This is a Bid Tabulation Report for the Heron & El Vado Road Rehabilitation project (Project No. NM BR AAO EL VADO) administered by the Bureau of Reclamation in Rio Arriba County, New Mexico. The solicitation (No. 6982AF25B000003) was opened on December 12, 2025, at Lakewood, Colorado, with bids tabulated by Contract Specialist Denise Martinez and certified on December 23, 2025. Eight contractors submitted bids for both the Base Schedule A and an optional Schedule X component.
For Schedule A (Base), the bid amounts ranged from $5,527,280.00 (West Point Contractors, Inc., lowest) to $11,431,273.62 (Miami Nation Stronghold, LLC, highest), with an Engineer's Estimate of $3,940,804.14. For Schedule X (Option), bids ranged from $2,047,095.00 (Siete, Inc.) to $5,639,452.28 (Miami Nation Stronghold, LLC), with an Engineer's Estimate of $2,122,590.11. The project encompasses road rehabilitation work including mobilization, surveying and staking, quality control and testing, soil erosion control, roadway aggregate and reclamation, asphalt concrete pavement, and related construction items such as culvert installation, sidewalk work, traffic control, and landscaping. The detailed line-item pricing throughout the tabulation reflects unit prices and total amounts for numerous work categories across all bidders, enabling comparison of cost proposals for contract award evaluation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary.pdf | ||
| QnA 12 9 2025.pdf | ||
| Amendment A001.pdf | ||
| QnA 12 8 2025.pdf | ||
| QnA El Vado 12.04.2025.pdf | ||
| Plans - Final.pdf | ||
| 6982AF25B000003.pdf | ||
| 21.100 DrainageMemo.pdf | ||
| Geotech Eng Report - El Vado and Heron Lake GEO Pavement Report_Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HERON & EL VADO ROAD
REHABILITATION
Siete, Inc. $8,131,845.00 Engineer's Estimate $6,063,394.25
TNT General Contractors $10,313,234.60 West Point Contractors, Inc. $8,387,048.00
Whelcon Contractors LLC. $11,961,831.38 Eagle Eye Electric, LLC $11,191,751.00
Miami Nation Stronghold, LLC $17,070,725.90 McKenzie Construction & Site D l t LLC
$12,607,323.01
Engineer's Estimate $3,940,804.14 $2,122,590.11
Contractor Responsive? Total Base Schedule A and Option(s): X
West Point Contractors, Inc. $5,527,280.00 $2,859,768.00 Siete, Inc. $6,084,750.00 $2,047,095.00
Eagle Eye Electric, LLC $7,457,497.00 $3,734,254.00 TNT General Contractors $7,555,502.20 $2,757,732.40
McKenzie Construction & Site
$8,879,506.82 $3,727,816.19 Whelcon Contractors LLC. $7,490,885.74 $4,470,945.64
Option: X Miami Nation Stronghold, LLC $11,431,273.62 $5,639,452.28
BID TABULATION REPORT
Project No. : NM BR AAO EL VADO Project Name:
Contractor Responsive? Base Schedule A
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Denise Martinez
TNT General $680,000.00
Unit Unit Price Amount A0020 15101-0000 MOBILIZATION McKenzie Construction $1,052,488.77
Miami Nation $712,944.85
Line Item Number
Pay Item Number
Description Contractor Quantity
Schedule: A Schedule Type: Base Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO ROAD
West Point Contractors, Inc., $5,527,280.00
Engineer's Estimate $3,940,804.14
Eagle Eye Electric, LLC, $7,457,497.00 Siete, Inc., $6,084,750.00
TNT General Contractors, $7,555,502.20 Whelcon Contractors LLC., $7,490,885.74
Miami Nation Stronghold, LLC, $11,431,273.62
$8,879,506.82
Contractor Comment Bid Amount Responsive
Date:
Contract Awarded to: Award Date:
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Federal Land: Bureau of Reclamation Bid Open Date and Time: 12/12/2025 State: NM County: Rio Arriba Solicitation No. : 6982AF25B000003 Opened at: Lakewood, CO Opened by: Denise Martinez Schedule: A Schedule Type: Base Lead Designer:
BID TABULATION REPORT
Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO Division: Central Federal Lands
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Denise Martinez
Contract Specialist
12/23/2025
BID TABULATION REPORT
$346,686.00 Miami Nation $199,290.39
Siete, Inc. $500,000.00
A0100 15401-0000 CONTRACTOR
TESTING
TNT General
McKenzie Construction
Eagle Eye Electric, LLC $126,500.00 Whelcon Contractors $106,980.04
$150,000.00 Miami Nation $99,645.19
$302,835.81 McKenzie Construction $301,536.00
$502,500.00
$13,860.00 $63,894.60
$1,321,250.00 Siete, Inc. $500,000.00
A0080 15301-0000 CONTRACTOR
QUALITY CONTROL
TNT General
Whelcon Contractors
West Point
Eagle Eye Electric, LLC $45,800.00 Engineer's Estimate ALL LPSM LPSM $98,528.00
A0060 15216-2000 SURVEY AND
STAKING, GRADE
FINISHING STAKES
McKenzie Construction 4.61
Eagle Eye Electric, LLC 4.61
West Point 4.61
Miami Nation 4.61 $2,179.76 $10,048.69 Engineer's Estimate 4.61 MILE $17,500.00 $80,675.00
$8,000.00 $36,880.00 Siete, Inc. 4.61 $7,500.00 $34,575.00
$30,300.00 $139,683.00 TNT General 4.61
$7,500.00 $34,575.00
$19,431.00 $89,576.91 TNT General 4.61 $13,860.00 $63,894.60
$88,524.00 $408,095.64 Whelcon Contractors 4.61 $33,575.28 $154,782.04
$24,400.00 $112,484.00 Whelcon Contractors 4.61 $22,630.39 $104,326.10
A0040 15210-3000 CENTERLINE,
VERIFICATION AND
STAKING
Eagle Eye Electric, LLC 4.61
McKenzie Construction 4.61
Miami Nation 4.61
West Point 4.61 $5,000.00 $23,050.00 Engineer's Estimate 4.61 MILE $15,000.00 $69,150.00
$8,164.55 $37,638.58 Siete, Inc. 4.61
ALL LPSM LPSM $400,774.64
Eagle Eye Electric, LLC $343,450.00 West Point $600,000.00 Siete, Inc. $600,000.00 Whelcon Contractors $604,804.51
Engineer's Estimate
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0200 20402-0000 SUBEXCAVATION Miami Nation 200.000
$55,000.00 Whelcon Contractors $28,315.55
$100,000.00 Eagle Eye Electric, LLC $61,000.00
$754.91 $150,982.00
$23,000.00
$280,000.00 Miami Nation $156,160.21
A0180 15802-0000 WATERING FOR
DUST CONTROL
TNT General
Siete, Inc.
West Point
McKenzie Construction $12,040.00 Engineer's Estimate ALL LPSM LPSM $40,000.00
A0160 15720-0000 STORM WATER
POLLUTION
PREVENTION PLAN
Siete, Inc.
Miami Nation
McKenzie Construction
Eagle Eye Electric, LLC $7,260.00 Engineer's Estimate ALL LPSM LPSM $5,000.00
$20,371.00 Whelcon Contractors $13,166.77
$37,682.54 West Point
$76,000.00
$130,000.00 Siete, Inc. $100,000.00
$100,000.00 TNT General $45,000.00
$508,005.85 McKenzie Construction $468,897.00
A0140 15701-0000 SOIL EROSION
CONTROL
Miami Nation
TNT General
West Point
Whelcon Contractors $51,222.90 Engineer's Estimate ALL LPSM LPSM $41,482.20
$80,000.00 Eagle Eye Electric, LLC
LPSM LPSM $16,421.00
$15,000.00 West Point $9,000.00
$22,144.77 McKenzie Construction $16,260.00
$50,000.00 Whelcon Contractors $22,829.70
A0120 15501-0000 CONSTRUCTION
SCHEDULE
Siete, Inc.
Miami Nation
TNT General
Eagle Eye Electric, LLC $7,000.00 Engineer's Estimate ALL
West Point $82,000.00 Engineer's Estimate ALL LPSM LPSM $98,528.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$565.00 $367,250.00 Whelcon Contractors 650.000 $512.58 $333,177.00
$15.83 $902,310.00
$649.40 $422,110.00 McKenzie Construction 650.000 $589.00 $382,850.00
A0280 30510-0000 CEMENTITIOUS
MATERIAL
Miami Nation 650.000
Eagle Eye Electric, LLC 650.000
A0260 30502-0400 FULL DEPTH
RECLAMATION WITH
CEMENT, 4-INCH
DEPTH
McKenzie Construction 57,000.000
Miami Nation 57,000.000
TNT General 57,000.000
Eagle Eye Electric, LLC 57,000.000 $4.50 $256,500.00 Engineer's Estimate 57,000.000 SQYD $9.00 $513,000.00
$12.00 $684,000.00 Siete, Inc. 57,000.000 $10.00 $570,000.00
$16.08 $916,560.00 Whelcon Contractors 57,000.000
$25.00 $2,500.00
$225.00 $22,500.00 Siete, Inc. 100.000 $200.00 $20,000.00
$24.00 $1,368,000.00 West Point 57,000.000 $19.00 $1,083,000.00
$1,095.31 $109,531.00 Whelcon Contractors 100.000 $261.72 $26,172.00
A0240 30302-1000 DITCH
RECONDITIONING
Miami Nation 100.000
West Point 100.000
McKenzie Construction 100.000
Eagle Eye Electric, LLC 100.000 $12.00 $1,200.00 Engineer's Estimate 100.000 LNFT $50.00 $5,000.00
$120.00 $12,000.00 TNT General 100.000
TON $40.00 $28,000.00
$103.00 $72,100.00 Siete, Inc. 700.000 $100.00 $70,000.00
$119.00 $83,300.00 McKenzie Construction 700.000 $108.00 $75,600.00
$250.00 $50,000.00 West Point 200.000 $220.00 $44,000.00
$674.52 $472,164.00 Whelcon Contractors 700.000 $341.50 $239,050.00
A0220 30202-2000 ROADWAY
AGGREGATE,
METHOD 2
Miami Nation 700.000
Eagle Eye Electric, LLC 700.000
West Point 700.000
TNT General 700.000 $46.00 $32,200.00 Engineer's Estimate 700.000
Whelcon Contractors 200.000 $259.49 $51,898.00
Siete, Inc. 200.000
McKenzie Construction 200.000
Eagle Eye Electric, LLC 200.000 $38.00 $7,600.00 Engineer's Estimate 200.000 CUYD $100.00 $20,000.00
$56.00 $11,200.00 TNT General 200.000 $39.00 $7,800.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$1,700.00 $85,000.00
A0400 41101-1000 PRIME COAT,
METHOD 1
Eagle Eye Electric, LLC 50.000
Whelcon Contractors 50.000
McKenzie Construction 50.000
Siete, Inc. 50.000 $750.00 $37,500.00
$1,444.00 $72,200.00 TNT General 50.000 $960.00 $48,000.00
$2,199.01 $109,950.50 West Point 50.000
$1,200.00 $42,000.00
$2,399.33 $83,976.55 McKenzie Construction 35.000 $2,251.00 $78,785.00
$7,375.00 $368,750.00 Miami Nation 50.000 $6,594.44 $329,722.00
$7,375.00 $258,125.00 Miami Nation 35.000 $6,594.44 $230,805.40
A0380 40601-0000 FOG SEAL Eagle Eye Electric, LLC 35.000
Whelcon Contractors 35.000
TNT General 35.000
Siete, Inc. 35.000 $1,000.00 $35,000.00 Engineer's Estimate 35.000 TON $2,295.63 $80,347.05
$1,727.00 $60,445.00 West Point 35.000
TON $462.10 $41,589.00
$500.00 $45,000.00 West Point 90.000 $320.00 $28,800.00
$1,805.00 $162,450.00 Eagle Eye Electric, LLC 90.000 $1,475.00 $132,750.00
$361.00 $3,321,200.00 Whelcon Contractors 9,200.000 $347.21 $3,194,332.00
$2,468.77 $222,189.30 Miami Nation 90.000 $1,978.33 $178,049.70
A0340 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3
Whelcon Contractors 90.000
McKenzie Construction 90.000
Siete, Inc. 90.000
TNT General 90.000 $248.00 $22,320.00 Engineer's Estimate 90.000
Eagle Eye Electric, LLC 9,200.000 $485.00 $4,462,000.00
A0300 40101-5600 ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL
MAXIMUM SIZE
AGGREGATE, 0.3 TO
<3 MILLION ESAL
Miami Nation 9,200.000
McKenzie Construction 9,200.000
West Point 9,200.000
TNT General 9,200.000 $235.00 $2,162,000.00 Engineer's Estimate 9,200.000 TON $175.00 $1,610,000.00
$265.00 $2,438,000.00 Siete, Inc. 9,200.000 $250.00 $2,300,000.00
$266,500.00 Siete, Inc. 650.000 $375.00 $243,750.00
$649.87 $5,978,804.00
TNT General 650.000
West Point 650.000 $292.00 $189,800.00 Engineer's Estimate 650.000 TON $380.00 $247,000.00
$410.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
A0500 62201-0950 WHEEL LOADER, 3
CUBIC YARD
Eagle Eye Electric, LLC 20.000
$135.00 $2,700.00
$240.00 $4,800.00 West Point 20.000 $200.00 $4,000.00
$300.00 $6,000.00 McKenzie Construction 20.000 $258.00 $5,160.00
$434.61 $8,692.20 McKenzie Construction 20.000 $252.00 $5,040.00
A0480 62201-0200 DUMP TRUCK, 8
CUBIC YARD
MINIMUM CAPACITY
Miami Nation 20.000
Eagle Eye Electric, LLC 20.000
Whelcon Contractors 20.000
TNT General 20.000 $125.00 $2,500.00 Engineer's Estimate 20.000 HOUR $205.00 $4,100.00
$194.85 $3,897.00 Siete, Inc. 20.000
EACH $2,000.00 $22,000.00
$2,400.00 $26,400.00 Miami Nation 11.000 $1,833.88 $20,172.68
$4,213.00 $46,343.00 Eagle Eye Electric, LLC 11.000 $3,500.00 $38,500.00
$2,400.00 $60,000.00 Whelcon Contractors 25.000 $2,199.01 $54,975.25
$12,000.00 $132,000.00 Whelcon Contractors 11.000 $5,909.22 $65,001.42
A0460 60704-0000 CLEANING CULVERT
IN PLACE
Siete, Inc. 11.000
McKenzie Construction 11.000
West Point 11.000
TNT General 11.000 $640.00 $7,040.00 Engineer's Estimate 11.000
Miami Nation 25.000 $6,594.44 $164,861.00 A0440 41201-0000 TACK COAT Eagle Eye Electric, LLC 25.000
West Point 25.000
McKenzie Construction 25.000
TNT General 25.000 $960.00 $24,000.00 Engineer's Estimate 25.000 TON $1,848.67 $46,216.75
$2,082.00 $52,050.00 Siete, Inc. 25.000 $1,500.00 $37,500.00
$3,200.00 TNT General 8.000 $96.00 $768.00
$822.92 $6,583.36 McKenzie Construction 8.000 $662.00 $5,296.00
$7,400.00 $185,000.00
$1,475.00 $11,800.00 Miami Nation 8.000 $1,318.89 $10,551.12
A0420 41105-0000 BLOTTER Eagle Eye Electric, LLC 8.000
Whelcon Contractors 8.000
West Point 8.000
Siete, Inc. 8.000 $50.00 $400.00 Engineer's Estimate 8.000 TON $425.00 $3,400.00
$400.00
Engineer's Estimate 50.000 TON $2,334.20 $116,710.00
[Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$301.00 $3,010.00 Miami Nation 10.000 $282.62 $2,826.20
$584.56 $5,845.60 Eagle Eye Electric, LLC 10.000 $340.00 $3,400.00
A0580 62302-1000 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
Whelcon Contractors 10.000
McKenzie Construction 10.000
West Point 10.000 $180.00 $1,800.00
HOUR $67.00 $1,340.00
$65.00 $1,300.00 Siete, Inc. 20.000 $60.00 $1,200.00
$114.00 $2,280.00 Whelcon Contractors 20.000 $86.03 $1,720.60
$250.00 $5,000.00 Miami Nation 20.000 $224.84 $4,496.80
$240.00 $4,800.00 West Point 20.000 $120.00 $2,400.00
A0560 62301-0000 GENERAL LABOR McKenzie Construction 20.000
Eagle Eye Electric, LLC 20.000
TNT General 20.000
Miami Nation 20.000 $37.68 $753.60 Engineer's Estimate 20.000
Eagle Eye Electric, LLC 20.000 $280.00 $5,600.00
A0540 62201-3350 HYDRAULIC
EXCAVATOR, 1 CUBIC
YARD MINIMUM
CAPACITY
McKenzie Construction 20.000
West Point 20.000
TNT General 20.000
Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000 HOUR $180.00 $3,600.00
$210.00 $4,200.00 Whelcon Contractors 20.000 $195.68 $3,913.60
$4,600.00 West Point 20.000 $200.00 $4,000.00
$278.85 $5,577.00 Whelcon Contractors 20.000 $272.70 $5,454.00
$361.00 $7,220.00
$222.33 $4,446.60
$343.00 $6,860.00 Eagle Eye Electric, LLC 20.000 $340.00 $6,800.00
A0520 62201-2850 MOTOR GRADER, 12
FOOT MINIMUM
BLADE
McKenzie Construction 20.000
Miami Nation 20.000
TNT General 20.000
Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000 HOUR $195.00 $3,900.00
$230.00
MINIMUM RATED
CAPACITY
West Point 20.000
TNT General 20.000
Whelcon Contractors 20.000 $150.22 $3,004.40 Engineer's Estimate 20.000 HOUR $215.00 $4,300.00
$190.00 $3,800.00 Siete, Inc. 20.000 $160.00 $3,200.00
$225.00 $4,500.00 Miami Nation 20.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
LPSM LPSM $200,000.00
$214,726.92 West Point $150,000.00
$314,021.16 McKenzie Construction $252,535.00
$7,020.26 $196,567.28 McKenzie Construction 28.000 $6,992.00 $195,776.00
$720,000.00 Siete, Inc. $400,000.00
A0660 63501-0000 TEMPORARY TRAFFIC
CONTROL
TNT General
Miami Nation
Whelcon Contractors
Eagle Eye Electric, LLC $101,500.00 Engineer's Estimate ALL
TNT General 28.000 $12,980.00 $363,440.00
A0640 63402-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID
Whelcon Contractors 28.000
Miami Nation 28.000
Eagle Eye Electric, LLC 28.000
Siete, Inc. 28.000 $1,100.00 $30,800.00 Engineer's Estimate 28.000 MILE $1,600.00 $44,800.00
$6,050.00 $169,400.00 West Point 28.000 $1,850.00 $51,800.00
$16,625.00 TNT General 2.500 $4,200.00 $10,500.00
$10,000.00 $25,000.00 West Point 2.500 $9,500.00 $23,750.00
$17,382.41 $486,707.48
$251.22 $2,512.20
$16,640.61 $41,601.53 Whelcon Contractors 2.500 $11,691.21 $29,228.03
A0620 62501-0000 TURF
ESTABLISHMENT
Miami Nation 2.500
Siete, Inc. 2.500
Eagle Eye Electric, LLC 2.500
McKenzie Construction 2.500 $4,131.00 $10,327.50 Engineer's Estimate 2.500 ACRE $16,178.00 $40,445.00
$6,650.00
A0600 62302-1100 SPECIAL LABOR,
HIRED SURVEY
SERVICES
Whelcon Contractors 10.000
McKenzie Construction 10.000
West Point 10.000
TNT General 10.000 $110.00 $1,100.00 Engineer's Estimate 10.000 HOUR $250.00 $2,500.00
$230.00 $2,300.00 Siete, Inc. 10.000 $165.00 $1,650.00
$252.00 $2,520.00 Miami Nation 10.000
$150.00 $1,500.00
$584.56 $5,845.60 Eagle Eye Electric, LLC 10.000 $364.00 $3,640.00
TNT General 10.000 $95.00 $950.00 Engineer's Estimate 10.000 HOUR $190.00 $1,900.00
Siete, Inc. 10.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$40,333.00 $40,333.00
A0700 63701-0000 FIELD OFFICE West Point 1.000
Whelcon Contractors 1.000
Siete, Inc. 1.000
TNT General 1.000 $15,000.00 $15,000.00 Engineer's Estimate 1.000 EACH $30,000.00 $30,000.00
$40,000.00 $40,000.00 Eagle Eye Electric, LLC 1.000 $23,500.00 $23,500.00
$46,083.71 $46,083.71 McKenzie Construction 1.000
$4.27 $8,540.00
$7.00 $14,000.00 Siete, Inc. 2,000.000 $6.00 $12,000.00
$110,000.00 $110,000.00 Miami Nation 1.000 $73,365.08 $73,365.08
$21.00 $42,000.00 Eagle Eye Electric, LLC 2,000.000 $11.00 $22,000.00
A0680 63503-1000 TEMPORARY TRAFFIC
CONTROL, PLASTIC
FENCE
McKenzie Construction 2,000.000
West Point 2,000.000
TNT General 2,000.000
Whelcon Contractors 2,000.000 $2.79 $5,580.00 Engineer's Estimate 2,000.000 LNFT $10.00 $20,000.00
$4.50 $9,000.00 Miami Nation 2,000.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
TNT General $360,000.00
Unit Unit Price Amount X0020 15101-0000 MOBILIZATION West Point $399,388.00
Whelcon Contractors $382,727.38
Line Item Number
Pay Item Number
Description Contractor Quantity
Schedule: X Schedule Type: Option Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO ROAD
Siete, Inc., $2,047,095.00
Engineer's Estimate $2,122,590.11
West Point Contractors, Inc., $2,859,768.00 TNT General Contractors, $2,757,732.40
Eagle Eye Electric, LLC, $3,734,254.00
$3,727,816.19
Miami Nation Stronghold, LLC, $5,639,452.28 Whelcon Contractors LLC., $4,470,945.64
Contractor Comment Bid Amount Responsive
Date:
Contract Awarded to: Award Date:
I certify that this Bid Tabulation reflects the offers received for this solicitation
Signed:
Title:
Federal Land: Bureau of Reclamation Bid Open Date and Time: 12/12/2025 State: NM County: Rio Arriba Solicitation No. : 6982AF25B000003 Opened at: Lakewood, CO Opened by: Denise Martinez Schedule: X Schedule Type: Option Lead Designer:
BID TABULATION REPORT
Project No. : NM BR AAO EL VADO Project Name: HERON & EL VADO Division: Central Federal Lands
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
Generated by : Denise Martinez
Contract Specialist
12/23/2025
$30,300.00 $18,786.00 TNT General 0.62 $19,350.00 $11,997.00
Whelcon Contractors 0.62 $36,414.95 $22,577.27
X0100 15216-2000 SURVEY AND
STAKING, GRADE
FINISHING STAKES
McKenzie Construction 0.62
Eagle Eye Electric, LLC 0.62
West Point 0.62 $19,000.00 $11,780.00 Miami Nation 0.62 $16,207.54 $10,048.67
$2,512.17 Eagle Eye Electric, LLC 1.000 $2,425.00 $2,425.00
$3,690.05 $3,690.05 Siete, Inc. 1.000 $3,000.00 $3,000.00
$117,556.00 $72,884.72
$45,000.00
$9,000.00 $9,000.00 McKenzie Construction 1.000 $6,630.00 $6,630.00
X0080 15215-3000 SURVEY AND
STAKING, DRAINAGE
STRUCTURE
West Point 1.000
Whelcon Contractors 1.000
Miami Nation 1.000
TNT General 1.000 $1,000.00 $1,000.00 Engineer's Estimate 1.000 EACH $1,050.00 $1,050.00
$2,512.17
X0060 15214-3000 SURVEY AND
STAKING, PARKING
AREA
Eagle Eye Electric, LLC
Whelcon Contractors
West Point
TNT General $6,000.00 Engineer's Estimate ALL LPSM LPSM $25,000.00
$12,000.00 Miami Nation $7,536.51
$56,103.30 Siete, Inc.
$13,168.63 $8,164.55
$22,000.00 $13,640.00 TNT General 0.62 $19,350.00 $11,997.00
$82,300.00 McKenzie Construction $81,695.00
$43,697.92 $27,092.71 McKenzie Construction 0.62 $36,356.00 $22,540.72
X0040 15210-3000 CENTERLINE,
VERIFICATION AND
STAKING
Whelcon Contractors 0.62
West Point 0.62
Eagle Eye Electric, LLC 0.62
Siete, Inc. 0.62 $10,000.00 $6,200.00 Engineer's Estimate 0.62 MILE $15,000.00 $9,300.00
$19,250.00 $11,935.00 Miami Nation 0.62
ALL LPSM LPSM $244,191.78
Eagle Eye Electric, LLC $67,500.00 Siete, Inc. $200,000.00 McKenzie Construction $335,635.77 Miami Nation $356,979.25
Engineer's Estimate
[Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0200 15802-0000 WATERING FOR
Miami Nation
$24,000.00 Siete, Inc. $15,000.00
$40,397.60 Eagle Eye Electric, LLC $24,650.00
$126,461.35
$5,000.00
$156,528.24 McKenzie Construction $109,595.00
X0180 15701-0000 SOIL EROSION
CONTROL
Miami Nation
Whelcon Contractors
TNT General
West Point $13,000.00 Engineer's Estimate ALL LPSM LPSM $41,482.20
X0160 15501-0000 CONSTRUCTION
SCHEDULE
West Point
McKenzie Construction
Miami Nation
Siete, Inc. $1,600.00 Engineer's Estimate ALL LPSM LPSM $10,000.00
$2,976.92 Eagle Eye Electric, LLC $2,500.00
$5,975.00 TNT General
$25,000.00
$63,000.00 West Point $35,000.00
$9,000.00 Whelcon Contractors $7,483.18
$98,312.00 TNT General $87,000.00
X0140 15401-0000 CONTRACTOR
TESTING
McKenzie Construction
Eagle Eye Electric, LLC
Miami Nation
Whelcon Contractors $16,184.42 Engineer's Estimate ALL LPSM LPSM $55,488.00
$26,804.85 Siete, Inc.
LPSM LPSM $55,488.00
$32,100.00 Siete, Inc. $20,000.00
$53,409.97 West Point $50,000.00
$342,000.00 McKenzie Construction $85,509.00
X0120 15301-0000 CONTRACTOR
QUALITY CONTROL
TNT General
Miami Nation
Eagle Eye Electric, LLC
Whelcon Contractors $16,184.42 Engineer's Estimate ALL
Siete, Inc. 0.62 $10,000.00 $6,200.00 Engineer's Estimate 0.62 MILE $17,500.00 $10,850.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$478.00 $1,434.00 Siete, Inc. 3.000 $320.00 $960.00
$3,200.00 $3,200.00
$1,002.36 $3,007.08 West Point 3.000 $850.00 $2,550.00
X0280 20301-2400 REMOVAL OF SIGN Miami Nation 3.000
McKenzie Construction 3.000
X0260 20301-1900 REMOVAL OF PIPE
CULVERT
West Point 1.000
Miami Nation 1.000
TNT General 1.000
McKenzie Construction 1.000 $299.00 $299.00 Engineer's Estimate 1.000 EACH $4,300.00 $4,300.00
$2,870.00 $2,870.00 Eagle Eye Electric, LLC 1.000 $1,650.00 $1,650.00
$6,012.88 $6,012.88 Siete, Inc. 1.000
$316.00 $1,264.00
$800.00 $3,200.00 TNT General 4.000 $800.00 $3,200.00
$10,000.00 $10,000.00 Whelcon Contractors 1.000 $7,164.55 $7,164.55
$1,002.36 $4,009.44 West Point 4.000 $850.00 $3,400.00
X0240 20301-0100 REMOVAL OF
BOLLARD
Miami Nation 4.000
Siete, Inc. 4.000
Whelcon Contractors 4.000
McKenzie Construction 4.000 $298.00 $1,192.00 Engineer's Estimate 4.000 EACH $515.00 $2,060.00
$471.13 $1,884.52 Eagle Eye Electric, LLC 4.000
EACH $100.00 $100.00
$2,000.00 $2,000.00 Miami Nation 1.000 $830.27 $830.27
$4,442.69 $4,442.69 Eagle Eye Electric, LLC 1.000 $3,025.00 $3,025.00
$27,844.08 Eagle Eye Electric, LLC $15,300.00
$6,500.00 $6,500.00 McKenzie Construction 1.000 $5,975.00 $5,975.00
X0220 20216-0000 TREE PRUNING Siete, Inc. 1.000
Whelcon Contractors 1.000
West Point 1.000
TNT General 1.000 $400.00 $400.00 Engineer's Estimate 1.000
TNT General $32,000.00
DUST CONTROL
Whelcon Contractors
West Point
McKenzie Construction $5,975.00 Engineer's Estimate ALL LPSM LPSM $30,000.00
$12,000.00 Siete, Inc. $8,000.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$95.00 $47,500.00
X0360 20401-0000 ROADWAY
EXCAVATION
Whelcon Contractors 500.000
Siete, Inc. 500.000
Eagle Eye Electric, LLC 500.000
TNT General 500.000 $19.00 $9,500.00
$36.00 $18,000.00 McKenzie Construction 500.000 $31.00 $15,500.00
$102.00 $51,000.00 West Point 500.000
$49.00 $2,450.00
$79.17 $3,958.50 McKenzie Construction 50.000 $59.00 $2,950.00
$399.25 $199,625.00 Miami Nation 500.000 $154.50 $77,250.00
$108.02 $5,401.00 West Point 50.000 $95.00 $4,750.00
X0340 20303-3200 REMOVAL OF
SIDEWALK,
CONCRETE
Miami Nation 50.000
Whelcon Contractors 50.000
Eagle Eye Electric, LLC 50.000
TNT General 50.000 $12.80 $640.00 Engineer's Estimate 50.000 SQYD $125.00 $6,250.00
$55.00 $2,750.00 Siete, Inc. 50.000
LNFT $60.00 $37,200.00
$11.00 $6,820.00 TNT General 620.000 $8.20 $5,084.00
$16.00 $9,920.00 West Point 620.000 $12.00 $7,440.00
$9,500.00 $19,000.00 Whelcon Contractors 2.000 $7,418.31 $14,836.62
$32.66 $20,249.20 Whelcon Contractors 620.000 $27.66 $17,149.20
X0320 20302-0500 REMOVAL OF CURB,
CONCRETE
Miami Nation 620.000
Siete, Inc. 620.000
McKenzie Construction 620.000
Eagle Eye Electric, LLC 620.000 $4.00 $2,480.00 Engineer's Estimate 620.000
Miami Nation 2.000 $10,022.30 $20,044.60
X0300 20301-2800 REMOVAL OF
STRUCTURES AND
OBSTRUCTIONS
(UTILITY VAULT)
McKenzie Construction 2.000
West Point 2.000
Siete, Inc. 2.000
Eagle Eye Electric, LLC 2.000 $1,990.00 $3,980.00 Engineer's Estimate 2.000 EACH $1,000.00 $2,000.00
$3,800.00 $7,600.00 TNT General 2.000 $3,260.00 $6,520.00
$472.14 TNT General 3.000 $140.00 $420.00
$11,949.00 $23,898.00
Whelcon Contractors 3.000
Eagle Eye Electric, LLC 3.000 $61.00 $183.00 Engineer's Estimate 3.000 EACH $235.00 $705.00
$157.38
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0460 30202-2000 ROADWAY
AGGREGATE,
Whelcon Contractors 2,500.000
$190.00 $760.00
$801.38 $3,205.52 Siete, Inc. 4.000 $800.00 $3,200.00
$297.29 $743,225.00 McKenzie Construction 2,500.000 $107.00 $267,500.00
$2,000.00 $8,000.00 McKenzie Construction 4.000 $1,195.00 $4,780.00
X0440 25126-0000 REMOVE AND RESET
BOULDER
West Point 4.000
Miami Nation 4.000
TNT General 4.000
Whelcon Contractors 4.000 $85.48 $341.92 Engineer's Estimate 4.000 EACH $120.00 $480.00
$200.00 $800.00 Eagle Eye Electric, LLC 4.000
EACH $1,000.00 $8,000.00
$732.86 $5,862.88 TNT General 8.000 $400.00 $3,200.00
$1,577.64 $12,621.12 West Point 8.000 $900.00 $7,200.00
$43.00 $34,400.00 TNT General 800.000 $13.60 $10,880.00
$2,389.00 $19,112.00 Siete, Inc. 8.000 $1,800.00 $14,400.00
X0420 25125-0000 BOULDER McKenzie Construction 8.000
Miami Nation 8.000
Whelcon Contractors 8.000
Eagle Eye Electric, LLC 8.000 $305.00 $2,440.00 Engineer's Estimate 8.000
Whelcon Contractors 800.000 $80.92 $64,736.00
X0400 21101-2000 ROADWAY
OBLITERATION,
METHOD 2
Miami Nation 800.000
McKenzie Construction 800.000
Eagle Eye Electric, LLC 800.000
Siete, Inc. 800.000 $2.00 $1,600.00 Engineer's Estimate 800.000 SQYD $20.00 $16,000.00
$5.00 $4,000.00 West Point 800.000 $4.50 $3,600.00
$11,200.00 TNT General 200.000 $39.00 $7,800.00
$225.00 $45,000.00 West Point 200.000 $102.00 $20,400.00
$601.66 $481,328.00
$641.86 $128,372.00 Whelcon Contractors 200.000 $277.09 $55,418.00
X0380 20402-0000 SUBEXCAVATION Miami Nation 200.000
Siete, Inc. 200.000
McKenzie Construction 200.000
Eagle Eye Electric, LLC 200.000 $36.00 $7,200.00 Engineer's Estimate 200.000 CUYD $100.00 $20,000.00
$56.00
Engineer's Estimate 500.000 CUYD $65.00 $32,500.00
[Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$358.00 $1,432,000.00 Whelcon Contractors 4,000.000 $290.18 $1,160,720.00
$649.87 $2,599,480.00 Eagle Eye Electric, LLC 4,000.000 $485.00 $1,940,000.00
X0540 40101-5600 ASPHALT CONCRETE
PAVEMENT,
GYRATORY MIX, 1/2-
INCH OR 3/4-INCH
NOMINAL
Miami Nation 4,000.000
McKenzie Construction 4,000.000
West Point 4,000.000 $265.00 $1,060,000.00
TON $380.00 $95,000.00
$425.00 $106,250.00 Siete, Inc. 250.000 $320.00 $80,000.00
$565.00 $141,250.00 Whelcon Contractors 250.000 $504.05 $126,012.50
$19.00 $399,000.00 Miami Nation 21,000.000 $16.08 $337,680.00
$959.65 $239,912.50 McKenzie Construction 250.000 $585.00 $146,250.00
X0520 30510-0000 CEMENTITIOUS
MATERIAL
Miami Nation 250.000
Eagle Eye Electric, LLC 250.000
TNT General 250.000
West Point 250.000 $292.00 $73,000.00 Engineer's Estimate 250.000
McKenzie Construction 21,000.000 $23.00 $483,000.00
X0500 30502-0400 FULL DEPTH
RECLAMATION WITH
CEMENT, 4-INCH
DEPTH
Whelcon Contractors 21,000.000
West Point 21,000.000
Eagle Eye Electric, LLC 21,000.000
Siete, Inc. 21,000.000 $6.00 $126,000.00 Engineer's Estimate 21,000.000 SQYD $11.00 $231,000.00
$13.50 $283,500.00 TNT General 21,000.000 $12.00 $252,000.00
$19,050.00 TNT General 150.000 $25.00 $3,750.00
$225.00 $33,750.00 McKenzie Construction 150.000 $179.00 $26,850.00
$42.24 $887,040.00
$103.00 $257,500.00
$684.57 $102,685.50 Whelcon Contractors 150.000 $257.36 $38,604.00
X0480 30302-1000 DITCH
RECONDITIONING
Miami Nation 150.000
West Point 150.000
Siete, Inc. 150.000
Eagle Eye Electric, LLC 150.000 $23.00 $3,450.00 Engineer's Estimate 150.000 LNFT $50.00 $7,500.00
$127.00
METHOD 2 Eagle Eye Electric, LLC 2,500.000
Siete, Inc. 2,500.000
Miami Nation 2,500.000 $5.02 $12,550.00 Engineer's Estimate 2,500.000 TON $38.00 $95,000.00
$70.00 $175,000.00 TNT General 2,500.000 $46.00 $115,000.00
$105.00 $262,500.00 West Point 2,500.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
TON $425.00 $3,400.00
$400.00 $3,200.00 TNT General 8.000 $96.00 $768.00
$809.22 $6,473.76 McKenzie Construction 8.000 $657.00 $5,256.00
$2,162.40 $54,060.00 West Point 25.000 $1,700.00 $42,500.00
$1,475.00 $11,800.00 Miami Nation 8.000 $1,318.89 $10,551.12
X0660 41105-0000 BLOTTER Eagle Eye Electric, LLC 8.000
Whelcon Contractors 8.000
West Point 8.000
Siete, Inc. 8.000 $50.00 $400.00 Engineer's Estimate 8.000
Miami Nation 25.000 $6,594.44 $164,861.00
X0640 41101-1000 PRIME COAT,
METHOD 1
Eagle Eye Electric, LLC 25.000
Whelcon Contractors 25.000
McKenzie Construction 25.000
Siete, Inc. 25.000 $750.00 $18,750.00 Engineer's Estimate 25.000 TON $2,334.20 $58,355.00
$1,433.00 $35,825.00 TNT General 25.000 $960.00 $24,000.00
$34,540.00 West Point 20.000 $1,200.00 $24,000.00
$2,251.67 $45,033.40 McKenzie Construction 20.000 $2,234.00 $44,680.00
$7,375.00 $184,375.00
$1,475.00 $66,375.00
$7,375.00 $147,500.00 Miami Nation 20.000 $6,594.44 $131,888.80
X0620 40601-0000 FOG SEAL Eagle Eye Electric, LLC 20.000
Whelcon Contractors 20.000
TNT General 20.000
Siete, Inc. 20.000 $1,000.00 $20,000.00 Engineer's Estimate 20.000 TON $2,295.63 $45,912.60
$1,727.00
X0580 40105-3000 ANTISTRIP ADDITIVE,
TYPE 3
Whelcon Contractors 45.000
McKenzie Construction 45.000
Siete, Inc. 45.000
West Point 45.000 $240.00 $10,800.00 Engineer's Estimate 45.000 TON $462.10 $20,794.50
$500.00 $22,500.00 TNT General 45.000 $248.00 $11,160.00
$1,792.00 $80,640.00 Eagle Eye Electric, LLC 45.000
$256.00 $1,024,000.00
$2,427.66 $109,244.70 Miami Nation 45.000 $1,978.33 $89,024.85
MAXIMUM SIZE
AGGREGATE, 0.3 TO
<3 MILLION ESAL
Siete, Inc. 4,000.000 $218.00 $872,000.00 Engineer's Estimate 4,000.000 TON $175.00 $700,000.00
TNT General 4,000.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$182.38 $5,471.40
$4,182.00 $12,546.00 Eagle Eye Electric, LLC 3.000 $3,550.00 $10,650.00
$400.00 $12,000.00 Siete, Inc. 30.000 $320.00 $9,600.00
X0760 60905-1000 GUTTER, CONCRETE McKenzie Construction 30.000
Whelcon Contractors 30.000
Siete, Inc. 3.000 $6,500.00 $19,500.00
X0740 60704-0000 CLEANING CULVERT
IN PLACE
Whelcon Contractors 3.000
McKenzie Construction 3.000
Miami Nation 3.000
TNT General 3.000 $640.00 $1,920.00 Engineer's Estimate 3.000 EACH $2,000.00 $6,000.00
$801.38 $2,404.14 West Point 3.000 $650.00 $1,950.00
$1,820.00 Whelcon Contractors 1.000 $1,049.22 $1,049.22
$2,000.00 $2,000.00 West Point 1.000 $2,000.00 $2,000.00
$8,522.56 $25,567.68
$370.00 $16,280.00
$15,130.80 $15,130.80 McKenzie Construction 1.000 $3,824.00 $3,824.00
X0720 60210-0800 END SECTION FOR 24-
INCH PIPE CULVERT
Miami Nation 1.000
Siete, Inc. 1.000
TNT General 1.000
Eagle Eye Electric, LLC 1.000 $967.00 $967.00 Engineer's Estimate 1.000 EACH $1,400.00 $1,400.00
$1,820.00
X0700 60201-0800 24-INCH PIPE
CULVERT
Whelcon Contractors 44.000
McKenzie Construction 44.000
West Point 44.000
Eagle Eye Electric, LLC 44.000 $121.00 $5,324.00 Engineer's Estimate 44.000 LNFT $235.97 $10,382.68
$150.00 $6,600.00 TNT General 44.000 $142.00 $6,248.00
$376.00 $16,544.00 Siete, Inc. 44.000
$1,500.00 $22,500.00
$2,400.00 $36,000.00 Whelcon Contractors 15.000 $2,166.18 $32,492.70
$1,111.87 $48,922.28 Miami Nation 44.000 $625.53 $27,523.32
$7,375.00 $110,625.00 Miami Nation 15.000 $6,594.44 $98,916.60
X0680 41201-0000 TACK COAT Eagle Eye Electric, LLC 15.000
West Point 15.000
McKenzie Construction 15.000
TNT General 15.000 $960.00 $14,400.00 Engineer's Estimate 15.000 TON $1,848.67 $27,730.05
$2,067.00 $31,005.00 Siete, Inc. 15.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$225.00 $4,500.00 Miami Nation 20.000 $222.33 $4,446.60
McKenzie Construction 20.000 $256.00 $5,120.00
X0840 62201-0950 WHEEL LOADER, 3
CUBIC YARD
MINIMUM RATED
CAPACITY
Eagle Eye Electric, LLC 20.000
West Point 20.000
TNT General 20.000 $190.00 $3,800.00 Siete, Inc. 20.000 $160.00 $3,200.00
$3,897.00 Siete, Inc. 20.000 $135.00 $2,700.00
$240.00 $4,800.00 West Point 20.000 $200.00 $4,000.00
$300.00 $6,000.00
$895.00 $5,370.00
$434.61 $8,692.20 McKenzie Construction 20.000 $250.00 $5,000.00
X0820 62201-0200 DUMP TRUCK, 8
CUBIC YARD
MINIMUM CAPACITY
Miami Nation 20.000
Eagle Eye Electric, LLC 20.000
Whelcon Contractors 20.000
TNT General 20.000 $125.00 $2,500.00 Engineer's Estimate 20.000 HOUR $205.00 $4,100.00
$194.85
X0800 61509-0000 DETECTABLE
WARNING PANELS
TNT General 6.000
West Point 6.000
Eagle Eye Electric, LLC 6.000
McKenzie Construction 6.000 $298.00 $1,788.00 Engineer's Estimate 6.000 SQYD $800.00 $4,800.00
$765.00 $4,590.00 Whelcon Contractors 6.000 $515.42 $3,092.52
$1,000.00 $6,000.00 Siete, Inc. 6.000
$140.00 $8,400.00
$275.00 $16,500.00 Miami Nation 60.000 $252.47 $15,148.20
$2,300.00 $13,800.00 Miami Nation 6.000 $1,094.05 $6,564.30
$345.00 $20,700.00 McKenzie Construction 60.000 $298.00 $17,880.00
X0780 61501-0100 SIDEWALK,
CONCRETE
Siete, Inc. 60.000
Eagle Eye Electric, LLC 60.000
Whelcon Contractors 60.000
TNT General 60.000 $64.00 $3,840.00 Engineer's Estimate 60.000 SQYD $225.00 $13,500.00
$203.50 $12,210.00 West Point 60.000
LNFT $100.00 $3,000.00
$126.86 $3,805.80 West Point 30.000 $103.00 $3,090.00
Eagle Eye Electric, LLC 30.000 $140.00 $4,200.00
Miami Nation 30.000
TNT General 30.000 $62.00 $1,860.00 Engineer's Estimate 30.000
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
X0940 62302-1100 SPECIAL LABOR,
Whelcon Contractors 10.000
$1,800.00 Siete, Inc. 10.000 $150.00 $1,500.00
$298.00 $2,980.00 Miami Nation 10.000 $282.62 $2,826.20
$584.56 $5,845.60
$86.03 $1,720.60
$584.56 $5,845.60 Eagle Eye Electric, LLC 10.000 $485.00 $4,850.00
X0920 62302-1000 SPECIAL LABOR,
HIRED TECHNICAL
SERVICES
Whelcon Contractors 10.000
McKenzie Construction 10.000
West Point 10.000
TNT General 10.000 $110.00 $1,100.00 Engineer's Estimate 10.000 HOUR $190.00 $1,900.00
$180.00
X0900 62301-0000 GENERAL LABOR McKenzie Construction 20.000
Eagle Eye Electric, LLC 20.000
TNT General 20.000
Miami Nation 20.000 $37.68 $753.60 Engineer's Estimate 20.000 HOUR $67.00 $1,340.00
$65.00 $1,300.00 Siete, Inc. 20.000 $60.00 $1,200.00
$115.00 $2,300.00 Whelcon Contractors 20.000
$195.68 $3,913.60
$250.00 $5,000.00 Miami Nation 20.000 $224.84 $4,496.80
$239.00 $4,780.00 West Point 20.000 $120.00 $2,400.00
$358.00 $7,160.00 Eagle Eye Electric, LLC 20.000 $290.00 $5,800.00
X0880 62201-3350 HYDRAULIC
EXCAVATOR, 1 CUBIC
YARD MINIMUM
CAPACITY
McKenzie Construction 20.000
West Point 20.000
TNT General 20.000
Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000 HOUR $180.00 $3,600.00
$210.00 $4,200.00 Whelcon Contractors 20.000
HOUR $195.00 $3,900.00
$230.00 $4,600.00 West Point 20.000 $220.00 $4,400.00
$278.85 $5,577.00 Whelcon Contractors 20.000 $272.70 $5,454.00
$340.00 $6,800.00 McKenzie Construction 20.000 $340.00 $6,800.00
X0860 62201-2850 MOTOR GRADER, 12
FOOT MINIMUM
BLADE
Eagle Eye Electric, LLC 20.000
Miami Nation 20.000
TNT General 20.000
Siete, Inc. 20.000 $160.00 $3,200.00 Engineer's Estimate 20.000
Whelcon Contractors 20.000 $149.70 $2,994.00 Engineer's Estimate 20.000 HOUR $215.00 $4,300.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$25,000.00 $750.00 TNT General 0.030 $12,980.00 $389.40
$9,300.00 $44,640.00
$500,000.00 $15,000.00 Miami Nation 0.030 $61,130.50 $1,833.92
X1020 63402-0400 PAVEMENT
MARKINGS, TYPE B,
BROKEN
Siete, Inc. 0.030
West Point 0.030
X1000 63402-0300 PAVEMENT
MARKINGS, TYPE B,
SOLID
Whelcon Contractors 4.800
Eagle Eye Electric, LLC 4.800
McKenzie Construction 4.800
West Point 4.800 $1,850.00 $8,880.00 Engineer's Estimate 4.800 MILE $1,600.00 $7,680.00
$6,940.00 $33,312.00 Miami Nation 4.800 $2,861.99 $13,737.55
$11,500.00 $55,200.00 Siete, Inc. 4.800
$478.00 $7,170.00
$971.07 $14,566.05 Miami Nation 15.000 $734.81 $11,022.15
$16,003.08 $76,814.78 TNT General 4.800 $12,980.00 $62,304.00
$1,320.00 $19,800.00 TNT General 15.000 $1,300.00 $19,500.00
X0980 63301-0000 SIGN SYSTEM West Point 15.000
Whelcon Contractors 15.000
Siete, Inc. 15.000
Eagle Eye Electric, LLC 15.000 $300.00 $4,500.00 Engineer's Estimate 15.000 EACH $925.00 $13,875.00
$675.00 $10,125.00 McKenzie Construction 15.000
ACRE $16,178.00 $24,267.00
$4,500.00 $6,750.00 TNT General 1.500 $4,200.00 $6,300.00
$10,000.00 $15,000.00 Eagle Eye Electric, LLC 1.500 $6,650.00 $9,975.00
$251.22 $2,512.20 McKenzie Construction 10.000 $250.00 $2,500.00
$16,580.32 $24,870.48 Whelcon Contractors 1.500 $11,691.21 $17,536.82
X0960 62501-0000 TURF
ESTABLISHMENT
Miami Nation 1.500
Siete, Inc. 1.500
West Point 1.500
McKenzie Construction 1.500 $4,100.00 $6,150.00 Engineer's Estimate 1.500
Eagle Eye Electric, LLC 10.000 $485.00 $4,850.00
HIRED SURVEY
SERVICES Miami Nation 10.000
West Point 10.000
TNT General 10.000 $95.00 $950.00 Engineer's Estimate 10.000 HOUR $450.00 $4,500.00
$230.00 $2,300.00 Siete, Inc. 10.000 $165.00 $1,650.00
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
$4.15 $1,037.50
$7.00 $1,750.00 Siete, Inc. 250.000 $6.00 $1,500.00
$20.00 $5,000.00 Eagle Eye Electric, LLC 250.000 $11.00 $2,750.00
X1080 63503-1000 TEMPORARY TRAFFIC
CONTROL, PLASTIC
FENCE
McKenzie Construction 250.000
West Point 250.000
TNT General 250.000
Whelcon Contractors 250.000 $2.79 $697.50 Engineer's Estimate 250.000 LNFT $10.00 $2,500.00
$4.50 $1,125.00 Miami Nation 250.000
LPSM LPSM $100,000.00
$55,625.00 Siete, Inc. $25,000.00
$90,000.00 Eagle Eye Electric, LLC $58,700.00
$537.00 $16,110.00 TNT General 30.000 $400.00 $12,000.00
$158,266.66 West Point $120,000.00
X1060 63501-0000 TEMPORARY TRAFFIC
CONTROL
Miami Nation
TNT General
McKenzie Construction
Whelcon Contractors $24,316.37 Engineer's Estimate ALL
Miami Nation 30.000 $916.63 $27,498.90
X1040 63405-0050 PAVEMENT
MARKINGS,
SYMBOLS
Whelcon Contractors 30.000
McKenzie Construction 30.000
Siete, Inc. 30.000
Eagle Eye Electric, LLC 30.000 $185.00 $5,550.00 Engineer's Estimate 30.000 EACH $480.00 $14,400.00
$350.00 $10,500.00 West Point 30.000 $300.00 $9,000.00
$388.43 Eagle Eye Electric, LLC 0.030 $11,500.00 $345.00
$1,051.99 $31,559.70
Whelcon Contractors 0.030
McKenzie Construction 0.030 $6,966.00 $208.98 Engineer's Estimate 0.030 MILE $1,360.00 $40.80
$12,947.67
Report Generated on 12/22/2025 12:28 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]
| Sheet1 |
| Sheet2 |
| Sheet3 |
File details come from the government source that posted it. Updated .