QnA_10.25.19.pdf

PDF 94 KB Posted

Attached to
HI ERFO FTNP HAVO 10(4), Crater Rim Drive Seismic Spot Repairs
Solicitation number
6982AF19B000020
Issued by

About this file

This solicitation is for seismic spot repairs and trail construction work at Hawaii Volcanoes National Park. The scope of work includes repairing approximately 12 sites damaged in recent seismic activity through installation of compacted riprap fill and special rock embankment. Additional work includes construction of a new multi-use trail approximately 15 miles long, removal and replacement of guardrail, rock scaling, repair of a historic stone wall, and replacement of a traffic counter system. Estimated quantities include over 900 cubic yards of keyed riprap, 260 cubic yards of special rock embankment, and 1200 tons of asphalt concrete pavement. The engineer's estimate is between $3 million to $5 million. The construction duration is approximately three months starting in January 2020. The solicitation number is 6982AF19B000020 and was issued by the Department of Transportation Federal Highway Administration. The anticipated advertisement, bid opening, and award dates are in October, November and December 2019 respectively.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers during Advertisement for HI ERFO/FTNP HAVO 10(4), Crater Rim Drive Seismic Spot Repairs

October 25, 2019

Questions Answers 1 For the Guardrail Specifications can we follow State of Hawaii

Products so we will have parts available to repair?

See attached drawings from a recent project on State of Hawaii, Department of Transportation, Highways Division Project.

31 inch MGS Guardrail with plastic 8 inch spacer block Trailing End Anchorage System with metal post Type A Flare with metal post plastic offset block

Minimizing the wood blocks and posts due to wet rot and termites that affect the wood posts and blocks.

HAVO park will not accept metal post and what we have shown on the plans for the end treatment is similar to what the contractor has submitted. Therefore, we will be using details in our plans. No changes.