Bid_Tabulation_WY_FLAP_6WX(1).pdf
PDF 604 KB Posted
- Attached to
- WY FLAP 6WX(1), Southfork Road Federal contract opportunity
- Solicitation number
- 6982AF19B000004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Disregard_the_posting_titled_QnA_4.22.19.docx | DOCX document | |
| QnA_4.22.19.pdf | ||
| QnA_4.22.19_4_WY.PFH.4.Beartooth_Highway.URS_Geotech.1999c.PDF | ||
| Southfork_Bid_Summary.pdf | ||
| Bid_Opening_Sign_In_Sheet.pdf | ||
| Bidder_Q_A_WY6WX(1)_Southfork_3.26.2019.pdf | ||
| Bidder_Q_A_WY6WX(1)_Southfork_3.25.2019.pdf | ||
| Bidder_Q_A_WY6WX(1)_Southfork_3.24.2019.pdf | ||
| A002_WY_6WX(1).pdf | ||
| Bidder_Q_A_WY6WX(1)_Southfork_3.20.2019.pdf | ||
| A001_WY_6WX(1).pdf | ||
| Southfork_Final_Geotechnical_Report.pdf | ||
| 100_X-sheets.pdf | ||
| 6982AF19B000004.pdf | ||
| 100_-Plan-sheets.pdf | ||
| WY_FLSP_6WX(1)_Pavement_Memo.pdf | ||
| FP-14.pdf | ||
| Hyd_6WX(1)_Final.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 04/03/19
1 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Contractor Responsive?
Engineer's Estimate
FirstMark Construction, LLC
Mountain Construction Company
Base Schedule A
$8,983,100.00
$12,126,000.00
$11,768,344.88
Option: X
$907,350.00
$1,357,000.00
$1,189,385.63
Option: Y
$300,000.00
$426,000.00
$514,895.10
Contractor Responsive?
Engineer's Estimate
FirstMark Construction, LLC
Mountain Construction Company
Total Base Schedule A and Option(s): X
$9,890,450.00
$13,483,000.00
$12,957,730.51
Total Base Schedule A and Option(s): XY
$10,190,450.00
$13,909,000.00
$13,472,625.61
Total Base Schedule A and Option(s): Y
$9,283,100.00
$12,552,000.00
$12,283,239.98
2 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Solcitation No: 6982AF19B000004
Division: Central Federal Lands
State: WY County: Park
Federal Land: Shoshone National Forest Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 03/29/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Mountain Construction Company $11,768,344.88 25 West 10th Lovell, WY 82431
FirstMark Construction, LLC $12,126,000.00 6611 Trade Center Ave Billings, MT 59101
Engineer's Estimate $8,983,100.00
3 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Mountain Construction Company Lump Sum $2,059,817.28 FirstMark Construction, LLC Lump Sum $1,056,693.00 Engineer's Estimate ALL LPSM Lump Sum $745,975.00
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
Mountain Construction Company Lump Sum $130,000.00 FirstMark Construction, LLC Lump Sum $130,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
A0060 15214-1000 SURVEY AND STAKING, BRIDGE
Mountain Construction Company Lump Sum $15,000.00 FirstMark Construction, LLC Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $8,000.00
A0080 15301-0000 CONTRACTOR QUALITY CONTROL
Mountain Construction Company Lump Sum $260,935.00 FirstMark Construction, LLC Lump Sum $318,950.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
A0100 15401-0000 CONTRACTOR TESTING
Mountain Construction Company Lump Sum $9,000.00 FirstMark Construction, LLC Lump Sum $210,000.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
A0120 15501-0000 CONSTRUCTION SCHEDULE
Mountain Construction Company Lump Sum $18,500.00 FirstMark Construction, LLC Lump Sum $35,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0140 15701-0000 SOIL EROSION CONTROL (EROSION CONTROL)
Mountain Construction Company Lump Sum $37,000.00 FirstMark Construction, LLC Lump Sum $70,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
4 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0160 15701-0000 SOIL EROSION CONTROL (SEDIMENT CONTROL)
Mountain Construction Company Lump Sum $102,500.00 FirstMark Construction, LLC Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $65,000.00
A0180 15701-0000 SOIL EROSION CONTROL (NON-STORM WATER CONTROL)
Mountain Construction Company Lump Sum $12,500.00 FirstMark Construction, LLC Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $40,000.00
A0200 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Mountain Construction Company Lump Sum $42,500.00 FirstMark Construction, LLC Lump Sum $28,990.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0220 15802-0000 WATERING FOR DUST CONTROL
Mountain Construction Company Lump Sum $164,000.00 FirstMark Construction, LLC Lump Sum $170,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A0240 20101-0000 CLEARING AND GRUBBING
Mountain Construction Company $2,475.00 $148,500.00 FirstMark Construction, LLC $8,000.00 $480,000.00 Engineer's Estimate 60.0 ACRE $1,000.00 $60,000.00
A0260 20301-0600 REMOVAL OF CATTLE GUARD
Mountain Construction Company $2,000.00 $2,000.00 FirstMark Construction, LLC $1,200.00 $1,200.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00
A0280 20301-2400 REMOVAL OF SIGN
Mountain Construction Company $100.00 $1,500.00 FirstMark Construction, LLC $120.00 $1,800.00 Engineer's Estimate 15 EACH $100.00 $1,500.00
5 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0300 20302-0700 REMOVAL OF FENCE
Mountain Construction Company $0.47 $2,209.00 FirstMark Construction, LLC $2.50 $11,750.00 Engineer's Estimate 4,700 LNFT $5.00 $23,500.00
A0320 20302-1200 REMOVAL OF GUARDRAIL
Mountain Construction Company $3.00 $540.00 FirstMark Construction, LLC $11.00 $1,980.00 Engineer's Estimate 180 LNFT $6.00 $1,080.00
A0340 20304-2000 REMOVAL OF BRIDGE (PARTIAL SUBSTRUCTURE)
Mountain Construction Company Lump Sum $180,000.00 FirstMark Construction, LLC Lump Sum $115,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00
A0360 20304-4000 REMOVAL OF BRIDGE SUPERSTRUCTURE
Mountain Construction Company Lump Sum $90,000.00 FirstMark Construction, LLC Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00
A0380 20401-0000 ROADWAY EXCAVATION
Mountain Construction Company $20.74 $1,327,360.00 FirstMark Construction, LLC $30.00 $1,920,000.00 Engineer's Estimate 64,000 CUYD $11.00 $704,000.00
A0400 20403-0000 UNCLASSIFIED BORROW
Mountain Construction Company $20.68 $217,140.00 FirstMark Construction, LLC $20.00 $210,000.00 Engineer's Estimate 10,500 CUYD $3.00 $31,500.00
A0420 20425-1000 DITCH, EXCAVATION (STANDARD)
Mountain Construction Company $4.89 $42,543.00 FirstMark Construction, LLC $8.00 $69,600.00 Engineer's Estimate 8,700 LNFT $10.00 $87,000.00
6 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0440 20425-1000 DITCH, EXCAVATION (OVERSIZED)
Mountain Construction Company $9.17 $27,510.00 FirstMark Construction, LLC $11.00 $33,000.00 Engineer's Estimate 3,000 LNFT $13.00 $39,000.00
A0460 20801-0000 STRUCTURE EXCAVATION
Mountain Construction Company $243.98 $68,314.40 FirstMark Construction, LLC $100.00 $28,000.00 Engineer's Estimate 280 CUYD $100.00 $28,000.00
A0480 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Mountain Construction Company $172.48 $24,147.20 FirstMark Construction, LLC $90.00 $12,600.00 Engineer's Estimate 140 CUYD $100.00 $14,000.00
A0500 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3
Mountain Construction Company $170.83 $25,624.50 FirstMark Construction, LLC $105.00 $15,750.00 Engineer's Estimate 150 CUYD $100.00 $15,000.00
A0520 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
Mountain Construction Company $160.72 $72,324.00 FirstMark Construction, LLC $110.00 $49,500.00 Engineer's Estimate 450 CUYD $120.00 $54,000.00
A0540 25101-2600 PLACED RIPRAP, METHOD B, CLASS 6
Mountain Construction Company $121.72 $255,612.00 FirstMark Construction, LLC $115.00 $241,500.00 Engineer's Estimate 2,100 CUYD $175.00 $367,500.00
A0560 30112-0000 AGGREGATE SURFACE COURSE
Mountain Construction Company $46.37 $834,660.00 FirstMark Construction, LLC $71.00 $1,278,000.00 Engineer's Estimate 18,000 CUYD $50.00 $900,000.00
7 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0600 30203-2000 ROADWAY AGGREGATE, METHOD 2
Mountain Construction Company $7.05 $775,500.00 FirstMark Construction, LLC $5.40 $594,000.00 Engineer's Estimate 110,000 SQYD $7.00 $770,000.00
A0620 31213-0000 MAGNESIUM CHLORIDE
Mountain Construction Company $138.00 $38,640.00 FirstMark Construction, LLC $400.00 $112,000.00 Engineer's Estimate 280 TON $175.00 $49,000.00
A0660 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
Mountain Construction Company $85.56 $1,540,080.00 FirstMark Construction, LLC $98.00 $1,764,000.00 Engineer's Estimate 18,000 TON $85.00 $1,530,000.00
A0680 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Mountain Construction Company $250.00 $45,000.00 FirstMark Construction, LLC $170.00 $30,600.00 Engineer's Estimate 180 TON $320.00 $57,600.00
A0720 40602-0000 FOG SEAL
Mountain Construction Company $0.55 $60,500.00 FirstMark Construction, LLC $0.50 $55,000.00 Engineer's Estimate 110,000 SQYD $0.35 $38,500.00
A0740 41102-1000 PRIME COAT, METHOD 1
Mountain Construction Company $1.70 $187,000.00 FirstMark Construction, LLC $1.40 $154,000.00 Engineer's Estimate 110,000 SQYD $1.50 $165,000.00
A0760 41201-0000 TACK COAT
Mountain Construction Company $803.96 $56,277.20 FirstMark Construction, LLC $650.00 $45,500.00 Engineer's Estimate 70 TON $800.00 $56,000.00
8 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0780 55101-2000 STEEL H-PILE, 14 X 102, IN PLACE
Mountain Construction Company $205.00 $102,500.00 FirstMark Construction, LLC $90.00 $45,000.00 Engineer's Estimate 500 LNFT $135.00 $67,500.00
A0800 55104-1000 DYNAMIC PILE LOAD TEST
Mountain Construction Company $15,000.00 $30,000.00 FirstMark Construction, LLC $6,000.00 $12,000.00 Engineer's Estimate 2 EACH $5,000.00 $10,000.00
A0820 55115-1000 PREBORING
Mountain Construction Company $999.00 $44,955.00 FirstMark Construction, LLC $100.00 $4,500.00 Engineer's Estimate 45 LNFT $50.00 $2,250.00
A0840 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Mountain Construction Company $1,500.00 $271,500.00 FirstMark Construction, LLC $2,350.00 $425,350.00 Engineer's Estimate 181 CUYD $1,200.00 $217,200.00
A0860 55401-1000 REINFORCING STEEL
Mountain Construction Company $3.00 $14,100.00 FirstMark Construction, LLC $3.00 $14,100.00 Engineer's Estimate 4,700 LB $1.75 $8,225.00
A0880 55401-2000 REINFORCING STEEL, EPOXY COATED
Mountain Construction Company $3.25 $139,425.00 FirstMark Construction, LLC $2.50 $107,250.00 Engineer's Estimate 42,900 LB $2.00 $85,800.00
A0900 55502-0000 STRUCTURAL STEEL, FURNISHED, FABRICATED, AND ERECTED
Mountain Construction Company $5.00 $897,000.00 FirstMark Construction, LLC $2.80 $502,320.00 Engineer's Estimate 179,400 LB $4.00 $717,600.00
9 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0920 55601-0900 BRIDGE RAILING, STEEL (WY DOT)
Mountain Construction Company $275.00 $94,050.00 FirstMark Construction, LLC $260.00 $88,920.00 Engineer's Estimate 342 LNFT $150.00 $51,300.00
A0940 56401-1000 BEARING DEVICE, ELASTOMERIC
Mountain Construction Company $2,000.00 $16,000.00 FirstMark Construction, LLC $250.00 $2,000.00 Engineer's Estimate 8 EACH $1,200.00 $9,600.00
A0960 60101-0000 CONCRETE
Mountain Construction Company $2,000.00 $2,000.00 FirstMark Construction, LLC $1,500.00 $1,500.00 Engineer's Estimate 1 CUYD $2,500.00 $2,500.00
A0980 60201-0600 18-INCH PIPE CULVERT
Mountain Construction Company $51.00 $31,110.00 FirstMark Construction, LLC $70.00 $42,700.00 Engineer's Estimate 610 LNFT $105.00 $64,050.00
A1000 60201-0800 24-INCH PIPE CULVERT
Mountain Construction Company $63.00 $91,350.00 FirstMark Construction, LLC $80.00 $116,000.00 Engineer's Estimate 1,450 LNFT $130.00 $188,500.00
A1020 60201-0800 24-INCH PIPE CULVERT (RCP)
Mountain Construction Company $405.00 $2,430.00 FirstMark Construction, LLC $260.00 $1,560.00 Engineer's Estimate 6 LNFT $160.00 $960.00
A1040 60201-0900 30-INCH PIPE CULVERT
Mountain Construction Company $107.00 $2,140.00 FirstMark Construction, LLC $120.00 $2,400.00 Engineer's Estimate 20 LNFT $150.00 $3,000.00
10 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1060 60201-1000 36-INCH PIPE CULVERT
Mountain Construction Company $107.00 $32,100.00 FirstMark Construction, LLC $130.00 $39,000.00 Engineer's Estimate 300 LNFT $150.00 $45,000.00
A1080 60201-1200 48-INCH PIPE CULVERT
Mountain Construction Company $145.00 $1,740.00 FirstMark Construction, LLC $206.00 $2,472.00 Engineer's Estimate 12 LNFT $300.00 $3,600.00
A1100 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
Mountain Construction Company $172.00 $6,020.00 FirstMark Construction, LLC $300.00 $10,500.00 Engineer's Estimate 35 EACH $360.00 $12,600.00
A1120 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Mountain Construction Company $250.00 $15,000.00 FirstMark Construction, LLC $350.00 $21,000.00 Engineer's Estimate 60 EACH $400.00 $24,000.00
A1140 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT (RCP)
Mountain Construction Company $1,500.00 $1,500.00 FirstMark Construction, LLC $375.00 $375.00 Engineer's Estimate 1 EACH $1,500.00 $1,500.00
A1160 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
Mountain Construction Company $450.00 $2,700.00 FirstMark Construction, LLC $500.00 $3,000.00 Engineer's Estimate 6 EACH $600.00 $3,600.00
A1180 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
Mountain Construction Company $575.00 $6,900.00 FirstMark Construction, LLC $725.00 $8,700.00 Engineer's Estimate 12 EACH $800.00 $9,600.00
11 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1200 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT
Mountain Construction Company $1,350.00 $1,350.00 FirstMark Construction, LLC $1,500.00 $1,500.00 Engineer's Estimate 1 EACH $2,000.00 $2,000.00
A1220 60703-0000 CLEANING CULVERTS IN PLACE
Mountain Construction Company $20.00 $6,200.00 FirstMark Construction, LLC $22.00 $6,820.00 Engineer's Estimate 310 LNFT $25.00 $7,750.00
A1240 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
Mountain Construction Company $45.00 $4,500.00 FirstMark Construction, LLC $45.00 $4,500.00 Engineer's Estimate 100 LNFT $100.00 $10,000.00
A1260 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Mountain Construction Company $4,700.00 $14,100.00 FirstMark Construction, LLC $4,700.00 $14,100.00 Engineer's Estimate 3 EACH $3,600.00 $10,800.00
A1280 61702-1600 TERMINAL SECTION, TYPE MGS FLARED
Mountain Construction Company $4,800.00 $4,800.00 FirstMark Construction, LLC $4,800.00 $4,800.00 Engineer's Estimate 1 EACH $3,600.00 $3,600.00
A1300 61707-0000 STRUCTURE TRANSITION RAILING
Mountain Construction Company $150.00 $15,000.00 FirstMark Construction, LLC $150.00 $15,000.00 Engineer's Estimate 100 LNFT $125.00 $12,500.00
A1320 61901-0900 FENCE, BARBED WIRE, 4 STRAND
Mountain Construction Company $3.45 $8,625.00 FirstMark Construction, LLC $4.00 $10,000.00 Engineer's Estimate 2,500 LNFT $5.00 $12,500.00
12 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1340 61903-1100 CATTLE GUARD, 32 FEET
Mountain Construction Company $27,214.80 $27,214.80 FirstMark Construction, LLC $20,000.00 $20,000.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00
A1360 61920-2000 REMOVE AND RESET GATE
Mountain Construction Company $105.00 $105.00 FirstMark Construction, LLC $100.00 $100.00 Engineer's Estimate 1 EACH $4,000.00 $4,000.00
A1380 61921-1000 REMOVE AND RESET FENCE
Mountain Construction Company $8.55 $1,966.50 FirstMark Construction, LLC $5.00 $1,150.00 Engineer's Estimate 230 LNFT $12.00 $2,760.00
A1400 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Mountain Construction Company $150.00 $6,000.00 FirstMark Construction, LLC $194.00 $7,760.00 Engineer's Estimate 40 HOUR $125.00 $5,000.00
A1420 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Mountain Construction Company $185.00 $7,400.00 FirstMark Construction, LLC $202.00 $8,080.00 Engineer's Estimate 40 HOUR $140.00 $5,600.00
A1440 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Mountain Construction Company $200.00 $8,000.00 FirstMark Construction, LLC $208.00 $8,320.00 Engineer's Estimate 40 HOUR $170.00 $6,800.00
A1460 62201-3300 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
Mountain Construction Company $185.00 $7,400.00 FirstMark Construction, LLC $225.00 $9,000.00 Engineer's Estimate 40 HOUR $135.00 $5,400.00
13 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1480 62301-0000 GENERAL LABOR
Mountain Construction Company $65.00 $2,600.00 FirstMark Construction, LLC $75.00 $3,000.00 Engineer's Estimate 40 HOUR $40.00 $1,600.00
A1500 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Mountain Construction Company $150.00 $3,000.00 FirstMark Construction, LLC $130.00 $2,600.00 Engineer's Estimate 20 HOUR $150.00 $3,000.00
A1520 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Mountain Construction Company $150.00 $3,000.00 FirstMark Construction, LLC $150.00 $3,000.00 Engineer's Estimate 20 HOUR $200.00 $4,000.00
A1540 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
Mountain Construction Company $4,335.00 $130,050.00 FirstMark Construction, LLC $4,000.00 $120,000.00 Engineer's Estimate 30.0 ACRE $1,400.00 $42,000.00
A1560 62510-2000 SEEDING, HYDRAULIC METHOD (UPLAND)
Mountain Construction Company $675.00 $18,900.00 FirstMark Construction, LLC $570.00 $15,960.00 Engineer's Estimate 28.0 ACRE $1,000.00 $28,000.00
A1580 62510-2000 SEEDING, HYDRAULIC METHOD (WETLAND)
Mountain Construction Company $1,850.00 $3,700.00 FirstMark Construction, LLC $1,855.00 $3,710.00 Engineer's Estimate 2.0 ACRE $1,000.00 $2,000.00
A1600 62515-2000 MULCHING, HYDRAULIC METHOD
Mountain Construction Company $1,100.00 $33,000.00 FirstMark Construction, LLC $1,200.00 $36,000.00 Engineer's Estimate 30.0 ACRE $1,000.00 $30,000.00
14 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1620 62520-0000 FERTILIZER
Mountain Construction Company $975.00 $29,250.00 FirstMark Construction, LLC $1,250.00 $37,500.00 Engineer's Estimate 30.0 ACRE $1,000.00 $30,000.00
A1640 63301-0000 SIGN SYSTEM
Mountain Construction Company $1,100.00 $13,200.00 FirstMark Construction, LLC $1,100.00 $13,200.00 Engineer's Estimate 12 EACH $400.00 $4,800.00
A1660 63316-1000 REMOVE AND RESET SIGN
Mountain Construction Company $450.00 $15,750.00 FirstMark Construction, LLC $450.00 $15,750.00 Engineer's Estimate 35 EACH $200.00 $7,000.00
A1680 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Mountain Construction Company $0.20 $37,000.00 FirstMark Construction, LLC $0.20 $37,000.00 Engineer's Estimate 185,000 LNFT $0.25 $46,250.00
A1700 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Mountain Construction Company $0.15 $7,800.00 FirstMark Construction, LLC $0.15 $7,800.00 Engineer's Estimate 52,000 LNFT $0.20 $10,400.00
A1720 63501-0000 TEMPORARY TRAFFIC CONTROL
Mountain Construction Company Lump Sum $657,000.00 FirstMark Construction, LLC Lump Sum $657,000.00 Engineer's Estimate ALL LPSM Lump Sum $250,000.00
A1740 63610-2200 CONDUIT, 3-INCH, PVC
Mountain Construction Company $20.00 $7,000.00 FirstMark Construction, LLC $24.00 $8,400.00 Engineer's Estimate 350 LNFT $10.00 $3,500.00
15 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1760 63610-3200 CONDUIT, 6-INCH, PVC
Mountain Construction Company $24.00 $7,680.00 FirstMark Construction, LLC $27.00 $8,640.00 Engineer's Estimate 320 LNFT $15.00 $4,800.00
A1780 64620-0400 REMOVE AND RESET MAILBOX
Mountain Construction Company $500.00 $7,500.00 FirstMark Construction, LLC $350.00 $5,250.00 Engineer's Estimate 15 EACH $300.00 $4,500.00
Total Schedule - All Items
Mountain Construction Company $11,768,344.88 FirstMark Construction, LLC $12,126,000.00 Engineer's Estimate $8,983,100.00
16 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Solcitation No: 6982AF19B000004
Division: Central Federal Lands
State: WY County: Park
Federal Land: Shoshone National Forest Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 03/29/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Mountain Construction Company $1,189,385.63 25 West 10th Lovell, WY 82431
FirstMark Construction, LLC $1,357,000.00 6611 Trade Center Ave Billings, MT 59101
Engineer's Estimate $907,350.00
17 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0020 15101-0000 MOBILIZATION
Mountain Construction Company Lump Sum $108,082.83 FirstMark Construction, LLC Lump Sum $71,314.00 Engineer's Estimate ALL LPSM Lump Sum $38,525.00
X0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
Mountain Construction Company Lump Sum $15,000.00 FirstMark Construction, LLC Lump Sum $15,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
X0060 15301-0000 CONTRACTOR QUALITY CONTROL
Mountain Construction Company Lump Sum $55,000.00 FirstMark Construction, LLC Lump Sum $27,100.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
X0080 15401-0000 CONTRACTOR TESTING
Mountain Construction Company Lump Sum $9,500.00 FirstMark Construction, LLC Lump Sum $25,400.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
X0100 15501-0000 CONSTRUCTION SCHEDULE
Mountain Construction Company Lump Sum $5,000.00 FirstMark Construction, LLC Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,500.00
X0120 15701-0000 SOIL EROSION CONTROL (EROSION CONTROL)
Mountain Construction Company Lump Sum $7,500.00 FirstMark Construction, LLC Lump Sum $75,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
X0140 15701-0000 SOIL EROSION CONTROL (SEDIMENT CONTROL)
Mountain Construction Company Lump Sum $10,000.00 FirstMark Construction, LLC Lump Sum $21,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
18 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0160 15701-0000 SOIL EROSION CONTROL (NON-STORM WATER CONTROL)
Mountain Construction Company Lump Sum $7,500.00 FirstMark Construction, LLC Lump Sum $9,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
X0180 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
Mountain Construction Company Lump Sum $7,500.00 FirstMark Construction, LLC Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,500.00
X0200 15802-0000 WATERING FOR DUST CONTROL
Mountain Construction Company Lump Sum $36,000.00 FirstMark Construction, LLC Lump Sum $13,000.00 Engineer's Estimate ALL LPSM Lump Sum $4,000.00
X0220 20101-0000 CLEARING AND GRUBBING
Mountain Construction Company $3,100.00 $37,200.00 FirstMark Construction, LLC $4,000.00 $48,000.00 Engineer's Estimate 12.0 ACRE $1,000.00 $12,000.00
X0240 20301-0600 REMOVAL OF CATTLE GUARD
Mountain Construction Company $2,000.00 $2,000.00 FirstMark Construction, LLC $1,400.00 $1,400.00 Engineer's Estimate 1 EACH $3,000.00 $3,000.00
X0260 20301-2400 REMOVAL OF SIGN
Mountain Construction Company $100.00 $700.00 FirstMark Construction, LLC $140.00 $980.00 Engineer's Estimate 7 EACH $100.00 $700.00
X0280 20302-0700 REMOVAL OF FENCE
Mountain Construction Company $0.47 $188.00 FirstMark Construction, LLC $3.50 $1,400.00 Engineer's Estimate 400 LNFT $5.00 $2,000.00
19 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0300 20401-0000 ROADWAY EXCAVATION
Mountain Construction Company $20.74 $186,660.00 FirstMark Construction, LLC $30.00 $270,000.00 Engineer's Estimate 9,000 CUYD $11.00 $99,000.00
X0320 20441-0000 WASTE
Mountain Construction Company $20.00 $8,000.00 FirstMark Construction, LLC $71.58 $28,632.00 Engineer's Estimate 400 CUYD $5.00 $2,000.00
X0340 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Mountain Construction Company $172.48 $3,449.60 FirstMark Construction, LLC $93.00 $1,860.00 Engineer's Estimate 20 CUYD $100.00 $2,000.00
X0360 30203-2000 ROADWAY AGGREGATE, METHOD 2
Mountain Construction Company $7.05 $148,050.00 FirstMark Construction, LLC $6.00 $126,000.00 Engineer's Estimate 21,000 SQYD $7.00 $147,000.00
X0380 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL
Mountain Construction Company $84.52 $295,820.00 FirstMark Construction, LLC $98.00 $343,000.00 Engineer's Estimate 3,500 TON $85.00 $297,500.00
X0420 40105-3000 ANTISTRIP ADDITIVE, TYPE 3
Mountain Construction Company $250.00 $8,750.00 FirstMark Construction, LLC $170.00 $5,950.00 Engineer's Estimate 35 TON $320.00 $11,200.00
X0460 40602-0000 FOG SEAL
Mountain Construction Company $0.55 $11,000.00 FirstMark Construction, LLC $0.50 $10,000.00 Engineer's Estimate 20,000 SQYD $0.35 $7,000.00
20 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0480 41102-1000 PRIME COAT, METHOD 1
Mountain Construction Company $1.70 $34,000.00 FirstMark Construction, LLC $1.40 $28,000.00 Engineer's Estimate 20,000 SQYD $1.50 $30,000.00
X0500 41201-0000 TACK COAT
Mountain Construction Company $803.96 $12,059.40 FirstMark Construction, LLC $650.00 $9,750.00 Engineer's Estimate 15 TON $800.00 $12,000.00
X0520 60201-0800 24-INCH PIPE CULVERT
Mountain Construction Company $63.00 $16,065.00 FirstMark Construction, LLC $90.00 $22,950.00 Engineer's Estimate 255 LNFT $130.00 $33,150.00
X0540 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Mountain Construction Company $250.00 $2,500.00 FirstMark Construction, LLC $410.00 $4,100.00 Engineer's Estimate 10 EACH $400.00 $4,000.00
X0560 61901-0900 FENCE, BARBED WIRE, 4 STRAND
Mountain Construction Company $2.80 $1,106.00 FirstMark Construction, LLC $4.00 $1,580.00 Engineer's Estimate 395 LNFT $5.00 $1,975.00
X0580 61903-1100 CATTLE GUARD, 32 FEET
Mountain Construction Company $27,214.80 $27,214.80 FirstMark Construction, LLC $22,000.00 $22,000.00 Engineer's Estimate 1 EACH $25,000.00 $25,000.00
X0600 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Mountain Construction Company $150.00 $3,000.00 FirstMark Construction, LLC $194.00 $3,880.00 Engineer's Estimate 20 HOUR $125.00 $2,500.00
21 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0620 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Mountain Construction Company $185.00 $3,700.00 FirstMark Construction, LLC $202.00 $4,040.00 Engineer's Estimate 20 HOUR $140.00 $2,800.00
X0640 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
Mountain Construction Company $200.00 $4,000.00 FirstMark Construction, LLC $208.00 $4,160.00 Engineer's Estimate 20 HOUR $170.00 $3,400.00
X0660 62201-3300 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
Mountain Construction Company $185.00 $3,700.00 FirstMark Construction, LLC $225.00 $4,500.00 Engineer's Estimate 20 HOUR $135.00 $2,700.00
X0680 62301-0000 GENERAL LABOR
Mountain Construction Company $65.00 $650.00 FirstMark Construction, LLC $75.00 $750.00 Engineer's Estimate 10 HOUR $40.00 $400.00
X0700 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES
Mountain Construction Company $150.00 $1,500.00 FirstMark Construction, LLC $300.00 $3,000.00 Engineer's Estimate 10 HOUR $150.00 $1,500.00
X0720 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
Mountain Construction Company $150.00 $1,500.00 FirstMark Construction, LLC $150.00 $1,500.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00
X0740 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
Mountain Construction Company $4,335.00 $17,340.00 FirstMark Construction, LLC $4,500.00 $18,000.00 Engineer's Estimate 4.0 ACRE $1,400.00 $5,600.00
22 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0760 62510-2000 SEEDING, HYDRAULIC METHOD
Mountain Construction Company $675.00 $2,700.00 FirstMark Construction, LLC $1,966.00 $7,864.00 Engineer's Estimate 4.0 ACRE $1,000.00 $4,000.00
X0780 62515-2000 MULCHING, HYDRAULIC METHOD
Mountain Construction Company $1,200.00 $4,800.00 FirstMark Construction, LLC $1,250.00 $5,000.00 Engineer's Estimate 4.0 ACRE $1,000.00 $4,000.00
X0800 62520-0000 FERTILIZER
Mountain Construction Company $975.00 $3,900.00 FirstMark Construction, LLC $1,285.00 $5,140.00 Engineer's Estimate 4.0 ACRE $1,000.00 $4,000.00
X0820 63301-0000 SIGN SYSTEM
Mountain Construction Company $1,100.00 $1,100.00 FirstMark Construction, LLC $1,100.00 $1,100.00 Engineer's Estimate 1 EACH $400.00 $400.00
X0840 63316-1000 REMOVE AND RESET SIGN
Mountain Construction Company $450.00 $1,800.00 FirstMark Construction, LLC $450.00 $1,800.00 Engineer's Estimate 4 EACH $200.00 $800.00
X0860 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Mountain Construction Company $0.20 $7,200.00 FirstMark Construction, LLC $0.20 $7,200.00 Engineer's Estimate 36,000 LNFT $0.25 $9,000.00
X0880 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
Mountain Construction Company $0.15 $1,650.00 FirstMark Construction, LLC $0.15 $1,650.00 Engineer's Estimate 11,000 LNFT $0.20 $2,200.00
23 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: X
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
X0900 63501-0000 TEMPORARY TRAFFIC CONTROL
Mountain Construction Company Lump Sum $75,000.00 FirstMark Construction, LLC Lump Sum $90,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
Total Schedule - All Items
Mountain Construction Company $1,189,385.63 FirstMark Construction, LLC $1,357,000.00 Engineer's Estimate $907,350.00
24 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: Y
Schedule Type: Options
Solcitation No: 6982AF19B000004
Division: Central Federal Lands
State: WY County: Park
Federal Land: Shoshone National Forest Opened at: Lakewood, CO
Opened by: Sheri Walsh
Date: 03/29/19
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
FirstMark Construction, LLC $426,000.00 6611 Trade Center Ave Billings, MT 59101
Mountain Construction Company $514,895.10 25 West 10th Lovell, WY 82431
Engineer's Estimate $300,000.00
25 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0020 15101-0000 MOBILIZATION
FirstMark Construction, LLC Lump Sum $40,000.00 Mountain Construction Company Lump Sum $113,320.30 Engineer's Estimate ALL LPSM Lump Sum $30,810.00
Y0040 15214-1000 SURVEY AND STAKING, BRIDGE
FirstMark Construction, LLC Lump Sum $10,000.00 Mountain Construction Company Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00
Y0060 15301-0000 CONTRACTOR QUALITY CONTROL
FirstMark Construction, LLC Lump Sum $34,825.00 Mountain Construction Company Lump Sum $32,000.00 Engineer's Estimate ALL LPSM Lump Sum $2,500.00
Y0080 15401-0000 CONTRACTOR TESTING
FirstMark Construction, LLC Lump Sum $5,000.00 Mountain Construction Company Lump Sum $9,500.00 Engineer's Estimate ALL LPSM Lump Sum $3,500.00
Y0100 15501-0000 CONSTRUCTION SCHEDULE
FirstMark Construction, LLC Lump Sum $5,000.00 Mountain Construction Company Lump Sum $1,500.00 Engineer's Estimate ALL LPSM Lump Sum $1,500.00
Y0120 15701-0000 SOIL EROSION CONTROL (EROSTION CONTROL)
FirstMark Construction, LLC Lump Sum $60,000.00 Mountain Construction Company Lump Sum $5,500.00 Engineer's Estimate ALL LPSM Lump Sum $2,000.00
Y0140 15701-0000 SOIL EROSION CONTROL (SEDIMENT CONTROL)
FirstMark Construction, LLC Lump Sum $10,000.00 Mountain Construction Company Lump Sum $7,500.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00
26 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0160 15701-0000 SOIL EROSION CONTROL (NON-STORM WATER CONTROL)
FirstMark Construction, LLC Lump Sum $6,000.00 Mountain Construction Company Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $3,000.00
Y0180 20304-2000 REMOVAL OF BRIDGE
FirstMark Construction, LLC Lump Sum $39,985.00 Mountain Construction Company Lump Sum $40,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
Y0200 20801-0000 STRUCTURE EXCAVATION
FirstMark Construction, LLC $70.00 $16,800.00 Mountain Construction Company $243.98 $58,555.20 Engineer's Estimate 240 CUYD $50.00 $12,000.00
Y0220 20803-0000 STRUCTURAL BACKFILL
FirstMark Construction, LLC $85.00 $9,350.00 Mountain Construction Company $78.00 $8,580.00 Engineer's Estimate 110 CUYD $75.00 $8,250.00
Y0240 30112-0000 AGGREGATE SURFACE COURSE
FirstMark Construction, LLC $100.00 $8,000.00 Mountain Construction Company $46.37 $3,709.60 Engineer's Estimate 80 CUYD $50.00 $4,000.00
Y0260 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
FirstMark Construction, LLC $1,200.00 $49,200.00 Mountain Construction Company $1,200.00 $49,200.00 Engineer's Estimate 41 CUYD $1,200.00 $49,200.00
Y0280 55401-1000 REINFORCING STEEL
FirstMark Construction, LLC $1.00 $6,800.00 Mountain Construction Company $5.25 $35,700.00 Engineer's Estimate 6,800 LB $1.75 $11,900.00
27 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0300 55504-0000 PRE-FABRICATED STEEL BRIDGE
FirstMark Construction, LLC Lump Sum $95,500.00 Mountain Construction Company Lump Sum $86,500.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
Y0320 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
FirstMark Construction, LLC $194.00 $1,940.00 Mountain Construction Company $100.00 $1,000.00 Engineer's Estimate 10 HOUR $125.00 $1,250.00
Y0340 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
FirstMark Construction, LLC $202.00 $2,020.00 Mountain Construction Company $150.00 $1,500.00 Engineer's Estimate 10 HOUR $140.00 $1,400.00
Y0360 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
FirstMark Construction, LLC $208.00 $2,080.00 Mountain Construction Company $200.00 $2,000.00 Engineer's Estimate 10 HOUR $170.00 $1,700.00
Y0380 62201-3300 HYDRAULIC EXCAVATOR, 3/4 CUBIC YARD MINIMUM CAPACITY
FirstMark Construction, LLC $225.00 $2,250.00 Mountain Construction Company $185.00 $1,850.00 Engineer's Estimate 10 HOUR $135.00 $1,350.00
Y0400 62301-0000 GENERAL LABOR
FirstMark Construction, LLC $75.00 $750.00 Mountain Construction Company $65.00 $650.00 Engineer's Estimate 10 HOUR $40.00 $400.00
Y0420 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES
FirstMark Construction, LLC $150.00 $1,500.00 Mountain Construction Company $150.00 $1,500.00 Engineer's Estimate 10 HOUR $200.00 $2,000.00
28 out of 28Source Selection Information - See FAR 2.101 & 3.104
Project No: WY FLAP 6WX(1)
Project Name: Southfork Road
Schedule: Y
Schedule Type: Options
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Y0440 63301-0000 SIGN SYSTEM
FirstMark Construction, LLC $1,100.00 $2,200.00 Mountain Construction Company $1,500.00 $3,000.00 Engineer's Estimate 2 EACH $400.00 $800.00
Y0460 63308-3000 OBJECT MARKER, TYPE 3
FirstMark Construction, LLC $450.00 $1,800.00 Mountain Construction Company $900.00 $3,600.00 Engineer's Estimate 4 EACH $110.00 $440.00
Y0480 63501-0000 TEMPORARY TRAFFIC CONTROL
FirstMark Construction, LLC Lump Sum $5,000.00 Mountain Construction Company Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $5,000.00
Y0500 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION
FirstMark Construction, LLC Lump Sum $10,000.00 Mountain Construction Company Lump Sum $28,230.00 Engineer's Estimate ALL LPSM Lump Sum $26,000.00
Total Schedule - All Items
FirstMark Construction, LLC $426,000.00 Mountain Construction Company $514,895.10 Engineer's Estimate $300,000.00