Tabulation of Bids.pdf
PDF 601 KB Posted
- Solicitation number
- 6982AF23B000029
About this file
This is a bid tabulation report for a federal construction project to develop trails at the Rocky Flats National Wildlife Refuge in Colorado. The report details 23 line items with quantities, units, and unit pricing from 8 contractors competing for the base schedule of the project. Major work includes clearing and grubbing, excavation, structural concrete, reinforced steel, pre-fabricated bridges, drilled shafts, culverts, fencing, signage, and erosion control. Contractor pricing ranges from $3.28 million to $7.70 million for the base schedule. The low bidder was T1-MW Joint Venture at $3.28 million. The engineer's estimate was $3.85 million. The report documents contractor responsiveness and includes an anticipated award date of November 9, 2023. The solicitation was issued by the Federal Highway Administration for the Department of Transportation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/09/23
1 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Solcitation No: 698AF23B000029
Division: Central Federal Lands
State: CO County: Jefferson
Federal Land: Rocky Flats NWR Opened at: Lakewood
Opened by: Sheri Walsh
Date: 11/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
T1-MW Joint Venture $3,284,340.00 3201 Tremont Ave North Bend, OR 97459
Siete, Inc. $3,669,218.00 8155 Park Road Rye, CO 81069
Jalisco International. Inc $3,779,730.80 6663 Colorado Blvd Commerce City, CO 80022
Structures Inc. Bid Total- $4,046,722.50 Calculated Total- $4,046,722.70
$4,046,722.70 4 Iverness Ct East, Suite 250 Englewood, CO 80112
American West Construction, Inc. A0560- Bid Total- $36,630.00 Calculated Total- $33,300.00
Bid Total- $4,185,752.00 Calculated Total- $4,182,422.00
$4,182,422.00 275 E 64th Ave.
Denver, CO 80221
Iron Mike Construction, LLC A0060- Bid Total- $12,638.21 Calculated Total- $12,638.22 A0080- Bid Total- $1,604.29 Calculated Total- $1,604.28 A0120- Bid Total- $11,636.42 Calculated Total- $11,636.43 A0280- Bid Total- $15,686.36 Calculated Total- $15,686.37 A0300- Bid Total- $748.67 Calculated Total- $749.00 A0320- Bid Total- $347.33 Calculated Total- $374.40 A0340- Bid Total- $280,453.04 Calculated Total- $280,440.00 A0360- Bid Total- $12,596.62 Calculated Total- $12,597.00 A0380- Bid Total- $13,369.05 Calculated Total- $13,365.00 A0400- Bid Total- $4,425.45 Calculated Total- $4,425.48 A0420- Bid Total- $8,627.50
2 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Solcitation No: 698AF23B000029
Division: Central Federal Lands
State: CO County: Jefferson
Federal Land: Rocky Flats NWR Opened at: Lakewood
Opened by: Sheri Walsh
Date: 11/07/23
Calculated Total- $8,627.30 A0480- Bid Total- $3,505.66 Calculated Total- $3,505.75 A0500- Bid Total- $718.96 Calculated Total- $718.95 A0540- Bid Total- $24,123.72 Calculated Total- $24,122.00 A0560- Bid Total- $31,016.21 Calculated Total- $31,014.00 A0580- Bid Total- $57,041.30 Calculated Total- $7,042.00 A0600- Bid Total- $571,511.01 Calculated Total- $571,511.16 A0620- Bid Total- $6,010.73 Calculated Total- $6,010.56 A0640- Bid Total- $11,788.53 Calculated Total- $11,780.00 A0660- Bid Total- $60,392.47 Calculated Total- $60,291.00 A0740- Bid Total- $244,041.68 Calculated Total- $44,041.80 A0760- Bid Total- $69,483.43 Calculated Total- $69,483.60 A0780- Bid Total- $12,168.81 Calculated Total- $12,168.80 A0820- Bid Total- $467,342.91 Calculated Total- $467,342.96 A0900- Bid Total- $51,337.17 Calculated Total- $51,336.00 A0940- Bid Total- $4,931.70 Calculated Total- $4,932.00 A0960- Bid Total- $6,179.47 Calculated Total- $6,179.60 A0980- Bid Total- $2,852.06 Calculated Total- $2,852.00 A1000- Bid Total- $3,327.41 Calculated Total- $3,327.40 A1020- Bid Total- $4,634.61 Calculated Total- $4,634.60 A1040- Bid Total- $4,396.93 Calculated Total- $4,397.00 A1060- Bid Total- $6,654.82 Calculated Total- $6,654.80 A1080- Bid Total- $3,042.20 Calculated Total- $3,042.40 A1120- Bid Total- $9,697.02 Calculated Total- $9,697.20 A1140- Bid Total- $7,058.86 Calculated Total- $7,029.00 A1160- Bid Total- $8,287.63 Calculated Total- $8,287.62 A1260- Bid Total- $7,814.66 Calculated Total- $7,814.88 A1320- Bid Total- $44,171.35 Calculated Total- $44,171.82
Bid Total- $4,826,639.86 Calculated Total- $4,826,481.99
$4,826,481.98 6950 Tucson Way, Suite L Centennial, CO 80112
HD Inc A0060- Bid Total- $142,542.95 Calculated Total- $124,542.96 A0080- Bid Total- $6,227.15 Calculated Total- $6,227.16 A0280- Bid Total- $124,542.95 Calculated Total- $124,542.96 A0300- Bid Total- $1,056.73 Calculated Total- $1,057.00 A0320- Bid Total- $584.97 Calculated Total- $585.00
3 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Solcitation No: 698AF23B000029
Division: Central Federal Lands
State: CO County: Jefferson
Federal Land: Rocky Flats NWR Opened at: Lakewood
Opened by: Sheri Walsh
Date: 11/07/23
A0340- Bid Total- $150,961.15 Calculated Total- $150,960.00 A0360- Bid Total- $4,654.64 Calculated Total- $4,655.00 A0380- Bid Total- $56,610.43 Calculated Total- $$56,610.00 A0400- Bid Total- $8,126.74 Calculated Total- $$8,126.68 A0420- Bid Total- $20,757.16 Calculated Total- $20,757.00 A0480- Bid Total- $8,585.92 Calculated Total- $8,586.00 A0500- Bid Total- $2,723.59 Calculated Total- $2,723.60 A0520- Bid Total- $17,926.64 Calculated Total- 17,926.50 A0540- Bid Total- $39,627.30 Calculated Total- $39,627.00 A0560- Bid Total- $91,708.90 Calculated Total- $91,710.00 A0580- Bid Total- $55,666.92 Calculated Total- $55,666.50 A0600- Bid Total- $328,768.23 Calculated Total- $328,768.64 A0620- Bid Total- $12,680.74 Calculated Total- $12,680.64 A0640- Bid Total- $14,663.36 Calculated Total- $14,694.00 A0660- Bid Total- $70,034.65 Calculated Total- $69,993.00 A0740- Bid Total- $106,503.09 Calculated Total- $106,501.60 A0760- Bid Total- $60,761.86 Calculated Total- $60,762.00 A0780- Bid Total- $16,102.52 Calculated Total- $16,102.40 A0820- Bid Total- $882,493.73 Calculated Total- $882,493.71 A0900- Bid Total- $75,480.58 Calculated Total- $75,480.00 A0920- Bid Total- $59,755.46 Calculated Total- $59,755.45 A0940- Bid Total- $6,290.05 Calculated Total- $6,290.00 A0960- Bid Total- $8,302.86 Calculated Total- $8,302.80 A0980- Bid Total- 5,032.04 Calculated Total- $5,032.00 A1000- Bid Total- $4,528.83 Calculated Total- $4,528.80 A1020- Bid Total- $8,051.26 Calculated Total- $8,051.20 A1040- Bid Total- $6,038.45 Calculated Total- $6,038.40 A1060- Bid Total- 13,586.50 Calculated Total 13,586.40 A1080- Bid Total- $3,019.22 Calculated Total- $3,019.20 A1100- Bid Total- $15,096.12 Calculated Total- $15,096.00 A1120- Bid Total- $14,592.91 Calculated Total- $14,592.80 A1140- Bid Total- $43,590.03 Calculated Total- $43,560.00 A1160- Bid Total- $6,038.45 Calculated Total- $6,038.44 A1220- Bid Total- $22,140.97 Calculated Total- $22,141.02 A1260- Bid Total- $4,951.53
4 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Solcitation No: 698AF23B000029
Division: Central Federal Lands
State: CO County: Jefferson
Federal Land: Rocky Flats NWR Opened at: Lakewood
Opened by: Sheri Walsh
Date: 11/07/23
Calculated Total- $4,951.68 A1280- Bid Total- $105,672.81 Calculated Total- $105,672.80 A1300- Bid Total- $40,256.31 Calculated Total- $40,256.30 A1320- Bid Total- $96,690.62 Calculated Total- $96,691.14
Bid Total- $5,964,719.20 Calculated Total- $5,964,675.64
$5,964,675.64 6391 Aviation Circle Loveland, CO 80538
Aslan Construction, Inc A0040- Bid Amount Total- $22,520.38 Calculated Amount $23864.88
Bid Total- $7,699,649.17
5 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Solcitation No: 698AF23B000029
Division: Central Federal Lands
State: CO County: Jefferson
Federal Land: Rocky Flats NWR Opened at: Lakewood
Opened by: Sheri Walsh
Date: 11/07/23
Calculated Total- $7,700,993.67
$7,700,993.67 120 Bunyan Ave Suite 200 Berthod, CO 80513
6 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Solcitation No: 698AF23B000029
Division: Central Federal Lands
State: CO County: Jefferson
Federal Land: Rocky Flats NWR Opened at: Lakewood
Opened by: Sheri Walsh
Date: 11/07/23
Engineer's Estimate $3,845,000.00
7 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
T1-MW Joint Venture Lump Sum $165,000.00 Siete, Inc. Lump Sum $365,000.00 Jalisco International. Inc Lump Sum $450,000.00 Structures Inc. Lump Sum $320,000.00 American West Construction, Inc. Lump Sum $615,000.00 Iron Mike Construction, LLC Lump Sum $876,297.92 HD Inc Lump Sum $568,577.25 Aslan Construction, Inc Lump Sum $775,250.00 Engineer's Estimate ALL LPSM Lump Sum $442,369.00
A0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING
T1-MW Joint Venture $42,000.00 $14,910.00 Siete, Inc. $15,000.00 $5,325.00 Jalisco International. Inc $1,200.00 $426.00 Structures Inc. $35,300.00 $12,531.50 American West Construction, Inc. $12,000.00 $4,260.00 Iron Mike Construction, LLC $42,662.14 $15,145.06 HD Inc $21,386.16 $7,592.09 Aslan Construction, Inc $67,225.00 $23,864.88 Engineer's Estimate 0.355 MILE $14,000.00 $4,970.00
A0060 15215-2000 SURVEY AND STAKING, BRIDGE
T1-MW Joint Venture $6,500.00 $19,500.00 Siete, Inc. $20,000.00 $60,000.00 Jalisco International. Inc $8,000.00 $24,000.00 Structures Inc. $7,125.00 $21,375.00 American West Construction, Inc. $6,300.00 $18,900.00 Iron Mike Construction, LLC $4,212.74 $12,638.22 HD Inc $41,514.32 $124,542.96 Aslan Construction, Inc $11,150.00 $33,450.00 Engineer's Estimate 3 EACH $11,000.00 $33,000.00
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
T1-MW Joint Venture $1,000.00 $3,000.00 Siete, Inc. $2,000.00 $6,000.00 Jalisco International. Inc $1,700.00 $5,100.00 Structures Inc. $1,070.00 $3,210.00 American West Construction, Inc. $1,900.00 $5,700.00 Iron Mike Construction, LLC $534.76 $1,604.28 HD Inc $2,075.72 $6,227.16 Aslan Construction, Inc $7,860.00 $23,580.00 Engineer's Estimate 3 EACH $1,500.00 $4,500.00
8 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0100 15215-5000 SURVEY AND STAKING, BOX CULVERT
T1-MW Joint Venture $3,000.00 $3,000.00 Siete, Inc. $20,000.00 $20,000.00 Jalisco International. Inc $11,000.00 $11,000.00 Structures Inc. $3,205.00 $3,205.00 American West Construction, Inc. $3,600.00 $3,600.00 Iron Mike Construction, LLC $2,733.23 $2,733.23 HD Inc $41,514.32 $41,514.32 Aslan Construction, Inc $15,195.00 $15,195.00 Engineer's Estimate 1 EACH $5,600.00 $5,600.00
A0120 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
T1-MW Joint Venture $13,500.00 $4,590.00 Siete, Inc. $20,000.00 $6,800.00 Jalisco International. Inc $1,100.00 $374.00 Structures Inc. $57,700.00 $19,618.00 American West Construction, Inc. $14,000.00 $4,760.00 Iron Mike Construction, LLC $34,224.78 $11,636.43 HD Inc $41,514.32 $14,114.87 Aslan Construction, Inc $45,825.00 $15,580.50 Engineer's Estimate 0.340 MILE $22,000.00 $7,480.00
A0140 15236-2000 SURVEY CONTROL, GRADE FINISHING
T1-MW Joint Venture $35,500.00 $24,069.00 Siete, Inc. $6,000.00 $4,068.00 Jalisco International. Inc $1,100.00 $745.80 Structures Inc. $29,000.00 $19,662.00 American West Construction, Inc. $14,000.00 $9,492.00 Iron Mike Construction, LLC $27,926.47 $18,934.15 HD Inc $17,612.13 $11,941.02 Aslan Construction, Inc $77,555.00 $52,582.29 Engineer's Estimate 0.678 MILE $12,000.00 $8,136.00
A0160 15301-0000 CONTRACTOR QUALITY CONTROL
T1-MW Joint Venture Lump Sum $125,000.00 Siete, Inc. Lump Sum $222,000.00 Jalisco International. Inc Lump Sum $125,000.00 Structures Inc. Lump Sum $160,500.00 American West Construction, Inc. Lump Sum $115,000.00 Iron Mike Construction, LLC Lump Sum $167,257.76 HD Inc Lump Sum $242,752.77 Aslan Construction, Inc Lump Sum $395,400.00 Engineer's Estimate ALL LPSM Lump Sum $136,000.00
9 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0180 15401-0000 CONTRACTOR TESTING
T1-MW Joint Venture Lump Sum $15,000.00 Siete, Inc. Lump Sum $222,000.00 Jalisco International. Inc Lump Sum $120,000.00 Structures Inc. Lump Sum $139,200.00 American West Construction, Inc. Lump Sum $98,000.00 Iron Mike Construction, LLC Lump Sum $285,206.48 HD Inc Lump Sum $105,629.72 Aslan Construction, Inc Lump Sum $190,950.00 Engineer's Estimate ALL LPSM Lump Sum $85,000.00
A0200 15501-0000 CONSTRUCTION SCHEDULE
T1-MW Joint Venture Lump Sum $10,000.00 Siete, Inc. Lump Sum $5,000.00 Jalisco International. Inc Lump Sum $80,000.00 Structures Inc. Lump Sum $15,700.00 American West Construction, Inc. Lump Sum $16,000.00 Iron Mike Construction, LLC Lump Sum $23,529.53 HD Inc Lump Sum $42,729.24 Aslan Construction, Inc Lump Sum $26,915.00 Engineer's Estimate ALL LPSM Lump Sum $17,000.00
A0220 15701-0000 SOIL EROSION CONTROL
T1-MW Joint Venture Lump Sum $50,000.00 Siete, Inc. Lump Sum $50,000.00 Jalisco International. Inc Lump Sum $65,000.00 Structures Inc. Lump Sum $73,500.00 American West Construction, Inc. Lump Sum $51,000.00 Iron Mike Construction, LLC Lump Sum $104,694.55 HD Inc Lump Sum $298,105.19 Aslan Construction, Inc Lump Sum $267,700.00 Engineer's Estimate ALL LPSM Lump Sum $136,000.00
A0240 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
T1-MW Joint Venture Lump Sum $10,000.00 Siete, Inc. Lump Sum $10,000.00 Jalisco International. Inc Lump Sum $25,000.00 Structures Inc. Lump Sum $25,250.00 American West Construction, Inc. Lump Sum $11,000.00 Iron Mike Construction, LLC Lump Sum $24,955.57 HD Inc Lump Sum $28,891.14 Aslan Construction, Inc Lump Sum $223,725.00 Engineer's Estimate ALL LPSM Lump Sum $12,700.00
10 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 15802-0000 WATERING FOR DUST CONTROL
T1-MW Joint Venture Lump Sum $25,000.00 Siete, Inc. Lump Sum $10,000.00 Jalisco International. Inc Lump Sum $6,000.00 Structures Inc. Lump Sum $8,720.00 American West Construction, Inc. Lump Sum $20,000.00 Iron Mike Construction, LLC Lump Sum $16,637.04 HD Inc Lump Sum $203,754.47 Aslan Construction, Inc Lump Sum $86,650.00 Engineer's Estimate ALL LPSM Lump Sum $61,000.00
A0280 20101-0000 CLEARING AND GRUBBING
T1-MW Joint Venture $7,500.00 $22,500.00 Siete, Inc. $20,000.00 $60,000.00 Jalisco International. Inc $6,500.00 $19,500.00 Structures Inc. $6,540.00 $19,620.00 American West Construction, Inc. $11,000.00 $33,000.00 Iron Mike Construction, LLC $5,228.79 $15,686.37 HD Inc $41,514.32 $124,542.96 Aslan Construction, Inc $19,100.00 $57,300.00 Engineer's Estimate 3.0 ACRE $9,000.00 $27,000.00
A0300 20302-0700 REMOVAL OF FENCE
T1-MW Joint Venture $6.00 $840.00 Siete, Inc. $30.00 $4,200.00 Jalisco International. Inc $4.50 $630.00 Structures Inc. $5.00 $700.00 American West Construction, Inc. $18.00 $2,520.00 Iron Mike Construction, LLC $5.35 $749.00 HD Inc $7.55 $1,057.00 Aslan Construction, Inc $14.00 $1,960.00 Engineer's Estimate 140 LNFT $18.00 $2,520.00
A0320 20302-1200 REMOVAL OF GUARDRAIL
T1-MW Joint Venture $25.00 $375.00 Siete, Inc. $35.00 $525.00 Jalisco International. Inc $20.00 $300.00 Structures Inc. $20.00 $300.00 American West Construction, Inc. $40.00 $600.00 Iron Mike Construction, LLC $24.96 $374.40 HD Inc $39.00 $585.00 Aslan Construction, Inc $85.00 $1,275.00 Engineer's Estimate 15.0 LNFT $85.00 $1,275.00
11 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0340 20401-0000 ROADWAY EXCAVATION
T1-MW Joint Venture $30.00 $120,000.00 Siete, Inc. $30.00 $120,000.00 Jalisco International. Inc $35.00 $140,000.00 Structures Inc. $37.00 $148,000.00 American West Construction, Inc. $29.00 $116,000.00 Iron Mike Construction, LLC $70.11 $280,440.00 HD Inc $37.74 $150,960.00 Aslan Construction, Inc $51.60 $206,400.00 Engineer's Estimate 4,000 CUYD $50.00 $200,000.00
A0360 20402-0000 SUBEXCAVATION
T1-MW Joint Venture $43.00 $4,300.00 Siete, Inc. $120.00 $12,000.00 Jalisco International. Inc $110.00 $11,000.00 Structures Inc. $109.00 $10,900.00 American West Construction, Inc. $200.00 $20,000.00 Iron Mike Construction, LLC $125.97 $12,597.00 HD Inc $46.55 $4,655.00 Aslan Construction, Inc $43.85 $4,385.00 Engineer's Estimate 100 CUYD $110.00 $11,000.00
A0380 20703-2000 GEOGRID, STABILIZATION
T1-MW Joint Venture $2.50 $11,250.00 Siete, Inc. $4.00 $18,000.00 Jalisco International. Inc $9.00 $40,500.00 Structures Inc. $11.50 $51,750.00 American West Construction, Inc. $3.25 $14,625.00 Iron Mike Construction, LLC $2.97 $13,365.00 HD Inc $12.58 $56,610.00 Aslan Construction, Inc $14.60 $65,700.00 Engineer's Estimate 4,500 SQYD $7.00 $31,500.00
A0400 20801-0000 STRUCTURE EXCAVATION
T1-MW Joint Venture $160.00 $12,160.00 Siete, Inc. $500.00 $38,000.00 Jalisco International. Inc $95.00 $7,220.00 Structures Inc. $114.00 $8,664.00 American West Construction, Inc. $200.00 $15,200.00 Iron Mike Construction, LLC $58.23 $4,425.48 HD Inc $106.93 $8,126.68 Aslan Construction, Inc $75.50 $5,738.00 Engineer's Estimate 76 CUYD $90.00 $6,840.00
12 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0420 20803-0000 STRUCTURAL BACKFILL
T1-MW Joint Venture $240.00 $26,400.00 Siete, Inc. $625.00 $68,750.00 Jalisco International. Inc $72.00 $7,920.00 Structures Inc. $85.50 $9,405.00 American West Construction, Inc. $300.00 $33,000.00 Iron Mike Construction, LLC $78.43 $8,627.30 HD Inc $188.70 $20,757.00 Aslan Construction, Inc $201.00 $22,110.00 Engineer's Estimate 110 CUYD $230.00 $25,300.00
A0440 20810-0000 SHORING AND BRACING
T1-MW Joint Venture Lump Sum $85,000.00 Siete, Inc. Lump Sum $50,000.00 Jalisco International. Inc Lump Sum $100,000.00 Structures Inc. Lump Sum $98,150.20 American West Construction, Inc. Lump Sum $76,000.00 Iron Mike Construction, LLC Lump Sum $130,719.64 HD Inc Lump Sum $43,987.25 Aslan Construction, Inc Lump Sum $549,700.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
A0460 21201-0000 LINEAR GRADING
T1-MW Joint Venture $25,000.00 $10,000.00 Siete, Inc. $50,000.00 $20,000.00 Jalisco International. Inc $6,500.00 $2,600.00 Structures Inc. $6,540.00 $2,616.00 American West Construction, Inc. $38,000.00 $15,200.00 Iron Mike Construction, LLC $122,401.12 $48,960.45 HD Inc $75,480.58 $30,192.23 Aslan Construction, Inc $80,250.00 $32,100.00 Engineer's Estimate 0.400 MILE $50,000.00 $20,000.00
A0480 25101-2100 PLACED RIPRAP, METHOD B, CLASS 1
T1-MW Joint Venture $300.00 $7,500.00 Siete, Inc. $250.00 $6,250.00 Jalisco International. Inc $225.00 $5,625.00 Structures Inc. $218.00 $5,450.00 American West Construction, Inc. $240.00 $6,000.00 Iron Mike Construction, LLC $140.23 $3,505.75 HD Inc $343.44 $8,586.00 Aslan Construction, Inc $342.00 $8,550.00 Engineer's Estimate 25 CUYD $340.00 $8,500.00
13 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
T1-MW Joint Venture $310.00 $1,550.00 Siete, Inc. $260.00 $1,300.00 Jalisco International. Inc $225.00 $1,125.00 Structures Inc. $218.00 $1,090.00 American West Construction, Inc. $250.00 $1,250.00 Iron Mike Construction, LLC $143.79 $718.95 HD Inc $544.72 $2,723.60 Aslan Construction, Inc $342.00 $1,710.00 Engineer's Estimate 5 CUYD $330.00 $1,650.00
A0520 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
T1-MW Joint Venture $320.00 $16,000.00 Siete, Inc. $270.00 $13,500.00 Jalisco International. Inc $225.00 $11,250.00 Structures Inc. $218.00 $10,900.00 American West Construction, Inc. $210.00 $10,500.00 Iron Mike Construction, LLC $144.98 $7,249.00 HD Inc $358.53 $17,926.50 Aslan Construction, Inc $342.00 $17,100.00 Engineer's Estimate 50 CUYD $320.00 $16,000.00
A0540 30202-2000 ROADWAY AGGREGATE, METHOD 2
T1-MW Joint Venture $75.00 $26,250.00 Siete, Inc. $125.00 $43,750.00 Jalisco International. Inc $70.00 $24,500.00 Structures Inc. $65.50 $22,925.00 American West Construction, Inc. $66.00 $23,100.00 Iron Mike Construction, LLC $68.92 $24,122.00 HD Inc $113.22 $39,627.00 Aslan Construction, Inc $97.00 $33,950.00 Engineer's Estimate 350 TON $80.00 $28,000.00
A0560 30202-2000 ROADWAY AGGREGATE, METHOD 2 (CRUSHER FINES)
T1-MW Joint Venture $52.00 $46,800.00 Siete, Inc. $105.00 $94,500.00 Jalisco International. Inc $50.00 $45,000.00 Structures Inc. $62.75 $56,475.00 American West Construction, Inc. $37.00 $33,300.00 Iron Mike Construction, LLC $34.46 $31,014.00 HD Inc $101.90 $91,710.00 Aslan Construction, Inc $94.00 $84,600.00 Engineer's Estimate 900 TON $80.00 $72,000.00
14 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0580 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
T1-MW Joint Venture $250.00 $37,500.00 Siete, Inc. $120.00 $18,000.00 Jalisco International. Inc $145.00 $21,750.00 Structures Inc. $260.00 $39,000.00 American West Construction, Inc. $230.00 $34,500.00 Iron Mike Construction, LLC $380.28 $57,042.00 HD Inc $371.11 $55,666.50 Aslan Construction, Inc $496.00 $74,400.00 Engineer's Estimate 150 SQYD $160.00 $24,000.00
A0600 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
T1-MW Joint Venture $2,000.00 $292,000.00 Siete, Inc. $2,700.00 $394,200.00 Jalisco International. Inc $1,400.00 $204,400.00 Structures Inc. $1,640.00 $239,440.00 American West Construction, Inc. $1,600.00 $233,600.00 Iron Mike Construction, LLC $3,914.46 $571,511.16 HD Inc $2,251.84 $328,768.64 Aslan Construction, Inc $3,850.00 $562,100.00 Engineer's Estimate 146 CUYD $1,400.00 $204,400.00
A0620 55235-0000 EXPANSION JOINTS
T1-MW Joint Venture $68.00 $4,896.00 Siete, Inc. $100.00 $7,200.00 Jalisco International. Inc $150.00 $10,800.00 Structures Inc. $72.50 $5,220.00 American West Construction, Inc. $110.00 $7,920.00 Iron Mike Construction, LLC $83.48 $6,010.56 HD Inc $176.12 $12,680.64 Aslan Construction, Inc $132.00 $9,504.00 Engineer's Estimate 72 LNFT $200.00 $14,400.00
A0640 55401-1000 REINFORCING STEEL
T1-MW Joint Venture $2.00 $12,400.00 Siete, Inc. $2.00 $12,400.00 Jalisco International. Inc $1.50 $9,300.00 Structures Inc. $2.62 $16,244.00 American West Construction, Inc. $2.55 $15,810.00 Iron Mike Construction, LLC $1.90 $11,780.00 HD Inc $2.37 $14,694.00 Aslan Construction, Inc $3.95 $24,490.00 Engineer's Estimate 6,200 LB $2.90 $17,980.00
15 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0660 55401-2000 REINFORCING STEEL, EPOXY COATED
T1-MW Joint Venture $2.50 $57,750.00 Siete, Inc. $2.50 $57,750.00 Jalisco International. Inc $1.80 $41,580.00 Structures Inc. $3.17 $73,227.00 American West Construction, Inc. $2.95 $68,145.00 Iron Mike Construction, LLC $2.61 $60,291.00 HD Inc $3.03 $69,993.00 Aslan Construction, Inc $4.95 $114,345.00 Engineer's Estimate 23,100 LB $3.00 $69,300.00
A0680 55504-0000 PRE-FABRICATED STEEL BRIDGE (WOMAN CREEK)
T1-MW Joint Venture Lump Sum $150,000.00 Siete, Inc. Lump Sum $140,000.00 Jalisco International. Inc Lump Sum $175,000.00 Structures Inc. Lump Sum $176,000.00 American West Construction, Inc. Lump Sum $251,000.00 Iron Mike Construction, LLC Lump Sum $140,701.87 HD Inc Lump Sum $859,177.47 Aslan Construction, Inc Lump Sum $359,725.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
A0700 55504-0000 PRE-FABRICATED STEEL BRIDGE (ROCK CREEK)
T1-MW Joint Venture Lump Sum $175,000.00 Siete, Inc. Lump Sum $140,000.00 Jalisco International. Inc Lump Sum $180,000.00 Structures Inc. Lump Sum $176,000.00 American West Construction, Inc. Lump Sum $251,000.00 Iron Mike Construction, LLC Lump Sum $229,947.73 HD Inc Lump Sum $236,462.72 Aslan Construction, Inc Lump Sum $365,900.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
A0720 55504-0000 PRE-FABRICATED STEEL BRIDGE (INDIANA STREET)
T1-MW Joint Venture Lump Sum $470,000.00 Siete, Inc. Lump Sum $500,000.00 Jalisco International. Inc Lump Sum $575,000.00 Structures Inc. Lump Sum $570,000.00 American West Construction, Inc. Lump Sum $732,000.00 Iron Mike Construction, LLC Lump Sum $392,158.92 HD Inc Lump Sum $236,462.72 Aslan Construction, Inc Lump Sum $782,850.00 Engineer's Estimate ALL LPSM Lump Sum $473,000.00
16 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0740 56501-0200 DRILLED SHAFT, 24-INCH DIAMETER
T1-MW Joint Venture $650.00 $221,000.00 Siete, Inc. $450.00 $153,000.00 Jalisco International. Inc $325.00 $110,500.00 Structures Inc. $452.00 $153,680.00 American West Construction, Inc. $570.00 $193,800.00 Iron Mike Construction, LLC $717.77 $244,041.80 HD Inc $313.24 $106,501.60 Aslan Construction, Inc $450.00 $153,000.00 Engineer's Estimate 340 LNFT $900.00 $306,000.00
A0760 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER
T1-MW Joint Venture $1,300.00 $78,000.00 Siete, Inc. $1,000.00 $60,000.00 Jalisco International. Inc $675.00 $40,500.00 Structures Inc. $1,061.00 $63,660.00 American West Construction, Inc. $1,500.00 $90,000.00 Iron Mike Construction, LLC $1,158.06 $69,483.60 HD Inc $1,012.70 $60,762.00 Aslan Construction, Inc $1,367.00 $82,020.00 Engineer's Estimate 60 LNFT $1,500.00 $90,000.00
A0780 60201-0600 18-INCH PIPE CULVERT
T1-MW Joint Venture $100.00 $8,000.00 Siete, Inc. $150.00 $12,000.00 Jalisco International. Inc $195.00 $15,600.00 Structures Inc. $256.00 $20,480.00 American West Construction, Inc. $150.00 $12,000.00 Iron Mike Construction, LLC $152.11 $12,168.80 HD Inc $201.28 $16,102.40 Aslan Construction, Inc $155.00 $12,400.00 Engineer's Estimate 80 LNFT $240.00 $19,200.00
A0800 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
T1-MW Joint Venture $4,800.00 $4,800.00 Siete, Inc. $2,000.00 $2,000.00 Jalisco International. Inc $2,200.00 $2,200.00 Structures Inc. $2,565.00 $2,565.00 American West Construction, Inc. $2,300.00 $2,300.00 Iron Mike Construction, LLC $2,288.78 $2,288.78 HD Inc $5,157.84 $5,157.84 Aslan Construction, Inc $5,715.00 $5,715.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
17 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0820 60220-4150 12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
T1-MW Joint Venture $8,200.00 $500,200.00 Siete, Inc. $3,700.00 $225,700.00 Jalisco International. Inc $8,500.00 $518,500.00 Structures Inc. $9,760.00 $595,360.00 American West Construction, Inc. $7,100.00 $433,100.00 Iron Mike Construction, LLC $7,661.36 $467,342.96 HD Inc $14,467.11 $882,493.71 Aslan Construction, Inc $17,000.00 $1,037,000.00 Engineer's Estimate 61 LNFT $5,000.00 $305,000.00
A0840 60401-0000 MANHOLE (CDOT M-604-20)
T1-MW Joint Venture $6,400.00 $6,400.00 Siete, Inc. $7,000.00 $7,000.00 Jalisco International. Inc $9,000.00 $9,000.00 Structures Inc. $8,610.00 $8,610.00 American West Construction, Inc. $6,300.00 $6,300.00 Iron Mike Construction, LLC $12,156.93 $12,156.93 HD Inc $12,328.49 $12,328.49 Aslan Construction, Inc $9,325.00 $9,325.00 Engineer's Estimate 1 EACH $6,500.00 $6,500.00
A0860 60404-1000 CATCH BASIN, FLH TYPE 1
T1-MW Joint Venture $6,800.00 $6,800.00 Siete, Inc. $7,000.00 $7,000.00 Jalisco International. Inc $6,600.00 $6,600.00 Structures Inc. $9,725.00 $9,725.00 American West Construction, Inc. $5,400.00 $5,400.00 Iron Mike Construction, LLC $10,421.92 $10,421.92 HD Inc $10,315.68 $10,315.68 Aslan Construction, Inc $5,840.00 $5,840.00 Engineer's Estimate 1 EACH $9,000.00 $9,000.00
A0880 60409-0100 INLET TOP, METAL FRAME AND GRATE, FLH TYPE A
T1-MW Joint Venture $750.00 $750.00 Siete, Inc. $3,000.00 $3,000.00 Jalisco International. Inc $1,800.00 $1,800.00 Structures Inc. $10,270.00 $10,270.00 American West Construction, Inc. $2,700.00 $2,700.00 Iron Mike Construction, LLC $891.27 $891.27 HD Inc $503.20 $503.20 Aslan Construction, Inc $3,175.00 $3,175.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
18 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0900 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
T1-MW Joint Venture $72.00 $43,200.00 Siete, Inc. $78.00 $46,800.00 Jalisco International. Inc $70.00 $42,000.00 Structures Inc. $71.50 $42,900.00 American West Construction, Inc. $90.75 $54,450.00 Iron Mike Construction, LLC $85.56 $51,336.00 HD Inc $125.80 $75,480.00 Aslan Construction, Inc $197.00 $118,200.00 Engineer's Estimate 600.0 LNFT $70.00 $42,000.00
A0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
T1-MW Joint Venture $8,000.00 $40,000.00 Siete, Inc. $8,000.00 $40,000.00 Jalisco International. Inc $6,725.00 $33,625.00 Structures Inc. $6,200.00 $31,000.00 American West Construction, Inc. $8,800.00 $44,000.00 Iron Mike Construction, LLC $7,486.67 $37,433.35 HD Inc $11,951.09 $59,755.45 Aslan Construction, Inc $19,150.00 $95,750.00 Engineer's Estimate 5 EACH $7,100.00 $35,500.00
A0940 61901-0900 FENCE, BARBED WIRE, 4 STRAND
T1-MW Joint Venture $53.00 $5,300.00 Siete, Inc. $55.00 $5,500.00 Jalisco International. Inc $44.00 $4,400.00 Structures Inc. $71.00 $7,100.00 American West Construction, Inc. $18.00 $1,800.00 Iron Mike Construction, LLC $49.32 $4,932.00 HD Inc $62.90 $6,290.00 Aslan Construction, Inc $89.00 $8,900.00 Engineer's Estimate 100 LNFT $90.00 $9,000.00
A0960 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
T1-MW Joint Venture $150.00 $6,000.00 Siete, Inc. $110.00 $4,400.00 Jalisco International. Inc $115.00 $4,600.00 Structures Inc. $115.00 $4,600.00 American West Construction, Inc. $220.00 $8,800.00 Iron Mike Construction, LLC $154.49 $6,179.60 HD Inc $207.57 $8,302.80 Aslan Construction, Inc $420.00 $16,800.00 Engineer's Estimate 40 HOUR $160.00 $6,400.00
19 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0980 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH
T1-MW Joint Venture $170.00 $3,400.00 Siete, Inc. $110.00 $2,200.00 Jalisco International. Inc $150.00 $3,000.00 Structures Inc. $150.00 $3,000.00 American West Construction, Inc. $170.00 $3,400.00 Iron Mike Construction, LLC $142.60 $2,852.00 HD Inc $251.60 $5,032.00 Aslan Construction, Inc $471.00 $9,420.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
A1000 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
T1-MW Joint Venture $180.00 $3,600.00 Siete, Inc. $150.00 $3,000.00 Jalisco International. Inc $175.00 $3,500.00 Structures Inc. $175.00 $3,500.00 American West Construction, Inc. $250.00 $5,000.00 Iron Mike Construction, LLC $166.37 $3,327.40 HD Inc $226.44 $4,528.80 Aslan Construction, Inc $510.00 $10,200.00 Engineer's Estimate 20 HOUR $220.00 $4,400.00
A1020 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
T1-MW Joint Venture $190.00 $3,800.00 Siete, Inc. $150.00 $3,000.00 Jalisco International. Inc $240.00 $4,800.00 Structures Inc. $240.00 $4,800.00 American West Construction, Inc. $320.00 $6,400.00 Iron Mike Construction, LLC $231.73 $4,634.60 HD Inc $402.56 $8,051.20 Aslan Construction, Inc $510.00 $10,200.00 Engineer's Estimate 20 HOUR $280.00 $5,600.00
A1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
T1-MW Joint Venture $190.00 $3,800.00 Siete, Inc. $150.00 $3,000.00 Jalisco International. Inc $205.00 $4,100.00 Structures Inc. $210.00 $4,200.00 American West Construction, Inc. $280.00 $5,600.00 Iron Mike Construction, LLC $219.85 $4,397.00 HD Inc $301.92 $6,038.40 Aslan Construction, Inc $636.00 $12,720.00 Engineer's Estimate 20 HOUR $210.00 $4,200.00
20 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1060 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
T1-MW Joint Venture $215.00 $8,600.00 Siete, Inc. $200.00 $8,000.00 Jalisco International. Inc $220.00 $8,800.00 Structures Inc. $220.00 $8,800.00 American West Construction, Inc. $320.00 $12,800.00 Iron Mike Construction, LLC $166.37 $6,654.80 HD Inc $339.66 $13,586.40 Aslan Construction, Inc $510.00 $20,400.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00
A1080 62301-0000 GENERAL LABOR
T1-MW Joint Venture $85.00 $3,400.00 Siete, Inc. $60.00 $2,400.00 Jalisco International. Inc $65.00 $2,600.00 Structures Inc. $54.00 $2,160.00 American West Construction, Inc. $110.00 $4,400.00 Iron Mike Construction, LLC $76.06 $3,042.40 HD Inc $75.48 $3,019.20 Aslan Construction, Inc $94.00 $3,760.00 Engineer's Estimate 40 HOUR $80.00 $3,200.00
A1100 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
T1-MW Joint Venture $200.00 $8,000.00 Siete, Inc. $150.00 $6,000.00 Jalisco International. Inc $350.00 $14,000.00 Structures Inc. $164.00 $6,560.00 American West Construction, Inc. $110.00 $4,400.00 Iron Mike Construction, LLC $297.09 $11,883.60 HD Inc $377.40 $15,096.00 Aslan Construction, Inc $344.00 $13,760.00 Engineer's Estimate 40 HOUR $210.00 $8,400.00
A1120 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
T1-MW Joint Venture $200.00 $8,000.00 Siete, Inc. $165.00 $6,600.00 Jalisco International. Inc $235.00 $9,400.00 Structures Inc. $256.00 $10,240.00 American West Construction, Inc. $450.00 $18,000.00 Iron Mike Construction, LLC $242.43 $9,697.20 HD Inc $364.82 $14,592.80 Aslan Construction, Inc $242.00 $9,680.00 Engineer's Estimate 40 HOUR $215.00 $8,600.00
21 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1140 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
T1-MW Joint Venture $1.80 $17,820.00 Siete, Inc. $4.00 $39,600.00 Jalisco International. Inc $3.75 $37,125.00 Structures Inc. $4.26 $42,174.00 American West Construction, Inc. $0.80 $7,920.00 Iron Mike Construction, LLC $0.71 $7,029.00 HD Inc $4.40 $43,560.00 Aslan Construction, Inc $3.90 $38,610.00 Engineer's Estimate 9,900 SQYD $3.20 $31,680.00
A1160 62510-2000 SEEDING, HYDRAULIC METHOD
T1-MW Joint Venture $3,000.00 $6,000.00 Siete, Inc. $3,200.00 $6,400.00 Jalisco International. Inc $1,270.00 $2,540.00 Structures Inc. $1,995.00 $3,990.00 American West Construction, Inc. $3,800.00 $7,600.00 Iron Mike Construction, LLC $4,143.81 $8,287.62 HD Inc $3,019.22 $6,038.44 Aslan Construction, Inc $2,740.00 $5,480.00 Engineer's Estimate 2.0 ACRE $2,000.00 $4,000.00
A1180 62515-2000 MULCHING, HYDRAULIC METHOD
T1-MW Joint Venture $6,000.00 $12,000.00 Siete, Inc. $3,000.00 $6,000.00 Jalisco International. Inc $3,900.00 $7,800.00 Structures Inc. $4,800.00 $9,600.00 American West Construction, Inc. $3,400.00 $6,800.00 Iron Mike Construction, LLC $3,745.71 $7,491.42 HD Inc $3,019.22 $6,038.44 Aslan Construction, Inc $8,595.00 $17,190.00 Engineer's Estimate 2.0 ACRE $2,500.00 $5,000.00
A1200 62520-0000 FERTILIZER
T1-MW Joint Venture $650.00 $1,300.00 Siete, Inc. $2,200.00 $4,400.00 Jalisco International. Inc $1,000.00 $2,000.00 Structures Inc. $1,255.00 $2,510.00 American West Construction, Inc. $2,600.00 $5,200.00 Iron Mike Construction, LLC $2,812.85 $5,625.70 HD Inc $1,509.61 $3,019.22 Aslan Construction, Inc $2,245.00 $4,490.00 Engineer's Estimate 2.0 ACRE $3,600.00 $7,200.00
22 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1220 63301-0000 SIGN SYSTEM
T1-MW Joint Venture $470.00 $5,170.00 Siete, Inc. $1,000.00 $11,000.00 Jalisco International. Inc $875.00 $9,625.00 Structures Inc. $605.00 $6,655.00 American West Construction, Inc. $590.00 $6,490.00 Iron Mike Construction, LLC $449.20 $4,941.20 HD Inc $2,012.82 $22,141.02 Aslan Construction, Inc $900.00 $9,900.00 Engineer's Estimate 11 EACH $1,000.00 $11,000.00
A1240 63501-0000 TEMPORARY TRAFFIC CONTROL
T1-MW Joint Venture Lump Sum $195,000.00 Siete, Inc. Lump Sum $100,000.00 Jalisco International. Inc Lump Sum $275,000.00 Structures Inc. Lump Sum $375,000.00 American West Construction, Inc. Lump Sum $173,000.00 Iron Mike Construction, LLC Lump Sum $129,531.28 HD Inc Lump Sum $210,044.52 Aslan Construction, Inc Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $240,000.00
A1260 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (BIL INFRASTRUCTURE SIGN)
T1-MW Joint Venture $45.00 $2,160.00 Siete, Inc. $700.00 $33,600.00 Jalisco International. Inc $85.00 $4,080.00 Structures Inc. $136.00 $6,528.00 American West Construction, Inc. $120.00 $5,760.00 Iron Mike Construction, LLC $162.81 $7,814.88 HD Inc $103.16 $4,951.68 Aslan Construction, Inc $327.00 $15,696.00 Engineer's Estimate 48 SQFT $100.00 $4,800.00
A1280 64603-0000 FIXTURE (SINGLE PANEL KIOSK)
T1-MW Joint Venture $4,000.00 $8,000.00 Siete, Inc. $3,500.00 $7,000.00 Jalisco International. Inc $8,700.00 $17,400.00 Structures Inc. $3,550.00 $7,100.00 American West Construction, Inc. $8,800.00 $17,600.00 Iron Mike Construction, LLC $11,408.26 $22,816.52 HD Inc $52,836.40 $105,672.80 Aslan Construction, Inc $16,800.00 $33,600.00 Engineer's Estimate 2 EACH $6,200.00 $12,400.00
23 out of 23
Project No: CO FTFW ROFL TRAILS(1)
Project Name: Rocky Flats NWR Trails
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1300 64603-0000 FIXTURE (TIMBER ARCH STRUCTURE)
T1-MW Joint Venture $4,000.00 $8,000.00 Siete, Inc. $5,000.00 $10,000.00 Jalisco International. Inc $8,100.00 $16,200.00 Structures Inc. $3,025.00 $6,050.00 American West Construction, Inc. $5,600.00 $11,200.00 Iron Mike Construction, LLC $5,169.37 $10,338.74 HD Inc $20,128.15 $40,256.30 Aslan Construction, Inc $10,440.00 $20,880.00 Engineer's Estimate 2 EACH $4,000.00 $8,000.00
A1320 64604-3000 FIXTURE, PEDESTRIAN RAILING
T1-MW Joint Venture $50.00 $6,300.00 Siete, Inc. $350.00 $44,100.00 Jalisco International. Inc $165.00 $20,790.00 Structures Inc. $233.00 $29,358.00 American West Construction, Inc. $470.00 $59,220.00 Iron Mike Construction, LLC $350.57 $44,171.82 HD Inc $767.39 $96,691.14 Aslan Construction, Inc $398.00 $50,148.00 Engineer's Estimate 126 LNFT $500.00 $63,000.00
Total Schedule - All Items
T1-MW Joint Venture $3,284,340.00 Siete, Inc. $3,669,218.00 Jalisco International. Inc $3,779,730.80 Structures Inc. $4,046,722.70 American West Construction, Inc. $4,182,422.00 Iron Mike Construction, LLC $4,826,481.98 HD Inc $5,964,675.64 Aslan Construction, Inc $7,700,993.67 Engineer's Estimate $3,845,000.00
File details come from the government source that posted it. Updated .