A001 Red Rock.pdf
PDF 7 MB Posted
- Attached to
- NV FLAP 500(1) Red Rock Trail
- Solicitation number
- 6982AF24B000016
About this file
This is Amendment A001 to solicitation 6982AF24B000016 for the Red Rock Trail project, issued by the Federal Highway Administration Central Federal Lands Highway Division. The amendment modifies the bid schedule by replacing pay item 62901-0000 (Rolled Erosion Control Product) with pay item 62901-1000 (Rolled Erosion Control Product, Type 3.B) and updates corresponding quantities and specifications.
The amendment includes revised bid schedule pages, summary of quantities sheets, and technical drawings showing details for rolled erosion control product installation on slopes and in channels. The quantities have been updated to 6,900 SQYD for Schedule A and 1,400 SQYD for Schedule X. The amendment requires contractor acknowledgment prior to the bid opening date of January 14, 2025 at 2:00 PM local time. The project location remains in Las Vegas, Nevada near the Red Rock Conservation Area and includes construction of a multi-use trail, pedestrian bridge, and highway widening work divided into Schedule A (trail and bridge) and Option X (State Highway 159 work).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation of Bids.pdf | ||
| Bid Opening Summary Red Rock Trail.pdf | ||
| QnA 01.10.25.pdf | ||
| A003 Red Rock.pdf | ||
| QnA 01.08.25.pdf | ||
| A002 Red Rock.pdf | ||
| QnA 12.20.24 Red Rock.pdf | ||
| 6982AF24B000016 IFB .pdf | ||
| NV_FLAP_500(1)_01.100 Plans_Stamped_new_flat.pdf | ||
| NV_FLAP_500(1)_20.100 FINAL GEO Report_Stamped_flat.zip | ZIP file | |
| FP-14.pdf | ||
| NV_FLAP_500(1)_21.100 FINAL HYD Report_Stamped_flat.zip | ZIP file |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A001
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO ITEM 11.)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: LAURA VALLEJOS
HFLCEO240399PR
6982AF24B000016
NV FLAP 500(1)12/20/2024
11/25/2024
0*
* See Item 14
IFB
Remove and replace pages A-1, and A-7 thru A-20 with the attached corresponding pages.
Plans Remove and replace pages B1 thru B5, B14, T21, and T22 with the attached corresponding pages.
1 25
SOLICITATION, OFFER
AND AWARD
(Construction, Alteration or Repair)
1. SOLICITATION NO.
6982AF24B000016
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
11/25/2024
PAGE OF
PAGES
IMPORTANT - THE "OFFER SECTION ON THE REVERSE MUST BE FULLY COMPLETED BY OFFEROR.
4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
HFLCEO240399PR
6. PROJECT NO.
NV FLAP 500(1)
7. ISSUED BY:
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS DIVISION
12300 WEST DAKOTA AVENUE, SUITE 167
LAKEWOOD, COLORADO 80228
CODE: 69050001 8. ADDRESS OFFER TO:
Laura Vallejos, Contract Specialist Federal Highway Administration Central Federal Lands Division Office 12300 W. Dakota Avenue Lakewood, CO 80228
9. FOR INFORMATION CALL
SEE PAGE A-3
A. NAME:
SEE PAGE A-3
B. TELEPHONE NO. (Include area code)
SEE PAGE A-3
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
ROADWAY CONSTRUCTION PROJECT IN STRICT ACCORDANCE WITH:
1. FEDERAL ACQUISITION AND TRANSPORATION ACQUISITION REGULATIONS (FAR & TAR)
2. DEPARTMENT OF LABOR, CONSTRUCTION WAGE RATE REQUIREMENT RATES
3. SPECIAL CONTRACT REQUIREMENTS
4. PLANS
5. BID SCHEDULE
6. STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY
PROJECTS, FP-14, U.S. CUSTOMARY UNITS
See Subsection 104.04 of the FP-14 for governing order of precedence
11. The Contractor shall begin performance within 10 calendar days and complete it within * calendar days after receiving award notice to proceed. The performance period is mandatory negotiable. *Refer to Subsection 108.01 as amended in the Special Contract Requirements.
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.) YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8. by 2:00 p.m. (hour) local time on 1/07/25 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is is not required.
C. All offers are subject to the (1) work requirements and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA
FAR (48 CFR) 53.236-1(d)
X
X
X
X
X
A-1
01/14/25
Amendment A001 12.20.2024
Leslie.Karsten Cross-Out
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:NV FLAP 500(1)
Project Name:Red Rock Trail
Amendment A001 12.20.2024
A - 8
Contract Quantity Pay Items
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55235-0000 EXPANSION JOINTS
55401-1000 REINFORCING STEEL
55901-0000 MEMBRANE WATERPROOFING
56302-1000 PAINTING, CONCRETE STRUCTURE
64604-3000 FIXTURE, PEDESTRIAN RAILING (BRIDGE RAILING)
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15214-1000 SURVEY AND STAKING, BRIDGE (PEDESTRIAN BRIDGE)
ALL LPSM $___LPSM_____ $____________
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
3 EACH $____________ $____________
A0080 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
0.986 MILE $____________ $____________
A0100 15236-2000 SURVEY CONTROL, GRADE FINISHING
1.973 MILE $____________ $____________
A0120 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0140 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0160 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0180 15701-0000 SOIL EROSION CONTROL
ALL LPSM $___LPSM_____ $____________
A0200 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
Project Name:Red Rock Trail
(Contractor-furnished Lab)
A - 9
A0220 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A0240 20101-0000 CLEARING AND GRUBBING
4.5 ACRE $____________ $____________
A0260 20302-0300 REMOVAL OF CURB AND GUTTER, CONCRETE
90 LNFT $____________ $____________
A0280 20302-0700 REMOVAL OF FENCE
85 LNFT $____________ $____________
A0300 20302-1200 REMOVAL OF GUARDRAIL
100 LNFT $____________ $____________
A0320 20315-0000 SAWCUTTING PAVEMENT
275 LNFT $____________ $____________
A0340 20420-0000 EMBANKMENT CONSTRUCTION
4,300 CUYD $____________ $____________
A0360 20421-0000 ROCK EXCAVATION
115 CUYD $____________ $____________
A0380 20466-0000 CONSERVE AND STOCKPILE TOPSOIL
2,400 CUYD $____________ $____________
A0400 20801-0000 STRUCTURE EXCAVATION
80 CUYD $____________ $____________
A0420 20803-0000 STRUCTURAL BACKFILL
80 CUYD $____________ $____________
A0440 20810-0000 SHORING AND BRACING
ALL LPSM $___LPSM_____ $____________
A0460 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
25 CUYD $____________ $____________
A0480 25101-2700 PLACED RIPRAP, METHOD B, CLASS 7
1,450 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
A - 10
A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2
2,050 TON $____________ $____________
A0520 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
1,230 TON $____________ $____________
A0540 40601-0000 FOG SEAL
3 TON $____________ $____________
A0560 41102-1000 PRIME COAT, METHOD 1
7,200 SQYD $____________ $____________
A0580 41105-0000 BLOTTER
11 TON $____________ $____________
A0600 41201-0000 TACK COAT
4 TON $____________ $____________
A0620 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH
230 SQYD $____________ $____________
A0640 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
126 CUYD $____________ $____________
A0660 55235-0000 EXPANSION JOINTS
5 LNFT $____________ $____________
A0680 55302-1400 PRECAST, PRESTRESSED CONCRETE BOX BEAM, NON-STANDARD
820 LNFT $____________ $____________
A0700 55401-1000 REINFORCING STEEL
22,300 LB $____________ $____________
A0720 55901-0000 MEMBRANE WATERPROOFING
350 SQYD $____________ $____________
A0740 56302-1000 PAINTING, CONCRETE STRUCTURE
2,315 SQFT $____________ $____________
A0760 56401-1000 BEARING DEVICE, ELASTOMERIC
32 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
A - 11
A0780 56501-0400 DRILLED SHAFT, 36-INCH DIAMETER
160 LNFT $____________ $____________
A0800 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER
100 LNFT $____________ $____________
A0820 58502-0000 ULTRA HIGH PERFORMANCE CONCRETE
ALL LPSM $___LPSM_____ $____________
A0840 60201-0600 18-INCH PIPE CULVERT
50 LNFT $____________ $____________
A0860 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
45 LNFT $____________ $____________
A0880 60202-0400 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
35 LNFT $____________ $____________
A0900 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
1 EACH $____________ $____________
A0920 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
A0940 60211-0800 END SECTION FOR 24-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
A0960 60403-0000 INLET
1 EACH $____________ $____________
A0980 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH
110 LNFT $____________ $____________
A1000 60906-1000 GUTTER, CONCRETE
55 SQYD $____________ $____________
A1020 61501-0100 SIDEWALK, CONCRETE
335 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
A - 12
A1040 61601-1000 SLOPE PAVING, CONCRETE
30 SQYD $____________ $____________
A1060 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS (8' POSTS)
100 LNFT $____________ $____________
A1080 61702-1600 TERMINAL SECTION, TYPE MGS FLARED
1 EACH $____________ $____________
A1100 61707-0000 STRUCTURE TRANSITION RAILING
25 LNFT $____________ $____________
A1120 61901-0900 FENCE, BARBED WIRE, 4 STRAND
110 LNFT $____________ $____________
A1140 61904-0000 BOLLARD POST (REMOVABLE)
6 EACH $____________ $____________
A1160 62036-0000 JOINT SEALANT
55 LNFT $____________ $____________
A1180 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A1200 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A1220 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
A1240 62201-3000 HYDRAULIC EXCAVATOR
40 HOUR $____________ $____________
A1260 62301-0000 GENERAL LABOR
30 HOUR $____________ $____________
A1280 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
30 HOUR $____________ $____________
A1300 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
A - 13
A1320 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (AUTHORIZED DESERT
TORTOISE AND PLANT BIOLOGIST ADTB)
ALL LPSM $___LPSM_____ $____________
A1340 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
1.300 ACRE $____________ $____________
A1360 62510-2000 SEEDING, HYDRAULIC METHOD
3.1 ACRE $____________ $____________
A1380 62515-2000 MULCHING, HYDRAULIC METHOD
3.1 ACRE $____________ $____________
A001 A1400 62901-0000 ROLLED EROSION CONTROL PRODUCT
6,900 SQYD $____________ $____________
A001 A1410 62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
6,900 SQYD $____________ $____________
A1420 63301-0000 SIGN SYSTEM
3 EACH $____________ $____________
A1440 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
460 LNFT $____________ $____________
A1460 63401-0800 PAVEMENT MARKINGS, TYPE D, BROKEN
4,740 LNFT $____________ $____________
A1480 63401-1900 PAVEMENT MARKINGS, TYPE J, SOLID
300 LNFT $____________ $____________
A1500 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE D)
1 EACH $____________ $____________
A1520 63405-1350 PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
1 EACH $____________ $____________
A1540 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
A - 14
A1560 64604-3000 FIXTURE, PEDESTRIAN RAILING (BRIDGE RAILING)
460 LNFT $____________ $____________
A1580 64604-3000 FIXTURE, PEDESTRIAN RAILING
450 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NV FLAP 500(1)
Project Name:Red Rock Trail
A0140 15401-0000 CONTRACTOR TESTING
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $___LPSM_____ $____________
(Bid Item Alternative: Government Furnished Lab)
A - 15
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
X0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
X0040 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
1 EACH $____________ $____________
X0060 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
0.340 MILE $____________ $____________
X0080 15236-2000 SURVEY CONTROL, GRADE FINISHING
0.340 MILE $____________ $____________
X0100 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
X0120 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
X0140 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
X0160 15701-0000 SOIL EROSION CONTROL
ALL LPSM $___LPSM_____ $____________
X0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
X0200 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
X0220 20101-0000 CLEARING AND GRUBBING
2.1 ACRE $____________ $____________
X0240 20301-2400 REMOVAL OF SIGN
2 EACH $____________ $____________
X0260 20302-0700 REMOVAL OF FENCE
230 LNFT $____________ $____________
X0280 20315-0000 SAWCUTTING PAVEMENT
2,040 LNFT $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:NV FLAP 500(1)
Project Name:Red Rock Trail
(Contractor-furnished Lab)
A - 16
X0300 20420-0000 EMBANKMENT CONSTRUCTION
1,500 CUYD $____________ $____________
X0320 20466-0000 CONSERVE AND STOCKPILE TOPSOIL
1,200 CUYD $____________ $____________
X0340 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
10 CUYD $____________ $____________
X0360 25125-0000 BOULDER
87 EACH $____________ $____________
X0380 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,700 TON $____________ $____________
X0400 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
2,200 TON $____________ $____________
X0420 40601-0000 FOG SEAL
2 TON $____________ $____________
X0440 41102-1000 PRIME COAT, METHOD 1
5,970 SQYD $____________ $____________
X0460 41105-0000 BLOTTER
9 TON $____________ $____________
X0480 41201-0000 TACK COAT
5 TON $____________ $____________
X0500 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH
70 SQYD $____________ $____________
X0520 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
55 LNFT $____________ $____________
X0540 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:NV FLAP 500(1)
A - 17
X0560 60901-1000 CURB, CONCRETE, 12-INCH DEPTH
300 LNFT $____________ $____________
X0580 60915-1000 WHEELSTOP, CONCRETE
17 EACH $____________ $____________
X0600 61901-0900 FENCE, BARBED WIRE, 4 STRAND
560 LNFT $____________ $____________
X0620 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
X0640 62201-0900 WHEEL LOADER, 2 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
X0660 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
X0680 62201-3000 HYDRAULIC EXCAVATOR
40 HOUR $____________ $____________
X0700 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
X0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
X0740 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
20 HOUR $____________ $____________
X0760 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (AUTHORIZED DESERT
TORTOISE AND PLANT BIOLOGIST ADTB)
ALL LPSM $___LPSM_____ $____________
X0780 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
0.500 ACRE $____________ $____________
X0800 62510-2000 SEEDING, HYDRAULIC METHOD
1.2 ACRE $____________ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:NV FLAP 500(1)
A - 18
X0820 62515-2000 MULCHING, HYDRAULIC METHOD
1.2 ACRE $____________ $____________
A001 X0840 62901-0000 ROLLED EROSION CONTROL PRODUCT
1,400 SQYD $____________ $____________
A001 X0850 62901-1000 ROLLED EROSION CONTROL PRODUCT, TYPE 3.B
1,400 SQYD $____________ $____________
X0860 63301-0000 SIGN SYSTEM
22 EACH $____________ $____________
X0880 63316-1000 REMOVE AND RESET SIGN
3 EACH $____________ $____________
X0900 63316-1000 REMOVE AND RESET SIGN (RELOCATE STONE SIGN)
1 EACH $____________ $____________
X0920 63401-0700 PAVEMENT MARKINGS, TYPE D, SOLID
23,000 LNFT $____________ $____________
X0940 63401-0850 PAVEMENT MARKINGS, TYPE D, DOTTED
2,850 LNFT $____________ $____________
X0960 63405-0050 PAVEMENT MARKINGS, SYMBOLS (TYPE D)
6 EACH $____________ $____________
X0980 63405-1300 PAVEMENT MARKINGS, TYPE D, TURN ARROW
10 EACH $____________ $____________
X1000 63405-1350 PAVEMENT MARKINGS, TYPE D, STRAIGHT ARROW
13 EACH $____________ $____________
X1020 63405-1500 PAVEMENT MARKINGS, TYPE D, "STOP" WORD MESSAGE
10 EACH $____________ $____________
X1040 63405-1650 PAVEMENT MARKINGS, TYPE D, ACCESSIBILITY SYMBOL
1 EACH $____________ $____________
X1060 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:NV FLAP 500(1)
A - 19
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:X Schedule Type:Options
Project No:NV FLAP 500(1)
Project Name:Red Rock Trail
X0120 15401-0000 CONTRACTOR TESTING
BID ALTERNATE ITEM - SEE PAGE A-4 ALL LPSM $___LPSM_____ $____________
(Bid Item Alternative: Government Furnished Lab)
A - 20
Bid Schedule Summary
Schedule Bid Total
Schedule A - Base
Schedule X - Option
Total - Schedules
Submitted By: ________________________________
Bid Schedule
Project No:NV FLAP 500(1)
Sheet and Description
B6-B7 B9 B10 B11 B12-B13 B14 B15 S2
Grading Drainage Surfacing, Survey
Pavement
Markings
Permanent
Sign
Clearing and
Seeding
Removals, Misc.
Structures Allowance
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15214-1000 SURVEY AND STAKING, BRIDGE
(PEDESTRIAN BRIDGE) LPSM ALL
A0060 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 3 3
A0080 15225-0000 SLOPE, REFERENCE, AND CLEARING
AND GRUBBING CONTROL MILE 0.986 0.986
A0100 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.973 1.973
A0120 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0140 15401-0000 CONTRACTOR TESTING LPSM ALL
A0160 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0180 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0200 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
A0220 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0240 20101-0000 CLEARING AND GRUBBING ACRE 4.4 0.1 4.5
A0260 20302-0300 REMOVAL OF CURB AND GUTTER,
CONCRETE LNFT 82 8 90
A0280 20302-0700 REMOVAL OF FENCE LNFT 82 3 85
A0300 20302-1200 REMOVAL OF GUARDRAIL LNFT 93 7 100
A0320 20315-0000 SAWCUTTING PAVEMENT LNFT 271 4 275
A0340 20420-0000 EMBANKMENT CONSTRUCTION CUYD 3,912 388 4,300
A0360 20421-0000 ROCK EXCAVATION Removal of potential
CUYD 111 4 115 caliche
A0380 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 2,153 247 2,400
A0400 20801-0000 STRUCTURE EXCAVATION CUYD 80 80 Contract Quantity
A0420 20803-0000 STRUCTURAL BACKFILL CUYD 80 80 Contract Quantity
A0440 20810-0000 SHORING AND BRACING LPSM ALL
A0460 25101-2200 PLACED RIPRAP, METHOD B, CLASS
2 CUYD 20 5 25
A0480 25101-2700 PLACED RIPRAP, METHOD B, CLASS
7 CUYD 1,317 133 1,450
A0500 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2,020 30 2,050
A0520 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 1,095 91 44 1,230
A0540 40601-0000 FOG SEAL TON 3 3
A0560 41102-1000 PRIME COAT, METHOD 1 SQYD 6,961 239 7,200
A0580 41105-0000 BLOTTER TON 10 1 11
A0600 41201-0000 TACK COAT TON 3 1 4
MileStone: Amendment A001
Amendment Review Date: 12/18/24
Report Date: 12/18/24
A
M
E
N
D
Line
Item
No.
Pay Item
Number
SUMMARY OF QUANTITIES - Schedule A
-D e c -2
:3
A
M
Remarks and/or
Determination of
Estimated Quantity
Pay Item Description Unit
Estimated
Quantities g e c k o \t b g \C
F L R e d R o c k C a n y o n P a th
\3 E s ti m a te
\1 A m e n d m e n t e e b a c s -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
PROJECT
B1
NV FLAP 500(1)
RED ROCK TRAIL
SHEET
NUMBER
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
12/18/2024
Grading Drainage Surfacing, Survey
Pavement
Markings
Permanent
Sign
Clearing and
Seeding
Removals, Misc.
Structures Allowance
Bid
Schedule
A0620 50101-2600 MINOR CONCRETE PAVEMENT, Soaring Club Access
PLAIN, 6-INCH DEPTH SQYD 225 5 230
A0640 55201-0200 STRUCTURAL CONCRETE, CLASS A Contract Quantity
(AE) CUYD 13 113 126
A0660 55235-0000 EXPANSION JOINTS LNFT 5 5 Contract Quantity
A0680 55302-1400 PRECAST, PRESTRESSED CONCRETE
BOX BEAM, NON-STANDARD LNFT 816 4 820
A0700 55401-1000 REINFORCING STEEL LB 1,500 20,800 22,300 Contract Quantity
A0720 55901-0000 MEMBRANE WATERPROOFING SQYD 350 350 Contract Quantity
A0740 56302-1000 PAINTING, CONCRETE STRUCTURE SQFT 2,315 2,315 Contract Quantity
A0760 56401-1000 BEARING DEVICE, ELASTOMERIC EACH 32 32
A0780 56501-0400 DRILLED SHAFT, 36-INCH DIAMETER LNFT 160 160
A0800 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER LNFT 100 100
A0820 58502-0000 ULTRA HIGH PERFORMANCE CONCRETE LPSM ALL Contract Quantity
A0840 60201-0600 18-INCH PIPE CULVERT LNFT 45 5 50
A0860 60202-0200 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE CULVERT LNFT 40 5 45
A0880 60202-0400 24-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE CULVERT LNFT 32 3 35
A0900 60210-0600 END SECTION FOR 18-INCH PIPE
CULVERT EACH 1 1
A0920 60211-0600 END SECTION FOR 18-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 2 2
A0940 60211-0800 END SECTION FOR 24-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 2 2
A0960 60403-0000 INLET EACH 1 1
A0980 60902-1000 CURB AND GUTTER, CONCRETE,
12-INCH DEPTH LNFT 103 7 110
A1000 60906-1000 GUTTER, CONCRETE SQYD 52 3 55
A1020 61501-0100 SIDEWALK, CONCRETE SQYD 332 3 335
A1040 61601-1000 SLOPE PAVING, CONCRETE SQYD 24 6 30
A1060 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2,
CLASS A STEEL POSTS (8' POSTS) LNFT 88 12 100
A1080 61702-1600 TERMINAL SECTION, TYPE MGS
FLARED EACH 1 1
A1100 61707-0000 STRUCTURE TRANSITION RAILING LNFT 25 25
A1120 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 105 5 110
A1140 61904-0000 BOLLARD POST (REMOVABLE) EACH 6 6
-D e c -2
:3
A
M
MileStone: Amendment A001
Amendment Review Date: 12/18/24
Report Date: 12/18/24 g e c k o \t b g \C
F L R e d R o c k C a n y o n P a th
\3 E s ti m a te
\1 A m e n d m e n t e e b a c s -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
(2
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
PROJECT
B2
NV FLAP 500(1)
RED ROCK TRAIL
SHEET
NUMBER
B1A
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
Grading Drainage Surfacing, Survey
Pavement
Markings
Permanent
Sign
Clearing and
Seeding
Removals, Misc.
Structures Allowance
Bid
Schedule
A1160 62036-0000 JOINT SEALANT LNFT 52 3 55
A1180 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A1200 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
A1220 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
A1240 62201-3000 HYDRAULIC EXCAVATOR HOUR 40
A1260 62301-0000 GENERAL LABOR HOUR 30
A1280 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 30
A1300 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A1320 62303-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES (AUTHORIZED DESERT
TORTOISE AND PLANT BIOLOGIST
ADTB) LPSM ALL
A1340 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 1.286 0.014 1.300
A1360 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 3.0 0.1 3.1
A1380 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 3.0 0.1 3.1
A001 A1400 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 6,750 150 6,900
A001 A1410 62901-1000 ROLLED EROSION CONTROL
PRODUCT, TYPE 3.B SQYD 6,750 150 6,900
A1420 63301-0000 SIGN SYSTEM EACH 3 3
A1440 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 459 1 460
A1460 63401-0800 PAVEMENT MARKINGS, TYPE D,
BROKEN LNFT 4,731 9 4,740
A1480 63401-1900 PAVEMENT MARKINGS, TYPE J,
SOLID LNFT 300 300
A1500 63405-0050 PAVEMENT MARKINGS, SYMBOLS
(TYPE D) EACH 1 1
A1520 63405-1350 PAVEMENT MARKINGS, TYPE D,
STRAIGHT ARROW EACH 1 1
A1540 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A1560 64604-3000 FIXTURE, PEDESTRIAN RAILING Contract Quantity
(BRIDGE RAILING) LNFT 460 460
A1580 64604-3000 FIXTURE, PEDESTRIAN RAILING LNFT 448 2 450
-D e c -2
:3
A
M
MileStone: Amendment A001
Amendment Review Date: 12/18/24
Report Date: 12/18/24 g e c k o \t b g \C
F L R e d R o c k C a n y o n P a th
\3 E s ti m a te
\1 A m e n d m e n t e e b a c s -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
(3
SUMMARY OF QUANTITIES - Schedule A
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
PROJECT
B3
NV FLAP 500(1)
RED ROCK TRAIL
SHEET
NUMBER
B2
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
Grading Drainage Surfacing, Survey
Pavement
Markings
Permanent
Sign
Clearing and
Seeding
Removals, Misc.
Structures Allowance
Bid
Schedule
X0020 15101-0000 MOBILIZATION LPSM ALL
X0040 15215-3000 SURVEY AND STAKING, DRAINAGE
STRUCTURE EACH 1 1
X0060 15225-0000 SLOPE, REFERENCE, AND CLEARING
AND GRUBBING CONTROL MILE 0.340 0.340
X0080 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 0.340 0.340
X0100 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0120 15401-0000 CONTRACTOR TESTING LPSM ALL
X0140 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0160 15701-0000 SOIL EROSION CONTROL LPSM ALL
X0180 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
X0200 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
X0220 20101-0000 CLEARING AND GRUBBING ACRE 2.0 0.1 2.1
X0240 20301-2400 REMOVAL OF SIGN EACH 2 2
X0260 20302-0700 REMOVAL OF FENCE LNFT 224 6 230
X0280 20315-0000 SAWCUTTING PAVEMENT LNFT 2,017 23 2,040
X0300 20420-0000 EMBANKMENT CONSTRUCTION CUYD 1,320 180 1,500
X0320 20466-0000 CONSERVE AND STOCKPILE TOPSOIL CUYD 1,106 94 1,200
X0340 25101-2200 PLACED RIPRAP, METHOD B, CLASS
2 CUYD 8 2 10
X0360 25125-0000 BOULDER EACH 87 87
X0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,651 49 1,700
X0400 40301-0100 ASPHALT CONCRETE PAVEMENT,
TYPE 1 TON 2,116 84 2,200
X0420 40601-0000 FOG SEAL TON 2 2
X0440 41102-1000 PRIME COAT, METHOD 1 SQYD 5,680 290 5,970
X0460 41105-0000 BLOTTER TON 8 1 9
X0480 41201-0000 TACK COAT TON 4 1 5
X0500 50101-2600 MINOR CONCRETE PAVEMENT, Concrete foundation
PLAIN, 6-INCH DEPTH for relocated Red
SQYD 67 3 70 Rock sign
X0520 60202-0200 18-INCH EQUIVALENT DIAMETER
ARCH OR ELLIPTICAL PIPE CULVERT LNFT 50 5 55
X0540 60211-0600 END SECTION FOR 18-INCH
EQUIVALENT DIAMETER ARCH OR
ELLIPTICAL PIPE CULVERT EACH 2 2
X0560 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 287 13 300
-D e c -2
:3
A
M
MileStone: Amendment A001
Amendment Review Date: 12/18/24
Report Date: 12/18/24 g e c k o \t b g \C
F L R e d R o c k C a n y o n P a th
\3 E s ti m a te
\1 A m e n d m e n t e e b a c s -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
(4
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of Estimated
Quantity
PROJECT
B4
NV FLAP 500(1)
RED ROCK TRAIL
SHEET
NUMBER
B3
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
Grading Drainage Surfacing, Survey
Pavement
Markings
Permanent
Sign
Clearing and
Seeding
Removals, Misc.
Structures Allowance
Bid
Schedule
X0580 60915-1000 WHEELSTOP, CONCRETE EACH 17 17
X0600 61901-0900 FENCE, BARBED WIRE, 4 STRAND LNFT 552 8 560
X0620 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 40
X0640 62201-0900 WHEEL LOADER, 2 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
X0660 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM
BLADE HOUR 40
X0680 62201-3000 HYDRAULIC EXCAVATOR HOUR 40
X0700 62301-0000 GENERAL LABOR HOUR 40
X0720 62302-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES HOUR 40
X0740 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
X0760 62303-1000 SPECIAL LABOR, HIRED TECHNICAL
SERVICES (AUTHORIZED DESERT
TORTOISE AND PLANT BIOLOGIST
ADTB) LPSM ALL
X0780 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.427 0.073 0.500
X0800 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 1.1 0.1 1.2
X0820 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 1.1 0.1 1.2
A001 X0840 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 1,340 60 1,400
A001 X0850 62901-1000 ROLLED EROSION CONTROL
PRODUCT, TYPE 3.B SQYD 1,340 60 1,400
X0860 63301-0000 SIGN SYSTEM EACH 22 22
X0880 63316-1000 REMOVE AND RESET SIGN EACH 3 3
X0900 63316-1000 REMOVE AND RESET SIGN Relocation of
(RELOCATE STONE SIGN) existing Red Rock
EACH 1 1 Canyon sign
X0920 63401-0700 PAVEMENT MARKINGS, TYPE D,
SOLID LNFT 22,959 41 23,000
X0940 63401-0850 PAVEMENT MARKINGS, TYPE D,
DOTTED LNFT 2,850 2,850
X0960 63405-0050 PAVEMENT MARKINGS, SYMBOLS
(TYPE D) EACH 6 6
X0980 63405-1300 PAVEMENT MARKINGS, TYPE D,
TURN ARROW EACH 10 10
-D e c -2
:3
A
M
MileStone: Amendment A001
Amendment Review Date: 12/18/24
Report Date: 12/18/24 g e c k o \t b g \C
F L R e d R o c k C a n y o n P a th
\3 E s ti m a te
\1 A m e n d m e n t e e b a c s -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
(5
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
PROJECT
B5
NV FLAP 500(1)
RED ROCK TRAIL
SHEET
NUMBER
B4
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
Grading Drainage Surfacing, Survey
Pavement
Markings
Permanent
Sign
Clearing and
Seeding
Removals, Misc.
Structures Allowance
Bid
Schedule
X1000 63405-1350 PAVEMENT MARKINGS, TYPE D,
STRAIGHT ARROW EACH 13 13
X1020 63405-1500 PAVEMENT MARKINGS, TYPE D,
"STOP" WORD MESSAGE EACH 10 10
X1040 63405-1650 PAVEMENT MARKINGS, TYPE D,
ACCESSIBILITY SYMBOL EACH 1 1
X1060 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
-D e c -2
:3
A
M
MileStone: Amendment A001
Amendment Review Date: 12/18/24
Report Date: 12/18/24 g e c k o \t b g \C
F L R e d R o c k C a n y o n P a th
\3 E s ti m a te
\1 A m e n d m e n t e e b a c s -s u m m a ry
-q u a n ti ti e s .x ls m
]S h e e t
(6
SUMMARY OF QUANTITIES - Option X
A
M
E
N
D
Line
Item
No.
Pay Item
Number Pay Item Description Unit
Estimated
Quantities Remarks and/or
Determination of
Estimated Quantity
PROJECT
B6
NV FLAP 500(1)
RED ROCK TRAIL
SHEET
NUMBER
B5
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
B14
SUMMARY
CLEARING AND SEEDING
1 Amendment A001: Revised item 62901-0000 to 62901-1000
REVISED 12/18/2024 1
D
E S
IG
N
S U
B M
IT
T
A L
RED ROCK TRAIL
NV FLAP 500(1)
:2
P
M
J u n e
D e f a u lt c p w w o r k d ir
\j a c o b s u s v a p w
\d m s \R
R T
B
O R
G
E N
.d g n
PROJECT
NUMBER
SHEET
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
ON SLOPES
CONTROL PRODUCT
ROLLED EROSION
U.S. CUSTOMARY SPECIAL
6" min. overlap
4" min. edge overlap
3' max. c-c
6" x 6" trench
12" max. c-c
12" max. c-c
12" max. c-c
3'
Slope stake
6" x 6" trench
See Note 1
Staple Spacing
12" spacing
Staple
12" spacing
Staples
FLOW PERSPECTIVE VIEW
Staple
Erosion control blanket
Blanket edge
Staple (typ.)
Blanket ends
NOTE:
Staple
NO SCALE
native soil
Compacted
Toe of slope
Erosion control blanket
Compacted native soil blanket control
Erosion
AT TOP OF SLOPE
ANCHOR TRENCH
DETAIL A
AT TOE OF SLOPE
ANCHOR TRENCH
DETAIL B
SHINGLE SPLICE
DETAIL C
See Detail B at toe of slope
Anchor trench
See Detail C
Shingle splice
See Detail A at top of slope
Anchor trench
3.
2.
1.
3.B on all slopes 1:3 and steeper.
Use Rolled Erosion Control Product (RECP) Type
Overlap in the direction of the prevailing wind.
recommendations.
Install staples according to the manufacturer's
Se e
Not e
Pr ev ail in g wi nd
T21
1 Amendment A001: Revised item 62901-0000 to 62901-1000
REVISED 12/18/2024 629-A 1
D E
S
IG
N S
U B
M
IT
T A
L
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:2
J u n e
D e f a p w w o r k d ir
\j a c o b s u s v a p w
\d m s \R
R T
B
O R
G
E N
.d g n
PROJECT
NUMBER
SHEET
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
T R
R T
.d g n
T22
U.S. CUSTOMARY SPECIAL
NO SCALE
3' max. c-c
Staple6" max. c-c
Staple
6" min. edge overlap
12" max. c-c
Staple
6" max. c-c
12'' max. c-c end overlap
6" min.
6"
12" max. c-c
Staple
12'' max. c-c
Staple
See Detail D
Anchor trench
6"
6"
PERSPECTIVE VIEW
NOTE:
1.
blanket control
Erosion
FLOW
blanket control
Erosion
Staple
FL
OW blanket control
Erosion
Staple edges
Blanket
(typ.)
Staple ends
Blanket
Erosion control blanket
FLOW
5.
4.
3.
2.
1.
Compacted native soil native soil
Compacted
See Note 2
INITIAL ANCHOR
DETAIL A
CHECK SLOT
DETAIL B
SHINGLE SPLICE
DETAIL C
ANCHOR TRENCH
DETAIL D
See Detail A
Initial anchor
See Detail B
Check slot
See Detail C
Shingle splice
See Detail D
Anchor trench a V-ditch.
Trapezoidal ditch shown. Similar details for
Roll ends may be spliced in a check slot.
manufacturer's recommendations.
Provide check slots according to the recommendations.
Install staples according to the manufacturer's all ditches.
Type 3.B on all slopes 1:3 and steeper and in
Use Rolled Erosion Control Product (RECP)
See Note 1
Staple Spacing
Compacted native soil
IN CHANNEL
CONTROL PRODUCT
ROLLED EROSION
1 Amendment A001: Revised item 62901-0000 to 62901-1000
629-BREVISED 12/18/2024
D E
S
IG
N S
U B
M
IT
T A
L
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:2
J u n e
D e f a p w w o r k d ir
\j a c o b s u s v a p w
\d m s \R
R T
B
O R
G
E N
.d g n
PROJECT
NUMBER
SHEET
CIVIL
Exp:
EERNI - G SN TAE TL EA
ON
FOI S N
S E
E VF A
DO
AR
P
JULIE
TRUMPOLDT
N 4o 1. 5030
06/30/2026
| B14_001_stamped.pdf |
| B Sheets |
| B01_SumRRT-01 |
| T21_001_stamped.pdf |
| T Sheets |
| T629-02_629-50RRT |
| T629-02_629-51RRT |
File details come from the government source that posted it. Updated .