The file is an Excel spreadsheet titled "PVD Drawing Clarification List" for the Rhode Island T.F. Green Airport Roof Replacement project. The document details 13 specific drawing modifications and clarifications across multiple building drawings (PVD-1800508 series), including changes to roofing membrane thickness, warranty periods, and painting requirements. Key modifications include: deleting the EG Building from roofing work, specifying PVC membrane thicknesses for different buildings (60-80 mils), changing roof warranty from 20 to 25 years, and adding instructions for stripping and repainting door coatings across various building elevations. The clarifications apply to the base building, Telco, Tech-Ops building, Tower Cab, and other structures at the airport, ensuring precise technical specifications for the roof replacement project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 PVD Roof Replacement Project Drawing Clarification List

Item Number Drawing Number Question / Mark Up Description of Change

1 PVD-1800508-G002 Summary of Work note 1.1 to delete EG Building. EG building will not require a new roofing system

2 PVD-1800508-G002 Summary of Work note 1.2 to delete EG Building. EG building will not require a new coping system. Add Tech-Ops to note. Tech-Ops will require new coping system.

3 PVD-1800508-A140 The base building and Telco will have a minimum PVC membrane 60 mils thick and the link will be 80 mils thick.

4 PVD-1800508-A141 The Tech-Ops building will have a minimum PVC membrane 60 mils thick

5PVD-1800508-A141Question 27 - Demolition drawing PVD-1800508-A141 (Sheet 14) calls for 20 year roof
warranty. Is it correct we need a 25 year roof manufacturer warranty?Change Note 1 from 20 year warranty to - "New PVC Roofing System Provided with a 25 year warranty…"

6 PVD-1800508-A142 The Tower Cab will have a minimum PVC membrane 60 mils thick

7 PVD-1800508-A200 Add Key Note 5 - Strip All Existing Door Paint Coatings and Repaint in Accordance with Specification 09 91 13 Exterior Painting

8 PVD-1800508-A202 Add Key Note 8 - Strip All Existing Door Paint Coatings and Repaint in Accordance with Specification 09 91 13 Exterior Painting

9 PVD-1800508-A203 Add Key Note 7 - Strip All Existing Door Paint Coatings and Repaint in Accordance with Specification 09 91 13 Exterior Painting

10 PVD-1800508-A205 Add Key Note 4 - Strip All Existing Door Paint Coatings and Repaint in Accordance with Specification 09 91 13 Exterior Painting

11 PVD-1800508-A205 Add Key Note 5 - Existing Door signs to be taken down and reattched when painting is completed.

12 PVD-1800508-A206 Add Key Note 4 - Strip All Existing Door Paint Coatings and Repaint in Accordance with Specification 09 91 13 Exterior Painting

13 PVD-1800508-A206 Add Key Note 5 - Existing Door signs to be taken down and reattched when painting is completed.