T A B U L A T I O N O F B I D S Schedule A Central Federal Lands Highway Division

Project No : NV NV/AZ FTBR OLD US93(2) FLMA No:

Project Name : Hoover Dam Access Road Solcitation No:

State : NV County : Clark County, NV & Mohave County, AZ Federal Location : Hoover Dam

Opened at: 2:00pm Opened by: Ryan Phillips Date: 1/18/2018

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 1,733,000.00$

Eagle Peak Rock & Pav 1,411,334.00$

Stormwater Plans, LLC 1,757,391.00$

GC Works 1,462,466.30$

Las Vegas Paving Corp 1,862,000.00$

6982AF18B000007

Eagle Peak Rock & Paving, Inc.

1/23/2018 FHWA Confidential Page 1 of 1

Schedule A Total of Bid Items: 1,733,000.00$ -18.6% 1,411,334.00$ Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line A0020 ALL LPSM 159,793.00$ 159,793.00$ 140,000.00$

15210-3000 Line A0040 3.513 MILE 5,000.00$ 17,565.00$ 3,513.00$

15301-0000 Line A0060 ALL LPSM 40,000.00$ 40,000.00$ 50,000.00$

15401-0000 Line A0080 ALL LPSM 30,000.00$ 30,000.00$ 30,000.00$

15501-0000 Line A0100 ALL LPSM 20,000.00$ 20,000.00$ 20,000.00$

15706-1000 Line A0120 70 EACH 250.00$ 17,500.00$ 7,000.00$

20304-1000 Line A0140 ALL LPSM 15,000.00$ 15,000.00$ 40,000.00$

20402-0000 Line A0160 100 CUYD 200.00$ 20,000.00$ 16,500.00$

30202-2000 Line A0180 220 TON 50.00$ 11,000.00$ 18,700.00$

40301-0100 Line A0200 1,610 TON 110.00$ 177,100.00$ 198,030.00$

40601-0000 Line A0220 16 TON 1,100.00$ 17,600.00$ 6,400.00$

41201-0000 Line A0240 16 TON 1,100.00$ 17,600.00$ 8,000.00$

41301-0000 Line A0260 11,550 SQYD 4.50$ 51,975.00$ 69,300.00$

Engineer's Estimate

6.00$

500.00$

400.00$

123.00$

85.00$

165.00$

40,000.00$

100.00$

20,000.00$

50,000.00$

Eagle Peak Rock & Paving, Inc.

1,000.00$

140,000.00$

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

CONTRACTOR QUALITY CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SUBEXCAVATION

ROADWAY AGGREGATE, METHOD 2

ASPHALT CONCRETE PAVEMENT, TYPE 1

FOG SEAL

TACK COAT

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, INLET PROTECTION

ASPHALT PAVEMENT MILLING

CONTRACTOR TESTING

30,000.00$

1/23/2018 Page 1 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Eagle Peak Rock & Paving, Inc.

41402-2000 Line A0280 2.5 MILE 9,000.00$ 22,500.00$ 37,500.00$

41801-2000 Line A0300 2,100 SQYD 100.00$ 210,000.00$ 157,500.00$

42901-0000 Line A0320 2,500 TON 200.00$ 500,000.00$ 375,000.00$

42905-0000 Line A0340 56 TON 1,100.00$ 61,600.00$ 44,800.00$

62201-0050 Line A0360 10 HOUR 125.00$ 1,250.00$ 1,200.00$

62201-0450 Line A0380 10 HOUR 125.00$ 1,250.00$ 1,200.00$

62201-2350 Line A0400 20 HOUR 125.00$ 2,500.00$ 2,400.00$

62301-0000 Line A0420 20 HOUR 65.00$ 1,300.00$ 1,300.00$

62302-1000 Line A0440 10 HOUR 150.00$ 1,500.00$ 750.00$

62302-1100 Line A0460 10 HOUR 150.00$ 1,500.00$ 1,550.00$

63310-0000 Line A0480 170 EACH 125.00$ 21,250.00$ 9,350.00$

63310-0000 Line A0500 90 EACH 125.00$ 11,250.00$ 4,950.00$

63316-1000 Line A0520 2 EACH 100.00$ 200.00$ 800.00$ 400.00$

55.00$

55.00$

155.00$

75.00$

65.00$

120.00$

120.00$

120.00$

800.00$

150.00$

75.00$

15,000.00$

ULTRA-THIN BONDED WEARING COURSE

POLYMER MODIFIED EMULSION MEMBRANE

DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY

CHANNELIZING DEVICE (YELLOW)

REMOVE AND RESET SIGN

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

POWER BROOM

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

CHANNELIZING DEVICE (WHITE)

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

1/23/2018 Page 2 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Eagle Peak Rock & Paving, Inc.

63402-0300 Line A0540 35.0 MILE 3,500.00$ 122,500.00$ 28,000.00$

63402-0400 Line A0560 0.5 MILE 3,500.00$ 1,750.00$ 100.00$

63405-0050 Line A0580 21 EACH 200.00$ 4,200.00$ 525.00$

63406-0100 Line A0600 5,578 EACH 1.50$ 8,367.00$ 16,734.00$

63406-0200 Line A0620 1,078 EACH 2.50$ 2,695.00$ 3,234.00$

63406-0300 Line A0640 116 EACH 2.50$ 290.00$ 348.00$

63501-1000 Line A0660 ALL LPSM 25,000.00$ 25,000.00$ 20,000.00$

63502-0600 Line A0680 10 EACH 400.00$ 4,000.00$ 850.00$

63502-0700 Line A0700 100 EACH 30.00$ 3,000.00$ 1,500.00$

63502-1600 Line A0720 15 EACH 135.00$ 2,025.00$ 225.00$

63502-2000 Line A0740 3 EACH 10,000.00$ 30,000.00$ 9,000.00$

63503-1000 Line A0760 1,000 LNFT 5.00$ 5,000.00$ 2,000.00$

63504-1000 Line A0780 240 SQFT 30.00$ 7,200.00$ 4,800.00$ 20.00$

2.00$

3,000.00$

15.00$

15.00$

85.00$

20,000.00$

3.00$

3.00$

3.00$

25.00$

200.00$

800.00$

PAVEMENT MARKINGS, TYPE B, SOLID

PAVEMENT MARKINGS, TYPE B, BROKEN

PAVEMENT MARKINGS, SYMBOLS

RAISED PAVEMENT MARKER, NON-REFLECTIVE

TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

RAISED PAVEMENT MARKER, NON-PLOWABLE, BI-DIRECTIONAL REFLECTIVE

RAISED PAVEMENT MARKER, NON-PLOWABLE, MONO-DIRECTIONAL REFLECTIVE

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

1/23/2018 Page 3 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Eagle Peak Rock & Paving, Inc.

63505-1000 Line A0800 2.7 MILE 1,200.00$ 3,240.00$ 5,400.00$

63506-0500 Line A0820 825 HOUR 70.00$ 57,750.00$ 53,625.00$

63506-0600 Line A0840 275 HOUR 90.00$ 24,750.00$ 19,250.00$ 70.00$

65.00$

2,000.00$

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

1/23/2018 Page 4 of 12

Schedule A Total of Bid Items:

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15210-3000 Line A0040 3.513 MILE

15301-0000 Line A0060 ALL LPSM

15401-0000 Line A0080 ALL LPSM

15501-0000 Line A0100 ALL LPSM

15706-1000 Line A0120 70 EACH

20304-1000 Line A0140 ALL LPSM

20402-0000 Line A0160 100 CUYD

30202-2000 Line A0180 220 TON

40301-0100 Line A0200 1,610 TON

40601-0000 Line A0220 16 TON

41201-0000 Line A0240 16 TON

41301-0000 Line A0260 11,550 SQYD

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

CONTRACTOR QUALITY CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SUBEXCAVATION

ROADWAY AGGREGATE, METHOD 2

ASPHALT CONCRETE PAVEMENT, TYPE 1

FOG SEAL

TACK COAT

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, INLET PROTECTION

ASPHALT PAVEMENT MILLING

CONTRACTOR TESTING

1.4% 1,757,391.00$ -15.6% 1,462,466.30$

Unit Price Amount Unit Price Amount

173,000.00$ 140,000.00$

7,026.00$ 20,000.00$

200,000.00$ 50,000.00$

138,000.00$ 12,000.00$

10,000.00$ 5,000.00$

19,250.00$ 19,250.00$

30,000.00$ 14,000.00$

6,500.00$ 7,000.00$

17,600.00$ 19,140.00$

233,450.00$ 241,500.00$

8,800.00$ 8,960.00$

8,800.00$ 8,960.00$

98,175.00$ 51,975.00$ 8.50$ 4.50$

550.00$ 560.00$

550.00$ 560.00$

145.00$ 150.00$

80.00$ 87.00$

65.00$ 70.00$

30,000.00$ 14,000.00$

275.00$ 275.00$

10,000.00$ 5,000.00$

2,000.00$ 5,693.14$

200,000.00$ 50,000.00$

Stormwater Plans, LLC GC Works

173,000.00$ 140,000.00$

138,000.00$ 12,000.00$

1/23/2018 Page 5 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

41402-2000 Line A0280 2.5 MILE

41801-2000 Line A0300 2,100 SQYD

42901-0000 Line A0320 2,500 TON

42905-0000 Line A0340 56 TON

62201-0050 Line A0360 10 HOUR

62201-0450 Line A0380 10 HOUR

62201-2350 Line A0400 20 HOUR

62301-0000 Line A0420 20 HOUR

62302-1000 Line A0440 10 HOUR

62302-1100 Line A0460 10 HOUR

63310-0000 Line A0480 170 EACH

63310-0000 Line A0500 90 EACH

63316-1000 Line A0520 2 EACH

ULTRA-THIN BONDED WEARING COURSE

POLYMER MODIFIED EMULSION MEMBRANE

DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACIT

CHANNELIZING DEVICE (YELLOW)

REMOVE AND RESET SIGN

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RA

POWER BROOM

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

CHANNELIZING DEVICE (WHITE)

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

1.4% 1,757,391.00$ -15.6% 1,462,466.30$

Unit Price Amount Unit Price Amount

Stormwater Plans, LLC GC Works

32,500.00$ 20,000.00$

88,200.00$ 136,500.00$

337,500.00$ 345,000.00$

50,400.00$ 50,400.00$

1,250.00$ 1,250.00$

1,750.00$ 1,800.00$

3,500.00$ 3,600.00$

1,700.00$ 1,600.00$

1,500.00$ 1,650.00$

1,500.00$ 1,250.00$

10,200.00$ 11,050.00$

5,400.00$ 5,850.00$

330.00$ 320.00$ 165.00$ 160.00$

60.00$ 65.00$

60.00$ 65.00$

150.00$ 125.00$

150.00$ 165.00$

85.00$ 80.00$

175.00$ 180.00$

175.00$ 180.00$

125.00$ 125.00$

900.00$ 900.00$

135.00$ 138.00$

42.00$ 65.00$

13,000.00$ 8,000.00$

1/23/2018 Page 6 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

63402-0300 Line A0540 35.0 MILE

63402-0400 Line A0560 0.5 MILE

63405-0050 Line A0580 21 EACH

63406-0100 Line A0600 5,578 EACH

63406-0200 Line A0620 1,078 EACH

63406-0300 Line A0640 116 EACH

63501-1000 Line A0660 ALL LPSM

63502-0600 Line A0680 10 EACH

63502-0700 Line A0700 100 EACH

63502-1600 Line A0720 15 EACH

63502-2000 Line A0740 3 EACH

63503-1000 Line A0760 1,000 LNFT

63504-1000 Line A0780 240 SQFT

PAVEMENT MARKINGS, TYPE B, SOLID

PAVEMENT MARKINGS, TYPE B, BROKEN

PAVEMENT MARKINGS, SYMBOLS

RAISED PAVEMENT MARKER, NON-REFLECTIVE

TEMPORARY TRAFFIC CONTROL, PORTABLE CHA

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

RAISED PAVEMENT MARKER, NON-PLOWABLE, B

RAISED PAVEMENT MARKER, NON-PLOWABLE, M

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONT

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

1.4% 1,757,391.00$ -15.6% 1,462,466.30$

Unit Price Amount Unit Price Amount

Stormwater Plans, LLC GC Works

29,750.00$ 122,500.00$

105.00$ 1,950.00$

630.00$ 4,200.00$

13,945.00$ 18,686.30$

2,695.00$ 4,042.50$

290.00$ 406.00$

90,000.00$ 36,000.00$

1,000.00$ 2,000.00$

1,200.00$ 2,500.00$

1,125.00$ 1,725.00$

18,000.00$ 24,000.00$

4,000.00$ 5,500.00$

2,880.00$ 2,364.00$ 12.00$ 9.85$

4.00$ 5.50$

6,000.00$ 8,000.00$

75.00$ 115.00$

12.00$ 25.00$

100.00$ 200.00$

90,000.00$ 36,000.00$

2.50$ 3.50$

2.50$ 3.75$

2.50$ 3.35$

30.00$ 200.00$

210.00$ 3,900.00$

850.00$ 3,500.00$

1/23/2018 Page 7 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

63505-1000 Line A0800 2.7 MILE

63506-0500 Line A0820 825 HOUR

63506-0600 Line A0840 275 HOUR

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

1.4% 1,757,391.00$ -15.6% 1,462,466.30$

Unit Price Amount Unit Price Amount

Stormwater Plans, LLC GC Works

8,640.00$ 9,450.00$

69,300.00$ 24,337.50$

27,500.00$ 24,750.00$ 100.00$ 90.00$

84.00$ 29.50$

3,200.00$ 3,500.00$

1/23/2018 Page 8 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line A0020 ALL LPSM

15210-3000 Line A0040 3.513 MILE

15301-0000 Line A0060 ALL LPSM

15401-0000 Line A0080 ALL LPSM

15501-0000 Line A0100 ALL LPSM

15706-1000 Line A0120 70 EACH

20304-1000 Line A0140 ALL LPSM

20402-0000 Line A0160 100 CUYD

30202-2000 Line A0180 220 TON

40301-0100 Line A0200 1,610 TON

40601-0000 Line A0220 16 TON

41201-0000 Line A0240 16 TON

41301-0000 Line A0260 11,550 SQYD

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

CONTRACTOR QUALITY CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SUBEXCAVATION

ROADWAY AGGREGATE, METHOD 2

ASPHALT CONCRETE PAVEMENT, TYPE 1

FOG SEAL

TACK COAT

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, INLET PROTECTION

ASPHALT PAVEMENT MILLING

CONTRACTOR TESTING

7.4% 1,862,000.00$

Unit Price Amount

260,655.25$

49,884.60$

179,000.00$

80,000.00$

1.00$

10,500.00$

13,300.00$

98,300.00$

39,380.00$

183,540.00$

21,632.00$

16,144.00$

43,774.50$ 3.79$

1,009.00$

1,352.00$

114.00$

179.00$

983.00$

13,300.00$

150.00$

1.00$

14,200.00$

179,000.00$

Las Vegas Paving Corp

260,655.25$

80,000.00$

1/23/2018 Page 9 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

41402-2000 Line A0280 2.5 MILE

41801-2000 Line A0300 2,100 SQYD

42901-0000 Line A0320 2,500 TON

42905-0000 Line A0340 56 TON

62201-0050 Line A0360 10 HOUR

62201-0450 Line A0380 10 HOUR

62201-2350 Line A0400 20 HOUR

62301-0000 Line A0420 20 HOUR

62302-1000 Line A0440 10 HOUR

62302-1100 Line A0460 10 HOUR

63310-0000 Line A0480 170 EACH

63310-0000 Line A0500 90 EACH

63316-1000 Line A0520 2 EACH

ULTRA-THIN BONDED WEARING COURSE

POLYMER MODIFIED EMULSION MEMBRANE

DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACIT

CHANNELIZING DEVICE (YELLOW)

REMOVE AND RESET SIGN

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RA

POWER BROOM

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

CHANNELIZING DEVICE (WHITE)

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

7.4% 1,862,000.00$

Unit Price Amount

Las Vegas Paving Corp

23,500.00$

171,150.00$

333,750.00$

36,960.00$

1,140.00$

1,490.00$

2,780.00$

1,670.00$

4,580.00$

2,600.00$

8,585.00$

4,545.00$

298.00$ 149.00$

50.50$

50.50$

260.00$

458.00$

83.50$

139.00$

149.00$

114.00$

660.00$

133.50$

81.50$

9,400.00$

1/23/2018 Page 10 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

63402-0300 Line A0540 35.0 MILE

63402-0400 Line A0560 0.5 MILE

63405-0050 Line A0580 21 EACH

63406-0100 Line A0600 5,578 EACH

63406-0200 Line A0620 1,078 EACH

63406-0300 Line A0640 116 EACH

63501-1000 Line A0660 ALL LPSM

63502-0600 Line A0680 10 EACH

63502-0700 Line A0700 100 EACH

63502-1600 Line A0720 15 EACH

63502-2000 Line A0740 3 EACH

63503-1000 Line A0760 1,000 LNFT

63504-1000 Line A0780 240 SQFT

PAVEMENT MARKINGS, TYPE B, SOLID

PAVEMENT MARKINGS, TYPE B, BROKEN

PAVEMENT MARKINGS, SYMBOLS

RAISED PAVEMENT MARKER, NON-REFLECTIVE

TEMPORARY TRAFFIC CONTROL, PORTABLE CHA

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

RAISED PAVEMENT MARKER, NON-PLOWABLE, B

RAISED PAVEMENT MARKER, NON-PLOWABLE, M

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONT

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

7.4% 1,862,000.00$

Unit Price Amount

Las Vegas Paving Corp

30,660.00$

109.50$

588.00$

12,271.60$

2,371.60$

255.20$

46,500.00$

5,000.00$

2,400.00$

918.75$

55,500.00$

1,880.00$

3,156.00$ 13.15$

1.88$

18,500.00$

61.25$

24.00$

500.00$

46,500.00$

2.20$

2.20$

2.20$

28.00$

219.00$

876.00$

1/23/2018 Page 11 of 12

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

63505-1000 Line A0800 2.7 MILE

63506-0500 Line A0820 825 HOUR

63506-0600 Line A0840 275 HOUR

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, PILOT CAR

7.4% 1,862,000.00$

Unit Price Amount

Las Vegas Paving Corp

7,830.00$

75,900.00$

27,500.00$ 100.00$

92.00$

2,900.00$

1/23/2018 Page 12 of 12

Option X Central Federal Lands Highway Division

Project No : NV NV/AZ FTBR OLD US93(2) FLMA No:

Project Name : Hoover Dam Access Road Solcitation No:

State : NV County : Clark County, NV, Mohave County, AZ Federal Location : Hoover Dam

Opened at: 2:00pm Opened by: Ryan Phillips Date: 1/18/2018

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 436,000.00$

Eagle Peak Rock & Pav 390,575.00$

Stormwater Plans LLC 338,225.00$

GC Works 400,215.00$

Las Vegas Paving Corp 453,000.00$

6982AF18B000007

Option X Total of Bid Items: 436,000.00$ -10.4% 390,575.00$

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line X0020 ALL LPSM 39,675.00$ 39,675.00$ 30,000.00$

15301-0000 Line X0040 ALL LPSM 10,000.00$ 10,000.00$ 13,000.00$

15401-0000 Line X0060 ALL LPSM 7,000.00$ 7,000.00$ 6,000.00$

15501-0000 Line X0080 ALL LPSM 6,000.00$ 6,000.00$ 1,000.00$

20304-1000 Line X0100 ALL LPSM 4,000.00$ 4,000.00$ 1,500.00$

40601-0000 Line X0120 2 TON 1,100.00$ 2,200.00$ 1,000.00$

40901-2000 Line X0140 38,850 SQYD 5.00$ 194,250.00$ 202,020.00$

41402-2000 Line X0160 2.1 MILE 9,000.00$ 18,900.00$ 35,700.00$

41801-2000 Line X0180 110 SQYD 100.00$ 11,000.00$ 8,250.00$

60920-0000 Line X0200 60 EACH 50.00$ 3,000.00$ 3,600.00$

62201-2350 Line X0220 20 HOUR 125.00$ 2,500.00$ 2,400.00$

62301-0000 Line X0240 20 HOUR 65.00$ 1,300.00$ 1,300.00$

62302-1000 Line X0260 10 HOUR 150.00$ 1,500.00$ 750.00$

Engineer's Estimate

75.00$

65.00$

120.00$

60.00$

75.00$

17,000.00$

5.20$

500.00$

1,500.00$

6,000.00$

Eagle Peak Rock & Paving, Inc.

13,000.00$

30,000.00$

MOBILIZATION

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

MICRO SURFACING, TYPE 2

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

RESET WHEELSTOP

POWER BROOM

GENERAL LABOR

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

FOG SEAL

SPECIAL LABOR, HIRED TECHNICAL SERVICES

CONSTRUCTION SCHEDULE

1,000.00$

1/23/2018 Page 1 of 6

Option X Total of Bid Items: 436,000.00$ -10.4% 390,575.00$

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Engineer's Estimate Eagle Peak Rock & Paving, Inc.

62302-1100 Line X0280 10 HOUR 150.00$ 1,500.00$ 1,550.00$

63310-0000 Line X0300 60 EACH 125.00$ 7,500.00$ 3,300.00$

63310-0000 Line X0320 60 EACH 125.00$ 7,500.00$ 3,300.00$

63402-0300 Line X0340 13.0 MILE 3,500.00$ 45,500.00$ 29,250.00$

63405-0050 Line X0360 100 EACH 200.00$ 20,000.00$ 2,500.00$

63501-1000 Line X0380 ALL LPSM 4,000.00$ 4,000.00$ 10,000.00$

63502-0600 Line X0400 8 EACH 400.00$ 3,200.00$ 680.00$

63502-1300 Line X0420 150 EACH 75.00$ 11,250.00$ 7,500.00$

63502-1600 Line X0440 15 EACH 135.00$ 2,025.00$ 225.00$

63503-1000 Line X0460 2,000 LNFT 5.00$ 10,000.00$ 4,000.00$

63504-1000 Line X0480 150 SQFT 30.00$ 4,500.00$ 3,000.00$

63505-1000 Line X0500 6.0 MILE 1,200.00$ 7,200.00$ 9,000.00$

63506-0500 Line X0520 150 HOUR 70.00$ 10,500.00$ 9,750.00$ 65.00$

1,500.00$

20.00$

2.00$

15.00$

50.00$

85.00$

10,000.00$

25.00$

2,250.00$

55.00$

55.00$

155.00$

CHANNELIZING DEVICE (YELLOW)

PAVEMENT MARKINGS, TYPE B, SOLID

PAVEMENT MARKINGS, SYMBOLS

TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SPECIAL LABOR, HIRED SURVEY SERVICES

CHANNELIZING DEVICE (WHITE)

1/23/2018 Page 2 of 6

Option X Total of Bid Items:

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line X0020 ALL LPSM

15301-0000 Line X0040 ALL LPSM

15401-0000 Line X0060 ALL LPSM

15501-0000 Line X0080 ALL LPSM

20304-1000 Line X0100 ALL LPSM

40601-0000 Line X0120 2 TON

40901-2000 Line X0140 38,850 SQYD

41402-2000 Line X0160 2.1 MILE

41801-2000 Line X0180 110 SQYD

60920-0000 Line X0200 60 EACH

62201-2350 Line X0220 20 HOUR

62301-0000 Line X0240 20 HOUR

62302-1000 Line X0260 10 HOUR

MOBILIZATION

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

MICRO SURFACING, TYPE 2

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

RESET WHEELSTOP

POWER BROOM

GENERAL LABOR

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

FOG SEAL

SPECIAL LABOR, HIRED TECHNICAL SERVICES

CONSTRUCTION SCHEDULE

-22.4% 338,225.00$ -8.2% 400,215.00$

Unit Price Amount Unit Price Amount

35,000.00$ 50,000.00$

13,000.00$ 10,000.00$

8,500.00$ 5,000.00$

5,000.00$ 3,000.00$

1,000.00$ 4,000.00$

1,100.00$ 1,120.00$

116,550.00$ 135,975.00$

29,400.00$ 16,800.00$

14,300.00$ 11,000.00$

5,400.00$ 6,000.00$

3,500.00$ 3,200.00$

1,700.00$ 1,700.00$

1,500.00$ 1,650.00$ 150.00$ 165.00$

85.00$ 85.00$

175.00$ 160.00$

90.00$ 100.00$

130.00$ 100.00$

14,000.00$ 8,000.00$

3.00$ 3.50$

550.00$ 560.00$

1,000.00$ 4,000.00$

13,000.00$ 10,000.00$

8,500.00$ 5,000.00$

Stormwater Plans LLC GC Works

35,000.00$ 50,000.00$

5,000.00$ 3,000.00$

1/23/2018 Page 3 of 6

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

62302-1100 Line X0280 10 HOUR

63310-0000 Line X0300 60 EACH

63310-0000 Line X0320 60 EACH

63402-0300 Line X0340 13.0 MILE

63405-0050 Line X0360 100 EACH

63501-1000 Line X0380 ALL LPSM

63502-0600 Line X0400 8 EACH

63502-1300 Line X0420 150 EACH

63502-1600 Line X0440 15 EACH

63503-1000 Line X0460 2,000 LNFT

63504-1000 Line X0480 150 SQFT

63505-1000 Line X0500 6.0 MILE

63506-0500 Line X0520 150 HOUR

CHANNELIZING DEVICE (YELLOW)

PAVEMENT MARKINGS, TYPE B, SOLID

PAVEMENT MARKINGS, SYMBOLS

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONT

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

SPECIAL LABOR, HIRED SURVEY SERVICES

CHANNELIZING DEVICE (WHITE)

-22.4% 338,225.00$ -8.2% 400,215.00$

Unit Price Amount Unit Price Amount

Stormwater Plans LLC GC Works

1,500.00$ 1,250.00$

3,600.00$ 3,900.00$

3,600.00$ 3,900.00$

32,500.00$ 45,500.00$

3,000.00$ 20,000.00$

6,000.00$ 5,000.00$

800.00$ 1,600.00$

12,750.00$ 30,000.00$

1,125.00$ 1,725.00$

8,000.00$ 11,000.00$

1,800.00$ 1,470.00$

15,000.00$ 21,000.00$

12,600.00$ 4,425.00$ 84.00$ 29.50$

2,500.00$ 3,500.00$

12.00$ 9.80$

4.00$ 5.50$

75.00$ 115.00$

85.00$ 200.00$

100.00$ 200.00$

6,000.00$ 5,000.00$

30.00$ 200.00$

2,500.00$ 3,500.00$

60.00$ 65.00$

60.00$ 65.00$

150.00$ 125.00$

1/23/2018 Page 4 of 6

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line X0020 ALL LPSM

15301-0000 Line X0040 ALL LPSM

15401-0000 Line X0060 ALL LPSM

15501-0000 Line X0080 ALL LPSM

20304-1000 Line X0100 ALL LPSM

40601-0000 Line X0120 2 TON

40901-2000 Line X0140 38,850 SQYD

41402-2000 Line X0160 2.1 MILE

41801-2000 Line X0180 110 SQYD

60920-0000 Line X0200 60 EACH

62201-2350 Line X0220 20 HOUR

62301-0000 Line X0240 20 HOUR

62302-1000 Line X0260 10 HOUR

MOBILIZATION

CONTRACTOR QUALITY CONTROL

CONTRACTOR TESTING

MICRO SURFACING, TYPE 2

CRACKS, CLEANING AND SEALING

ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2

RESET WHEELSTOP

POWER BROOM

GENERAL LABOR

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

FOG SEAL

SPECIAL LABOR, HIRED TECHNICAL SERVICES

CONSTRUCTION SCHEDULE

3.9% 453,000.00$

Unit Price Amount

44,173.25$

27,000.00$

16,000.00$

1.00$

1,400.00$

6,376.00$

208,624.50$

26,250.00$

15,345.00$

5,460.00$

2,780.00$

1,670.00$

4,580.00$ 458.00$

83.50$

139.00$

91.00$

139.50$

12,500.00$

5.37$

3,188.00$

1,400.00$

27,000.00$

16,000.00$

Las Vegas Paving Corp

44,173.25$

1.00$

1/23/2018 Page 5 of 6

Project No: NV NV/AZ FTBR OLD US93(2)

Project Name: Hoover Dam Access Road CQ = "Contract Quantity"

Item No. Quantity Unit

62302-1100 Line X0280 10 HOUR

63310-0000 Line X0300 60 EACH

63310-0000 Line X0320 60 EACH

63402-0300 Line X0340 13.0 MILE

63405-0050 Line X0360 100 EACH

63501-1000 Line X0380 ALL LPSM

63502-0600 Line X0400 8 EACH

63502-1300 Line X0420 150 EACH

63502-1600 Line X0440 15 EACH

63503-1000 Line X0460 2,000 LNFT

63504-1000 Line X0480 150 SQFT

63505-1000 Line X0500 6.0 MILE

63506-0500 Line X0520 150 HOUR

CHANNELIZING DEVICE (YELLOW)

PAVEMENT MARKINGS, TYPE B, SOLID

PAVEMENT MARKINGS, SYMBOLS

TEMPORARY TRAFFIC CONTROL, PAVEMENT MAR

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, TRAFFIC CONT

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, DRUM

TEMPORARY TRAFFIC CONTROL, WARNING LIGH

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

SPECIAL LABOR, HIRED SURVEY SERVICES

CHANNELIZING DEVICE (WHITE)

3.9% 453,000.00$

Unit Price Amount

Las Vegas Paving Corp

2,600.00$

3,030.00$

3,030.00$

28,769.00$

2,800.00$

5,200.00$

4,000.00$

9,900.00$

918.75$

3,760.00$

1,972.50$

13,560.00$

13,800.00$ 92.00$

2,260.00$

13.15$

1.88$

61.25$

66.00$

500.00$

5,200.00$

28.00$

2,213.00$

50.50$

50.50$

260.00$

1/23/2018 Page 6 of 6

Option Y Central Federal Lands Highway Division

Project No : AZ AZ FTBR DAVIS DAM ROAD (1)FLMA No:

Project Name : Davis Dam Road Rehabilitation Solcitation No:

State : AZ County : Mohave Federal Location : Davis Dam

Opened at: 2:00pm Opened by: Ryan Phillips Date: 1/18/2018

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed:

Title:

Date:

Contract Awarded to: Award Date:

Contract Number: Data is Public

Contractor Comment Bid Amount Responsive

Engineer's Estimate 420,000.00$

Eagle Peak Rock & Pav 319,973.00$

Stormwater Plans, LLC 334,045.00$

GC Works 930,244.00$

Las Vegas Paving Corp 530,000.00$

6982AF18B000007

Option Y Total of Bid Items: 420,000.00$ -23.8% 319,973.00$

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

15101-0000 Line Y0020 ALL LPSM 44,095.00$ 44,095.00$ 30,000.00$

15210-3000 Line Y0040 0.347 MILE 15,000.00$ 5,205.00$ 1,388.00$

15301-0000 Line Y0060 ALL LPSM 25,000.00$ 25,000.00$ 10,000.00$

15401-0000 Line Y0080 ALL LPSM 20,000.00$ 20,000.00$ 10,000.00$

15501-0000 Line Y0100 ALL LPSM 8,000.00$ 8,000.00$ 1,000.00$

15705-1400 Line Y0120 100 LNFT 20.00$ 2,000.00$ 500.00$

15802-0000 Line Y0140 ALL LPSM 8,000.00$ 8,000.00$ 10,000.00$

20304-1000 Line Y0160 ALL LPSM 10,000.00$ 10,000.00$ 3,000.00$

20402-0000 Line Y0180 100 CUYD 150.00$ 15,000.00$ 20,000.00$

25125-0000 Line Y0200 22 EACH 400.00$ 8,800.00$ 5,500.00$

30202-2000 Line Y0220 160 TON 75.00$ 12,000.00$ 11,200.00$

30402-5300 Line Y0240 6,500 SQYD 10.00$ 65,000.00$ 39,000.00$

40301-0100 Line Y0260 1,000 TON 115.00$ 115,000.00$ 125,000.00$

CONTRACTOR TESTING

10,000.00$

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

CONTRACTOR QUALITY CONTROL

WATERING FOR DUST CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SUBEXCAVATION

BOULDER

ROADWAY AGGREGATE, METHOD 2

FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

ASPHALT CONCRETE PAVEMENT, TYPE 1

Eagle Peak Rock & Paving, Inc.

4,000.00$

30,000.00$

1,000.00$

10,000.00$

3,000.00$

10,000.00$

5.00$

250.00$

200.00$

6.00$

70.00$

125.00$

Engineer's Estimate

1/23/2018 Page 1 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Eagle Peak Rock & Paving, Inc.Engineer's Estimate

40601-0000 Line Y0280 3 TON 1,000.00$ 3,000.00$ 1,950.00$

41102-1000 Line Y0300 6,500 SQYD 1.50$ 9,750.00$ 6,500.00$

41201-0000 Line Y0320 3 TON 1,000.00$ 3,000.00$ 2,250.00$

62201-0050 Line Y0340 40 HOUR 125.00$ 5,000.00$ 4,800.00$

62201-0450 Line Y0360 40 HOUR 125.00$ 5,000.00$ 4,800.00$

62301-0000 Line Y0380 40 HOUR 65.00$ 2,600.00$ 2,600.00$

62302-1000 Line Y0400 40 HOUR 150.00$ 6,000.00$ 3,000.00$

62302-1100 Line Y0420 40 HOUR 150.00$ 6,000.00$ 6,200.00$

63301-0000 Line Y0440 5 EACH 500.00$ 2,500.00$ 2,500.00$

63308-3000 Line Y0460 5 EACH 100.00$ 500.00$ 500.00$

63309-0200 Line Y0480 10 EACH 100.00$ 1,000.00$ 1,000.00$

63402-0300 Line Y0500 3.0 MILE 3,000.00$ 9,000.00$ 1,950.00$

63406-0200 Line Y0520 110 EACH 10.00$ 1,100.00$ 440.00$

TACK COAT

DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACITY

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 18-INCH WIDTH

PAVEMENT MARKINGS, TYPE B, SOLID

RAISED PAVEMENT MARKER, NON-PLOWABLE, BI-DIRECTIONAL REFLECTIVE

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

SIGN SYSTEM

OBJECT MARKER, TYPE 3

DELINEATOR, TYPE 2

FOG SEAL

PRIME COAT, METHOD 1

650.00$

750.00$

1.00$

120.00$

120.00$

75.00$

65.00$

500.00$

155.00$

100.00$

100.00$

4.00$

650.00$

1/23/2018 Page 2 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit Unit Price Amount Unit Price Amount

Eagle Peak Rock & Paving, Inc.Engineer's Estimate

63502-0600 Line Y0540 7 EACH 300.00$ 2,100.00$ 595.00$

63502-0700 Line Y0560 25 EACH 30.00$ 750.00$ 500.00$

63503-1000 Line Y0580 500 LNFT 10.00$ 5,000.00$ 1,000.00$

63504-1000 Line Y0600 120 SQFT 30.00$ 3,600.00$ 2,400.00$

63506-0500 Line Y0620 160 HOUR 100.00$ 16,000.00$ 10,400.00$

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

20.00$

85.00$

20.00$

2.00$

65.00$

1/23/2018 Page 3 of 9

Option Y Total of Bid Items:

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line Y0020 ALL LPSM

15210-3000 Line Y0040 0.347 MILE

15301-0000 Line Y0060 ALL LPSM

15401-0000 Line Y0080 ALL LPSM

15501-0000 Line Y0100 ALL LPSM

15705-1400 Line Y0120 100 LNFT

15802-0000 Line Y0140 ALL LPSM

20304-1000 Line Y0160 ALL LPSM

20402-0000 Line Y0180 100 CUYD

25125-0000 Line Y0200 22 EACH

30202-2000 Line Y0220 160 TON

30402-5300 Line Y0240 6,500 SQYD

40301-0100 Line Y0260 1,000 TON

CONTRACTOR TESTING

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

CONTRACTOR QUALITY CONTROL

WATERING FOR DUST CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SUBEXCAVATION

BOULDER

ROADWAY AGGREGATE, METHOD 2

FULL DEPTH RECLAMATION, METHOD 2, 6-INCH

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

ASPHALT CONCRETE PAVEMENT, TYPE 1

-20.5% 334,045.00$ 121.5% 930,244.00$

Unit Price Amount Unit Price Amount

33,000.00$ 55,000.00$

1,735.00$ 2,082.00$

46,000.00$ 10,000.00$

26,000.00$ 5,000.00$

5,000.00$ 3,000.00$

450.00$ 5,000.00$

10,000.00$ 8,500.00$

1,000.00$ 10,000.00$

8,500.00$ 9,200.00$

5,720.00$ 66,000.00$

9,600.00$ 22,400.00$

24,375.00$ 520,000.00$

120,000.00$ 150,000.00$

26,000.00$ 5,000.00$

33,000.00$ 55,000.00$

Stormwater Plans, LLC GC Works

5,000.00$ 3,000.00$

5,000.00$ 6,000.00$

46,000.00$ 10,000.00$

1,000.00$ 10,000.00$

10,000.00$ 8,500.00$

4.50$ 50.00$

260.00$ 3,000.00$

85.00$ 92.00$

3.75$ 80.00$

60.00$ 140.00$

120.00$ 150.00$

1/23/2018 Page 4 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit

40601-0000 Line Y0280 3 TON

41102-1000 Line Y0300 6,500 SQYD

41201-0000 Line Y0320 3 TON

62201-0050 Line Y0340 40 HOUR

62201-0450 Line Y0360 40 HOUR

62301-0000 Line Y0380 40 HOUR

62302-1000 Line Y0400 40 HOUR

62302-1100 Line Y0420 40 HOUR

63301-0000 Line Y0440 5 EACH

63308-3000 Line Y0460 5 EACH

63309-0200 Line Y0480 10 EACH

63402-0300 Line Y0500 3.0 MILE

63406-0200 Line Y0520 110 EACH

TACK COAT

DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACIT

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RA

PAVEMENT MARKINGS, TYPE B, SOLID

RAISED PAVEMENT MARKER, NON-PLOWABLE, B

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

SIGN SYSTEM

OBJECT MARKER, TYPE 3

DELINEATOR, TYPE 2

FOG SEAL

PRIME COAT, METHOD 1

-20.5% 334,045.00$ 121.5% 930,244.00$

Unit Price Amount Unit Price Amount

Stormwater Plans, LLC GC Works

1,650.00$ 1,680.00$

3,250.00$ 6,500.00$

3,000.00$ 1,680.00$

2,200.00$ 4,800.00$

4,000.00$ 7,200.00$

1,280.00$ 3,200.00$

6,000.00$ 6,600.00$

6,000.00$ 5,000.00$

850.00$ 2,500.00$

850.00$ 1,000.00$

1,700.00$ 2,000.00$

2,100.00$ 10,500.00$

495.00$ 550.00$

550.00$ 560.00$

1,000.00$ 560.00$

0.50$ 1.00$

100.00$ 180.00$

55.00$ 120.00$

150.00$ 165.00$

32.00$ 80.00$

170.00$ 500.00$

150.00$ 125.00$

170.00$ 200.00$

170.00$ 200.00$

4.50$ 5.00$

700.00$ 3,500.00$

1/23/2018 Page 5 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit

63502-0600 Line Y0540 7 EACH

63502-0700 Line Y0560 25 EACH

63503-1000 Line Y0580 500 LNFT

63504-1000 Line Y0600 120 SQFT

63506-0500 Line Y0620 160 HOUR

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

-20.5% 334,045.00$ 121.5% 930,244.00$

Unit Price Amount Unit Price Amount

Stormwater Plans, LLC GC Works

700.00$ 1,575.00$

300.00$ 625.00$

1,250.00$ 2,750.00$

1,440.00$ 1,182.00$

5,600.00$ 4,720.00$

12.00$ 25.00$

100.00$ 225.00$

12.00$ 9.85$

2.50$ 5.50$

35.00$ 29.50$

1/23/2018 Page 6 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit

15101-0000 Line Y0020 ALL LPSM

15210-3000 Line Y0040 0.347 MILE

15301-0000 Line Y0060 ALL LPSM

15401-0000 Line Y0080 ALL LPSM

15501-0000 Line Y0100 ALL LPSM

15705-1400 Line Y0120 100 LNFT

15802-0000 Line Y0140 ALL LPSM

20304-1000 Line Y0160 ALL LPSM

20402-0000 Line Y0180 100 CUYD

25125-0000 Line Y0200 22 EACH

30202-2000 Line Y0220 160 TON

30402-5300 Line Y0240 6,500 SQYD

40301-0100 Line Y0260 1,000 TON

CONTRACTOR TESTING

MOBILIZATION

CENTERLINE, VERIFICATION AND STAKING

CONTRACTOR QUALITY CONTROL

WATERING FOR DUST CONTROL

REMOVAL OF STRUCTURES AND OBSTRUCTIONS

SUBEXCAVATION

BOULDER

ROADWAY AGGREGATE, METHOD 2

FULL DEPTH RECLAMATION, METHOD 2, 6-INCH

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FIBER ROLL

ASPHALT CONCRETE PAVEMENT, TYPE 1

26.2% 530,000.00$

Unit Price Amount

137,114.00$

20,126.00$

34,500.00$

16,500.00$

1.00$

660.00$

3,800.00$

1,300.00$

33,700.00$

19,162.00$

27,360.00$

25,220.00$

132,000.00$

16,500.00$

137,114.00$

Las Vegas Paving Corp

1.00$

58,000.00$

34,500.00$

1,300.00$

3,800.00$

6.60$

871.00$

337.00$

3.88$

171.00$

132.00$

1/23/2018 Page 7 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit

40601-0000 Line Y0280 3 TON

41102-1000 Line Y0300 6,500 SQYD

41201-0000 Line Y0320 3 TON

62201-0050 Line Y0340 40 HOUR

62201-0450 Line Y0360 40 HOUR

62301-0000 Line Y0380 40 HOUR

62302-1000 Line Y0400 40 HOUR

62302-1100 Line Y0420 40 HOUR

63301-0000 Line Y0440 5 EACH

63308-3000 Line Y0460 5 EACH

63309-0200 Line Y0480 10 EACH

63402-0300 Line Y0500 3.0 MILE

63406-0200 Line Y0520 110 EACH

TACK COAT

DUMP TRUCK, 5 CUBIC YARD MINIMUM CAPACIT

BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RA

PAVEMENT MARKINGS, TYPE B, SOLID

RAISED PAVEMENT MARKER, NON-PLOWABLE, B

GENERAL LABOR

SPECIAL LABOR, HIRED TECHNICAL SERVICES

SPECIAL LABOR, HIRED SURVEY SERVICES

SIGN SYSTEM

OBJECT MARKER, TYPE 3

DELINEATOR, TYPE 2

FOG SEAL

PRIME COAT, METHOD 1

26.2% 530,000.00$

Unit Price Amount

Las Vegas Paving Corp

3,258.00$

3,705.00$

2,994.00$

4,560.00$

5,960.00$

3,340.00$

18,320.00$

10,400.00$

800.00$

800.00$

1,600.00$

2,046.00$

396.00$

1,086.00$

998.00$

0.57$

149.00$

114.00$

458.00$

83.50$

160.00$

260.00$

160.00$

160.00$

3.60$

682.00$

1/23/2018 Page 8 of 9

Project No: AZ AZ FTBR DAVIS DAM ROAD (1)

Project Name: Davis Dam Road Rehabilitation CQ = "Contract Quantity"

Item No. Quantity Unit

63502-0600 Line Y0540 7 EACH

63502-0700 Line Y0560 25 EACH

63503-1000 Line Y0580 500 LNFT

63504-1000 Line Y0600 120 SQFT

63506-0500 Line Y0620 160 HOUR

TEMPORARY TRAFFIC CONTROL, CONSTRUCTIO

TEMPORARY TRAFFIC CONTROL, FLAGGER

TEMPORARY TRAFFIC CONTROL, BARRICADE TY

TEMPORARY TRAFFIC CONTROL, CONE

TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

26.2% 530,000.00$

Unit Price Amount

Las Vegas Paving Corp

3,500.00$

600.00$

940.00$

1,578.00$

13,760.00$

24.00$

500.00$

13.15$

1.88$

86.00$

1/23/2018 Page 9 of 9