This is a Bid Opening Summary document for the Red Rock Trail project (NV FLAP 500(1)) with bids opened on January 14, 2025 at 2:00 p.m. MST in Lakewood, CO. Three amendments were issued on 12/20/2024, 01/07/2025, and 01/10/2025. The project received bids from three contractors: Monitor Construction Company, Inc. (Sonoita, AZ) with a total bid of $9,893,333.00, Whelcon Contractors, LLC (Tucson, AZ) with a total bid of $9,949,687.06, and Steve Manning Construction, Inc. (Redding, CA) which did not provide calculated totals.

The Engineer's Estimate for the project was $7,755,000.00 total, broken down into Schedule A at $5,595,000.00 and Option X at $2,160,000.00. Both submitted bids were significantly higher than the Engineer's Estimate, with Monitor Construction Company being the apparent low bidder at approximately $2.1 million over the estimate. Schedule A includes trail and bridge construction work, while Option X covers work related to State Highway 159. The document notes that all bids are subject to verification.

View the file

Other files

File Type Posted
Tabulation of Bids.pdf PDF
QnA 01.10.25.pdf PDF
A003 Red Rock.pdf PDF
QnA 01.08.25.pdf PDF
A002 Red Rock.pdf PDF
QnA 12.20.24 Red Rock.pdf PDF
A001 Red Rock.pdf PDF
6982AF24B000016 IFB .pdf PDF
NV_FLAP_500(1)_01.100 Plans_Stamped_new_flat.pdf PDF
NV_FLAP_500(1)_20.100 FINAL GEO Report_Stamped_flat.zip ZIP file
FP-14.pdf PDF
NV_FLAP_500(1)_21.100 FINAL HYD Report_Stamped_flat.zip ZIP file
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Opening Summary

Project Name: Red Rock Trail Project Number: NV FLAP 500(1) Bid Opening Date: 01/14/2025 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Leslie Karsten

Amendments: (1)_12/20/2024____ (2) __01/07/2025___ (3) 01/10/2025___

Bidder’s Name Schedule A Option X BID TOTAL

1. Monitor Construction Company, Inc.

Sonoita, AZ

$6,990,262.30 $2,903,070.70 $9,893,333.00

2. Whelcon Contractors, LLC Tucson, AZ

$8,149,142.97 $1,800,544.09 $9,949,687.06

3. Steve Manning Construction, Inc.

Redding, CA

Did not provide a calculated total

Did not provide a calculated total

Did not provide a calculated total

Engineer’s Estimate

$5,595,000.00 $2,160,000.00 $7,755,000.00

*All bids are subject to verification.