SOW_Drawings_NEMC Double Door Apr 2023.pdf
PDF 985 KB Posted
- Attached to
- Remove and Replace Facility Doors and Double Doors in NEMC Building Salt Lake City ARTCC - UT
- Solicitation number
- 697DCK-24-R-00069
About this file
This statement of work document outlines requirements for replacing double doors in a federal facility. The contractor will replace existing wooden double doors measuring approximately 6' wide by 7' tall in Room 224 of the NEMC building located at the Salt Lake City Air Route Traffic Control Center. The contractor must investigate retaining the existing frame and maintaining a one-hour fire rating, or fully replacing the assembly if necessary. Upon completion, federal technicians will perform finishing work. The contractor must demonstrate all door components operate properly. The related solicitation seeks bids to remove and replace facility doors and double doors in the NEMC building in Salt Lake City, Utah for the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEMC DOUBLE DOOR REPLACEMENT APRIL 2023
SALT LAKE CITY, UT ARTCC
FINAL
NEMC
DOUBLE DOOR REPLACEMENT
JCN 23001099
APRIL 2023
A I R T R A F F I C O R G A N I Z A T I O NA I R T R A F F I C O R G A N I Z A T I O N
PREPARED BY: TECHNICAL OPERATIONS
EN ROUTE/FLIGHT SERVICE STATION ENGINEERING CENTER
2200 S 216th ST
DES MOINES, WA 98198
STATEMENT OF WORK 010000 - 1
SECTION 010000 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 STATEMENT OF WORK
A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following:
1. Work area to be limited to immediate area around existing double doors for Room 224 in the NEMC building at the Salt Lake Air Route Traffic Control Center (ARTCC). Existing set of double doors are made of wood and measure roughly 6’-0” in width and 7’-0” in height. The door frame is set in a standard 2x6 stud wall with gypsum wall board.
2. Contractor to investigate and determine if existing frame can be retrofitted with new door leafs and maintain 1-hour fire rating. If it is determined that the fire rating cannot be maintained with alterations, Contractor to replace entire assembly with new hollow metal doors and frame with 1-hour fire rating. Contracting Officer’s Representative (COR) to determine which surface mounted door hardware components will require temporary removal and reinstallation. At minimum, the following will require temporary removal and reinstallation:
a. Electrified security door hardware.
b. Signage
3. Upon substantial completion of construction, FAA building technician(s) will caulk and paint door frame to match existing interior finishes and textures. Local FAA technician(s) will also remove and replace any signage on door(s) as needed.
4. Contractor to verify all sizes, dimensions and quantities as all figures provided in these Contract Documents are approximations.
5. All work to comply with latest building codes and authorities having jurisdiction.
1.2 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at ZLC ARTCC at 2150 W 700 N, Salt Lake City, UT 84116.
1.3 ACTION SUBMITTALS
A. General:
1. Schedule of construction.
2. Contingency plan to keep area secure if work cannot be completed during normal working hours.
3. Accident prevention plan.
B. Product Data:
1. Manufacturer’s catalog data sheets.
C. Shop Drawings:
1. Include plans, elevations, sections, and mounting and attachment details.
2. Include details of door assemblies. Indicate dimensions, clearances, method of field assembly, components, and location and size of each field connection.
1.4 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1.5 WARRANTY
A. Special Warranty: Manufacturer or Installer agree to repair or replace any component of newly installed door assembly that fail in materials or workmanship within specified warranty period.
1. Warranty Period: 1 year from date of Substantial Completion.
1.6 WORK RESTRICTIONS
A. Work Restrictions, General: Comply with restrictions on construction operations.
B. On-Site Work Hours: Limit work on Project site to normal business working hours of 6:00 a.m.
to 4:30 p.m., Monday through Friday, unless otherwise indicated.
1. Holidays: On-site work is not permitted on federal holidays.
2. Moratoriums: On-site work is not permitted during the week of Thanksgiving, and the week of Christmas through New Year’s Day.
C. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.
1. Notify Owner not less than two days in advance of proposed disruptive operations.
2. Obtain Owner’s written permission before proceeding with disruptive operations.
D. Employee Identification: Owner will provide identification badges for Contractor personnel working on Project site. Require personnel to display identification badges at all times.
E. Employee Screening: Comply with Owner's requirements for background screening of Contractor personnel working on Project site.
1. Maintain list of approved screened personnel with Owner's representative.
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following:
1. Pioneer Industries ASSA ABLOY
2. Curries Steel Doors and Frames ASSA ABLOY
B. Source Limitations: Obtain hollow metal work from single source from single manufacturer.
2.2 PERFORMANCE REQUIREMENTS
A. Fire-Rated Assemblies: Complying with NFPA 80 that are listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratings and temperature-rise limits, based on testing at positive pressure according to NFPA 252 or UL 10C.
2.3 INTERIOR DOORS AND FRAMES
A. Heavy-Duty Doors and Frames:
1. Doors:
a. Type: Flush hollow metal doors.
b. Thickness: 1-3/4 inches, or as determined by Contractor for full operability.
c. Face: Uncoated, steel sheet, minimum thickness of 0.042 inch.
d. Fire-Rated Core: Manufacturer's standard core for fire-rated and temperature-rise-rated doors.
e. Clearances: Ensure new door leaves receive enough ground clearance for full operability with no deficiencies from existing flooring.
2. Frames:
a. Materials: steel sheet, minimum thickness of 0.053 inch or as determined by Contractor.
b. Construction:
1) Knocked down, no in-field welding allowed.
c. Fire rated same as door.
2.4 DOOR HARDWARE
A. Astragals: Manufacturer’s compatible type for 1-hour fire rated assembly.
B. Door Trim: Lever-type handles, match existing. Color selected by COR from manufacturer
C. Lock cylinders and keying: Coordinate with existing system and FAA security representative.
D. Hinges: Match existing hinge locations to frame if retrofitting door leafs.
PART 3 - EXECUTION
3.1 DEMONSTRATION
A. Contractor to demonstrate that all door components within newly installed assembly is fully operable with no defects in presence of FAA technicians.
END OF SECTION 010000
DOOR PHOTOS
PHILLIP
BANNAVONG
Digitally signed by PHILLIP
BANNAVONG
Date: 2023.05.02 15:44:20 -07'00' KEVIN C YARNELL
Digitally signed by KEVIN C
YARNELL
Date: 2023.05.16 09:35:51 -07'00'
PHILLIP
BANNAVONG
Digitally signed by PHILLIP
BANNAVONG
Date: 2023.05.02 15:45:12 -07'00'
KEVIN C YARNELL Digitally signed by KEVIN C YARNELL Date: 2023.05.16 09:36:35 -07'00'
| 000000 - Cover |
| 010000 - SOW |
| PART 1 - GENERAL |
| 1.1 STATEMENT OF WORK |
| A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: |
| 1. Work area to be limited to immediate area around existing double doors for Room 224 in the NEMC building at the Salt Lake Air Route Traffic Control Center (ARTCC). Existing set of double doors are made of wood and measure roughly 6’-0” in width and... |
| 2. Contractor to investigate and determine if existing frame can be retrofitted with new door leafs and maintain 1-hour fire rating. If it is determined that the fire rating cannot be maintained with alterations, Contractor to replace entire assembly ... |
| a. Electrified security door hardware. |
| b. Signage |
| 3. Upon substantial completion of construction, FAA building technician(s) will caulk and paint door frame to match existing interior finishes and textures. Local FAA technician(s) will also remove and replace any signage on door(s) as needed. |
| 4. Contractor to verify all sizes, dimensions and quantities as all figures provided in these Contract Documents are approximations. |
| 5. All work to comply with latest building codes and authorities having jurisdiction. |
| 1.2 PREINSTALLATION MEETINGS |
| A. Preinstallation Conference: Conduct conference at ZLC ARTCC at 2150 W 700 N, Salt Lake City, UT 84116. |
| 1.3 ACTION SUBMITTALS |
| A. General: |
| 1. Schedule of construction. |
| 2. Contingency plan to keep area secure if work cannot be completed during normal working hours. |
| 3. Accident prevention plan. |
| B. Product Data: |
| 1. Manufacturer’s catalog data sheets. |
| C. Shop Drawings: |
| 1. Include plans, elevations, sections, and mounting and attachment details. |
| 1.4 CLOSEOUT SUBMITTALS |
| A. Operation and maintenance data. |
| 1.5 WARRANTY |
| A. Special Warranty: Manufacturer or Installer agree to repair or replace any component of newly installed door assembly that fail in materials or workmanship within specified warranty period. |
| 1. Warranty Period: 1 year from date of Substantial Completion. |
| 1.6 WORK RESTRICTIONS |
| A. Work Restrictions, General: Comply with restrictions on construction operations. |
| B. On-Site Work Hours: Limit work on Project site to normal business working hours of 6:00 a.m. to 4:30 p.m., Monday through Friday, unless otherwise indicated. |
| 1. Holidays: On-site work is not permitted on federal holidays. |
| 2. Moratoriums: On-site work is not permitted during the week of Thanksgiving, and the week of Christmas through New Year’s Day. |
| C. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner. |
| 1. Notify Owner not less than two days in advance of proposed disruptive operations. |
| 2. Obtain Owner’s written permission before proceeding with disruptive operations. |
| D. Employee Identification: Owner will provide identification badges for Contractor personnel working on Project site. Require personnel to display identification badges at all times. |
| E. Employee Screening: Comply with Owner's requirements for background screening of Contractor personnel working on Project site. |
| 1. Maintain list of approved screened personnel with Owner's representative. |
| PART 2 - PRODUCTS |
| 2.1 MANUFACTURERS |
| A. Manufacturers: Subject to compliance with requirements, available manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| 1. Pioneer Industries ASSA ABLOY |
| 2. Curries Steel Doors and Frames ASSA ABLOY |
B. Source Limitations: Obtain hollow metal work from single source from single manufacturer.
| 2.2 PERFORMANCE REQUIREMENTS |
| A. Fire-Rated Assemblies: Complying with NFPA 80 that are listed and labeled by a qualified testing agency acceptable to authorities having jurisdiction for fire-protection ratings and temperature-rise limits, based on testing at positive pressure acc... |
| 2.3 INTERIOR DOORS AND FRAMES |
| A. Heavy-Duty Doors and Frames: |
| 1. Doors: |
| a. Type: Flush hollow metal doors. |
| b. Thickness: 1-3/4 inches, or as determined by Contractor for full operability. |
| c. Face: Uncoated, steel sheet, minimum thickness of 0.042 inch. |
| d. Fire-Rated Core: Manufacturer's standard core for fire-rated and temperature-rise-rated doors. |
| e. Clearances: Ensure new door leaves receive enough ground clearance for full operability with no deficiencies from existing flooring. |
| 2. Frames: |
| a. Materials: steel sheet, minimum thickness of 0.053 inch or as determined by Contractor. |
| b. Construction: |
| 1) Knocked down, no in-field welding allowed. |
c. Fire rated same as door.
| 2.4 DOOR HARDWARE |
| A. Astragals: Manufacturer’s compatible type for 1-hour fire rated assembly. |
| B. Door Trim: Lever-type handles, match existing. Color selected by COR from manufacturer |
| C. Lock cylinders and keying: Coordinate with existing system and FAA security representative. |
| D. Hinges: Match existing hinge locations to frame if retrofitting door leafs. |
| PART 3 - EXECUTION |
| 3.1 DEMONSTRATION |
| A. Contractor to demonstrate that all door components within newly installed assembly is fully operable with no defects in presence of FAA technicians. |
| DOOR PHOTOS |
| SLC-23001099-G001 |
| SLC-23001099-A201 |
File details come from the government source that posted it. Updated .