This document is Amendment 0006 to Solicitation No. 697DCK-27-R-00022A issued by the Federal Aviation Administration (FAA), Regional Acquisitions office located in College Park, Georgia. The amendment is effective November 23, 2026, and applies to a design renovation project for a building located at 3551 Combine Street, Paso Robles, California 93446.

The amendment addresses vendor questions and provides as-built plans of the building. Key clarifications include: (1) a fire alarm system currently exists in the building and does not require design; (2) a full sprinkler system is in place, and vendors are required only to show sprinkler head locations for the expanded and redesigned office space rather than design a complete fire protection system; and (3) data and communication design requirements are limited to showing locations for data drops in office and cubicle areas, with specific locations to be provided by the FAA at the 50% design review. The amendment includes Building As-Built Drawings dated March 20, 2017 (7 pages) as an attachment. The contracting officer is Linda Hennequant (Linda.hennequant@faa.gov). Offerors must acknowledge receipt of this amendment prior to the offer submission deadline by completing required items and returning the document or submitting a separate letter or telegram referencing the solicitation and amendment number.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6)CODE

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. CONTRACT AUTHORITY

(Signature of Contracting Officer)

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Linda M. Hennequant

See continuation page

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

AAQ510ATL-AFN

697DCK-27-R-00022

11/23/2026

10/07/2026

1 2

A

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

ITEM NO.

(A)

QUANTITY

(C)

Design Renovation, SSC, 3551 Combine St., Paso

Robles, California 93446.

Contracting Officer: Linda.hennequant@faa.gov

The purpose of this amendment is to Answer

Vendor Questions and Provide As-Built Plans of the Building.

QUESTIONS & ANSWERS

1. Is there a fire alarm system in this project or do we need to design one? There is no mention of it.

FAA ANSWER: There is a system in the building currently.

2. The scope for Fire Protection in the RFP asks for riser, main pipe routing, Hydraulic calcs, etc. But through the Q&A they mentioned that full sprinkler system is in place and we only need to relocate heads as required. Which is it?

FAA ANSWER: There is a full sprinkler system in the building. Show the sprinkler head locations for the expanded/redesigned office space.

3. Is any data or communication design required for this project?

FAA ANSWER: The only data/communication required will be showing locations the FAA provides at the 50% review for data drops in the office space and cubicle areas.

ATTACHMENTS:

1. Building As-Built Drawings, dated 3/20/2017, 7 pages.

END OF AMENDMENT

PAGE 2 OF 2697DCK-27-R-00022A/0006

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Continuation sheet
Reference Number
Name of Offeror or Contractor

File details come from the government source that posted it. Updated .