QnA 8.21.2023.pdf
PDF 88 KB Posted
- Attached to
- Full Service Architect - Engineer (A-E) Design IDIQ Federal contract opportunity
- Solicitation number
- 6982AF23R000003
About this file
This document contains questions and answers from a pre-solicitation conference for solicitation number 6982AF23R000003, a full-service Architect-Engineer Design indefinite-delivery/indefinite-quantity (IDIQ) multiple award contract opportunity with the Department of Transportation Federal Highway Administration. Key details include: the Part II forms are excluded from the 50-page response limit; firms have discretion in including resumes and structuring their responses within the 50-page limit; and both key and non-key personnel can be listed on the organizational chart, distinguished as such. The solicitation seeks qualified firms for full design services on an indefinite-delivery/indefinite-quantity basis, with no defined minimum or maximum ordering limitations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QnA 9.8.2023.pdf | ||
| 6982AF23R000003 Amendment A002 8.25.2023.pdf | ||
| 6982AF23R000003 Amendment A001 8.15.2023.pdf | ||
| QnA 8.15.2023.pdf | ||
| 6982AF23R000003 AE IDIQ 2023 RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers during Advertisement for Full Service A-E IDIQ
August 15, 2023
Questions Answers 1 Request that the Part IIs be removed from the 50-page count limit;
or increase the page count to 80 pages as it was on the previous proposal.
See Amendment A001 – the Part II’s are now removed from the 50-page count
2 Section E Resumes – please clarify if one resume per discipline is acceptable.
Per the RFQ, “In Item E, provide only resumes of key personnel that are anticipated to work on the contract.” It is up to the firm how to respond to that requirement.
3 Section D Organizational Chart – in addition to key personnel, please clarify if we can list non-key personnel on the organizational chart
You can list both. Distinguish between key and non-key.
August 21, 2023
Questions Answers 4 Please verify that the Part II forms are excluded from the overall
50 page count
See Amendment A001 – the Part II’s are excluded from being included in the overall 50-page count.
5 May some resumes (Item E) and project descriptions (Item F) be up to two pages in length as long as our overall response for Section 1 (Items A through I) are 50 pages or less.
It is up to the firm how to structure the responses.
File details come from the government source that posted it. Updated .