Market Survey - BIL ATCT Execution - DWH Draft.pdf

PDF 130 KB Posted

Attached to
Market Survey -- BIL David Wayne Hooks (DWH) ATCT Replacement
Solicitation number
697DCK-25-R-00109
Issued by

About this file

This is a Market Survey document from the Federal Aviation Administration (FAA) seeking capability statements for the design and construction of a new airport traffic control tower at David Wayne Hooks Regional Airport by 2030. The project will be funded through the Bipartisan Infrastructure Law (BIL) with an estimated construction cost between $10M-$40M.

The FAA plans to award a Firm-Fixed Price Design-Build contract under NAICS code 236220 (Commercial and Institutional Building Construction) with a size standard of $45M. Interested vendors must submit 10-page capability statements addressing specific requirements including company experience with ATCT construction (60-119 ft cab floor height), past performance on similar government contracts, Design-Build teaming agreements, and SAM registration details. The capability statements must also include feedback on potential risks and suggested improvements to the draft SOW, RFQ, and RFP. Electronic submissions are due by 2:00 PM ET on January 6, 2025 to ThuyLinh TranNguyen at thuylinh.t.trannguyen@faa.gov, with a 10MB file size limit per email.

View the file

Other files

File Type Posted
DRAFT - DWH Phase II RFP.pdf PDF
DRAFT - SOW_ ATCT_DWH.pdf PDF
DRAFT - DWH Phase I RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Market Survey

697DCK-25-R-00109

Bipartisan Infrastructure Law (BIL) – David Wayne Hooks (DWH) Airport Traffic Control Tower Replacement

The following contract opportunity record has been posted on the FAA Contract Opportunities website at SAM.gov. No attachments are forwarded with this message. To view the full announcement, please visit the website.

• Title: David Wayne Hooks (DWH) Airport Traffic Control Tower (ATCT) Replacement

• Contact: Thuylinh TranNguyen

• Organization: AAQ-550

• Email: Thuylinh.T.TranNguyen@faa.gov

In accordance with Federal Aviation Administration Acquisition Management System (AMS) Policy

3.2.1.2.1 - this announcement is to conduct an updated Market Survey for the purpose of soliciting statements of interest and capabilities from interested vendors along with soliciting comments from industry for the market survey.

REQUIREMENT:

The Federal Aviation Administration (FAA) has a goal to construct a new airport traffic control tower at the David Wayne Hooks Regional Airport by 2030. The tower can also be found in the U.S. Department of Transportation “Budget Estimates Fiscal Year 2023”. The tower construction will be funded by BIL funding. The estimated magnitude of construction is between $10M and $40M per tower.

PURPOSE:

The FAA is conducting this market survey to seek potential sources capable of meeting technical and delivery requirements, receiving industry feedback on scope and SIR requirement, and determining the best procurement strategy to achieve the FAA’s goal of a Design-Build construction contract for the DWH ATCT by 2030.

Any vendor that believes it can provide these services in whole or in part is invited to submit a capability statement (in contractor format) addressing its abilities to meet all of the requirements below. A vendor's ability to meet the requirements can be demonstrated through performance by the prime, teaming partners, and/or coordination with subcontracting partners.

The construction contract is anticipated to be a Firm-Fixed Price Design-Build contract type.

The Principal North American Industry Classification System (NAICS) size standard code for this requirement is 236220 – Commercial and Institutional Building Construction with a size standard of $45M.

All responses (one per company) are to be provided on company letterhead and limited to a total of 10 typewritten pages. Please ensure the response captures ALL the questions listed below. No type font less than 11 point may be used.

CAPABILITY STATEMENT:

All responders must provide a Capability Statement that addresses each of the following capabilities that are of concern to the FAA. These topics are to be addressed in the order presented below.

a. Point of Contact name, e-mail address and telephone number.

https://faaco.faa.gov/ mailto:Thuylinh.T.TranNguyen@faa.gov

b. Number of years in business. For the responding company as well as Mentor or Protégé and/or other teammates, if applicable. Size standard and any applicate SB category.

c. Provide a brief description of your company's expertise and qualifications for performing similar efforts to constructing ATCT at 60-119 ft. cab floor height AGL high or high rise commercial buildings under a 12 month time constraint. Address whether the effort(s) were part of a teaming arrangement and provide the name of the teammate.

d. List experience similar to constructing ATCTs project.

e. Experience as a prime contractor administering Government contracts that are similar in size, scope, complexity and geographic area to this effort.

f. If applicable, provide current Design-Build Teaming agreements in place.

g. Systems for Award Management (SAM), including UEI and CAGE Code information.

h. What are the opportunities or potential risks you foresee in this procurement?

i. What are some issues or improvements in the Statement of Work that the FAA should considered updating or implementing. Provide vendor’s solutions.

j. What are some issues or improvements in the solicitation that the FAA should consider updating or implanting. Provide vendor’s solutions.

REQUIREMENTS FOR EXPRESSION OF INTEREST:

In order to make this determination and to be considered responsive, the FAA requires the following information from interested vendors:

a. Capability Statement (addressing the ability to meet all the requirements identified in this Market Survey Package)

ATTACHMENTS:

1. DRAFT SOW

2. DRAFT RFQ

3. DRAFT RFP

SUBMISSION FORMAT:

Format: Electronic Quantity: 1 set Address: See email addresses below

NOTES: Electronic submission is preferred. Submissions must not exceed 10 pages in length for the Capability Statement. The electronic submission should be in either Microsoft WORD format or portable document format (PDF). Please note that the FAA e-mail server restricts file size to 10MB per email message, therefore, responses may have to be submitted in more than one e-mail in order to be received.

This market survey is for informational purposes only and must not be construed as a commitment or a promise to contract by the Government. Nor should the procurement strategy be construed as competition, direct award, or set asides. Again, this market survey is for INFORMATIONAL PURPOSES ONLY. All Submissions must be received by 2:00 p.m. ET on January 6, 2025.

For questions, requests for additional information, etc. regarding this market survey, contact ThuyLinh TranNguyen, Contracting Officer, via E-mail: thuylinh.t.trannguyen@faa.gov. Submission must include company Point(s) of Contact, telephone number(s), FAX number(s), E-mail address(es) (if available), and mailing address.

This announcement is not intended to guarantee procurement of the services and must not be construed as a commitment by the Government to enter into a contract. The Government is not liable for costs associated with the preparation, submittal of inquiries or responses for this announcement and will not reimburse any firm for costs incurred in responding to this public announcement. Responses will not be returned. Since this is a sources sought announcement, no evaluation letters and/or results will be issued to the respondents. No solicitation exists at this time. If a solicitation is issued, it will be announced on the FAA's Contract Opportunities web page. It is the Offeror's responsibility to monitor this site for the release of the solicitation.

REQUIREMENT:
PURPOSE:
CAPABILITY STATEMENT:
REQUIREMENTS FOR EXPRESSION OF INTEREST:

File details come from the government source that posted it. Updated .