This document provides details for a federal solicitation seeking seismic damage repair services in Hawaii Volcanoes National Park. The solicitation involves repair of approximately 12 sites damaged in 2018 volcanic activity and earthquakes through installation of compacted riprap fill, special rock embankment, and restoration of asphalt pavement and markings. It also includes replacement of 3,725 linear feet of guardrail, repair of a historic stone guardwall, removal and replacement of a traffic counter, and scaling of rock on Chain of Craters Road. The engineer's estimate for the base scope and three option areas ranges from $3 million to $5 million. The anticipated response date is November 5, 2019 with an award date of November 19, 2019 and construction period from January 15 to April 7, 2020. The soliciting agency is the Department of Transportation Federal Highway Administration.
Justification for Other than Full and Open Competition - Solicitation
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION
1. Identification of the agency and the contracting activity
Department of Transportation, Federal Highway Administration, Central Federal Lands Highway Division (CFLHD), 12300 Dakota Avenue, Lakewood, Colorado.
2. Nature and/or description of the action being approved
Justification and approval to use other than full and open competition to award a contract for w-beam guardrail terminals.
3. Description of the supplies or services required to meet the agency’s needs (including the estimated value)
The project scope includes sixteen tangent w-beam guardrail terminals:
• Pay item 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (4 EA)
The total estimated amount of this product is $20,000.
The proprietary type for the tangent w-beam terminal is shown in the Special Contract Requirements. The product name is SoftStop, manufactured by Trinity Industries https://trinityhighway.com
4. Statutory authority permitting other than full and open competition
The authority to enter into a contract for this effort without full and open competition is FAR 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements.
5. Demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited
The project is located on Chain of Craters Road in Hawaii Volcanoes National Park on the island of Hawaii. Chain of Craters Road is owned and maintained by the National Park Service.
The current crash testing criteria for roadside safety hardware is provided in the AASHTO Manual for Assessing Safety Hardware (MASH). The project proposes to replace the existing guardrail terminals with a terminal type that meets the current MASH criteria. There are no generic tangent terminals that meet MASH criteria. There are other proprietary tangent terminals that meet MASH, but the SoftStop is the preferred option due to aesthetics. The project is located in a scenic national park where visual https://trinityhighway.com/ impact is a concern. The SoftStop provides a crashworthy terminal with a narrow impact head that minimizes the visual impact.
6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized
The Justification for Other than Full and Open Competition will be posted with the solicitation as required by FAR 5.102(a)(6).
7. Determination that the anticipated cost to the Government will be fair and reasonable
The FHWA will ensure that all costs associated with the proposed contract are fair and reasonable. The FHWA will perform a thorough analysis of the Offeror’s bid and/or proposal to substantiate this determination.
8. Description of the market research conducted and the results or a statement of the reason market research was not conducted
The SoftStop is commercially available. The SoftStop is one of the terminals currently used by the Hawaii Department of Transportation (a SoftStop was recently installed by HDOT on Highway 11 within the park limits). There is crash testing documentation available to show that the SoftStop has successfully passed MASH crash test level 2 criteria.
9. Other facts supporting the use of other than full and open competition
None.
10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.
None.
11. Statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.
None. This is the only guardrail terminal that meets crashworthy criteria while minimizing visual impact.
12. Certification
I certify that the information provided in this justification is complete and accurate to the best of my knowledge and belief.
Date
Date
Thomas Sohn Project Manager/COR
Sheri T. Walsh Contracting Officer
| 1. Identification of the agency and the contracting activity |
| Department of Transportation, Federal Highway Administration, Central Federal Lands Highway Division (CFLHD), 12300 Dakota Avenue, Lakewood, Colorado. |
| 2. Nature and/or description of the action being approved |
| Justification and approval to use other than full and open competition to award a contract for w-beam guardrail terminals. |
| 3. Description of the supplies or services required to meet the agency’s needs (including the estimated value) |
| The project scope includes sixteen tangent w-beam guardrail terminals: |
| Pay item 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (4 EA) |
| The total estimated amount of this product is $20,000. |
| The proprietary type for the tangent w-beam terminal is shown in the Special Contract Requirements. The product name is SoftStop, manufactured by Trinity Industries https://trinityhighway.com |
| 4. Statutory authority permitting other than full and open competition |
| The authority to enter into a contract for this effort without full and open competition is FAR 6.302-1, only one responsible source and no other supplies or services will satisfy agency requirements. |
| 5. Demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited |
| The project is located on Chain of Craters Road in Hawaii Volcanoes National Park on the island of Hawaii. Chain of Craters Road is owned and maintained by the National Park Service. |
| The current crash testing criteria for roadside safety hardware is provided in the AASHTO Manual for Assessing Safety Hardware (MASH). The project proposes to replace the existing guardrail terminals with a terminal type that meets the current MASH c... |
| 6. Description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized |
| The Justification for Other than Full and Open Competition will be posted with the solicitation as required by FAR 5.102(a)(6). |
| 7. Determination that the anticipated cost to the Government will be fair and reasonable |
| 8. Description of the market research conducted and the results or a statement of the reason market research was not conducted |
| The SoftStop is commercially available. The SoftStop is one of the terminals currently used by the Hawaii Department of Transportation (a SoftStop was recently installed by HDOT on Highway 11 within the park limits). There is crash testing documenta... |
| 9. Other facts supporting the use of other than full and open competition |
| None. |
| 10. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition. |
| None. |
| 11. Statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required. |
| None. This is the only guardrail terminal that meets crashworthy criteria while minimizing visual impact. |
| 12. Certification |
| I certify that the information provided in this justification is complete and accurate to the best of my knowledge and belief. |
| _______________________________________________ _________________ |
| Thomas Sohn Date |
| Project Manager/COR |
| ________________________________________________ _________________ |
| Ryan Phillips Date |
| Contracting Officer |
| 2019-09-11T12:48:33-0600 | |
| THOMAS CHANGWOOK SOHN |
| 2019-09-12T13:19:24-0600 | |
| Sheri T. Walsh |
File details come from the government source that posted it. Updated .