This is an amendment to a solicitation for construction services. The amendment revises the plans, bid schedule, and quantities for a project involving trail crossings at the Rocky Flats National Wildlife Refuge in Colorado. The solicitation is issued by the Federal Highway Administration Central Federal Lands Highway Division on behalf of the Department of Transportation. Offerors must acknowledge receipt of the amendment by the date and time specified in the original solicitation to have their bids considered. The revised bid documents modify the roadway excavation and pipe culvert quantities, replacing certain plan sheets and pages in the bid schedule with updated versions dated November 1st and 2nd, 2023.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1 12
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE
DATE 11/2/202
CO FTFW ROFL Trails (1)
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
12300 WEST DAKOTA AVENUE, SUITE 360
LAKEWOOD, COLORADO 80228
ATTENTION: CONTRACT SPECIALIST NAME
6905001
6982AF23B000029
9/18/2023
0*
*See Item 14
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
INVITATION FOR BID- PLANS
1. Replace PLAN SHEETS B1; B2; B3; X5; with the Amended Sheets attached dated 11/2/2023.
INVITATION FOR BID- A SECTION BID SCHEDULE
2. Remove BID SCHEDULE pages A-6 through A-12 and replace with the Amended pages A-6 through A-12 dated 11/1/2023.
*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN BLOCK 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION
OF YOUR BID (REFER TO ITEM 11.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
A006
STATE PROJECT
NUMBER
SHEET
CO FLAP JEF128(1)
CO FTFW ROFL TRAILS(1)
CO
S U
M (M
A
IN
)C O
F T
F W
R O
F L
T ra il s d g n
[U
S S u r_ ft D
/1
/2
B1
AMENDMENT A006 11/01/23 Revise Roadway Excavation quantities and 18-Inch Pipe Culvert quantities6
6 6
Amendment A006 Dated 11/1/2023
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Q' t!
,._I
<1)1
2.
I
Line
Item No.
Pay Item Number Pay Item Description
A0820 60220-4150 12 FEET SPAN, 10 FEET RISE P RECAST REINFORCED CONCRETE BOX CULVERT
A0840 60401-0000 MANHOLE (CDOT M-604-20)
A0860 60404-1000 CATCH BASIN, FLH TYPE 1
A0880 60409-0100 INLET TOP, METAL FRAME AND GRATE, FLH TYPE A
A0900 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
A0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
A0940 61901-0900 FENCE, BARBED WIRE, 4 STRAND
A0960 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
A0980 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH AlO00 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
A1020 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
A1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
A1060 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Al080 62301-0000 GENERAL LABOR
All00 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
A1120 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
A1140 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
A1160 62510-2000 SEEDING, HYDRAULIC METHOD
A1180 62515-2000 MULCHING, HYDRAULIC METHOD
A1200 62520-0000 FERTILIZER
A1220 63301-0000 SIGN SYSTEM
A1240 63501-0000 TEMPORARY TRAFFIC CONTROL
A1260 63504-1000 TEMPORARY TRAFFIC CONT ROL, CONST RUCTION SIGN (BIL INFRAST RUCTURE SIGN)
A1280 64603-0000 FIXTURE (SINGLE PANEL KIOSK)
Al300 64603-0000 FIXTURE (TIMBER ARCH STRUCTURE)
A1320 64604-3000 FIXTURE, PEDESTRIAN RAILING
� MileSWne :Amendme�A006 ::;_ Amendment Review Date : 11/01/23
Unit
LNFT
EACH
EACH
EACH
LNFT
EACH
LNFT
HOUR
HOUR
HOUR
HOUR
HOUR
HOUR
HOUR
HOUR
HOUR
SQYD
ACRE
ACRE
ACRE
EACH
LPSM
SQFT
EACH
EACH
LNFT
Sheet and Description
B3
Grading Summary
BS
Surfacing Summary
B6
Drainage
Summary
B7
Miscellaneous Summaries
562.5
9,346 1.9 1.9 1.9
B8
Permanent Signing
Summary
S2, S7, S16, S25
Structura l Summaries
Allowance
37.5
0.1
0.1
0.1
STATE PROJECT
SHEET
NUMBER
co CO FTFW ROFL TRAILS(l)
CO FLAP JEF128/1)
B2
Estimated Quantities
Bid Schedule
600.0
9,900 2.0 2.0 2.0
ALL
Remarks and/or Determination of
Estimated Quantity
Contract Quantity
Contract Quantity
Sheet 2 of 2
� '---�R�e=-.iio;;.:;,o:.:.rt:...:.;D.:;:.at::;;;e...:.:-=1-=1""-/0::..1:.i:./.:.2;;;:3 _______________ .....;..;....;..;....;..;....;=..=-=.....;_.;.....;..;...;;=-=--=-=;...;_.;....;..;....;=-=--=.....;..;....;..;....;..;....;=..=-=.....;_.;.....;..;...;;=-=--=-=;...;_.;..A.=------------------------------------'
GRADING SUMMARY
Roadway Excavation Pay Item Additional Excavation
For info only 20401-0000 For info onl
(-) Total
Prismoidal Approach ROADWAY Available
Unavailable Shrink/Swell Excavation
Station to Station Volume Roads EXCAVATION Material
Material Factor Avaliable For (see note 1) Fills
BCY BCY CUYD BCY BCY CCY
Segment 01
101+00.45 - 107+00.00 840 0 840 0 124 1.06 759
6 107+00.00 - 108+57.16 1,456 0 1,456 0 78 1.06 1,460
Box Ol/vert
6 109+18.16 - 110+09.43 602 602 0 39 1.06 597
Segment 02
136+12.13 - 137+21.97 4 0 4 0 4 1.06 1
Segment 03
409+41.70 - 410+49.78 4 0 4 0 3 1.06 1
Segment 04
457+24.79 - 463+00.00 140 0 140 0 63 1.06 82
463+00.00 - 463+87.70 18 0 18 0 10 1.06 9
TOTALS 3,064 0 3,064 0 321 2,909
NOTE:
1. Unavailable Material and Various Additional Backfill Material Needed Onsite includes topsoil striping.
2. Conserve three inches of topsoil in cut and fill slope areas.
Embankment For info onl
Various
Additional Backfill Prismoidal Approach
Material Volume Roads
Needed Onsite
(see note 1)
CCY CCY CCY
132 0 70
71 0 22
52 0 18
131 0 13
145 0 14
119 0 42
3 0 4
652 0 183
For info only
Total Embankment
CCY
Excavation- Embankment
CCY
1,411
-143
-158
-79
2,152
For Info Only
WASTE
(see note 3)
CUYD
STATE
co
PROJECT
CO FTFW ROFL TRAILS(l)
CO FLAP JEF128 1
3. Estimated waste quantity calculated using volumes adjusted for estimated material source shrink/swell of 1.06. The contractor is responsible for determining the shrink/swell on the borrow material.
4. The quantities shown herein are approximations. Payment will be made for the actual quantities of work performed.
5. BCY - Bank cubic yard - one cubic yard of material as it lies in the natural state.
CCY - Compacted cubic yard - one cubic yard of material after it has been compacted to specification density.
AMENDMENT A006
ffi 11/01/23 Revise Segment 01 quantities to remove grading related to the precast concrete box culvert and revise total quantities
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
GRADING SUMMARY
REVISED 11/01/23
SHEET
NUMBER
B3
5,92
-50 -40
5,910
5,900
5,890
-50 -40
5,920 -� 5,910
0 5,900 u
5,890
I t- H mt-
-50 -40 u
-30 -20
109+00.00
Des Grade = 5,896.48
Subgrade = 5,895.98
Original Grnd = 5,910.24
-10 0 10 108+50.00
Des Grade= 5,897.10
Subgrade = 5,896.60
Original Grnd = 5,907.53
,- -f-
40 50
:d�t.: P--:--;1,- -f---
STATE
co ffi 5,920
5,910
5,900
5,890
5,910
PROJECT
CO FTFW ROFL TRAILS(!)
CO FLAP JEF128(1)
i----
-30 -20
--..L-i
,!,;O 1-9/o
-10 0 10 108+49.48
Des Grade= 5,897.11
Subgrade = 5,896.61
Original Grnd = 5,907.57
1.·.3 ,.._ ,.,...
�::EC
iV· _R
,.:. 0"/c -I- _j__ -�
- . _j__ I_� • -- f-- �- . - -
I �--+ I =H +-=t +-� r= --+ I =H • I
I m, TTT T,T, I
5,900
5,890
30 40 50
5,920 l'• J._ ,. ,- -,,;, r--
5,910
5,900
�--+ I =H I
I --l-1-----1- _J_ -� -Li--+ _J_ I _j__ -Li---1- _J_ -� --l-1-----1- _J_ -� J__
5,890
-30 -20 -10 0 10 108+04.70
Des Grade = 5,898.69
Subgrade = 5,898.19
Original Grnd = 5,908.50
FHWA, Office of Federal Lands Highway Central Federal Lands Highway Division
30 40 50 i AMENDMENT A006 ffi 11/01/23 Remove cross section at precast concrete box culvert, station 109+00.00
SHEET
NUMBER
XS
l
X-SECTIONS
Segment 01 REVISED 11/01/23
A - 6
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:CO FTFW ROFL TRAILS(1)
Project Name:Rocky Flats NWR Trails
A - 7
Contract Quantity Pay Items
20801-0000 STRUCTURE EXCAVATION
20803-0000 STRUCTURAL BACKFILL
55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
55235-0000 EXPANSION JOINTS
55401-1000 REINFORCING STEEL
55401-2000 REINFORCING STEEL, EPOXY COATED
60220-4150 12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
64604-3000 FIXTURE, PEDESTRIAN RAILING
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15210-3000 CENTERLINE, VERIFICATION AND STAKING
0.355 MILE $____________ $____________
A0060 15215-2000 SURVEY AND STAKING, BRIDGE
3 EACH $____________ $____________
A0080 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE
3 EACH $____________ $____________
A0100 15215-5000 SURVEY AND STAKING, BOX CULVERT
1 EACH $____________ $____________
A0120 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL
0.340 MILE $____________ $____________
A0140 15236-2000 SURVEY CONTROL, GRADE FINISHING
0.678 MILE $____________ $____________
A0160 15301-0000 CONTRACTOR QUALITY CONTROL
ALL LPSM $___LPSM_____ $____________
A0180 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0200 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FTFW ROFL TRAILS(1)
A - 8
A0220 15701-0000 SOIL EROSION CONTROL
ALL LPSM $___LPSM_____ $____________
A0240 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0260 15802-0000 WATERING FOR DUST CONTROL
ALL LPSM $___LPSM_____ $____________
A0280 20101-0000 CLEARING AND GRUBBING
3.0 ACRE $____________ $____________
A0300 20302-0700 REMOVAL OF FENCE
140 LNFT $____________ $____________
A0320 20302-1200 REMOVAL OF GUARDRAIL
15.0 LNFT $____________ $____________
A006 A0340 20401-0000 ROADWAY EXCAVATION
4,000 CUYD $____________ $____________
A0360 20402-0000 SUBEXCAVATION
100 CUYD $____________ $____________
A0380 20703-2000 GEOGRID, STABILIZATION
4,500 SQYD $____________ $____________
A0400 20801-0000 STRUCTURE EXCAVATION
76 CUYD $____________ $____________
A0420 20803-0000 STRUCTURAL BACKFILL
110 CUYD $____________ $____________
A0440 20810-0000 SHORING AND BRACING
ALL LPSM $___LPSM_____ $____________
A0460 21201-0000 LINEAR GRADING
0.400 MILE $____________ $____________
A0480 25101-2100 PLACED RIPRAP, METHOD B, CLASS 1
25 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FTFW ROFL TRAILS(1)
A - 9
A0500 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2
5 CUYD $____________ $____________
A0520 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3
50 CUYD $____________ $____________
A0540 30202-2000 ROADWAY AGGREGATE, METHOD 2
350 TON $____________ $____________
A0560 30202-2000 ROADWAY AGGREGATE, METHOD 2 (CRUSHER FINES)
900 TON $____________ $____________
A0580 41801-1000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
150 SQYD $____________ $____________
A0600 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
146 CUYD $____________ $____________
A0620 55235-0000 EXPANSION JOINTS
72 LNFT $____________ $____________
A0640 55401-1000 REINFORCING STEEL
6,200 LB $____________ $____________
A0660 55401-2000 REINFORCING STEEL, EPOXY COATED
23,100 LB $____________ $____________
A0680 55504-0000 PRE-FABRICATED STEEL BRIDGE (WOMAN CREEK)
ALL LPSM $___LPSM_____ $____________
A0700 55504-0000 PRE-FABRICATED STEEL BRIDGE (ROCK CREEK)
ALL LPSM $___LPSM_____ $____________
A0720 55504-0000 PRE-FABRICATED STEEL BRIDGE (INDIANA STREET)
ALL LPSM $___LPSM_____ $____________
A0740 56501-0200 DRILLED SHAFT, 24-INCH DIAMETER
340 LNFT $____________ $____________
A0760 56501-0600 DRILLED SHAFT, 48-INCH DIAMETER
60 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FTFW ROFL TRAILS(1)
A - 10
A006 A0780 60201-0600 18-INCH PIPE CULVERT
80 LNFT $____________ $____________
A0800 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
1 EACH $____________ $____________
A0820 60220-4150 12 FEET SPAN, 10 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT
61 LNFT $____________ $____________
A0840 60401-0000 MANHOLE (CDOT M-604-20)
1 EACH $____________ $____________
A0860 60404-1000 CATCH BASIN, FLH TYPE 1
1 EACH $____________ $____________
A0880 60409-0100 INLET TOP, METAL FRAME AND GRATE, FLH TYPE A
1 EACH $____________ $____________
A0900 61701-4550 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A WOOD POSTS
600.0 LNFT $____________ $____________
A0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
5 EACH $____________ $____________
A0940 61901-0900 FENCE, BARBED WIRE, 4 STRAND
100 LNFT $____________ $____________
A0960 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0980 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
24-INCH WIDTH
20 HOUR $____________ $____________
A1000 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
20 HOUR $____________ $____________
A1020 62201-1300 BULLDOZER, 160HP MINIMUM FLYWHEEL POWER
20 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FTFW ROFL TRAILS(1)
A - 11
A1040 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
20 HOUR $____________ $____________
A1060 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A1080 62301-0000 GENERAL LABOR
40 HOUR $____________ $____________
A1100 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
40 HOUR $____________ $____________
A1120 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
40 HOUR $____________ $____________
A1140 62405-0200 PLACING CONSERVED TOPSOIL, 3-INCH DEPTH
9,900 SQYD $____________ $____________
A1160 62510-2000 SEEDING, HYDRAULIC METHOD
2.0 ACRE $____________ $____________
A1180 62515-2000 MULCHING, HYDRAULIC METHOD
2.0 ACRE $____________ $____________
A1200 62520-0000 FERTILIZER
2.0 ACRE $____________ $____________
A1220 63301-0000 SIGN SYSTEM
11 EACH $____________ $____________
A1240 63501-0000 TEMPORARY TRAFFIC CONTROL
ALL LPSM $___LPSM_____ $____________
A1260 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN (BIL
INFRASTRUCTURE SIGN)
48 SQFT $____________ $____________
A1280 64603-0000 FIXTURE (SINGLE PANEL KIOSK)
2 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FTFW ROFL TRAILS(1)
A - 12
A1300 64603-0000 FIXTURE (TIMBER ARCH STRUCTURE)
2 EACH $____________ $____________
A1320 64604-3000 FIXTURE, PEDESTRIAN RAILING
126 LNFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:CO FTFW ROFL TRAILS(1)
| A004 CO FTFW ROFL Trails (1) 10.26.23.pdf |
| CO FTFW ROFL Trails (1) C1-C2 Amendment A004.pdf |
| (C01)CO FTFW ROFL Trails (1)_Plan-Profile-signed |
| (C02)CO FTFW ROFL Trails (1)_Plan-Profile-signed |
File details come from the government source that posted it. Updated .