CO_FLAP_CHA_CR300(1) Plans - Signed.pdf
PDF 43 MB Posted
- Solicitation number
- 6982AF24B000008
About this file
This document appears to be construction plans for the CO FLAP CHA CR300(1) Browns Canyon NM Access Road project. The scope of this project is to widen 0.10 miles of the existing roadway to a consistent 22-foot-wide gravel surface and provide geometry and sight distance improvements along the project corridor. The solicitation number is 6982AF24B000008 and the contracting agency is the Department of Transportation Federal Highway Administration. The document contains detailed construction plans and specifications for the roadway improvements.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D E P
A R T
M
E
NT
OF TRANSPO
R T
A T I O
N
U N
IT
E
D STATES OF
AME
R I C
A
PLANS FOR PROPOSED
PROJECT MANAGER
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DENVER, COLORADO
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
BROWNS CANYON NM ACCESS ROAD
CO FLAP CHA CR300(1)
NC
20 mph
15%
50%
<200 e(max) ---------------
V --------------------
T --------------------
D --------------------
DHV ------------------
ADT (2043) -----------
ADT (2023) -----------
DESIGN DESIGNATIONS:
and aggregate surface
Road reconstruction, grading, TYPE OF CONSTRUCTION:
APPROVED:
DATE:
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
LENGTH 0.10 miles
CHAFFEE COUNTY
BROWNS CANYON NATIONAL MONUMENT
Slopes are expressed as RISE:RUN
U.S. CUSTOMARY DIMENSIONS:
Know what'sbelow.
before you dig.Call
R www.call811.com
AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14"
"STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS
SPECIFICATIONS:
LEAD DESIGNER CHAFFEE COUNTY
CHAIR OF BOARD OF COMMISSIONERS
Browns Canyon Road
CO FLAP CHA CR300(1)
APPROVED:
DATE:
UNITED STATES FOREST SERVICE
CIMARRON AND COMANCHE NATIONAL GRASSLANDS
DISTRICT RANGER, PIKE-SAN ISABEL NATIONAL FOREST &
T. EGGERS M. STEINER
200010000
Scale in Feet
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Greeley
Sterling
Limon
Pueblo
Walsenburg
Cortez Durango
DENVER
COLORADO
SPRINGS
Steamboat
Springs
GRAND
WYOMING NEBRASKA
OKLAHOMA
NEW MEXICO
UTAH KANSAS
Trinidad
KEY MAP OF COLORADO
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
INTERSTATE
JUNCTION
Gunnison Montrose
APPROVED:
DATE:
BUREAU OF LAND MANAGEMENT
FIELD MANAGER, ROYAL GORGE FIELD OFFICE
APPROVED:
DATE:
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
CHIEF OF ENGINEERING
ESTIMATE DATED APRIL 20, 2023
SEE APPROVAL LETTER OF PLANS, SPECIFICATIONS, AND
ESTIMATE DATED AUGUST 15, 2023
SEE APPROVAL LETTER OF PLANS, SPECIFICATIONS, AND
ESTIMATE DATED APRIL 6, 2023
SEE APPROVAL LETTER OF PLANS, SPECIFICATIONS, AND
Browns Canyon Access Road
CO FLAP CHA CR300(1)
Begin Sta. 16+40
Browns Canyon Access Road
CO FLAP CR300(1)
End Sta. 21+46.66
:2
P
M
F e b r u a r y
C
R
T tl
S h e e t]
N
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\ tt l_
U S
.d g n
STATE PROJECT
NUMBER
SHEET
CO
CO FLAP CHA CR300(1)
A1
BROWNS CANYON ROAD
jointjt.J westWWinteriorint.
vertical point of intersectionVPIincrementincr.
vehicles per hourvphinclusive, includingincl.
verticalvert.inside diameterIDI design speedVVhighwayhwy.
typicaltyp.high waterHW Material Source point of tangent to spiralTShorizontalhoriz.
transversetransv.hexagonhex.
Boring Location (Existing, Proposed) temporary construction easementTCEhomestead entry surveyHES temporary bench markTBMheadwallhdwl.H GEOLOGIC SYMBOLS tangenttan.girdergdr.
townshipT.galvanizedgalv.
tangent lengthTTgage (gauge)ga.G Cattleguard (Existing, Proposed) symmetricalsym.footingftg.
structuralstruc.finishfin.
Fence w/ Gate (Existing, Proposed) straightstr.flared end sectionFES stiffenerstiff.federalFed.
Fence (Existing, Proposed) standardstd.fill facef.f.F stationsta.exteriorext. FENCE & CATTLEGUARD SYMBOLS point of spiral to tangentSTexpansion jointexp. jt.
streetst.excavationexc.
specificationspec.edge of waterEW Fiber Roll (Slope Protection) spacing, Spaces or Spacedspa.and wifeet ux shouldershldr.and otherset al Temporary Inlet Protection sectionsec.edge of roadER point of spiral to curveSCequationEQ or eq.
Silt Fence seasonal average daily trafficSADTedge of pavementEOP southSSEngineer(s)engr(s).
Fiber Roll (Ditch and/or Cut Slope) routerte.embankmentemb.
rightRt. or RTelevationelev.
Riprap reference hubRHelevation with numberEl. 94.066 retaining wallret. wallsuperelevation ratee Rolled Erosion Control Product
ReservationRes.eastEE reservoirres.drawing(s)dwg(s).
Diversion Berm requiredreqd.donation land claimDLC reinforcementreinf.districtDist.
Check Dam reconstructionreconst.distancedist.
roadwayrdwy.diaphragmdiaph.
Bonded Fiber Matrix Mulching roadrd.diagonaldiag.
right-of-wayR/Wdiameterdia. or D EROSION & SEDIMENT CONTROL SYMBOLS rangeR.drop inletDI radiusRRdesign hour volumeDHV quantitiesquant., QtyQdecrementdecr.D Riprap Apron (Proposed) pavementpvmt.culvertculv.
point of tangentPTcontingent sumCTSM Underdrain (Existing, Proposed) pounds per square inchpsicentersctrs.
projectproj.point of curve to spiralCS With Drop Inlet (Existing, Proposed) point on tangentPOTcreekcr.
point on spiralPOScorrugatedcorr.
With Headwalls (Existing, Proposed) point on curvePOCcontinuouscont.
platepl.construction jointconstr. jt.
With End Sections (Existing, Proposed) point of intersectionPIconstructionconstr.
perforateperf.concreteconc.
Pipe Culvert (Existing, Proposed) point of compound curvePCCcolumncol.
point of curvePCPcountyCo.
Box Culvert (Existing, Proposed) outside diameterODcorrugated metal pipeCMP other faceo.f.clearclr.
Bridge (Existing, Proposed) on centerso.c.Ocenter to centerc-c numberno. or #concrete box culvertCBCC negativeneg.bearingbrg.
normal crownNCbridgebr.
Spring northNNbalance pointBP mountain(s)mtn(s).bench markBM River monumentmon.backBK minimummin.beginning, beginbeg.
Wetland maximummax.both facesb.f.B materialmatl.asphaltasph.
Large Creek maintenancemaint.approachappr.
magneticmag.Malternatealt.
Lake, Pond or Reservoir low waterLWaheadAH leftLt. or LTaggregateaggr.
Drainage or Small Creek lump sumLPSMaverage daily trafficADT longitudinallong.abutmentabut.A Flow Arrow latitudelat.diameter� laminationlam.curve delta� Ditch (Existing, Proposed) length of curveLLcenterline
DRAINAGE SYMBOLSABBREVIATIONS
SPRING
DI
:5
A
A u g u s t
S h e e t
N C
O \c r3 (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
CO
A2
CP
36 31
36 31
0.00EL.
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone Section Corner (Found)16
Sanitary Sewer Section Corner (Found, Projected)4
Power Section Corner (Found, Projected)
Oil Right-of-Way Line (Proposed)
Gas Right-of-Way Line (Existing)
Fiber Optic Property Line
CATV
Parcel Number
Underground Utility (Existing, Proposed) Monument (As described)
Telephone Pedestal (Existing, Proposed) Temporary (Proposed)
Telephone Booth (Existing, Proposed) Permanent (Proposed)
Street Light (Existing, Proposed) Permanent (Existing)
Support Pole Anchor (Existing, Proposed) Easements
Support Pole (Existing, Proposed) National Wildlife Refuge
Surface (Existing, Proposed) National Park
Underground (Existing, Proposed) National Forest
Irrigation Ditch Bureau of Land Management
Bureau of Indian Affairs UTILITY SYMBOLS 1/16 Section
Post Mounted (Existing, Proposed) 1/4 Section
Portable (Proposed) Section
Delineator (Existing, Proposed) Township or Range Line
Commercial (Existing, Proposed) City
Signs County
State SIGN SYMBOLS National
Roadway Obliteration Boundaries
Roadway Centerline (With Station ticks)
Proposed
RIGHT-OF-WAY SYMBOLS
ExistingSurvey Control Point
Edge of Roadway Trail
Toe of FillSpot Elevation
Transition Double Track
Top of Cut Single Track
Slope Stake Limits Railroad
Clearing/Construction LimitsNorth Arrow
Coordinate Grid Tick ROADWAY SYMBOLS
Building (Existing, Proposed)
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
MAPPING SYMBOLS
Guardwall (Existing, Proposed)Treeline
Guardrail (Existing, Proposed) Tree
PROJECT SPECIFIC SYMBOLSGUARDRAIL, BARRIER & WALL SYMBOLSLANDSCAPING & VEGETATION SYMBOLS
:5
A u g u s t
S h e e t
N C
O \c r3 (1
R o a d w a y \C
A D
D S h e e ts
\A -G e n s h t\ s y m
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
Sheet 2 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
STATE PROJECT
NUMBER
SHEET
CO
A3
REVISIONS (OR CHANGE NOTICES)
DESCRIPTION
NO.
DATE INIT.
SURVEY CONTROL
STATE PROJECT
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
:2
S e p te m b e r
U n ti tl e d
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\A G e n s h t\ C
O
C o n tr o l_ s h e e t.
d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
A4
Scale in Feet
500' 1000'
Sta 16+40
CO FLAP CHA CR300(1)
Begin Project
Sta 21+46.66
CO FLAP CHA CR300(1)
End Project
Nathrop
BIL Sign
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
SITE MAP20 miles to Salida
Buena Vista
5 miles to
CR 301
CR 300 &
1 mile to
US HWY 285
9 miles to CR 307 &
C R
C R
C R
C R
U S H
W Y
U S H
W Y 285
:1 e b r u a r y
U n ti tl e d
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
C O
S it e M a p .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
A5
Typical 12 ft
B=5'F=5'
Station to Station
LENGTH OF PROJECT
16+40 to 21+46.66
TOTAL (mi)
TOTALS (ft)
(ft)
Roadway
0.10
Hinge point
Hinge point
1:4
3%
Cut slope
(variable) 3%
NO SCALE
NOTE:
(variable)
Fill slope
1.
3.
2.
2.
16+40 to 21+46.66
PROPOSED TYPICAL SECTION
16+40 to 21+46.66
EXISTING TYPICAL SECTION
Existing ground
1:4
5' reduce the B and F dimensions to the actual cut height.
Round all earth slopes and all rippable rock slopes. For cut heights less than B, See the cross sections for cut and fill slope ratios.
slope ratios may be adjusted by the CO to assure adequate drainage and stability.
The gradient and width of roadway ditches and the excavation and embankment
3.
2.
1.
limit
Slope stake
Existing 6" aggregate base cut slope
Rounded ditch
Method 2, Surface Course 6" Roadway Aggregate, limit stake
Slope
Cut slope
16+40 to 17+80
PLACED RIPRAP
13'
Subgrade
13'
Subgrade
3' Clear Zone
10'
Traveled way
10'
Traveled way
2'
Seeding limits
Construction limits
Clearing limits
1'
Shdr.
3'-12' Clear Zone
.5 ty p
1:4
Place class 2 riprap
Proposed Roadway
TYPICAL SECTIONS
TYPICAL SECTION
Profile Grade
Class 1, Type C, non-woven
Place geotextile fabric, 1' sldr.
from 12 ft to 22 ft Existing width varies
19+40 - 21+47: 5' 16+33 - 19+40: Varies from 0' to 5'
Graded
Varies
2'
:3 e b r u a r y
T y p ic a l
S h e e t
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\A G e n s h t\
R ty p .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
A6
Sheet and Description
B3 B3 B4 B4 B4 B4 B4 B4 B4
Grading Summary
Clearing and Grubbing Summary
Survey and Staking
Summary
Surfacing Summary
Fencing Summary
Drainage Summary
Permanent Sign Summary
Delineator Summary
Seeding and Mulch
Summary
ALLOWANCE
Bid Schedule
A1000 15101-0000 MOBILIZATION LPSM ALL
A1020 15206-0000 SLOPE, REFERENCE, AND
CLEARING AND GRUBBING STAKE MILE 0.096 0.096
A1040 15216-2000 SURVEY AND STAKING, GRADE
FINISHING STAKES MILE 0.192 0.192
A1060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A1080 15401-0000 CONTRACTOR TESTING LPSM ALL
A1100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A1120 15701-0000 SOIL EROSION CONTROL LPSM ALL
A1140 15720-0000 STORM WATER POLLUTION
PREVENTION PLAN LPSM ALL
A1160 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A1180 20103-0000 CLEARING AND GRUBBING SQYD 3,667 133 3,800
A1200 20301-0700 REMOVAL OF DELINEATOR EACH 2 2
A1220 20301-2400 REMOVAL OF SIGN EACH 3 3
A1240 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS LPSM ALL
A1260 20401-0000 ROADWAY EXCAVATION CUYD 5,320 430 5,750
A1280 20402-0000 SUBEXCAVATION CUYD 200 As directed by CO
A1300 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 CUYD 62 18 80
A1320 26001-0000 ROCK BOLT LNFT 50 As directed by CO
A1340 26002-0000 ROCK DOWEL LNFT 50 As directed by CO
A1360 30202-2100 ROADWAY AGGREGATE, METHOD 2,
SURFACE COURSE TON 423 27 450
A1380 62201-0200 DUMP TRUCK, 8 CUBIC YARD
MINIMUM CAPACITY HOUR 40
A1400 62201-0350 BACKHOE HOUR 40
A1420 62201-1000 WHEEL LOADER, 4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40
A1440 62201-3000 HYDRAULIC EXCAVATOR HOUR 40
A1460 62301-0000 GENERAL LABOR HOUR 80
A1480 62302-1000 SPECIAL LABOR, HIRED
TECHNICAL SERVICES HOUR 20
A1500 62302-1100 SPECIAL LABOR, HIRED SURVEY
SERVICES HOUR 20
A1520 62511-2000 SEEDING, HYDRAULIC METHOD SQYD 219 81 300
A1540 62516-3000 MULCHING, HYDRAULIC METHOD,
BONDED FIBER MATRIX SQYD 219 81 300
A1560 63301-0000 SIGN SYSTEM EACH 6 6
MileStone: 100% Estimate Date Completed: 02/20/24 Report Date: 02/20/24
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -F eb -2
:2 A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
N
C O
\c r3
(1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
C R (1
S O
Q
.x ls m ]S h ee t
STATE PROJECT
B1
CO FLAP CHA CR300(1)
Browns Canyon RoadCO
SHEET
NUMBER
Sheet and Description
B3 B3 B4 B4 B4 B4 B4 B4 B4
Grading Summary
Clearing and Grubbing Summary
Survey and Staking
Summary
Surfacing Summary
Fencing Summary
Drainage Summary
Permanent Sign Summary
Delineator Summary
Seeding and Mulch
Summary
ALLOWANCE
Bid Schedule
A1580 63309-0000 DELINEATOR EACH 12 2 14
A1600 63501-0000 TEMPORARY TRAFFIC CONTROL
(RIVER MONITOR) LPSM ALL
A1620 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A1640 63701-0000 FIELD OFFICE EACH 1
-F eb -2
:2 A
M
MileStone: 100% Estimate Date Completed: 02/20/24 Report Date: 02/20/24
N
C O
\c r3
(1
R o a d w a y\
C A D
D S h ee ts \B
-S u m m
C R (1
S O
Q
.x ls m ]S h ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B2
CO FLAP CHA CR300(1)
Browns Canyon Road
CO
SUMMARIES
EARTHWORK 4
:0 e b r u a r y
E a r th w o r k S u m m a r ie s
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\B S u m m \C
R
Q u a n ti ti e s .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
B3
MISC SUMMARIES
:1
J a n u a r y
M is c S u m m a r y
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\B S u m m \C
R
Q u a n ti ti e s .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
B4
T-P
OST
AC
T P
OST
EM
JH
NAIL
JH
RES
ECT
JH
RES
ECT
JH
NAIL
AC
JH
NAIL
S62°33'32"E
N84 °5
2'4 1"
E
S66°36'59"E
N83 °0
1'
"E S53°56'00"E
.5
C
.6
T
.0
.5
.7
.4
.3
.2
.0
P
O B
.7
P O
0 1
100'50'0
Scale in Feet at clearing limits
Place temporary fencing
Existing gate
Do not disturb
22ft roadway width
Roadway width to
Transition from 15.5ft
Sta. 17+10 - 18+10
16.5 ft roadway width
Roadway width to existing
Transition from 22ft
Sta. 20+46.66 - 21+46.66 roadside ditch
Place class 2 riprap along
Sta. 16+40 - 17+80
2836229.85E:
1336057.68N:
16+40.00Sta.
Begin Project
2836713.15E:
1335945.32N:
Sta. 21+46.66
End Project
Boundary
Conservation Easement
Boundary
Conservation Easement
Existing Ground
Proposed Grade barbed wire fence
Do not disturb existing
Remove traffic signal
Remove traffic signal
'74.63L =
'38.10T =
'150.00R =
(RT)28°30'20"Δ =
18+47.89PI
'93.91L = '49.30T = '125.00R =
(RT)43°02'43"Δ =
21+16.63PI
'71.04L = '36.51T = '125.00R =
(LT)32°33'47"Δ =
17+38.06PI
'79.49L = '40.70T = '150.00R =
(LT)30°21'45"Δ =
20+16.74PI
17+00 18+00 19+00 20+00 21+00
7,620
7,630
7,640
7,650
17+00 18+00 19+00 20+00 21+00
7,620 7,620
7,630 7,630
7,640 7,640
7,650 7,650
Place temporary plastic fencing, RtPlace class 2 riprap, Lt
.6
,6
.8
-9.091%
-7.942% +3.904
.4
V P
I
.2
V P
I
' VC200
15.39K =
'182.35SSD = ' VC100
8K =
STA. 16+40 to 21+46.66
BROWNS CANYON ACCESS ROAD
:1 e b ru a ry
B
L
P la n
-1 S h e
C
O \c r3 (1
R o a d w a y \C
A D
D S h e e ts
\C -M
L P
P
\C R
(1
P N
P
S h o rt e n e d
.d g n
STATE PROJECT
NUMBER
SHEET
CO
C1
0 1
100'50'0
Scale in Feet
NOTE:
See cross sections for excavation sections.
considerations, and Appendix C for site photos.
3 describes existing site conditions, Section 4 provides recommendations and construction
September 2022 for more information regarding excavation characteristics. Section
Road 300), Chaffee County, CO, CO FLAP CR300(1), FINAL Geotechnical Report" dated
See the project geotechnical report "Brown's Canyon National Monument Access Road (County
Image locations are approximate.
3.
2.
1.
1. 2.
6.
4. 5.
1.
3.
3. 4. 5. 6.
2.
:1
F e b r u a r y
B
R O
W N
S C
A N
Y O
N A
C C
E S
S R
O A
D
R
O C
K E
X C
A V
A T
IO
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\D M in o r
P
P \C
R
B la s ti n g s h e e t.
d g n
ROCK EXCAVATION
BROWNS CANYON ACCESS ROAD
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
D1 structural section
See typical sections for
Finished grade according to Section 204
Backfill with material
See note 7
Geotextile filter structural section
See typical sections for
Finished grade according to Section 204
Backfill with material
NOTE:
1. Replace unsuitable material according to Subsection 204.07 unless otherwise specified.
2. Minimum subexcavation dimensions are 6 ft wide x 6 ft long.
3. Do not place backfill material within the structural section.
4. Widen top of subexcavation area to allow for bench width in bottom layers. Provide a 1 ft min. bench width for every 2 ft of subexcavation depth.
5. Daylight to drain when the excavation is within 4 ft of the subgrade hinge point. Slope the excavation bottom 2% toward the daylight for drainage, or match the existing roadway cross slope when steeper than
2%.
6. At daylight locations, match the existing fill slope or make slope adjustments to match the subgrade hinge point. Do not construct slopes steeper than 1V:2H unless approved by the CO.
7. Furnish geotextile filter type conforming to subsection 714.01(a). See summary tables for class and type.
NO SCALE
SUBEXCAVATION
TYPICAL SECTION
BENCH DETAIL
See bench detail than 2 ft Bench if greater Varies (2 ft typ.)
Width of need
Total subexcavation width
1'
2 ft max.
See note 4 min.
SUBEXCAVATION
C204-51
:2
S e p te m b e r
C
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\F
\C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
12/2012DETAIL APPROVED FOR USE
10/2020 08/2020 08/2014REVISED:
STATE PROJECT
NUMBER
SHEET
CO
F1
NOTES:
No Scale
6" m in.
A'
A
Centralizer grout (as required)
Flowable non-shrink grout (as required)
Flowable non-shrink
Existing rock cut face
Washer (beveled)
Hex nut
Bond length grout tube
Keyhole bearing plate
15° to 30°
BOND LENGTH
SECTION A-A'
Epoxy
No. 8 Bar
Block requiring stabilization
TYPICAL SHEAR PIN DETAIL
3" m in.
DOWEL DETAIL
TYPICAL ROCK
Bon d Le ngt h, L = 6
3" min.
No. 8 Bar
12"
6"
6"
6"
1/4"
1.25" Ø typ.
A-36 Galvanized Steel
Non-shrink grout field conditions.
Shear pins to be installed at location directed by the CO based on 8.
The design load is 5 kips per anchor.7.
during construction.
may be required as directed by the CO based on conditions observed
Rock Dowels designed to provide confinement. Additional Rock Dowels 6.
The design assumes the bond zone of the Rock Dowel will be in hard rock.5.
Rock Dowels shall be fully grouted.4.
field based on the quantities and general locations provided in the Plans.
The CO will mark locations and orientations of the Rock Dowels in the3.
CO to verify quantities prior to ordering.2.
be galvanized.
and hex nut (ASTM A-29). All hardware and bars that are exposed shall be epoxy coated with bearing plate, beveled washers (ASTM A-536), Rock Dowels shall consist of 1" reinforcing bar. Reinforcing bars shall 1.
TYPICAL BEARING PLATE DETAIL
Epoxy
No. 8 Bar
6"
Block requiring stabilization
45° typ.OR
Sheet 1 of 2
ROCK REINFORCEMENT DETAIL
260-A
:3
A u g u s t
A
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\G \2
R o c k R e in f o r c e m e n t
D e ta il .d g n
DETAIL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
G1
NOTES:
No Scale
STATE PROJECT
NUMBER
SHEET
260-A
ROCK REINFORCEMENT DETAIL
BOND LENGTH
SECTION A-A'
Grout
3" min.
No. 8 Bar
TYPICAL BEARING PLATE DETAIL
6"
6"
1/4"
1.25" Ø typ.
A-36 Galvanized Steel
DONNER PASS
CA FLAP 40(1)
CA
6" min.
A'
A grout (as required)
Flowable non-shrink
Existing rock cut face
Washer (beveled)
Hex nut
Bond length grout tube
Keyhole bearing plate
Bond Length, L = 6' grout (as required)
Flowable non-shrinkCentralizer
(MECHANICAL ANCHOR) DETAIL
TYPICAL ROCK BOLT
Cone System
Expansion Shell and
Varies
", or 2" 3", 1 8
The design load is 5 kips per anchor.7.
observed during construction.
may be required as directed by the CO based on conditions
Rock Bolt designed to provide confinement. Additional Rock Bolts6.
rock.
The design assumes the bond zone of the Rock Bolt will be in hard5.
Rock Bolts shall be fully grouted following tension and lock off.4.
Plans.
field based on the quantities and general locations provided in the
The CO will mark locations and orientations of the Rock Bolts in the3.
CO to verify quantities of Rock Bolts prior to ordering.2.
shall be galvanized.
conforming to ASTM F432. All hardware and bars that are exposed epoxy coated with bearing plate, beveled washers and hex nut to a mechanical, steel expansion shell. Reinforcing bars shall be
Rock Bolts shall consist of 1" hollow core bar (ASTM 615) connected 1.
Sheet 2 of 21 :4
J u n e
A
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\G \2
R o c k R e in f o r c e m e n t
D e ta il .d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
G2
T-P
OST
T P
OST
A N
G L E
R A
L E
R T
N O S
T O
P N
O S
T A
N D
STOP HERE
EM
O N
E L
A N
E
M
P H
N O S
T O
P N
O S
T A
N D
No Parking
R8-3a
Remove and replace
Sta. 17+73
Remove delineator
Sta. 18+02
25ft spacing
Place delineators, Rt.
Sta. 18+60-21+40
Advisory Speed (20 mph)
Winding Road
W1-5 and W13-1P
Remove and replace
Sta. 21+40
Stop
R1-1
Remove and replace
Sta. 21+45
Remove existing sign
Sta. 18+78
100'50'0
Scale in Feet
Advisory Speed (20 mph)
Winding Road
W1-5 and W13-1P
Place Sign System
Sta. 16+80
Speed Limit (25 mph)
R2-1
Place Sign System
Sta. 21+50
Speed Limit (25 mph)
R2-1
Place Sign System
Sta. 17+80
:4 e b r u a r y
B
L
P la n
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\V
\C R
S ig n in g P la n
.d g n
SIGNING PLAN
STATE PROJECT
NUMBER
SHEET
CO
T1
Scale in Feet
500' 1000'
Sta 16+40
CO FLAP CHA CR300(1)
Begin Project
Sta 21+46.66
CO FLAP CHA CR300(1)
End Project
Nathrop
2 MILES
ROAD WORK
W20-1 Sign with Road Closed Signs
3 each, Barricade Type 3
Message Sign
Portable Changeable with Road Closed Signs
3 each, Barricade Type 3
© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS
ROAD CLOSURE PLAN
20 miles to Salida
Buena Vista
5 miles to
US HWY 285
CR 301 &
1 mile to
US HWY 285
9 miles to CR 307 &
C R
C R
C R
C R
U S H
W Y
U S H
W Y 285
CR 300
:3
F e b r u a r y
U n ti tl e d
S h e
C O
\c r \R o a d w a y \C
A D
D S h e e ts
\V \C
O C lo s u r e M a p .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
T2
C633-51
DELINEATORS
NO SCALE
(Accel/Decel Lanes)
Double delineator
(Object marker)
Triple delineator
(Normal application)
Single delineator
(R)
OF CURVE
RADIUS
1st Space (2 S)
SPACING ON TANGENTS AT CURVE ENDS
(S)
ON CURVE
SPACING
2nd Space (3 S) 3rd Space (6 S)
E d g e o f P a v e m e n t
ATTACHMENT DETAIL
(for rigid metal posts)
POST DETAILS
(TYPE 1 - acrylic plastic lens)
DELINEATOR (RIGID)
PLAN VIEW
NOTE:
Typical rigid post
Typical reflective lens
LOCATION OF DELINEATOR
DELINEATOR SPACING
DELINEATOR SPACING ON CURVES
DELINEATOR SPACING NOTES
2.
1.
SHEETING DETAIL
RETROREFLECTIVE
(both sides of post) material.
strip of retroreflective may be a single or triple delineators
Single, double, Delineator
Use aluminum bolts
Values are rounded to the nearest
S = 3 R- , where S = delineator spacing and R = horizontal curve radius
Values shown for S in the table are computed from the formula
Spacing for specific radii may be interpolated from the table.
9.
8.
7.
6.
5.
4.
3.
2.
1.
(feet)(feet)(feet)(feet)(feet)
2S
Space
1st
3S
Space
2nd
8' (max.)
2' (min.)
6' desired
5 feet.
Tangent
Spacing on
200' - 530'
1,000
6S
Space
3rd
S e e N o te s p a c e d a t c c d ia h o le s reflector by pulling into post cavity length required to prevent breaking
" inside dia. aluminum ferrule x8
See Subsection 718.05 for rigid post requirements.
as required.
Furnish anti-theft hardware for mounting retroreflectors all rigid posts. See Subsection 718.04.
delineator immediately behind the guardrail.
the edge of pavement and the delineator offset, locate the pavement. Where guardrail intrudes into the space between
Place delineators at a constant distance from the edge of the according to the manufacturer's recommendations.
CO. Provide delineators conforming to the MUTCD and install
Alternate delineator types may be used with approval of the recommendations.
Install reflective elements according to the manufacturer's and deceleration lanes or to mark changes in width.
to mark obstructions.
Use yellow reflective elements for triple delineators installed
Use white reflective elements.
Install double delineators on 100-foot spacing for acceleration
A minimum of 12 holes spaced on 1" centers are required for
S
S
V a r ie s
3" min.
3" min.
m in
:3 e b r u a r y
C
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\V
\C
.d g n
DETAIL
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD DETAIL
03/2011DETAIL APPROVED FOR USE
08/2021 08/2014REVISED:
STATE PROJECT
NUMBER
SHEET
CO
T3
633-ANO SCALE
DETAILS
SIGN POST
V3
Adapted from CDOT Standard S-614-8.
NOTES:
on two posts to prevent turning.
All sign panels greater than 60 inches in width must be mounted a minimum of 2 inches to the edge of the backing zee.
inches. When backing zees are used, posts shall be installed with
Distance from post to edge of sign panel(s) shall be 0 to 4 posts shall be 2 feet and the maximum distance shall be 8 feet.
For signs mounted on two posts, the minimum distance between signs are mounted on steeper fill or cut slopes.
panel are 7, 8, or 9 feet. Other heights may be required when
Typical post mounting heights from ground to bottom of sign
3.
2.
1.
POST SPECIFICATIONS
** Color powder coating may be added according to manufacturer specifications for special locations when shown on the plans.
T AND U BRACKET ATTACHMENT
dia. hole
#5 rebar in 1"
8 to 10"- #4 or
Ground stub
601 Concrete casting
Slipbase
T BRACKET
U BRACKET
of the edge of the panel extend to 2" to 3" short
T and U brackets shall
Sign Mounting Clamp as applicable
U sign support, Use Zee, T, or
(WITH SLIPBASE)
TUBULAR STEEL POST
washer required.
flat and one lock to ASTM A-454. One
ASTM A-325 galv.
1/2" x 3-1/2" hex bolt or Z-bar
Sign panel bolt
3/8"
Washer
Washer
Lock
Post
Steel Sign
Nut
Bolt
Square
TYPICAL SINGLE BRACKET
TYPICAL BACK TO BACK
Lock Washer or Z-bar
Sign Panel
Washer bolt
3/8" or Z-bar
Sign Panel
Nut Bolt
Square bolt sign post
Steel
18 Thread
5/16"
1-15/32" R
U-BOLT
spring lockwashers.
American standard regular semi-finished hex nuts and procedure. 1/4" or 5/18" diameter stock is permissible.
U-Bolt to made in accordance with standard manufacturing
Install posts according to manufacturer's instructions.
U-brackets may be used for multiple sign installations.
without zees.
than 48 in. in width may attach directly to T or U brackets zee requirements. When directed by the CO, sign panels less require a T or U sign support bracket in addition to the backing
Signs between 37 in. and 60 in. width with one post installation
7.
6.
5.
4.
Y
Y
X X
3/16" R 1/32" R
The bolt head must not turn in the slot.
aluminum self-locking hex head nut.
a medium washer, and galv steel or
The bolt shall be 1/4" long, with full threads, Slot to hold head of 3/8" hex head bolt.
SECTION X-X
Rib
R 1-7/16"
R 1-1/2"
SECTION Y-Y
CO
BROWNS CANYON ROAD
CO FLAP CHA CR300(1)
Sign Width
S ig n H e ig h t
M o u n ti n g H e ig h t m a x
12" dia.
3-1/4"
/1
"1
4-1/4"
3-1/4"
/3
3/8"
3/4"
3/8"
4-1/4"
3-1/4"
2"
/4
/4
1"
/2
9/16"
3/8"
:1
A u g u s t
U
S
S u r_ ft
D
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\V
\S P
B
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
DETAIL APPROVED FOR USE
REVISED:
STATE PROJECT
NUMBER
SHEET
CO
T4
G20-2
G20-2
G20-2
See Note 11
G20-1
See Note 11
G20-1
M in o r R o a d
M a jo r R o a d
See Note 10
W20-1
See Note 10
W20-1
See Note 9
W16-8P
W20-1 over
See Note 9
W16-8P
W20-1 over
W20-1
Ro ad N am e
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
14.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
See Note 10
W20-1
See Note 10
W20-1
G20-2
For work zones that are 2 miles or more in length, install G20-1 signs at signs "B" feet apart according to the Sign Spacing Table.
sign when approach speeds exceed 50 MPH. When used place the two W20-1 the distance to the work area in feet or in miles. Install an additional W20-1
The message on the W20-1 signs may be "ROAD WORK AHEAD" or may specify of the road on which the construction does occur (applies to major roads only).
construction work occurs, include a supplementary plaque indicating the name
If W20-1 is placed on a roadway other than that on which the actual post-mounted signs when not applicable.
Do not store traffic control devices along the roadway when not in use. Cover
Maintain two-way traffic during all non-work hours except as approved by the CO.
NCHRP-350 or MASH for crashworthiness.
Ensure all sign supports exposed to impact by traffic meet the requirements of indicate a maximum recommended speed through the construction area.
Install advisory speed plates under the W20 series warning signs as needed to construction conditions.
Additional or different message signs may be required to fit the actual messages as required.
locate the warning signs as determined by the CO for best results. Vary
Where advance warning signs, placed as shown, interfere with permanent signs, traffic control plan as necessary to accommodate actual operations.
to this project. The Contractor may add or delete information and details in this
Not all details shown on the temporary traffic control sheets may be applicable
Erect all project advance warning signs before starting construction work.
retroreflective sheeting types.
Refer to the Section 635 of the Special Contract Requirements for allowable
State standards may be used as an alternative if approved by the CO.
that an encroachment permit has been obtained.
If signing on a roadway under a jurisdiction other than the client agency, verify whole mile.
each end of the project. Show the distance on the G20-1 sign to the nearest
Expressway / Freeway
ROAD NAME
ROAD NAME
ROAD WORK
NEXT xx MILES
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxx
WORK
ROAD
xxxxxxx
WORK
ROAD
xxxxxxx
ROAD WORK
NEXT xx MILES
(optional) W13-1P
(optional) W13-1P xx
MPH
xx
MPH
STANDARD APPROVED FOR USE 6/2005
DRAFT: 6/2014
REVISED:
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
NOTE:
ROAD WORK
END
WORK
ROAD
AHEAD
ROAD WORK
END
ROAD WORK
END
ROAD WORK
END
WORK
ROAD
AHEAD
WORK
ROAD
AHEAD
A
B
C
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
B as de ter mi ne d b y t he C
O
Wor k z on e A re a o f I nfl ue nc
Pr oje ct Lim its
A
A
(S ee S ign S pa cin g T ab le)
ADVANCE W
ARNI
NG
AREA
A
A
:4 e b ru a ry
S T
D
-1
C O
\c r3
(1
R o a d w a y \C
A D
D
S h e e ts \V
-6
\S td
-1 .d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
ADVANCE SIGNING
TEMPORARY TRAFFIC CONTROL
635-1
STATE PROJECT
NUMBER
SHEET
CO
T5
Traffic flow
Traffic flow the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the Contractor on the pilot car.
at a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the "PILOT CAR FOLLOW ME" (G20-4) sign conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
Spacing Table)
(See Length and
LENGTH AND SPACING TABLE
SPEED*
APPROACH
6.
5.
4.
3.
2.
1.
Spacing Table)
(See Length and WORK SPACE
See Note 4
G20-2
See Note 4
W20-1 W3-4
(optional)
W16-2P
W20-7
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C posted speed, not the advisory speed.
Approach speed based on the regulatory *
BUFFER SPACE
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
WORK
ROAD
AHEAD
BE
PREPARED
TO STOP
ROAD WORK
END
xxx
FEET
Flagger location
Flagger location
MPH
FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
ROAD CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
DRAFT: 8/2013
REVISED:
STANDARD APPROVED FOR USE 6/2005
635-5
ADVANCE WARNING AREA (See Sign Spacing Table)
TERMINATION AREAVARIABLEBUFFER SPACEABC
(optional)
A
:4 e b r u a r y
S td
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\V
\S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
T6
7.
6.
5.
4.
3.
2.
1.
the buffer space.
Do not allow equipment, materials, or vehicles to be parked or stored in
Requirements, Section 156.
For project specific minimum width, refer to the Special Contract
For night time flagging operation, provide floodlighting at flagger stations.
WORK AHEAD" (W20-1) and "END ROAD WORK" (G20-2) signs.
If closure is completely within the project limits, eliminate the "ROAD name of the contractor on the pilot car.
at a conspicuous location on the rear of vehicle. Prominently display the
For pilot car operation, mount the PILOT CAR FOLLOW ME (G20-4) sign conditions as approved by the CO.
Final location and spacing of signs and devices may be changed to fit field those depicted for the opposite direction of travel.
Signs are shown for one direction of travel only. Place devices similar to
LENGTH AND SPACING TABLE
SPEED*
APPROACH
AREA
TAPER
SPACE
BUFFER
SPACE
WORK
CHANNELIZING DEVICE
not the advisory speed.
Approach speed based on the regulatory posted speed, *
SIGN SPACING TABLE
ROAD TYPE
DISTANCE BETWEEN
A B C
LENGTH
BUFFER SPACE
NOTE:
Expressway / Freeway
See Note 4
G20-2
Spacing Table)
(See Length and
(optional)
WORK SPACE (optional)(optional)
ROAD WORK
END
Channelizing devices Flagger location
Traffic flow
Traffic flow
See Note 4
W20-1 W20-7W20-4
(optional)
W13-1P
(optional)
W16-2P
ONE LANE
ROAD
AHEAD
xx
MPH
xxx
FEET
Flagger location
WORK
ROAD
AHEAD
NO SCALE
MPH
FEET
SPACING IN FEET
Rural greater than 50 MPH
Urban and Rural 35 MPH to 50 MPH
Urban and Rural 30 MPH and less
SIGNS IN FEET
(WITH FLAGGERS)
SINGLE LANE CLOSURE LAYOUT
TEMPORARY TRAFFIC CONTROL
STANDARD APPROVED FOR USE 6/2005
DRAFT: 8/2013
REVISED:
635-6
ATAPER AREABUFFER SPACEVARIABLEBUFFER SPACETAPER AREAABC
(See Length and Spacing Table)ADVANCE WARNING AREA (See Sign Spacing Table) TERMINATION AREA
Device spacing
BUFFER SPACE
:4 e b r u a r y
S
T D
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\V
\S td
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
T7
SINGLE POST SIGN TWO POST SIGN
S e e N o te
S e e N o te
See Note 4 E d g e o f t r a v e le d w a y
E d g e o f p a v e d s h o u ld e r
See post detail (typ.)
Break-away holes.
6" x 6" or larger.
Use 7' minimum spacing between posts for sign posts and 6' minimum mounting height for secondary sign.
use 7' minimum mounting height for main sign a minimum lateral distance of 1' behind the face of lateral offset of 2' may be used. In areas with curbs, " dia. bolts 4
Attach sign panels with a minimum of 2 -
Diamond ≤ 48"
> 30'
> 17'
12' - 16'
> 13'
< 10
65 - 95
65 - 95
50 - 65
50 - 65
20 - 50
10 - 20
10 - 20
6 x 6
4 x 6
4 x 6
6 x 6
4 x 6
4 x 4
6 x 6
4 x 6
4 x 4
(INCH) (INCH)
(INCH)(SQFT)
Other Shapes ≤ 48" Diamond ≤ 36"
Other Shapes ≤ 12' Diamond ≤ 48"
1.5
1.5
1.5
1.5
"X"
WIDTH AREA
OF POSTS
NUMBER POST SIZE D HOLE SIZE
WOOD POST SELECTION TABLE
POST DETAIL
CL Post
Bottom of sign panel
SIGN INSTALLATION ANGLE
Local tangent
WOOD POSTS
SIGN INSTALLATION
TEMPORARY TRAFFIC CONTROL
STANDARD APPROVED FOR USE 6/2005
DRAFT: 10/2017
REVISED: 635-14
7.
6.
5.
4.
3.
2.
1.
by the CO.
State standards may be used as an alternative if approved
In areas where lateral distance is limited, a minimum
D = Post embedment depth for average soil conditions.
Select post lengths to fit field conditions.
H1 and H2 = Overall post length.
per post.
In pedestrian locations, or in areas with obstructed views, the curb may be used.
NOTE:
See table for hole size parallel to sign face.
Field drill holes through post m in m in
6' - 12'
X
H
H
D
H
0.75X
X
D
X
H
Y D
H
0.2X
0.6X 0.2X
Long side of post
D
200'
90°
93°
:4 e b ru a ry
S T
D -1
C
O \c r3 (1
R o a d w a y \C
A D
D S h e e ts
\V -6
\S td -1
.d g n
FLH STANDARD
STANDARD
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
CO
T8
See USDOT Pictograph spaced 0.5-inch apart
Three 0.5-inch stripes
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
See BLM Pictograph and Note 3 5 .2
.5
.2
.5
0.4510.2
0.675
2.25
0.675
0.4510.23.6
0.510.153.6
0.52 sqftArea:
Background - Blue (retroreflective)
Legend - White (retroreflective)Colors:
USDOT PICTOGRAPH
9.7652.489.76
22.52722.5
164016
3.7664.483.76
5.660.85.6
9.76 9.76
.3
.2
E
E
C
C .3
BIL PROJECT FUNDING SOURCE SIGN
24 sqftArea:
Background - Green (retroreflective)
Legend, Border - White (retroreflective)Colors:
2.3" Radius, 1" BorderDimensions:
Ensure all pictographs are vector-based, vinyl-ready.
All incorporated pictographs are subject to approval. 3.
requirements.
Refer to Standard 635-14 for post and sign mounting 2.
Unless otherwise noted, dimensions are inches.1.
NOTES:
1.175
0.5C
0.7
0.5C
0.7
0.5C
1.175
14.25
.3
Background - White (retroreflective)
Legend, Outline - Black (retroreflective)Colors:
BLM PICTOGRAPH
635-A
LAW SIGN
BIPARTISAN INFRASTRUCTURE
:4 e b r u a r y
B
L
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\V
\s p
A
.d g n
SPECIAL
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
CFLHD SPECIAL
STATE PROJECT
NUMBER
SHEET
CO
BROWNS CANYON ROAD
T9
16+33.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
E x is ti n g F e n c e
E x is ti n g F e n c e
E x is ti n g F e n c e
W
R
W
R
W
R
W
R
W
R
W
R
16+50.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,643.99 Des Grade =
1:3.29 1:41 :4-3.0% -3.0% 1:4
7,643.49 Subgrade =
7,643.90 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X1
STATE PROJECT
CO
16+75.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,641.89 Des Grade = E x is ti n g F e n c e
E x is ti n g F e n c e
E x is ti n g F e n c e
W
R
W
R
W
R
W
R
1:2.18 1:41
:4-3.0% -3.0% 1:4
7,641.39 Subgrade =
7,641.64 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X2
17+00.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,639.79 Des Grade =
E x is ti n g F e n c e
E x is ti n g F e n c e
E x is ti n g F e n c e
W
R
W
R
W
R
W
R 1:1.5
1:41 :4-3.0% -3.0%1:4
7,639.29 Subgrade =
7,639.63 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X3
17+25.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,638.14 Des Grade = E x is ti n g F e n c e
E x is ti n g F e n c e
E x is ti n g F e n c e
W
R
W
R
1:1.5
1:41 :4-3.0% -3.0%1:4
7,637.64 Subgrade =
7,638.03 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X4
17+50.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,637.25 Des Grade = E x is ti n g F e n c e
E x is ti n g F e n c e
E x is ti n g F e n c e
W
R
W
R :1
1:41 :4-3.0% -3.0%1:4
7,636.75 Subgrade =
7,637.04 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X5
17+75.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,637.14 Des Grade =
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
W
R
W
R
:1
1:41 :4 -3.0% -3.0% 1:4
7,636.64 Subgrade =
7,637.03 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X6
18+00.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,637.78 Des Grade =
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
W
R
W
R
:1
1:4 1:4 -3.0% -3.0% 1:41:6
7,637.28 Subgrade =
7,637.81 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:3 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X7
18+25.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,638.75 Des Grade =
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
W
R
W
R
.5 :1
1:4 1:4 -3.0% -3.0% 1:41:6
7,638.25 Subgrade =
7,638.83 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X8
18+50.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,639.72 Des Grade =
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
W
R
W
R
:1
1:4 1:4
-3.0%1:4 1:6
7,639.22 Subgrade =
7,640.14 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X9
18+75.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,640.68 Des Grade =
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
W
R
W
R
.5 :1
1:4 1:4
-3.0% 1:41:6
7,640.18 Subgrade =
7,641.38 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0 e b r u a r y
B
L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X10
19+00.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,641.65 Des Grade =
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
E d g e o f W a te r
E d g e o f W a te r
E x is ti n g F e n c e
W
R
W
R
1:4 1:4 -3.0% -3.0% 1:4
7,641.15 Subgrade =
7,642.37 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X11
19+25.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,642.62 Des Grade =
W
R
W
R
1:4 1:4 -3.0% -3.0% 1:41:6
7,642.12 Subgrade =
7,643.18 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X12
19+50.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,643.59 Des Grade =
E d g e o f W a te r E d g e o f W a te r E d g e o f W a te r
W
R
W
R
1:4 1:4 -3.0% -3.0% 1:41:6
7,643.09 Subgrade =
7,644.13 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X13
19+75.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,760 7,760
7,644.32 Des Grade =
E d g e o f W a te r E d g e o f W a te r E d g e o f W a te r
W
R
W
R
1:4 1:4 -3.0% -3.0% 1:41:6
7,643.82 Subgrade =
7,644.57 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X14
20+00.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,760 7,760
7,644.59 Des Grade =
E d g e o f W a te r E d g e o f W a te r E d g e o f W a te r
W
R
W
R
1:4 1:4 -3.0% -3.0% 1:41:6
7,644.09 Subgrade =
7,649.23 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X15 d g e o f W a te r
W
R
20+25.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,760 7,760
7,644.35 Des Grade =
.7
:1
1:4 1:4 -3.0% -3.0% 1:41:6
7,643.85 Subgrade =
7,646.90 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X16
20+50.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,760 7,760
7,643.69 Des Grade =
E d g e o f W a te r E d g e o f W a te r E d g e o f W a te r
W
R
W
R
1:4 1:4 -3.0% 1:41:5.98
7,643.19 Subgrade =
7,644.83 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X17
20+75.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,690 7,690
7,700 7,700
7,710 7,710
7,720 7,720
7,730 7,730
7,740 7,740
7,750 7,750
7,642.53 Des Grade =
E d g e o f W a te r E d g e o f W a te r E d g e o f W a te r
W
R
W
R
.8
:1
1:4 1:4
-3.0% 1:4
7,642.03 Subgrade =
7,643.79 Original Grnd =
BROWNS CANYON ROAD
X-SECTIONS
Central Federal Lands Highway Division
FHWA, Office of Federal Lands Highway
:0
O c to b e r
B L
.0
S h e
C O
\c r
\R o a d w a y
\C A
D D
S h e e ts
\X M
L
X s e c \C
R
X S e c ti o n s
S h o r te n e d
.d g n
BROWNS CANYON ROAD
X18
21+00.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,660 7,660
7,670 7,670
7,680 7,680
7,640.89 Des Grade =
E d g e o f W a te r E d g e o f W a te r E d g e o f W a te r
W
R
W
R
:1
1:4 1:4-3.
0% -3.0% 1:41:6
7,640.39 Subgrade =
7,640.34 Original Grnd =
21+25.00
-150 -140 -130 -120 -110 -100 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150
7,630 7,630
7,640 7,640
7,650 7,650
7,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .