This document is an amendment to a solicitation for waterproofing and roof upgrades at the Treasure Coast Airport air traffic control tower in Fort Pierce, Florida. The amendment extends the offer due date from December 1st to December 8th, 2023 and provides responses to vendor questions to clarify requirements. The Federal Aviation Administration is seeking replacement of the roof hatch, door, and curb along with corrosion repairs to metal wall panels on the second and fifth floors. Insulated metal panels must match the existing dark bronze color and depth. The agency will provide a secure laydown area for contractor use within the fenced site but specific square footage is not stated.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 6
0002 11/29/2023
FEDERAL AVIATION ADMINISTRATION
AAQ-500 - REGIONAL ACQUISITIONS
1701 COLUMBIA AVENUE
COLLEGE PARK GA 30337
AAQ510ATL-AFN
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
697DCK-24-R-00038
1 copies to the issuing office.
10/27/2023
(x)
Waterproofing & Roof Upgrades, Treasure Coast Airport Air Traffic Control Tower (FPR ATCT), Fort Pierce, FL.
The purpose of this amendment is to extend the Offer Due Date, Add Attachment(s), and answer vendor questions.
LIST OF CHANGES:
Offer due date : 01-DEC-23 changed to 08-DEC-23
ATTACHAMENT:
1. Site Picture, 1 page.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Linda M. Hennequant
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
697DCK-24-R-00038/0002
QUESTIONS & ANSWERS:
Question 1: Project Specifications called for ACM to be removed. Will the FAA allow roofing systems that encapsulate in place exiting roofs and negate roof removal costs?
Reason: Liquid monolithic roofing encapsulation, prevents roof removal, saves on project costs with less labor, fewer products, and meets EO, FAR and Net-Zero goals for waste reduction and
Co2 reduction.
Reference: EO 14008 and 14057 Construction Waste
Reduction, Co2 emission reduction.
FAA ANSWER: The contract documents do not call for significant roofing demo and installation. The only roofing to be removed and replaced is to allow the replacement of the hatch door and hatch door curb per detail 3/A001. The contractor is expected to coordinate with the roofing manufacturer, Sika Corporation, to maintain the warranty.
Question 2: The specification calls for 12” wall panels and Centria manufactured, will other size panels be allowed for new installation?
Reason: 12” panels aren’t made by Centria and are custom made—cost higher to produce.
FAA ANSWER: The panels shall match the size of the existing panels. Contractor shall submit on panels and shop drawings that they intend to use.
Question 3: Will the FAA allow manufactured wall panels made by Metl Span, which is owned by
Nucor? The Spec Part 2-Products, 1.1.1
Manufacturer, states “must” be manufactured by
Centria which is a Nucor company.
FAA ANSWER: The new panels to be used can be any approved manufacturer. The new panels shall match the existing flat panels and reveal.
Contractor shall submit on panels and shop drawings that they intend to use.
Question 4: The spec, states, panel must have a stiffening bead, but the FWDS panel called out in the same specification, doesn’t have a stiffening bead according to the manufacturer’s representative. Will other panel options be allowed?
FAA ANSWER: The new panels are to match
Continued ...
3 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
697DCK-24-R-00038/0002
existing.
Question 5: The Spec states the FWDS panel will be 1.5” deep, but contacting the Centria rep, they do not make the panels in that depth. Will other panel options be considered, or a SPEC drafted by FAA that meets current Nucor--Centria or Metl Span wall panel models?
FAA ANSWER: The contractor shall verify existing conditions and match depth prior to installation. Other panel options will be considered upon an approved submittal.
Question 6: How does the FAA want the wall panels on the 2nd and 5th floor patched? Re-skinned?
Corrosion cut-out and metal patch sealed/riveted to existing panel? Polymer fillers/Epoxy?
FAA ANSWER: The wall panels shall have the corrosion cut out and patched with polymer fillers/epoxy.
Question 7: Will the FAA provide a color palette for products to match existing site color scheme?
FAA ANSWER: All new product colors shall match existing. The color of the insulated metal panels, windows, coping, and related sealant is to be dark bronze. The color of the sealant on the cab roof shall be white.
Question 8: Will the CO/CS, extend proposal due dates to allow Centria representatives time to collect data, cross-reference the FAA specification for clarification with COR and review RFI answers?
FAA ANSWER: Yes.
Question 9: Will the FAA allow wall panel contractors with less than 10-years’ experience to install?
FAA ANSWER: The intent of the requirement is for experienced installers in this specialty.
Less experienced installers are allowed with examples of prior relevant experience.
Question 10: Will lay down area be provided inside the secure fenced area?
FAA ANSWER: Yes
Question 11: What total square footage of space will be provided for contractor laydown area?
4 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
697DCK-24-R-00038/0002
FAA ANSWER: See attached photo.
Question 12: Bilco safety gate has a standard swing gate in line with the direction of roof ladder access. There isn’t enough space for a swinging gate because of the parapet wall. Does the FAA want to special order a gate to swing from the side mount or have a safety chain and clasp in line with the existing ladder access?
FAA ANSWER: Per Detail 3/A001 the guardrail gate is to open to the left of the ladder. The
Bilco Rep stated this type of gate is referred as
“RL2-S factory modified to open opposite of the hold open arm side.” The gate is to be made of the same material as the guardrail and shall be self-closing.
Question 13: 01 10 00 Summary of work/ Part 1 -
General/1.1 Scope of Work/D-9: States patching the roofing membrane around new roof hatch. 07 54
19/Part 1-General/1.2 Related Work/A: States
Removal of Existing Roofing and Insulation. Is this a complete reroof or patching/repair job?
FAA ANSWER: It is just a patching job around the hatch door. The contractor is to coordinate with Sika Corporation to maintain the warranty.
Warranty: WAR17-1540155-REV1
Question 14: We would like to offer our competitively priced quality products as a solution for the project. We are proposing our
MRS Flush Seam as product equal to that specified. Note that this product does provide superior warranties with our 25-years, 6-months substrate warranty vs. 1-year specified, plus a
35-year finish warranty specified, thus providing the owner with additional value.
FAA ANSWER: Sheet A001 note 7 requires a 2” insulated metal panel to match existing and the specifications reference an insulated metal panel.
THE FOLLOWING QUESTIONS WILL BE ANSWERED IN A
FUTURE AMENDMENT:
Question: It was stated that during the site visit that asbestos survey reports have been completed over the past couple years. Can these be provided to the contractor?
Question: There was a significant presence of wasps on the catwalk and the roof. Will the FAA
5 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
697DCK-24-R-00038/0002
perform pest control prior to the project starting or will it be on the contract to remedy once the project has started?
Question: Do you have the dimensions of the metal panels above the cab windows? They were inaccessible during the site visit as they were too high to reach without a ladder.
Question: Some of the drawings do not appear to be to scale based off measurements taken during the site visit. Are there As-Builts available as well that could be utilized to validate dimensions?
Question: Since there is only one 110-volt receptacle on the roof, is it possible to utilize power sources from inside the cab for additional power capabilities or will generator power have to be utilized?
END OF AMENDMENT