This is Amendment 0004 to Solicitation 697DCK-27-R-00022A issued by the Federal Aviation Administration (FAA), Regional Acquisitions office in College Park, Georgia. The amendment changes the offer due date from November 30, 2026 to December 2, 2026 and provides responses to 36 vendor questions regarding design renovation services for a facility located at 3551 Combine Street, Paso Robles, California. The contracting officer is Linda M. Hennequant (Linda.hennequant@faa.gov).
Key scope clarifications include: design must comply with the 2025 California Building Code adopted by the City of Paso Robles; architectural, civil, and structural design services must be included in the proposal if required for permitting; the thermal envelope upgrade is not expected to be required; CAD/BIM background drawings will be provided by the FAA; no formal land survey is required, only on-site field verification; specific finishes will be selected by the FAA at the 90% review stage; a high-low electric water cooler with bottle filler is required; all exterior and locked interior doors must accept a Best Lock 7-pin core; and the selected consultant must serve as the Architect of Record and prepare architectural permit documents. The project completion period spans ten weeks from Notice to Proceed to final permit drawing submission, with FAA reviews occurring within this timeframe. Award is anticipated within 60 days after the offer due date, with a post-award meeting to establish the project start date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6)CODE
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. CONTRACT AUTHORITY
(Signature of Contracting Officer)
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Linda M. Hennequant
See continuation page
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
AAQ510ATL-AFN
697DCK-27-R-00022
11/13/2026
10/07/2026
1 8
A
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A /0004
Design Renovation, SSC, 3551 Combine St., Paso
Robles, California 93446.
Contracting Officer: Linda.hennequant@faa.gov
PURPOSE:
The purpose of this amendment is to Change the
Offer Due Date, and answer Vendor Questions.
CHANGE:
Offer due date: 30-NOV-26 changed to 02-DEC-26
QUESTIONS & ANSWERS:
1 – Applicable Building Code
The current code enforced by the City of Paso
Robles is the 2025 California Building Code
(CBC). Please confirm we are to design to the
2025 version.
FAA ANSWER: Please design to the 2025
California Building Code (CBC). While the
Statement of Work (SOW) references the 2022 edition, it explicitly states that “the design must adhere to all Building Codes and Design
Standards adopted by the City of Paso Robles.”
Because the City has since adopted the 2025 version, it supersedes the 2022 edition.
2 – Architectural, Civil, and Structural Design
Services
The Statement of Work indicates scope for MEP, Life Safety, and Fire Protection. Will architectural services be required? Can we provide, as an option, the cost for
Architectural, Civil, and Structural design services?
FAA ANSWER: Drawings and SOW are provided to show intent and scope. If additional architectural drawings are required for permit/construction you will need to provide.
3 – Existing Thermal Envelope
Please confirm that this project will not require upgrading the existing thermal envelope
(wall insulation, roof insulation, window glazing U-factors, etc.).
FAA ANSWER: It is not expected to be needed as the FAA does not have a standard, any deficiencies will be identified on the on-site
Continued...
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A/0004
pre-bid visit.
4 – Missing Sheets A001, A002, and A003
Sheet A201, General Notes, Note G, refers to
Sheets A001, A002, and A003. These sheets were not provided in the DID set. Please provide them to assist in pricing.
FAA ANSWER: These reference sheets are considered ‘boilerplate’ standard accessibility sheets you will need to provide any current sheets for this locality needed for permit/construction.
5 – Topographic and Boundary Survey
The DIDs indicate a new fence and gates surrounding the majority of the existing parking. Should our proposal include a topographic and boundary survey?
FAA ANSWER: That is not needed, the FAA will be doing it’s own Metes and Bounds survey for the exact boundary locators.
6 – As-Built Documents and CAD/BIM Files
Please provide available as-built documents and the CAD/BIM files of the provided DIDs. Please also provide fire sprinkler as-built drawings and calculations.
FAA ANSWER: We will provide the CAD files for the DIDs. We do not have the original CAD files or as-builts for the building or the fire sprinkler. The building owner/leasing company would have those.
7 – Laminated Glass for Force Protection
Please confirm whether existing doors and windows require laminated glass as a force protection measure.
FAA ANSWER: This is not required.
8 – Window and Door Coverings
Please confirm whether window or door coverings
(privacy film, shades, blinds) are required on any or all glazing and fenestrations.
FAA ANSWER: Shades or Blinds should be included on windows and doors.
9 – Door Security Hardware
Please confirm which doors, if any, require
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A/0004
specific security hardware, such as card access, cipher hardware, a wireless access system, a biometric system, or alarmed systems.
FAA ANSWER: None, only door hardware requirement as they must accept a Best Lock
7-pin core on all exterior and locked interior doors.
10 – Intrusion Detection System
Please confirm whether an intrusion detection system (IDS) is required, including cameras or alarms for monitoring traffic and security breaches.
FAA ANSWER: No, not part of this scope.
11 – Finish Specifications
Please provide specifications for the new finishes: luxury vinyl tile, carpet, porcelain/ceramic tile, and acoustical ceiling system.
FAA ANSWER: Specific finishes will be selected by FAA by 90% review.
12 – Locker Specification
Please provide the specification for the eight
(8) new lockers in Room 118, Back of House
(BOH).
FAA ANSWER: Vented metal lockers for PPE equipment, 18”W x 36”D x 72 “H.
13 – Electric Water Cooler
Please confirm whether the indicated electric water cooler is a single unit or a high-low
(bi-level) unit. Will a bottle filler be required in either case?
FAA ANSWER: This should be a high-low unit with a bottle filler.
14 – Salvaged Plumbing Fixtures
Sheet A200, Demo Note 4, indicates fixtures are to be salvaged. Please confirm that the existing fixtures meet current plumbing code water-saving standards.
FAA ANSWER: This should be noted on your design that the contractor is to determine what is salvageable and meeting the permitting guidelines. There may not be any salvageable
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A/0004
fixtures.
15 – Existing Flooring
Please indicate the existing flooring type and extent.
FAA ANSWER: Existing flooring includes ceramic/porcelain tile (general area) and polished concrete (back of house area). Will confirm on site visit.
16 – Existing Ceilings
Please establish the existing ceiling type and extent.
FAA ANSWER: Hard qypsum board ceiling (general areas) and exposed ceiling (back of house area). Will confirm on site visit.
17 – HVAC at ELEC/TELCO Room 105
Does ELEC/TELCO Room 105 require 24/7 HVAC?
FAA ANSWER: Yes, this area requires a separate mini-split unit for conditioning.
18 – Air Conditioning at BOH Room 118
Please confirm whether BOH Room 118 requires air conditioning.
FAA ANSWER: Yes, this is conditioned space.
19 – Partition Stud Type
On Sheet A501, Partition Types General Notes, Keynote 3, and Partition Type Detail 1, please confirm whether all studs are to be wood or metal.
FAA ANSWER: Specific partition types calls out
3 5/8” metal studs.
20 – Door Inset Grilles
Sheet A501, Notes by Number, Note 6, refers to inset grilles, but Note 6 is not listed on the
Schedule. Please verify whether inset grilles are required on doors.
FAA ANSWER: General notes are not all used on design, reference design schedule.
21 – Emergency Backup Power
Please confirm whether emergency backup power and a generator are required.
FAA ANSWER: No back-up power is required.
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A/0004
22 – Back-of-House Functions Please describe the functions and activities that will occur in the Back-of-House area.
FAA ANSWER: This area is used for project material delivery and storage along with storage of parts for FAA navigational and communications equipment. There will also be a HAZMAT locker for pesticides and paint storage.
Minimal shop tools and workbenches. It is not intended to house vehicles and we do not do any maintenance on FAA vehicles.
23 – Rooftop HVAC Unit Please confirm that the rooftop HVAC unit will be new and is part of the project scope. Is demolition of the existing HVAC system in the scope?
FAA ANSWER: It is not part of the scope to replace the HVAC system that is on the roof.
This system is provided by that lessor. The age of the system does not appear to need changing at this time.
24 – Roof-Mounted Antennas Will antennas be mounted on the roof? If so, please indicate weight, dimensions, and any special mounting requirements.
FAA ANSWER: We will not be installing any roof top antennas.
25 – Does the ten-week completion period include both FAA review and final City of Paso Robles approval, or is it the deadline for submitting completed permit-ready drawings?
FAA ANSWER: The ten-week completion period is from the NTP to the final permit drawing submittal to the City for approval. You cannot be responsible for City review timelines.
26 – The SOW requires the 90% design submission within three weeks of the “review submission.”
What event starts that three-week period?
FAA ANSWER: FAA’s return of approval/comments to the 90% design.
27 -Does the Texas architect have someone licensed in CA? If not, we would need to be the Architect of Record.
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A/0004
FAA ANSWER: Correct, you would need to be the Architect of Record
28 - Will we receive the CAD background drawings from the Texas architect or will we need to create our own drawings? This is important in terms of cost.
FAA ANSWER: Yes, we will provide the CAD for the Design Intent Drawings
29 - What is the requirement for site survey?
Do they need a boundary survey from a licensed surveyor? Or just a site visit to the existing building to verify the information in the design drawings from the Texas architect?
FAA ANSWER: Just a site visit to the existing building not a land boundary survey.
30 - When is the project expected to be awarded? When are our services expected to start?
FAA ANSWER: Award is expected within 60 days after the offer due date. A Post-award meeting will be held shortly after award to determine the start date.
31 - In addition to the required documents identified in Section L02, may offerors include supplemental qualifications such as key personnel resumes, relevant project sheets, or a brief overview of the team's experience working together?
FAA ANSWER: There are no objections to this.
However, the determination for award will be based on pricing.
32 - Does the Fire Protection Engineer need specific FAA experience? Will any specialty equipment require a specific Fire Protection system?
FAA ANSWER: No, there are no FAA requirements for the fire suppression, only what is required by the city/state.
33 - What is the anticipated award date?
FAA ANSWER: Within 60 days after Offer due date
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
ITEM NO.
(A)
QUANTITY
(C)
697DCK-27-R-00022A/0004
34 - Leidos provided the architectural Design Intent Drawings; however, architectural construction documents will still be required for submission to the local jurisdiction for permitting. Should we assume the awarded team will be responsible for completing these drawings and serving as the Architect of Record?
FAA ANSWER: Yes
35 - The SOW requires a site survey within seven days of Notice to Proceed. Can you confirm whether this refers to a formal land survey performed by a licensed land surveyor or on-site field verification of existing conditions by the A&E team?
FAA ANSWER: Does not refer to a land survey, just an on-site field verification.
36 - Who will be responsible for preparing the architectural portion of the permit set and for addressing any architectural questions, revisions, or plan-check comments related to the Leidos Design Intent Drawings during development of the permit set and City review?
Will Leidos remain available for architectural coordination and preparation of the architectural permit documents, or is the selected consultant expected to include architectural services as part of its team?
FAA ANSWER: The intent is to include this with your offer and the selected consultant expected to include architectural services as part of its team. The Leidos Architect will be available for architectural coordination but not for the preparation of the architectural permit documents. That must be included in the offer.
END OF AMENDMENT
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |