, LLC 0.62

Siete, Inc. 0.62 $10,000.00 $6,200.00 Engineer's Estimate 0.62 MILE $15,000.00 $9,300.00

$19,250.00 $11,935.00 Miami Nation 0.62

ALL LPSM LPSM $244,191.78

Eagle Eye Electric, LLC $67,500.00 Siete, Inc. $200,000.00 McKenzie Construction $335,635.77 Miami Nation $356,979.25

Engineer's Estimate

[Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0200 15802-0000 WATERING FOR

Miami Nation

$24,000.00 Siete, Inc. $15,000.00

$40,397.60 Eagle Eye Electric, LLC $24,650.00

$126,461.35

$5,000.00

$156,528.24 McKenzie Construction $109,595.00

X0180 15701-0000 SOIL EROSION

CONTROL

Miami Nation

Whelcon Contractors

TNT General

West Point $13,000.00 Engineer's Estimate ALL LPSM LPSM $41,482.20

X0160 15501-0000 CONSTRUCTION

SCHEDULE

West Point

McKenzie Construction

Miami Nation

Siete, Inc. $1,600.00 Engineer's Estimate ALL LPSM LPSM $10,000.00

$2,976.92 Eagle Eye Electric, LLC $2,500.00

$5,975.00 TNT General

$25,000.00

$63,000.00 West Point $35,000.00

$9,000.00 Whelcon Contractors $7,483.18

$98,312.00 TNT General $87,000.00

X0140 15401-0000 CONTRACTOR

TESTING

McKenzie Construction

Eagle Eye Electric, LLC

Miami Nation

Whelcon Contractors $16,184.42 Engineer's Estimate ALL LPSM LPSM $55,488.00

$26,804.85 Siete, Inc.

LPSM LPSM $55,488.00

$32,100.00 Siete, Inc. $20,000.00

$53,409.97 West Point $50,000.00

$342,000.00 McKenzie Construction $85,509.00

X0120 15301-0000 CONTRACTOR

QUALITY CONTROL

TNT General

Miami Nation

Eagle Eye Electric, LLC

Whelcon Contractors $16,184.42 Engineer's Estimate ALL

Siete, Inc. 0.62 $10,000.00 $6,200.00 Engineer's Estimate 0.62 MILE $17,500.00 $10,850.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$478.00 $1,434.00 Siete, Inc. 3.000 $320.00 $960.00

$3,200.00 $3,200.00

$1,002.36 $3,007.08 West Point 3.000 $850.00 $2,550.00

X0280 20301-2400 REMOVAL OF SIGN Miami Nation 3.000

McKenzie Construction 3.000

X0260 20301-1900 REMOVAL OF PIPE

CULVERT

West Point 1.000

Miami Nation 1.000

TNT General 1.000

McKenzie Construction 1.000 $299.00 $299.00 Engineer's Estimate 1.000 EACH $4,300.00 $4,300.00

$2,870.00 $2,870.00 Eagle Eye Electric, LLC 1.000 $1,650.00 $1,650.00

$6,012.88 $6,012.88 Siete, Inc. 1.000

$316.00 $1,264.00

$800.00 $3,200.00 TNT General 4.000 $800.00 $3,200.00

$10,000.00 $10,000.00 Whelcon Contractors 1.000 $7,164.55 $7,164.55

$1,002.36 $4,009.44 West Point 4.000 $850.00 $3,400.00

X0240 20301-0100 REMOVAL OF

BOLLARD

Miami Nation 4.000

Siete, Inc. 4.000

Whelcon Contractors 4.000

McKenzie Construction 4.000 $298.00 $1,192.00 Engineer's Estimate 4.000 EACH $515.00 $2,060.00

$471.13 $1,884.52 Eagle Eye Electric, LLC 4.000

EACH $100.00 $100.00

$2,000.00 $2,000.00 Miami Nation 1.000 $830.27 $830.27

$4,442.69 $4,442.69 Eagle Eye Electric, LLC 1.000 $3,025.00 $3,025.00

$27,844.08 Eagle Eye Electric, LLC $15,300.00

$6,500.00 $6,500.00 McKenzie Construction 1.000 $5,975.00 $5,975.00

X0220 20216-0000 TREE PRUNING Siete, Inc. 1.000

Whelcon Contractors 1.000

West Point 1.000

TNT General 1.000 $400.00 $400.00 Engineer's Estimate 1.000

TNT General $32,000.00

DUST CONTROL

Whelcon Contractors

West Point

McKenzie Construction $5,975.00 Engineer's Estimate ALL LPSM LPSM $30,000.00

$12,000.00 Siete, Inc. $8,000.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$95.00 $47,500.00

X0360 20401-0000 ROADWAY

EXCAVATION

Whelcon Contractors 500.000

Siete, Inc. 500.000

Eagle Eye Electric, LLC 500.000

TNT General 500.000 $19.00 $9,500.00

$36.00 $18,000.00 McKenzie Construction 500.000 $31.00 $15,500.00

$102.00 $51,000.00 West Point 500.000

$49.00 $2,450.00

$79.17 $3,958.50 McKenzie Construction 50.000 $59.00 $2,950.00

$399.25 $199,625.00 Miami Nation 500.000 $154.50 $77,250.00

$108.02 $5,401.00 West Point 50.000 $95.00 $4,750.00

X0340 20303-3200 REMOVAL OF

SIDEWALK,

CONCRETE

Miami Nation 50.000

Whelcon Contractors 50.000

Eagle Eye Electric, LLC 50.000

TNT General 50.000 $12.80 $640.00 Engineer's Estimate 50.000 SQYD $125.00 $6,250.00

$55.00 $2,750.00 Siete, Inc. 50.000

LNFT $60.00 $37,200.00

$11.00 $6,820.00 TNT General 620.000 $8.20 $5,084.00

$16.00 $9,920.00 West Point 620.000 $12.00 $7,440.00

$9,500.00 $19,000.00 Whelcon Contractors 2.000 $7,418.31 $14,836.62

$32.66 $20,249.20 Whelcon Contractors 620.000 $27.66 $17,149.20

X0320 20302-0500 REMOVAL OF CURB,

CONCRETE

Miami Nation 620.000

Siete, Inc. 620.000

McKenzie Construction 620.000

Eagle Eye Electric, LLC 620.000 $4.00 $2,480.00 Engineer's Estimate 620.000

Miami Nation 2.000 $10,022.30 $20,044.60

X0300 20301-2800 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(UTILITY VAULT)

McKenzie Construction 2.000

West Point 2.000

Siete, Inc. 2.000

Eagle Eye Electric, LLC 2.000 $1,990.00 $3,980.00 Engineer's Estimate 2.000 EACH $1,000.00 $2,000.00

$3,800.00 $7,600.00 TNT General 2.000 $3,260.00 $6,520.00

$472.14 TNT General 3.000 $140.00 $420.00

$11,949.00 $23,898.00

Whelcon Contractors 3.000

Eagle Eye Electric, LLC 3.000 $61.00 $183.00 Engineer's Estimate 3.000 EACH $235.00 $705.00

$157.38

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0460 30202-2000 ROADWAY

AGGREGATE,

Whelcon Contractors 2,500.000

$190.00 $760.00

$801.38 $3,205.52 Siete, Inc. 4.000 $800.00 $3,200.00

$297.29 $743,225.00 McKenzie Construction 2,500.000 $107.00 $267,500.00

$2,000.00 $8,000.00 McKenzie Construction 4.000 $1,195.00 $4,780.00

X0440 25126-0000 REMOVE AND RESET

BOULDER

West Point 4.000

Miami Nation 4.000

TNT General 4.000

Whelcon Contractors 4.000 $85.48 $341.92 Engineer's Estimate 4.000 EACH $120.00 $480.00

$200.00 $800.00 Eagle Eye Electric, LLC 4.000

EACH $1,000.00 $8,000.00

$732.86 $5,862.88 TNT General 8.000 $400.00 $3,200.00

$1,577.64 $12,621.12 West Point 8.000 $900.00 $7,200.00

$43.00 $34,400.00 TNT General 800.000 $13.60 $10,880.00

$2,389.00 $19,112.00 Siete, Inc. 8.000 $1,800.00 $14,400.00

X0420 25125-0000 BOULDER McKenzie Construction 8.000

Miami Nation 8.000

Whelcon Contractors 8.000

Eagle Eye Electric, LLC 8.000 $305.00 $2,440.00 Engineer's Estimate 8.000

Whelcon Contractors 800.000 $80.92 $64,736.00

X0400 21101-2000 ROADWAY

OBLITERATION,

METHOD 2

Miami Nation 800.000

McKenzie Construction 800.000

Eagle Eye Electric, LLC 800.000

Siete, Inc. 800.000 $2.00 $1,600.00 Engineer's Estimate 800.000 SQYD $20.00 $16,000.00

$5.00 $4,000.00 West Point 800.000 $4.50 $3,600.00

$11,200.00 TNT General 200.000 $39.00 $7,800.00

$225.00 $45,000.00 West Point 200.000 $102.00 $20,400.00

$601.66 $481,328.00

$641.86 $128,372.00 Whelcon Contractors 200.000 $277.09 $55,418.00

X0380 20402-0000 SUBEXCAVATION Miami Nation 200.000

Siete, Inc. 200.000

McKenzie Construction 200.000

Eagle Eye Electric, LLC 200.000 $36.00 $7,200.00 Engineer's Estimate 200.000 CUYD $100.00 $20,000.00

$56.00

Engineer's Estimate 500.000 CUYD $65.00 $32,500.00

[Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$358.00 $1,432,000.00 Whelcon Contractors 4,000.000 $290.18 $1,160,720.00

$649.87 $2,599,480.00 Eagle Eye Electric, LLC 4,000.000 $485.00 $1,940,000.00

X0540 40101-5600 ASPHALT CONCRETE

PAVEMENT,

GYRATORY MIX, 1/2-

INCH OR 3/4-INCH

NOMINAL

Miami Nation 4,000.000

McKenzie Construction 4,000.000

West Point 4,000.000 $265.00 $1,060,000.00

TON $380.00 $95,000.00

$425.00 $106,250.00 Siete, Inc. 250.000 $320.00 $80,000.00

$565.00 $141,250.00 Whelcon Contractors 250.000 $504.05 $126,012.50

$19.00 $399,000.00 Miami Nation 21,000.000 $16.08 $337,680.00

$959.65 $239,912.50 McKenzie Construction 250.000 $585.00 $146,250.00

X0520 30510-0000 CEMENTITIOUS

MATERIAL

Miami Nation 250.000

Eagle Eye Electric, LLC 250.000

TNT General 250.000

West Point 250.000 $292.00 $73,000.00 Engineer's Estimate 250.000

McKenzie Construction 21,000.000 $23.00 $483,000.00

X0500 30502-0400 FULL DEPTH

RECLAMATION WITH

CEMENT, 4-INCH

DEPTH

Whelcon Contractors 21,000.000

West Point 21,000.000

Eagle Eye Electric, LLC 21,000.000

Siete, Inc. 21,000.000 $6.00 $126,000.00 Engineer's Estimate 21,000.000 SQYD $11.00 $231,000.00

$13.50 $283,500.00 TNT General 21,000.000 $12.00 $252,000.00

$19,050.00 TNT General 150.000 $25.00 $3,750.00

$225.00 $33,750.00 McKenzie Construction 150.000 $179.00 $26,850.00

$42.24 $887,040.00

$103.00 $257,500.00

$684.57 $102,685.50 Whelcon Contractors 150.000 $257.36 $38,604.00

X0480 30302-1000 DITCH

RECONDITIONING

Miami Nation 150.000

West Point 150.000

Siete, Inc. 150.000

Eagle Eye Electric, LLC 150.000 $23.00 $3,450.00 Engineer's Estimate 150.000 LNFT $50.00 $7,500.00

$127.00

METHOD 2 Eagle Eye Electric, LLC 2,500.000

Siete, Inc. 2,500.000

Miami Nation 2,500.000 $5.02 $12,550.00 Engineer's Estimate 2,500.000 TON $38.00 $95,000.00

$70.00 $175,000.00 TNT General 2,500.000 $46.00 $115,000.00

$105.00 $262,500.00 West Point 2,500.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

TON $425.00 $3,400.00

$400.00 $3,200.00 TNT General 8.000 $96.00 $768.00

$809.22 $6,473.76 McKenzie Construction 8.000 $657.00 $5,256.00

$2,162.40 $54,060.00 West Point 25.000 $1,700.00 $42,500.00

$1,475.00 $11,800.00 Miami Nation 8.000 $1,318.89 $10,551.12

X0660 41105-0000 BLOTTER Eagle Eye Electric, LLC 8.000

Whelcon Contractors 8.000

West Point 8.000

Siete, Inc. 8.000 $50.00 $400.00 Engineer's Estimate 8.000

Miami Nation 25.000 $6,594.44 $164,861.00

X0640 41101-1000 PRIME COAT,

METHOD 1

Eagle Eye Electric, LLC 25.000

Whelcon Contractors 25.000

McKenzie Construction 25.000

Siete, Inc. 25.000 $750.00 $18,750.00 Engineer's Estimate 25.000 TON $2,334.20 $58,355.00

$1,433.00 $35,825.00 TNT General 25.000 $960.00 $24,000.00

$34,540.00 West Point 20.000 $1,200.00 $24,000.00

$2,251.67 $45,033.40 McKenzie Construction 20.000 $2,234.00 $44,680.00

$7,375.00 $184,375.00

$1,475.00 $66,375.00

$7,375.00 $147,500.00 Miami Nation 20.000 $6,594.44 $131,888.80

X0620 40601-0000 FOG SEAL Eagle Eye Electric, LLC 20.000

Whelcon Contractors 20.000

TNT General 20.000

Siete, Inc. 20.000 $1,000.00 $20,000.00 Engineer's Estimate 20.000 TON $2,295.63 $45,912.60

$1,727.00

X0580 40105-3000 ANTISTRIP ADDITIVE,

TYPE 3

Whelcon Contractors 45.000

McKenzie Construction 45.000

Siete, Inc. 45.000

West Point 45.000 $240.00 $10,800.00 Engineer's Estimate 45.000 TON $462.10 $20,794.50

$500.00 $22,500.00 TNT General 45.000 $248.00 $11,160.00

$1,792.00 $80,640.00 Eagle Eye Electric, LLC 45.000

$256.00 $1,024,000.00

$2,427.66 $109,244.70 Miami Nation 45.000 $1,978.33 $89,024.85

MAXIMUM SIZE

AGGREGATE, 0.3 TO

<3 MILLION ESAL

Siete, Inc. 4,000.000 $218.00 $872,000.00 Engineer's Estimate 4,000.000 TON $175.00 $700,000.00

TNT General 4,000.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$182.38 $5,471.40

$4,182.00 $12,546.00 Eagle Eye Electric, LLC 3.000 $3,550.00 $10,650.00

$400.00 $12,000.00 Siete, Inc. 30.000 $320.00 $9,600.00

X0760 60905-1000 GUTTER, CONCRETE McKenzie Construction 30.000

Whelcon Contractors 30.000

Siete, Inc. 3.000 $6,500.00 $19,500.00

X0740 60704-0000 CLEANING CULVERT

IN PLACE

Whelcon Contractors 3.000

McKenzie Construction 3.000

Miami Nation 3.000

TNT General 3.000 $640.00 $1,920.00 Engineer's Estimate 3.000 EACH $2,000.00 $6,000.00

$801.38 $2,404.14 West Point 3.000 $650.00 $1,950.00

$1,820.00 Whelcon Contractors 1.000 $1,049.22 $1,049.22

$2,000.00 $2,000.00 West Point 1.000 $2,000.00 $2,000.00

$8,522.56 $25,567.68

$370.00 $16,280.00

$15,130.80 $15,130.80 McKenzie Construction 1.000 $3,824.00 $3,824.00

X0720 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT

Miami Nation 1.000

Siete, Inc. 1.000

TNT General 1.000

Eagle Eye Electric, LLC 1.000 $967.00 $967.00 Engineer's Estimate 1.000 EACH $1,400.00 $1,400.00

$1,820.00

X0700 60201-0800 24-INCH PIPE

CULVERT

Whelcon Contractors 44.000

McKenzie Construction 44.000

West Point 44.000

Eagle Eye Electric, LLC 44.000 $121.00 $5,324.00 Engineer's Estimate 44.000 LNFT $235.97 $10,382.68

$150.00 $6,600.00 TNT General 44.000 $142.00 $6,248.00

$376.00 $16,544.00 Siete, Inc. 44.000

$1,500.00 $22,500.00

$2,400.00 $36,000.00 Whelcon Contractors 15.000 $2,166.18 $32,492.70

$1,111.87 $48,922.28 Miami Nation 44.000 $625.53 $27,523.32

$7,375.00 $110,625.00 Miami Nation 15.000 $6,594.44 $98,916.60

X0680 41201-0000 TACK COAT Eagle Eye Electric, LLC 15.000

West Point 15.000

McKenzie Construction 15.000

TNT General 15.000 $960.00 $14,400.00 Engineer's Estimate 15.000 TON $1,848.67 $27,730.05

$2,067.00 $31,005.00 Siete, Inc. 15.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$225.00 $4,500.00 Miami Nation 20.000 $222.33 $4,446.60

McKenzie Construction 20.000 $256.00 $5,120.00

X0840 62201-0950 WHEEL LOADER, 3

CUBIC YARD

MINIMUM RATED

CAPACITY

Eagle Eye Electric, LLC 20.000

West Point 20.000

TNT General 20.000 $190.00 $3,800.00 Siete, Inc. 20.000 $160.00 $3,200.00

$3,897.00 Siete, Inc. 20.000 $135.00 $2,700.00

$240.00 $4,800.00 West Point 20.000 $200.00 $4,000.00

$300.00 $6,000.00

$895.00 $5,370.00

$434.61 $8,692.20 McKenzie Construction 20.000 $250.00 $5,000.00

X0820 62201-0200 DUMP TRUCK, 8

CUBIC YARD

MINIMUM CAPACITY

Miami Nation 20.000

Eagle Eye Electric, LLC 20.000

Whelcon Contractors 20.000

TNT General 20.000 $125.00 $2,500.00 Engineer's Estimate 20.000 HOUR $205.00 $4,100.00

$194.85

X0800 61509-0000 DETECTABLE

WARNING PANELS

TNT General 6.000

West Point 6.000

Eagle Eye Electric, LLC 6.000

McKenzie Construction 6.000 $298.00 $1,788.00 Engineer's Estimate 6.000 SQYD $800.00 $4,800.00

$765.00 $4,590.00 Whelcon Contractors 6.000 $515.42 $3,092.52

$1,000.00 $6,000.00 Siete, Inc. 6.000

$140.00 $8,400.00

$275.00 $16,500.00 Miami Nation 60.000 $252.47 $15,148.20

$2,300.00 $13,800.00 Miami Nation 6.000 $1,094.05 $6,564.30

$345.00 $20,700.00 McKenzie Construction 60.000 $298.00 $17,880.00

X0780 61501-0100 SIDEWALK,

CONCRETE

Siete, Inc. 60.000

Eagle Eye Electric, LLC 60.000

Whelcon Contractors 60.000

TNT General 60.000 $64.00 $3,840.00 Engineer's Estimate 60.000 SQYD $225.00 $13,500.00

$203.50 $12,210.00 West Point 60.000

LNFT $100.00 $3,000.00

$126.86 $3,805.80 West Point 30.000 $103.00 $3,090.00

Eagle Eye Electric, LLC 30.000 $140.00 $4,200.00

Miami Nation 30.000

TNT General 30.000 $62.00 $1,860.00 Engineer's Estimate 30.000

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

X0940 62302-1100 SPECIAL LABOR,

Whelcon Contractors 10.000

$1,800.00 Siete, Inc. 10.000 $150.00 $1,500.00

$298.00 $2,980.00 Miami Nation 10.000 $282.62 $2,826.20

$584.56 $5,845.60

$86.03 $1,720.60

$584.56 $5,845.60 Eagle Eye Electric, LLC 10.000 $485.00 $4,850.00

X0920 62302-1000 SPECIAL LABOR,

HIRED TECHNICAL

SERVICES

Whelcon Contractors 10.000

McKenzie Construction 10.000

West Point 10.000

TNT General 10.000 $110.00 $1,100.00 Engineer's Estimate 10.000 HOUR $190.00 $1,900.00

$180.00

X0900 62301-0000 GENERAL LABOR McKenzie Construction 20.000

Eagle Eye Electric, LLC 20.000

TNT General 20.000

Miami Nation 20.000 $37.68 $753.60 Engineer's Estimate 20.000 HOUR $67.00 $1,340.00

$65.00 $1,300.00 Siete, Inc. 20.000 $60.00 $1,200.00

$115.00 $2,300.00 Whelcon Contractors 20.000

$195.68 $3,913.60

$250.00 $5,000.00 Miami Nation 20.000 $224.84 $4,496.80

$239.00 $4,780.00 West Point 20.000 $120.00 $2,400.00

$358.00 $7,160.00 Eagle Eye Electric, LLC 20.000 $290.00 $5,800.00

X0880 62201-3350 HYDRAULIC

EXCAVATOR, 1 CUBIC

YARD MINIMUM

CAPACITY

McKenzie Construction 20.000

West Point 20.000

TNT General 20.000

Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000 HOUR $180.00 $3,600.00

$210.00 $4,200.00 Whelcon Contractors 20.000

HOUR $195.00 $3,900.00

$230.00 $4,600.00 West Point 20.000 $220.00 $4,400.00

$278.85 $5,577.00 Whelcon Contractors 20.000 $272.70 $5,454.00

$340.00 $6,800.00 McKenzie Construction 20.000 $340.00 $6,800.00

X0860 62201-2850 MOTOR GRADER, 12

FOOT MINIMUM

BLADE

Eagle Eye Electric, LLC 20.000

Miami Nation 20.000

TNT General 20.000

Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000

Whelcon Contractors 20.000 $149.70 $2,994.00 Engineer's Estimate 20.000 HOUR $215.00 $4,300.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$25,000.00 $750.00 TNT General 0.030 $12,980.00 $389.40

$9,300.00 $44,640.00

$500,000.00 $15,000.00 Miami Nation 0.030 $61,130.50 $1,833.92

X1020 63402-0400 PAVEMENT

MARKINGS, TYPE B,

BROKEN

Siete, Inc. 0.030

West Point 0.030

X1000 63402-0300 PAVEMENT

MARKINGS, TYPE B,

SOLID

Whelcon Contractors 4.800

Eagle Eye Electric, LLC 4.800

McKenzie Construction 4.800

West Point 4.800 $1,850.00 $8,880.00 Engineer's Estimate 4.800 MILE $1,600.00 $7,680.00

$6,940.00 $33,312.00 Miami Nation 4.800 $2,861.99 $13,737.55

$11,500.00 $55,200.00 Siete, Inc. 4.800

$478.00 $7,170.00

$971.07 $14,566.05 Miami Nation 15.000 $734.81 $11,022.15

$16,003.08 $76,814.78 TNT General 4.800 $12,980.00 $62,304.00

$1,320.00 $19,800.00 TNT General 15.000 $1,300.00 $19,500.00

X0980 63301-0000 SIGN SYSTEM West Point 15.000

Whelcon Contractors 15.000

Siete, Inc. 15.000

Eagle Eye Electric, LLC 15.000 $300.00 $4,500.00 Engineer's Estimate 15.000 EACH $925.00 $13,875.00

$675.00 $10,125.00 McKenzie Construction 15.000

ACRE $16,178.00 $24,267.00

$4,500.00 $6,750.00 TNT General 1.500 $4,200.00 $6,300.00

$10,000.00 $15,000.00 Eagle Eye Electric, LLC 1.500 $6,650.00 $9,975.00

$251.22 $2,512.20 McKenzie Construction 10.000 $250.00 $2,500.00

$16,580.32 $24,870.48 Whelcon Contractors 1.500 $11,691.21 $17,536.82

X0960 62501-0000 TURF

ESTABLISHMENT

Miami Nation 1.500

Siete, Inc. 1.500

West Point 1.500

McKenzie Construction 1.500 $4,100.00 $6,150.00 Engineer's Estimate 1.500

Eagle Eye Electric, LLC 10.000 $485.00 $4,850.00

HIRED SURVEY

SERVICES Miami Nation 10.000

West Point 10.000

TNT General 10.000 $95.00 $950.00 Engineer's Estimate 10.000 HOUR $450.00 $4,500.00

$230.00 $2,300.00 Siete, Inc. 10.000 $165.00 $1,650.00

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

$4.15 $1,037.50

$7.00 $1,750.00 Siete, Inc. 250.000 $6.00 $1,500.00

$20.00 $5,000.00 Eagle Eye Electric, LLC 250.000 $11.00 $2,750.00

X1080 63503-1000 TEMPORARY TRAFFIC

CONTROL, PLASTIC

FENCE

McKenzie Construction 250.000

West Point 250.000

TNT General 250.000

Whelcon Contractors 250.000 $2.79 $697.50 Engineer's Estimate 250.000 LNFT $10.00 $2,500.00

$4.50 $1,125.00 Miami Nation 250.000

LPSM LPSM $100,000.00

$55,625.00 Siete, Inc. $25,000.00

$90,000.00 Eagle Eye Electric, LLC $58,700.00

$537.00 $16,110.00 TNT General 30.000 $400.00 $12,000.00

$158,266.66 West Point $120,000.00

X1060 63501-0000 TEMPORARY TRAFFIC

CONTROL

Miami Nation

TNT General

McKenzie Construction

Whelcon Contractors $24,316.37 Engineer's Estimate ALL

Miami Nation 30.000 $916.63 $27,498.90

X1040 63405-0050 PAVEMENT

MARKINGS,

SYMBOLS

Whelcon Contractors 30.000

McKenzie Construction 30.000

Siete, Inc. 30.000

Eagle Eye Electric, LLC 30.000 $185.00 $5,550.00 Engineer's Estimate 30.000 EACH $480.00 $14,400.00

$350.00 $10,500.00 West Point 30.000 $300.00 $9,000.00

$388.43 Eagle Eye Electric, LLC 0.030 $11,500.00 $345.00

$1,051.99 $31,559.70

Whelcon Contractors 0.030

McKenzie Construction 0.030 $6,966.00 $208.98 Engineer's Estimate 0.030 MILE $1,360.00 $40.80

$12,947.67

Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]