Bid Opening Summary Red Rock Trail.pdf
PDF 114 KB Posted
- Attached to
- NV FLAP 500(1) Red Rock Trail
- Solicitation number
- 6982AF24B000016
About this file
This is a Bid Opening Summary document for the Red Rock Trail project (NV FLAP 500(1)) with bids opened on January 14, 2025 at 2:00 p.m. MST in Lakewood, CO. Three amendments were issued on 12/20/2024, 01/07/2025, and 01/10/2025. The project received bids from three contractors: Monitor Construction Company, Inc. (Sonoita, AZ) with a total bid of $9,893,333.00, Whelcon Contractors, LLC (Tucson, AZ) with a total bid of $9,949,687.06, and Steve Manning Construction, Inc. (Redding, CA) which did not provide calculated totals.
The Engineer's Estimate for the project was $7,755,000.00 total, broken down into Schedule A at $5,595,000.00 and Option X at $2,160,000.00. Both submitted bids were significantly higher than the Engineer's Estimate, with Monitor Construction Company being the apparent low bidder at approximately $2.1 million over the estimate. Schedule A includes trail and bridge construction work, while Option X covers work related to State Highway 159. The document notes that all bids are subject to verification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids.pdf | ||
| QnA 01.10.25.pdf | ||
| A003 Red Rock.pdf | ||
| QnA 01.08.25.pdf | ||
| A002 Red Rock.pdf | ||
| QnA 12.20.24 Red Rock.pdf | ||
| A001 Red Rock.pdf | ||
| 6982AF24B000016 IFB .pdf | ||
| NV_FLAP_500(1)_01.100 Plans_Stamped_new_flat.pdf | ||
| NV_FLAP_500(1)_20.100 FINAL GEO Report_Stamped_flat.zip | ZIP file | |
| FP-14.pdf | ||
| NV_FLAP_500(1)_21.100 FINAL HYD Report_Stamped_flat.zip | ZIP file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Summary
Project Name: Red Rock Trail Project Number: NV FLAP 500(1) Bid Opening Date: 01/14/2025 Time: 2:00 p.m. MST Bid Opening Location: Lakewood, CO Bid Opening Officer: Leslie Karsten
Amendments: (1)_12/20/2024____ (2) __01/07/2025___ (3) 01/10/2025___
Bidder’s Name Schedule A Option X BID TOTAL
1. Monitor Construction Company, Inc.
Sonoita, AZ
$6,990,262.30 $2,903,070.70 $9,893,333.00
2. Whelcon Contractors, LLC Tucson, AZ
$8,149,142.97 $1,800,544.09 $9,949,687.06
3. Steve Manning Construction, Inc.
Redding, CA
Did not provide a calculated total
Did not provide a calculated total
Did not provide a calculated total
Engineer’s Estimate
$5,595,000.00 $2,160,000.00 $7,755,000.00
*All bids are subject to verification.
| Bid Opening Summary |
| Bid Opening Date: 01/14/2025 Time: 2:00 p.m. MST |
| *All bids are subject to verification. |
File details come from the government source that posted it. Updated .